ML18218A506: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
                                          UNITED STATES
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD. KING OF PRUSSIA, PA 19406-2713
                              NUCLEAR REGULATORY COMMISSION
  August 6, 2018  
                                                  REGION I
Mr. Peter P. Sena, III  
                                        2100 RENAISSANCE BLVD.
President and Chief Nuclear Officer  
                                    KING OF PRUSSIA, PA 19406-2713
PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038  
                                            August 6, 2018
Mr. Peter P. Sena, III
President and Chief Nuclear Officer
PSEG Nuclear LLC - N09
P.O. Box 236
Hancocks Bridge, NJ 08038
SUBJECT:        SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 - CYBER
                SECURITY INSPECTION REPORT 05000272/2018403 AND 05000311/2018403
Dear Mr. Sena:
On June 22, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at
Salem Nuclear Generating Stations (Salem), Units 1 and 2. On the same day, the NRC
inspectors discussed the results of this inspection with Mr. Charles McFeaters, Salem Vice
President and other members of your staff. The results of this inspection are documented in the
enclosed report.
NRC inspectors documented one finding of very low safety significance (Green) in this report.
This finding involved a violation of NRC requirements. Additionally, inspectors documented a
licensee-identified violation which was determined to be of very low safety significance. The
NRC is treating these violations as a non-cited violations (NCVs) consistent with Section 2.3.2.a
of the Enforcement Policy.
One cross-cutting aspect was assigned to a finding in the area of Problem Identification and
Resolution. Specifically, PSEG failed to thoroughly evaluate issues to ensure that resolutions
address causes and extent of conditions commensurate with their safety significance, [P.2].
If you contest the violations or significance of these NCVs, you should provide a response within
30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear
Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with
copies to the Regional Administrator, Region I; the Director, Office of Enforcement; and the NRC
Resident Inspector at Salem.
                                              Enclosure(s) transmitted herewith contain(s) Sensitive,
                                              Unclassified, Non-Safeguards Information. When separated
                                              from the Enclosure(s), the transmittal document is decontrolled.
                OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION


                  OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
SUBJECT: SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 - CYBER SECURITY INSPECTION REPORT 05000272/2018403 AND 05000311/2018403
P. Sena                                            2
Dear Mr. Sena:  
In addition, if you disagree with the cross-cutting aspect assignment, you should provide a
response within 30 days of the date of this inspection report, with the basis for your
disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington, DC, 20555-0001; with copies to the Regional Administrator, Region I and the NRC
Resident Inspector at Salem.
This letter will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance
with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, Public Inspections,
Exemptions, Requests for Withholding.
However, the enclosed report contains Security-Related Information, so the enclosed report will
not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to
provide a response that contains Security-Related Information, please mark your entire
response Security-Related Information-Withhold from Public Disclosure under 10 CFR 2.390
in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in
10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in
accordance with 10 CFR 2.390(b)(1)(ii).
                                                Sincerely,
                                                /RA/
                                                Glenn T. Dentel, Chief
                                                Engineering Branch 2
                                                Division of Reactor Safety
Docket Numbers: 50-272 and 50-311
License Numbers: DPR-70 and DPR-75
Enclosure:
Inspection Report 05000272/2018403 and
  05000311/2018403 (OUO-SRI)
cc w/o encl:     Distribution via ListServ
                  OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION


On June 22, 2018, the U.S. Nuclear Regulatory
Commission (NRC) completed an inspection at Salem Nuclear Generating Stations (Salem), Units 1 and 2.  On the same day, the NRC inspectors discussed the results of this inspection with Mr. Charles McFeaters, Salem Vice President and other members of your staff.  The results of this inspection are documented in the
enclosed report.


   
  ML18218A506 (Cover letter)
NRC inspectors documented one
ADAMS ACCESSION NUMBER: ML18218A487 (Cover letter w/enclosure-NP)
finding of very low safety significance (Green) in this report.  This finding involved a violation of NRC requirements.  Additionally, inspectors documented a licensee-identified violation which was determined to be of very low safety significance.  The NRC is treating these violations as a non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy. 
Cover Letter                         Non-Sensitive                           Publicly Available
 
    SUNSI Review                      Sensitive                              Non-Publicly Available
Cover Letter w/ Enclosure             Non-Sensitive                           Publicly Available
One cross-cutting aspect was assigned to a finding in the area of Problem Identification and Resolution.  Specifically, PSEG failed to thor
    SUNSI Review                      Sensitive                              Non-Publicly Available
oughly evaluate issues to ensure that resolutions address causes and extent of conditions commensurate with their safety significance, [P.2].
OFFICE             RI/DRS         RI/DRS             RI/DRP             RI/DRP             RI/DRS
 
NAME               DWerkheiser     FArner/AAR for     FBower             GDentel
If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:  Document Control Desk, Washington, DC 20555-0001; with
  DATE               8/06/18         8/06/18             8/06/18             8/06/18
copies to the Regional Administrator, Region I; the Director, Office of Enforcement; and the NRC
 
Resident Inspector at Salem.
 
Enclosure(s) transmitted herewith contain(s) Sensitive, Unclassified, Non-Safeguards Information.  When separated
from the Enclosure(s), the transmittal document is decontrolled. 
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
P. Sena 2  OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
In addition, if you disagree with the cross-cutting aspect assignment, you should provide a response within 30 days of the date of this inspection report, with the basis for your
disagreement, to the U.S. Nuclear Regulatory Commission, ATTN:  Document Control Desk,
Washington, DC, 20555-0001; with copies to the Regional Administrator, Region I and the NRC
 
Resident Inspector at Salem.
 
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with Title 10 of the
Code of Federal Regulations (10 CFR), Part 2.390, "Public Inspections, Exemptions, Requests for Withholding."
 
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance
with 10 CFR 2.390(d)(1).  If you choose to provide a response that contains Security-Related Information, please mark your entire
response "Security-Related Information-Withhold from Public Disclosure under 10 CFR 2.390"
in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).  The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
 
Sincerely,  /RA/  Glenn T. Dentel, Chief
Engineering Branch 2
 
Division of Reactor Safety
Docket Numbers:  50-272 and 50-311
License Numbers:  DPR-70 and DPR-75
 
Enclosure:
Inspection Report 05000272/2018403 and      05000311/2018403 (OUO-SRI)
cc w/o encl: Distribution via ListServ
 
 
 
  ML18218A506 (Cover letter) ADAMS ACCESSION NUMBER: ML18218A487 (Cover letter w/enclosure-NP)  
Cover Letter SUNSI Review  Non-Sensitive Sensitive  Publicly Available Non-Publicly Available Cover Letter w/ Enclosure SUNSI Review  Non-Sensitive Sensitive  Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRP RI/DRP RI/DRS NAME DWerkheiser FArner/AAR for FBower GDentel  DATE 8/06/18 8/06/18 8/06/18 8/06/18
}}
}}

Latest revision as of 20:02, 20 October 2019

Cyber Security Inspection Report 05000272/2018403 and 05000311/2018403 (Cover Letter Only)
ML18218A506
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/06/2018
From: Glenn Dentel
Engineering Region 1 Branch 2
To: Sena P
Public Service Enterprise Group
Dentel G
References
IR 2018403
Download: ML18218A506 (3)


See also: IR 05000272/2018403

Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

2100 RENAISSANCE BLVD.

KING OF PRUSSIA, PA 19406-2713

August 6, 2018

Mr. Peter P. Sena, III

President and Chief Nuclear Officer

PSEG Nuclear LLC - N09

P.O. Box 236

Hancocks Bridge, NJ 08038

SUBJECT: SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 - CYBER

SECURITY INSPECTION REPORT 05000272/2018403 AND 05000311/2018403

Dear Mr. Sena:

On June 22, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at

Salem Nuclear Generating Stations (Salem), Units 1 and 2. On the same day, the NRC

inspectors discussed the results of this inspection with Mr. Charles McFeaters, Salem Vice

President and other members of your staff. The results of this inspection are documented in the

enclosed report.

NRC inspectors documented one finding of very low safety significance (Green) in this report.

This finding involved a violation of NRC requirements. Additionally, inspectors documented a

licensee-identified violation which was determined to be of very low safety significance. The

NRC is treating these violations as a non-cited violations (NCVs) consistent with Section 2.3.2.a

of the Enforcement Policy.

One cross-cutting aspect was assigned to a finding in the area of Problem Identification and

Resolution. Specifically, PSEG failed to thoroughly evaluate issues to ensure that resolutions

address causes and extent of conditions commensurate with their safety significance, [P.2].

If you contest the violations or significance of these NCVs, you should provide a response within

30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with

copies to the Regional Administrator, Region I; the Director, Office of Enforcement; and the NRC

Resident Inspector at Salem.

Enclosure(s) transmitted herewith contain(s) Sensitive,

Unclassified, Non-Safeguards Information. When separated

from the Enclosure(s), the transmittal document is decontrolled.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

P. Sena 2

In addition, if you disagree with the cross-cutting aspect assignment, you should provide a

response within 30 days of the date of this inspection report, with the basis for your

disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk,

Washington, DC, 20555-0001; with copies to the Regional Administrator, Region I and the NRC

Resident Inspector at Salem.

This letter will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance

with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, Public Inspections,

Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will

not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to

provide a response that contains Security-Related Information, please mark your entire

response Security-Related Information-Withhold from Public Disclosure under 10 CFR 2.390

in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in

10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in

accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Glenn T. Dentel, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Numbers: 50-272 and 50-311

License Numbers: DPR-70 and DPR-75

Enclosure:

Inspection Report 05000272/2018403 and

05000311/2018403 (OUO-SRI)

cc w/o encl: Distribution via ListServ

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

ML18218A506 (Cover letter)

ADAMS ACCESSION NUMBER: ML18218A487 (Cover letter w/enclosure-NP)

Cover Letter Non-Sensitive Publicly Available

SUNSI Review Sensitive Non-Publicly Available

Cover Letter w/ Enclosure Non-Sensitive Publicly Available

SUNSI Review Sensitive Non-Publicly Available

OFFICE RI/DRS RI/DRS RI/DRP RI/DRP RI/DRS

NAME DWerkheiser FArner/AAR for FBower GDentel

DATE 8/06/18 8/06/18 8/06/18 8/06/18