{{#Wiki_filter:March 25, 2010 Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708  
{{#Wiki_filter:March 25, 2010 Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708


==SUBJECT:==
==SUBJECT:==
DRAFT SAFETY EVALUATION FOR NUCLEAR ENERGY INSTITUTE TOPICAL REPORT MATERIALS RELIABILITY PROGRAM (MRP): TECHNICAL BASIS FOR PREMPTIVE WELD OVERLAYS FOR ALLOY 82/182 BUTT WELDS IN PRESSURIZED WATER REACTORS (MRP-169) (TAC NO. MD8005)
DRAFT SAFETY EVALUATION FOR NUCLEAR ENERGY INSTITUTE TOPICAL REPORT MATERIALS RELIABILITY PROGRAM (MRP): TECHNICAL BASIS FOR PREMPTIVE WELD OVERLAYS FOR ALLOY 82/182 BUTT WELDS IN PRESSURIZED WATER REACTORS (MRP-169) (TAC NO.
MD8005)


==Dear Mr. Riley:==
==Dear Mr. Riley:==


By letter dated September 7, 2005, the Nuclear Energy Institute (NEI) submitted Topical Report (TR) Material Reliability Program (MRP): Technical Basis For Preemptive Weld Overlays For Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169), Revision 0, to the U.S.
By letter dated September 7, 2005, the Nuclear Energy Institute (NEI) submitted Topical Report (TR) Material Reliability Program (MRP): Technical Basis For Preemptive Weld Overlays For Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169), Revision 0, to the U.S.
Nuclear Regulatory Commission (NRC) staff for review. In a letter to NEI dated April 26, 2007, the NRC discontinued its review of TR MRP-169, Revision 0. After an August 23, 2007, public pre-submittal meeting with the NRC staff, the NEI and the Electric Power Research Institute stated that they would submit the necessary documentation to re-initiate the NRC's review of TR MRP-169, Revision 0. By letter dated January 9, 2008, NEI re-submitted for NRC staff review TR MRP-169, Revision 0. The transmittal memo for the January 9, 2008, letter from NEI states that this document is considered to be non-proprietary.
Nuclear Regulatory Commission (NRC) staff for review. In a letter to NEI dated April 26, 2007, the NRC discontinued its review of TR MRP-169, Revision 0. After an August 23, 2007, public pre-submittal meeting with the NRC staff, the NEI and the Electric Power Research Institute stated that they would submit the necessary documentation to re-initiate the NRCs review of TR MRP-169, Revision 0. By letter dated January 9, 2008, NEI re-submitted for NRC staff review TR MRP-169, Revision 0. The transmittal memo for the January 9, 2008, letter from NEI states that this document is considered to be non-proprietary.
By letters dated August 3, 2006 and April 7, 2008, the NRC staff issued a request for additional information (RAI) to NEI to support the review of TR MRP-169. By letters dated January 9, 2008, May 2, 2008, March 2, 2009, November 30, 2009, and February 3, 2010, NEI responded to the NRC staff's RAIs and provided supplemental information in support of the NRC staff's review of TR MRP-169. Enclosed for NEI review and comment is a copy of the NRC staff's draft safety evaluation (SE) for the TR
By letters dated August 3, 2006 and April 7, 2008, the NRC staff issued a request for additional information (RAI) to NEI to support the review of TR MRP-169. By letters dated January 9, 2008, May 2, 2008, March 2, 2009, November 30, 2009, and February 3, 2010, NEI responded to the NRC staffs RAIs and provided supplemental information in support of the NRC staffs review of TR MRP-169. Enclosed for NEI review and comment is a copy of the NRC staff's draft safety evaluation (SE) for the TR.
 
J. Riley 2 Twenty working days are provided for you to comment on any factual errors or clarity concerns contained in the SE. The final SE will be issued after making any necessary changes and will be made publicly available. The NRC staff's disposition of your comments on the draft SE will be discussed in the final SE.
To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the draft SE showing proposed changes and provide a summary table of the proposed changes.  


J. Riley                                        2 Twenty working days are provided for you to comment on any factual errors or clarity concerns contained in the SE. The final SE will be issued after making any necessary changes and will be made publicly available. The NRC staff's disposition of your comments on the draft SE will be discussed in the final SE.
To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the draft SE showing proposed changes and provide a summary table of the proposed changes.
If you have any questions, please contact Tanya Mensah at 301-415-3610.
If you have any questions, please contact Tanya Mensah at 301-415-3610.
Sincerely,         /RA/ Stacey L. Rosenberg, Chief Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation  
Sincerely,
                                              /RA/
Stacey L. Rosenberg, Chief Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 669 and 689


Project Nos. 669 and 689
==Enclosure:==


==Enclosure:==
Draft SE cc w/encl: See next page
Draft SE cc w/encl: See next page J. Riley 2 Twenty working days are provided for you to comment on any factual errors or clarity concerns contained in the SE. The final SE will be issued after making any necessary changes and will be made publicly available. The NRC staff's disposition of your comments on the draft SE will be discussed in the final SE.
To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the draft SE showing proposed changes and provide a summary table of the proposed changes.


J. Riley                                        2 Twenty working days are provided for you to comment on any factual errors or clarity concerns contained in the SE. The final SE will be issued after making any necessary changes and will be made publicly available. The NRC staff's disposition of your comments on the draft SE will be discussed in the final SE.
To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the draft SE showing proposed changes and provide a summary table of the proposed changes.
If you have any questions, please contact Tanya Mensah at 301-415-3610.
If you have any questions, please contact Tanya Mensah at 301-415-3610.
Sincerely,       /RA/ Stacey L. Rosenberg, Chief Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 669 and 689  
Sincerely,
                                              /RA/
Stacey L. Rosenberg, Chief Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 669 and 689


==Enclosure:==
==Enclosure:==
Draft SE cc w/encl:  See next page DISTRIBUTION
: PUBLIC  PLPB Reading File RidsNrrDpr RidsNrrDprPlpb RidsNrrPMTMensah RidsNrrLADBaxley RidsOgcMailCenter RidsAcrsAcnwMailCenter RidsNrrDciCpnb J Tsao T Lupold T Sullivan R Hardies


J Collins A Csontos DRudland H Rathbun EXTERNAL DISTRIBUTION:
Draft SE cc w/encl: See next page DISTRIBUTION:
PUBLIC PLPB Reading File RidsNrrDpr RidsNrrDprPlpb RidsNrrPMTMensah RidsNrrLADBaxley RidsOgcMailCenter RidsAcrsAcnwMailCenter RidsNrrDciCpnb J Tsao T Lupold T Sullivan R Hardies J Collins A Csontos DRudland H Rathbun EXTERNAL DISTRIBUTION:
vka@nei.org ewillis@epri.com ADAMS ACCESSION NO.: *No major changes to SE input. NRR-043 ML100740466 (Cover Letter); ML100740481 (Enclosure)
vka@nei.org ewillis@epri.com ADAMS ACCESSION NO.: *No major changes to SE input. NRR-043 ML100740466 (Cover Letter); ML100740481 (Enclosure)
OFFICE PLPB/PM PLPB /LA DCI/CPNB* PLPB /BC NAME TMensah DBaxley TLupold SRosenberg DATE 3/   /10 3/   /10 2/28/10 3/25/10   OFFICIAL RECORD COPY J. Riley 3 Nuclear Energy Institute      Project No. 689 Electric Power Research Institute                                                    Project No. 669 
OFFICE     PLPB/PM       PLPB /LA       DCI/CPNB*       PLPB /BC NAME       TMensah       DBaxley       TLupold         SRosenberg DATE       3/ /10         3/ /10         2/28/10         3/25/10 OFFICIAL RECORD COPY
 
cc:Mr. Anthony Pietrangelo, Senior Vice President & Chief Nuclear Officer Nuclear Generation Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC  20006-3708 arp@nei.org Mr. Jack Roe, Director Security Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC  20006-3708 jwr@nei.org Mr. Charles B. Brinkman Washington Operations  ABB-Combustion Engineering, Inc. 12300 Twinbrook Parkway, Suite 330 Rockville, MD  20852 brinkmcb@westinghouse.com Mr. James Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC  20005 Barbara_lewis@platts.com Mr. Alexander Marion, Vice President Nuclear Operations Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 am@nei.org


Mr. John Butler, Director Operations Support Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jcb@nei.org Mr. James H. Riley, Director Engineering Nuclear Energy Institute 1776 I Street, NW Washington, DC 20006-3708 jhr@nei.org Mr. Chris Larsen Vice President and Chief Nuclear Officer EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 cblarsen@epri.com Mr. David J. Modeen Director, External Affairs EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 dmodeen@epri.com Dr. Sean Bushart EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 sbushart@epri.com Mr. Kurt Edsinger EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 kedsinge@epri.com
J. Riley                                  3 Nuclear Energy Institute                                   Project No. 689 Electric Power Research Institute                          Project No. 669 cc:
Mr. Anthony Pietrangelo, Senior Vice President & Chief Nuclear Officer          Mr. James H. Riley, Director Nuclear Generation                          Engineering Nuclear Energy Institute                   Nuclear Energy Institute 1776 I Street, NW, Suite 400                1776 I Street, NW Washington, DC 20006-3708                   Washington, DC 20006-3708 arp@nei.org                                jhr@nei.org Mr. Jack Roe, Director                      Mr. Chris Larsen Security                                    Vice President and Chief Nuclear Officer Nuclear Energy Institute                    EPRI 1776 I Street, NW, Suite 400                3412 Hillview Avenue Washington, DC 20006-3708                  Palo Alto, CA 94304-1338 jwr@nei.org                                cblarsen@epri.com Mr. Charles B. Brinkman                    Mr. David J. Modeen Washington Operations                      Director, External Affairs ABB-Combustion Engineering, Inc.            EPRI 12300 Twinbrook Parkway, Suite 330          1300 W. T. Harris Boulevard Rockville, MD 20852                        Charlotte, NC 28262-8550 brinkmcb@westinghouse.com                  dmodeen@epri.com Mr. James Gresham, Manager                  Dr. Sean Bushart Regulatory Compliance and Plant Licensing  EPRI Westinghouse Electric Company              3412 Hillview Avenue P.O. Box 355                                Palo Alto, CA 94304-1338 Pittsburgh, PA 15230-0355                  sbushart@epri.com greshaja@westinghouse.com Mr. Kurt Edsinger Ms. Barbara Lewis                          EPRI Assistant Editor                            3412 Hillview Avenue Platts, Principal Editorial Office          Palo Alto, CA 94304-1338 1200 G St., N.W., Suite 1100                kedsinge@epri.com Washington, DC 20005 Barbara_lewis@platts.com Mr. Alexander Marion, Vice President Nuclear Operations Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 am@nei.org Mr. John Butler, Director Operations Support Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jcb@nei.org


Mr. Ken Canavan EPRI 1300 W.T. Harris Boulevard Charlotte, NC 28262-8550 kcanavan@epri.com Mr. Greg Selby EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 gselby@epri.com Mr. David Steininger EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 dsteinin@epri.com Mr. Neil Wilmshurst EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 nwilmshu@epri.com}}
Mr. Ken Canavan EPRI 1300 W.T. Harris Boulevard Charlotte, NC 28262-8550 kcanavan@epri.com Mr. Greg Selby EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 gselby@epri.com Mr. David Steininger EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 dsteinin@epri.com Mr. Neil Wilmshurst EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 nwilmshu@epri.com}}

Latest revision as of 21:51, 13 November 2019

Cover Letter: Draft Safety Evaluation for Nuclear Energy Institutes Topical Report Materials Reliability Program (Mrp): Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169)-
ML100740466
Person / Time
Site: Nuclear Energy Institute, PROJ0669
Issue date: 03/25/2010
From: Rosenberg S
NRC/NRR/DPR/PSPB
To: Jeffrey Riley
Nuclear Energy Institute
Mensah T
References
TAC MD8005
Download: ML100740466 (5)


Text

March 25, 2010 Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708

SUBJECT:

DRAFT SAFETY EVALUATION FOR NUCLEAR ENERGY INSTITUTE TOPICAL REPORT MATERIALS RELIABILITY PROGRAM (MRP): TECHNICAL BASIS FOR PREMPTIVE WELD OVERLAYS FOR ALLOY 82/182 BUTT WELDS IN PRESSURIZED WATER REACTORS (MRP-169) (TAC NO.

MD8005)

Dear Mr. Riley:

By letter dated September 7, 2005, the Nuclear Energy Institute (NEI) submitted Topical Report (TR) Material Reliability Program (MRP): Technical Basis For Preemptive Weld Overlays For Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169), Revision 0, to the U.S.

Nuclear Regulatory Commission (NRC) staff for review. In a letter to NEI dated April 26, 2007, the NRC discontinued its review of TR MRP-169, Revision 0. After an August 23, 2007, public pre-submittal meeting with the NRC staff, the NEI and the Electric Power Research Institute stated that they would submit the necessary documentation to re-initiate the NRCs review of TR MRP-169, Revision 0. By letter dated January 9, 2008, NEI re-submitted for NRC staff review TR MRP-169, Revision 0. The transmittal memo for the January 9, 2008, letter from NEI states that this document is considered to be non-proprietary.

By letters dated August 3, 2006 and April 7, 2008, the NRC staff issued a request for additional information (RAI) to NEI to support the review of TR MRP-169. By letters dated January 9, 2008, May 2, 2008, March 2, 2009, November 30, 2009, and February 3, 2010, NEI responded to the NRC staffs RAIs and provided supplemental information in support of the NRC staffs review of TR MRP-169. Enclosed for NEI review and comment is a copy of the NRC staff's draft safety evaluation (SE) for the TR.

J. Riley 2 Twenty working days are provided for you to comment on any factual errors or clarity concerns contained in the SE. The final SE will be issued after making any necessary changes and will be made publicly available. The NRC staff's disposition of your comments on the draft SE will be discussed in the final SE.

To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the draft SE showing proposed changes and provide a summary table of the proposed changes.

If you have any questions, please contact Tanya Mensah at 301-415-3610.

Sincerely,

/RA/

Stacey L. Rosenberg, Chief Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 669 and 689

Enclosure:

Draft SE cc w/encl: See next page

J. Riley 2 Twenty working days are provided for you to comment on any factual errors or clarity concerns contained in the SE. The final SE will be issued after making any necessary changes and will be made publicly available. The NRC staff's disposition of your comments on the draft SE will be discussed in the final SE.

To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the draft SE showing proposed changes and provide a summary table of the proposed changes.

If you have any questions, please contact Tanya Mensah at 301-415-3610.

Sincerely,

/RA/

Stacey L. Rosenberg, Chief Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 669 and 689

Enclosure:

Draft SE cc w/encl: See next page DISTRIBUTION:

PUBLIC PLPB Reading File RidsNrrDpr RidsNrrDprPlpb RidsNrrPMTMensah RidsNrrLADBaxley RidsOgcMailCenter RidsAcrsAcnwMailCenter RidsNrrDciCpnb J Tsao T Lupold T Sullivan R Hardies J Collins A Csontos DRudland H Rathbun EXTERNAL DISTRIBUTION:

vka@nei.org ewillis@epri.com ADAMS ACCESSION NO.: *No major changes to SE input. NRR-043 ML100740466 (Cover Letter); ML100740481 (Enclosure)

OFFICE PLPB/PM PLPB /LA DCI/CPNB* PLPB /BC NAME TMensah DBaxley TLupold SRosenberg DATE 3/ /10 3/ /10 2/28/10 3/25/10 OFFICIAL RECORD COPY

J. Riley 3 Nuclear Energy Institute Project No. 689 Electric Power Research Institute Project No. 669 cc:

Mr. Anthony Pietrangelo, Senior Vice President & Chief Nuclear Officer Mr. James H. Riley, Director Nuclear Generation Engineering Nuclear Energy Institute Nuclear Energy Institute 1776 I Street, NW, Suite 400 1776 I Street, NW Washington, DC 20006-3708 Washington, DC 20006-3708 arp@nei.org jhr@nei.org Mr. Jack Roe, Director Mr. Chris Larsen Security Vice President and Chief Nuclear Officer Nuclear Energy Institute EPRI 1776 I Street, NW, Suite 400 3412 Hillview Avenue Washington, DC 20006-3708 Palo Alto, CA 94304-1338 jwr@nei.org cblarsen@epri.com Mr. Charles B. Brinkman Mr. David J. Modeen Washington Operations Director, External Affairs ABB-Combustion Engineering, Inc. EPRI 12300 Twinbrook Parkway, Suite 330 1300 W. T. Harris Boulevard Rockville, MD 20852 Charlotte, NC 28262-8550 brinkmcb@westinghouse.com dmodeen@epri.com Mr. James Gresham, Manager Dr. Sean Bushart Regulatory Compliance and Plant Licensing EPRI Westinghouse Electric Company 3412 Hillview Avenue P.O. Box 355 Palo Alto, CA 94304-1338 Pittsburgh, PA 15230-0355 sbushart@epri.com greshaja@westinghouse.com Mr. Kurt Edsinger Ms. Barbara Lewis EPRI Assistant Editor 3412 Hillview Avenue Platts, Principal Editorial Office Palo Alto, CA 94304-1338 1200 G St., N.W., Suite 1100 kedsinge@epri.com Washington, DC 20005 Barbara_lewis@platts.com Mr. Alexander Marion, Vice President Nuclear Operations Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 am@nei.org Mr. John Butler, Director Operations Support Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jcb@nei.org

Mr. Ken Canavan EPRI 1300 W.T. Harris Boulevard Charlotte, NC 28262-8550 kcanavan@epri.com Mr. Greg Selby EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 gselby@epri.com Mr. David Steininger EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 dsteinin@epri.com Mr. Neil Wilmshurst EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 nwilmshu@epri.com