{{#Wiki_filter:May 17, 2007Mr. Gene F. St. Pierre, Site Vice Presidentc/o James M. Peschel Seabrook Station PO Box 300 Seabrook, NH 03874
{{#Wiki_filter:May 17, 2007 Mr. Gene F. St. Pierre, Site Vice President c/o James M. Peschel Seabrook Station PO Box 300 Seabrook, NH 03874


==SUBJECT:==
==SUBJECT:==
SEABROOK STATION, UNIT NO. 1 - CORRECTION OF AMENDMENT RE:TECHNICAL SPECIFICATION TASK FORCE (TSTF)-449, "STEAM GENERATOR TUBE INTEGRITY," (TAC NO. MD0696)
SEABROOK STATION, UNIT NO. 1 - CORRECTION OF AMENDMENT RE:
TECHNICAL SPECIFICATION TASK FORCE (TSTF)-449, STEAM GENERATOR TUBE INTEGRITY, (TAC NO. MD0696)


==Dear Mr. St. Pierre:==
==Dear Mr. St. Pierre:==


By letter dated March 28, 2007, the Nuclear Regulatory Commission (NRC) issued AmendmentNo. 115 to Facility Operating License No. NPF-86 for the Seabrook Station, Unit No. 1 (Seabrook), in response to your application dated March 23, 2006, as supplemented by letters dated August 16 and November 28, 2006. The amendment revised the Seabrook Technical Specifications (TSs) consistent with TSTFStandard Technical Specification Change Traveler, TSTF-449, "Steam Generator Tube Integrity," Revision 4. TSTF-449 is part of the consolidated line item improvement process. Subsequent to issuance, it was identified that the amendment errata sheet issued did not reflectall the pages changed. Specifically, Index pages v, x, and xiv were incorrect. Index pages vi and xv, which were not included on the original Errata Sheet, were also changes by the amendment and should be listed on the errata sheet. The difference in page numbers does not impact the NRC staff's conclusion as documented in the associated Safety Evaluation.
By letter dated March 28, 2007, the Nuclear Regulatory Commission (NRC) issued Amendment No. 115 to Facility Operating License No. NPF-86 for the Seabrook Station, Unit No. 1 (Seabrook), in response to your application dated March 23, 2006, as supplemented by letters dated August 16 and November 28, 2006.
Therefore, the corrected page 1 of the Errata Sheet and TS pages are enclosed for implementation of Amendment No. 115. Sincerely,/ra/G. Edward Miller, Project ManagerPlant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-443
The amendment revised the Seabrook Technical Specifications (TSs) consistent with TSTF Standard Technical Specification Change Traveler, TSTF-449, Steam Generator Tube Integrity, Revision 4. TSTF-449 is part of the consolidated line item improvement process.
Subsequent to issuance, it was identified that the amendment errata sheet issued did not reflect all the pages changed. Specifically, Index pages v, x, and xiv were incorrect. Index pages vi and xv, which were not included on the original Errata Sheet, were also changes by the amendment and should be listed on the errata sheet. The difference in page numbers does not impact the NRC staffs conclusion as documented in the associated Safety Evaluation.
Therefore, the corrected page 1 of the Errata Sheet and TS pages are enclosed for implementation of Amendment No. 115.
Sincerely,
                                              /ra/
G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443


==Enclosures:==
==Enclosures:==
: 1. Page 1 of Errata Sheet
: 1. Page 1 of Errata Sheet
: 2. TS Pages v, vi, x, xiv, and xvcc w/encls: See next page May 17, 2007Mr. Gene F. St. Pierre, Site Vice President c/o James M. Peschel Seabrook Station PO Box 300 Seabrook, NH 03874
: 2. TS Pages v, vi, x, xiv, and xv cc w/encls: See next page
 
May 17, 2007 Mr. Gene F. St. Pierre, Site Vice President c/o James M. Peschel Seabrook Station PO Box 300 Seabrook, NH 03874


==SUBJECT:==
==SUBJECT:==
SEABROOK STATION, UNIT NO. 1 - CORRECTION OF AMENDMENT RE:TECHNICAL SPECIFICATION TASK FORCE (TSTF)-449, "STEAM GENERATOR TUBE INTEGRITY," (TAC NO. MD0696)
SEABROOK STATION, UNIT NO. 1 - CORRECTION OF AMENDMENT RE:
TECHNICAL SPECIFICATION TASK FORCE (TSTF)-449, STEAM GENERATOR TUBE INTEGRITY, (TAC NO. MD0696)


==Dear Mr. St. Pierre:==
==Dear Mr. St. Pierre:==


By letter dated March 28, 2007, the Nuclear Regulatory Commission (NRC) issued AmendmentNo. 115 to Facility Operating License No. NPF-86 for the Seabrook Station, Unit No. 1 (Seabrook), in response to your application dated March 23, 2006, as supplemented by letters dated August 16 and November 28, 2006. The amendment revised the Seabrook Technical Specifications (TSs) consistent with TSTFStandard Technical Specification Change Traveler, TSTF-449, "Steam Generator Tube Integrity," Revision 4. TSTF-449 is part of the consolidated line item improvement process. Subsequent to issuance, it was identified that the amendment errata sheet issued did not reflectall the pages changed. Specifically, Index pages v, x, and xiv were incorrect. Index pages vi and xv, which were not included on the original Errata Sheet, were also changes by the amendment and should be listed on the errata sheet. The difference in page numbers does not impact the NRC staff's conclusion as documented in the associated Safety Evaluation.
By letter dated March 28, 2007, the Nuclear Regulatory Commission (NRC) issued Amendment No. 115 to Facility Operating License No. NPF-86 for the Seabrook Station, Unit No. 1 (Seabrook), in response to your application dated March 23, 2006, as supplemented by letters dated August 16 and November 28, 2006.
Therefore, the corrected page 1 of the Errata Sheet and TS pages are enclosed for implementation of Amendment No. 115. Sincerely,/ra/G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-443
The amendment revised the Seabrook Technical Specifications (TSs) consistent with TSTF Standard Technical Specification Change Traveler, TSTF-449, Steam Generator Tube Integrity, Revision 4. TSTF-449 is part of the consolidated line item improvement process.
Subsequent to issuance, it was identified that the amendment errata sheet issued did not reflect all the pages changed. Specifically, Index pages v, x, and xiv were incorrect. Index pages vi and xv, which were not included on the original Errata Sheet, were also changes by the amendment and should be listed on the errata sheet. The difference in page numbers does not impact the NRC staffs conclusion as documented in the associated Safety Evaluation.
Therefore, the corrected page 1 of the Errata Sheet and TS pages are enclosed for implementation of Amendment No. 115.
Sincerely,
                                                      /ra/
G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443


==Enclosures:==
==Enclosures:==
: 1. Page 1 of Errata Sheet
: 1. Page 1 of Errata Sheet
: 2. Index Pagescc w/encls: See next pageDISTRIBUTIONRidsNRRLpl1-2RidsOgcMailCenterRidsRgn1MailCenterAHiserPUBLICRidsNrrRMGMillerRidsAcrsAcnwMailCenterKKarowski LPL1-2R/FRidsNrrLAMOBrienTKobetzMYoder RidsNrrDorlGHill (2)TWertzPackage Accession Number: ML071420135Correction Letter Accession Number: ML071000446Amendment Accession Number: ML070510629Corrected Pages Accession Number: ML071380443Tech Specs. Accession Number: ML070880286OFFICELPL1-2/PMLPL1-2/LALPL1-2/BCNAMEGEMillerMO'BrienHChernoff DATE4/26/074/26/075/17/07Official Record Copy Seabrook Station, Unit No. 1 cc:
: 2. Index Pages cc w/encls: See next page DISTRIBUTION RidsNRRLpl1-2  RidsOgcMailCenter      RidsRgn1MailCenter          AHiser PUBLIC          RidsNrrRMGMiller      RidsAcrsAcnwMailCenter KKarowski LPL1-2R/F      RidsNrrLAMOBrien      TKobetz                    MYoder RidsNrrDorl    GHill (2)             TWertz Package Accession Number: ML071420135            Correction Letter Accession Number: ML071000446 Amendment Accession Number: ML070510629          Corrected Pages Accession Number: ML071380443 Tech Specs. Accession Number: ML070880286 OFFICE LPL1-2/PM        LPL1-2/LA    LPL1-2/BC NAME      GEMiller      MOBrien      HChernoff DATE      4/26/07        4/26/07      5/17/07 Official Record Copy
Mr. J. A. StallSenior Vice President, Nuclear and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420Mr. Peter BrannAssistant Attorney General State House, Station #6 Augusta, ME 04333Resident InspectorU.S. Nuclear Regulatory Commission Seabrook Nuclear Power Station P.O. Box 1149 Seabrook, NH 03874Town of Exeter10 Front Street Exeter, NH 03823Regional Administrator, Region IU.S. Nuclear Regulatory Commission
 
Seabrook Station, Unit No. 1 cc:
Mr. J. A. Stall                    Ms. Cristine McComb, Director Senior Vice President, Nuclear and ATTN: John Giarrusso Chief Nuclear Officer               Massachusetts Emergency Management Agency Florida Power & Light Company       400 Worcester Road P.O. Box 14000                     Framingham, MA 01702-5399 Juno Beach, FL 33408-0420 Ms. Kelly Ayotte, Attorney General Mr. Peter Brann                    Mr. Orvil Fitch, Deputy Attorney General Assistant Attorney General         33 Capitol Street State House, Station #6             Concord, NH 03301 Augusta, ME 04333 Mr. Christopher M. Pope, Director Resident Inspector                  Homeland Security & Emergency Mgmt.
U.S. Nuclear Regulatory Commission New Hampshire Department of Safety Seabrook Nuclear Power Station     Bureau of Emergency Management P.O. Box 1149                       33 Hazen Drive Seabrook, NH 03874                  Concord, NH 03301 Town of Exeter                      Mr. M. S. Ross, Managing Attorney 10 Front Street                     Florida Power & Light Company Exeter, NH 03823                    P.O. Box 14000 Juno Beach, FL 33408-0420 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Mr. Rajiv S. Kundalkar 475 Allendale Road                  Vice President - Nuclear Engineering King of Prussia, PA 19406          Florida Power & Light Company P.O. Box 14000 Office of the Attorney General      Juno Beach, FL 33408-0420 One Ashburton Place, 20th Floor Boston, MA 02108                    James M. Peschel Regulatory Programs Manager Board of Selectmen                  FPL Energy Seabrook, LLC Town of Amesbury                    PO Box 300 Town Hall                          Seabrook, NH 03874 Amesbury, MA 01913 Mr. Mark E. Warner Mr. Robert Poole                    Vice President, Nuclear Operations Support Federal Emergency Management Agency Florida Power & Light Company Region I                            P.O. Box 14000 99 High Street, 6th Floor          Juno Beach, FL 33408-0420 Boston, MA 02110 Ms. Marjan Mashhadi Mr. Tom Crimmins                    Senior Attorney Polestar Applied Technology        Florida Power & Light Company One First Street, Suite 4          801 Pennsylvania Ave., NW Suite 220 Los Altos, CA 94019                Washington, DC 20004


475 Allendale Road King of Prussia, PA  19406Office of the Attorney GeneralOne Ashburton Place, 20th Floor Boston, MA  02108Board of SelectmenTown of Amesbury Town Hall Amesbury, MA  01913Mr. Robert PooleFederal Emergency Management Agency Region I 99 High Street, 6 th FloorBoston, MA  02110Mr. Tom CrimminsPolestar Applied Technology One First Street, Suite 4 Los Altos, CA  94019Ms. Cristine McComb, DirectorATTN:  John Giarrusso Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA  01702-5399Ms. Kelly Ayotte, Attorney GeneralMr. Orvil Fitch, Deputy Attorney General 33 Capitol Street Concord, NH  03301Mr. Christopher M. Pope, DirectorHomeland Security & Emergency Mgmt.
ATTACHMENT TO LICENSE AMENDMENT NO. 115 FACILITY OPERATING LICENSE NO. NPF-86 DOCKET NO. 50-443 Replace the following page of Facility Operating License No. NPF-86 with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
New Hampshire Department of Safety Bureau of Emergency Management 33 Hazen Drive Concord, NH  03301Mr. M. S. Ross, Managing AttorneyFlorida Power & Light Company P.O. Box 14000 Juno Beach, FL  33408-0420Mr. Rajiv S. KundalkarVice President - Nuclear Engineering Florida Power & Light Company P.O. Box 14000 Juno Beach, FL  33408-0420James M. PeschelRegulatory Programs Manager FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH  03874Mr. Mark E. WarnerVice President, Nuclear Operations Support Florida Power & Light Company P.O. Box 14000 Juno Beach, FL  33408-0420Ms. Marjan MashhadiSenior Attorney Florida Power & Light Company 801 Pennsylvania Ave., NW Suite 220 Washington, DC  20004 Corrected by letter dated                                  ATTACHMENT TO LICENSE AMENDMENT NO. 115 FACILITY OPERATING LICENSE NO. NPF-86DOCKET NO. 50-443Replace the following page of Facility Operating License No. NPF-86 with the attached revisedpage. The revised page is identified by amendment number and contains a marginal line indicating the area of change.RemoveInsert  33Replace the following pages of the Appendix A, Technical Specifications, with the attachedrevised pages as indicated. The revised pages are identified by amendment number and contain marginal lines indicating the area of change. RemoveInsert vvvivilxx xivxiv xvxvl1-41-4 1-51-5 3/4 4-133/4 4-13 3/4 4-143/4 4-14 3/4 4-153/4 4-15 3/4 4-163/4 4-16 3/4 4-16a--
Remove                              Insert 3                                  3 Replace the following pages of the Appendix A, Technical Specifications, with the attached revised pages as indicated. The revised pages are identified by amendment number and contain marginal lines indicating the area of change.
3/4 4-173/4 4-17 3/4 4-183/4 4-18 3/4 4-193/4 4-19 3/4 4-203/4 4-20 3/4 4-213/4 4-21 3/4 4-223/4 4-22 3/4 4-233/4 4-23 3/4 4-243/4 4-24 3/4 4-253/4 4-25 3/4 4-263/4 4-26 3/4 4-273/4 4-27 3/4 4-283/4 4-28 3/4 4-293/4 4-29 3/4 4-303/4 4-30 3/4 4-313/4 4-31 3/4 4-323/4 4-32 3/4 4-33--}}
Remove                              Insert v                                  v vi                                  vi                        l x                                  x xiv                                xiv xv                                  xv                        l 1-4                                1-4 1-5                                1-5 3/4 4-13                            3/4 4-13 3/4 4-14                            3/4 4-14 3/4 4-15                            3/4 4-15 3/4 4-16                            3/4 4-16 3/4 4-16a                           --
3/4 4-17                            3/4 4-17 3/4 4-18                            3/4 4-18 3/4 4-19                            3/4 4-19 3/4 4-20                            3/4 4-20 3/4 4-21                            3/4 4-21 3/4 4-22                            3/4 4-22 3/4 4-23                            3/4 4-23 3/4 4-24                            3/4 4-24 3/4 4-25                            3/4 4-25 3/4 4-26                            3/4 4-26 3/4 4-27                            3/4 4-27 3/4 4-28                            3/4 4-28 3/4 4-29                            3/4 4-29 3/4 4-30                            3/4 4-30 3/4 4-31                            3/4 4-31 3/4 4-32                            3/4 4-32 3/4 4-33                           --
Corrected by letter dated}}

Latest revision as of 07:32, 23 November 2019

Correction of Amendment Technical Specification Task Force (TSTF)-449, Steam Generator Tube Integrity,
ML071000446
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 05/17/2007
From: Geoffrey Miller
NRC/NRR/ADRO/DORL/LPLI-2
To: Peschel J, St.Pierre G
Florida Power & Light Energy Seabrook
Miller, G. Edward, 415-2481
Shared Package
ML071420135 List:
References
TAC MD0696
Download: ML071000446 (4)


Text

May 17, 2007 Mr. Gene F. St. Pierre, Site Vice President c/o James M. Peschel Seabrook Station PO Box 300 Seabrook, NH 03874

SUBJECT:

SEABROOK STATION, UNIT NO. 1 - CORRECTION OF AMENDMENT RE:

TECHNICAL SPECIFICATION TASK FORCE (TSTF)-449, STEAM GENERATOR TUBE INTEGRITY, (TAC NO. MD0696)

Dear Mr. St. Pierre:

By letter dated March 28, 2007, the Nuclear Regulatory Commission (NRC) issued Amendment No. 115 to Facility Operating License No. NPF-86 for the Seabrook Station, Unit No. 1 (Seabrook), in response to your application dated March 23, 2006, as supplemented by letters dated August 16 and November 28, 2006.

The amendment revised the Seabrook Technical Specifications (TSs) consistent with TSTF Standard Technical Specification Change Traveler, TSTF-449, Steam Generator Tube Integrity, Revision 4. TSTF-449 is part of the consolidated line item improvement process.

Subsequent to issuance, it was identified that the amendment errata sheet issued did not reflect all the pages changed. Specifically, Index pages v, x, and xiv were incorrect. Index pages vi and xv, which were not included on the original Errata Sheet, were also changes by the amendment and should be listed on the errata sheet. The difference in page numbers does not impact the NRC staffs conclusion as documented in the associated Safety Evaluation.

Therefore, the corrected page 1 of the Errata Sheet and TS pages are enclosed for implementation of Amendment No. 115.

Sincerely,

/ra/

G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443

Enclosures:

1. Page 1 of Errata Sheet
2. TS Pages v, vi, x, xiv, and xv cc w/encls: See next page

May 17, 2007 Mr. Gene F. St. Pierre, Site Vice President c/o James M. Peschel Seabrook Station PO Box 300 Seabrook, NH 03874

SUBJECT:

SEABROOK STATION, UNIT NO. 1 - CORRECTION OF AMENDMENT RE:

TECHNICAL SPECIFICATION TASK FORCE (TSTF)-449, STEAM GENERATOR TUBE INTEGRITY, (TAC NO. MD0696)

Dear Mr. St. Pierre:

By letter dated March 28, 2007, the Nuclear Regulatory Commission (NRC) issued Amendment No. 115 to Facility Operating License No. NPF-86 for the Seabrook Station, Unit No. 1 (Seabrook), in response to your application dated March 23, 2006, as supplemented by letters dated August 16 and November 28, 2006.

The amendment revised the Seabrook Technical Specifications (TSs) consistent with TSTF Standard Technical Specification Change Traveler, TSTF-449, Steam Generator Tube Integrity, Revision 4. TSTF-449 is part of the consolidated line item improvement process.

Subsequent to issuance, it was identified that the amendment errata sheet issued did not reflect all the pages changed. Specifically, Index pages v, x, and xiv were incorrect. Index pages vi and xv, which were not included on the original Errata Sheet, were also changes by the amendment and should be listed on the errata sheet. The difference in page numbers does not impact the NRC staffs conclusion as documented in the associated Safety Evaluation.

Therefore, the corrected page 1 of the Errata Sheet and TS pages are enclosed for implementation of Amendment No. 115.

Sincerely,

/ra/

G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443

Enclosures:

1. Page 1 of Errata Sheet
2. Index Pages cc w/encls: See next page DISTRIBUTION RidsNRRLpl1-2 RidsOgcMailCenter RidsRgn1MailCenter AHiser PUBLIC RidsNrrRMGMiller RidsAcrsAcnwMailCenter KKarowski LPL1-2R/F RidsNrrLAMOBrien TKobetz MYoder RidsNrrDorl GHill (2) TWertz Package Accession Number: ML071420135 Correction Letter Accession Number: ML071000446 Amendment Accession Number: ML070510629 Corrected Pages Accession Number: ML071380443 Tech Specs. Accession Number: ML070880286 OFFICE LPL1-2/PM LPL1-2/LA LPL1-2/BC NAME GEMiller MOBrien HChernoff DATE 4/26/07 4/26/07 5/17/07 Official Record Copy

Seabrook Station, Unit No. 1 cc:

Mr. J. A. Stall Ms. Cristine McComb, Director Senior Vice President, Nuclear and ATTN: John Giarrusso Chief Nuclear Officer Massachusetts Emergency Management Agency Florida Power & Light Company 400 Worcester Road P.O. Box 14000 Framingham, MA 01702-5399 Juno Beach, FL 33408-0420 Ms. Kelly Ayotte, Attorney General Mr. Peter Brann Mr. Orvil Fitch, Deputy Attorney General Assistant Attorney General 33 Capitol Street State House, Station #6 Concord, NH 03301 Augusta, ME 04333 Mr. Christopher M. Pope, Director Resident Inspector Homeland Security & Emergency Mgmt.

U.S. Nuclear Regulatory Commission New Hampshire Department of Safety Seabrook Nuclear Power Station Bureau of Emergency Management P.O. Box 1149 33 Hazen Drive Seabrook, NH 03874 Concord, NH 03301 Town of Exeter Mr. M. S. Ross, Managing Attorney 10 Front Street Florida Power & Light Company Exeter, NH 03823 P.O. Box 14000 Juno Beach, FL 33408-0420 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Mr. Rajiv S. Kundalkar 475 Allendale Road Vice President - Nuclear Engineering King of Prussia, PA 19406 Florida Power & Light Company P.O. Box 14000 Office of the Attorney General Juno Beach, FL 33408-0420 One Ashburton Place, 20th Floor Boston, MA 02108 James M. Peschel Regulatory Programs Manager Board of Selectmen FPL Energy Seabrook, LLC Town of Amesbury PO Box 300 Town Hall Seabrook, NH 03874 Amesbury, MA 01913 Mr. Mark E. Warner Mr. Robert Poole Vice President, Nuclear Operations Support Federal Emergency Management Agency Florida Power & Light Company Region I P.O. Box 14000 99 High Street, 6th Floor Juno Beach, FL 33408-0420 Boston, MA 02110 Ms. Marjan Mashhadi Mr. Tom Crimmins Senior Attorney Polestar Applied Technology Florida Power & Light Company One First Street, Suite 4 801 Pennsylvania Ave., NW Suite 220 Los Altos, CA 94019 Washington, DC 20004

ATTACHMENT TO LICENSE AMENDMENT NO. 115 FACILITY OPERATING LICENSE NO. NPF-86 DOCKET NO. 50-443 Replace the following page of Facility Operating License No. NPF-86 with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.

Remove Insert 3 3 Replace the following pages of the Appendix A, Technical Specifications, with the attached revised pages as indicated. The revised pages are identified by amendment number and contain marginal lines indicating the area of change.

Remove Insert v v vi vi l x x xiv xiv xv xv l 1-4 1-4 1-5 1-5 3/4 4-13 3/4 4-13 3/4 4-14 3/4 4-14 3/4 4-15 3/4 4-15 3/4 4-16 3/4 4-16 3/4 4-16a --

3/4 4-17 3/4 4-17 3/4 4-18 3/4 4-18 3/4 4-19 3/4 4-19 3/4 4-20 3/4 4-20 3/4 4-21 3/4 4-21 3/4 4-22 3/4 4-22 3/4 4-23 3/4 4-23 3/4 4-24 3/4 4-24 3/4 4-25 3/4 4-25 3/4 4-26 3/4 4-26 3/4 4-27 3/4 4-27 3/4 4-28 3/4 4-28 3/4 4-29 3/4 4-29 3/4 4-30 3/4 4-30 3/4 4-31 3/4 4-31 3/4 4-32 3/4 4-32 3/4 4-33 --

Corrected by letter dated