ML13114A746: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Appendix D Scenario Outline Form ES-D-1   Facility: _Byron Nuclear Station Scenario No.: __
{{#Wiki_filter:Appendix D                                   Scenario Outline                             Form ES-D-1 Facility: _Byron Nuclear Station           Scenario No.: __1__                Op-Test No.: _2013301_
1__  Op-Test No.:
Examiners:     _D. McNeil__________________ Operators:           _____________________________
_2013301_  Examiners:
_R. Baker___________________                     _____________________________
_D. McNeil__________________
_B. Palagi_________________                       _____________________________
Operators:
Initial Conditions: __IC-22____________________________________________________________
_____________________________
_R. Baker___________________
_____________________________
_B. Palagi_________________
_____________________________
Initial Conditions: __
IC-22____________________________________________________________ _________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
Turnover: Unit 1 is at 100% power, steady state, equilibrium xenon, MOL. Unit output is 1230 MW.
_________________________________________________________________________________
___ Boron concentration is 888 ppm. Online risk is green. A TV/GV surveillance is scheduled to be
Turnover: Unit 1 is at 100% power, steady state, equilibrium xenon, MOL. Unit output is 1230 MW. ___
___ performed. The unit will be ramped to 89% power at 3MW/min for the surveillance._______________
Boron concentration is 888 ppm. Online risk is green. A TV/GV surveillance is scheduled to be ___
Event No. Malf. No. Event Type*
performed. The unit will be ramped to 89% power at 3MW/min for the surveillance._______________
Event Description Preload IMF RP26C IMF RP28C Trgset 4 "zdi1fw012c(1).gt.0" Trg 4 "dor zlo1fw012c1" Trgset 5 "fwv1fw012c.gt.0.9" Trg 5 "ior zlo1fw012c1 off" ESF relay failure of 1A RH pump ESF relay failure of 1B RH pump 1 R (RO) (SRO)
Event                   Malf. No.             Event Type*                       Event No.                                                                        Description Preload       IMF RP26C                                         ESF relay failure of 1A RH pump IMF RP28C                                         ESF relay failure of 1B RH pump Trgset 4 zdi1fw012c(1).gt.0 Trg 4 dor zlo1fw012c1 Trgset 5 fwv1fw012c.gt.0.9 Trg 5 ior zlo1fw012c1 off 1                                               R (RO) (SRO) N   Ramp down for TV/GV Surveillance (BOP, SRO) 2             IMF PA0253 ON                     TS (SRO)         S/G PORV 1MS018A Inop IOR ZDI1MS018A CLS 3             IMF FW16 0                       I (BOP, SRO)     1PT508 fails low 4             IMF CV10 200 180 134             C (RO, SRO)     1CV121 slowly fails open. Manual control is available.
N (BOP, SRO)
5             IMF RX10A 0 30                   I (RO, SRO) TS   1PT 505 fails low (SRO) 6             ED11D                             TS (SRO)         Loss of IB 114 due to a bus fault.
Ramp down for TV/GV Surveillance 2 IMF PA0253 ON IOR ZDI1MS018A CLS TS (SRO) S/G PORV 1MS018A Inop 3 IMF FW16 0 I (BOP, SRO) 1PT508 fails low 4 IMF CV10 200 180 134 C (RO, SRO) 1CV121 slowly fails open. Manual control is available.
Tech Spec 3.8.9 required shutdown within 8 hours 7             Ramp fwv1FW012C 1 1               C (BOP, SRO)     1FW012C recirc fails open 08:00:00 8              MF TH04C 540000                   M (all)         LB LOCA terminating in transfer to Cold Leg Recic 9             Pre-load                         C (all)         ESF relay failure of 1A & B RH pumps
5 IMF RX10A 0 30 I (RO, SRO)
                                                                  - manual start required
TS (SRO) 1PT 505 fails low 6 ED11D TS (SRO) Loss of IB 114 due to a bus fault. Tech Spec 3.8.9 required shutdown within 8 hours 7 Ramp fwv1FW012C 1 1 08:00:00 C (BOP, SRO) 1FW012C recirc fails open 8 MF TH04C 540000 M (all) LB LOCA terminating in transfer to Cold Leg Recic 9 Pre-load C (all) ESF relay failure of 1A & B RH pumps  
*         (N)ormal,    (R)eactivity, (I)nstrument,   (C)omponent, (M)ajor
- manual start required
  * (N)ormal,    (R)eactivity,   (I)nstrument,   (C)omponent,   (M)ajor


Appendix D Scenario Outline Form ES-D-1   Facility: _Byron Nuclear Station Scenario No.: __
Appendix D                                   Scenario Outline                             Form ES-D-1 Facility: _Byron Nuclear Station           Scenario No.: __2__                Op-Test No.: _2013301_
2__  Op-Test No.:
Examiners:     _D. McNeil__________________ Operators:         _____________________________
_2013301_  Examiners:
_R. Baker___________________                     _____________________________
_D. McNeil__________________
_B. Palagi__________________                     _____________________________
Operators:
Initial Conditions: __IC-22, 75% power, steady state, MOL___________________________________
_____________________________
_R. Baker___________________
_____________________________
_B. Palagi__________________
_____________________________
Initial Conditions: __
IC-22, 75% power, steady state, MOL___________________________________ _________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
Turnover: Unit 1 is at 76% power, steady state, MOL, CB D is @ 141 steps and boron concentration is 998 ppm..
_________________________________________________________________________________
Online risk is green. Crew is to switch Bus 156 from SAT to UAT following ACB 1561 ____ maintenance. 1D CD/CB pump is OOS for maintenance.
Turnover: Unit 1 is at 76% power, steady state, MOL, CB D is @ 141 steps and boron concentration is 998 ppm.. Online risk is green. Crew is to switch Bus 156 from SAT to UAT following ACB 1561 ____
.____________________________________
maintenance. 1D CD/CB pump is OOS for maintenance..____________________________________
Event No. Malf. No. Event Type*
Event                                                                         Event Malf. No.               Event Type*
Event Description Preload ZDI 1CD05PD PTL ZLO1CB113DOPN OFF ZLO1CB113DCLS OFF ZDI1CB113D CLS ZDI1CD05PDB PTL IMF RP02A IMF RP02B IMF TC03 ZDIHSTG010 NORM Turbine fails to AUTO trip from Rx trip Manual Turbine trip PB fails to trip turbine 1 N (BOP,SRO)
No.                                                                        Description ZDI 1CD05PD PTL ZLO1CB113DOPN OFF ZLO1CB113DCLS OFF ZDI1CB113D CLS                                   Turbine fails to AUTO trip from Rx trip Preload      ZDI1CD05PDB PTL                                  Manual Turbine trip PB fails to trip IMF RP02A                                        turbine IMF RP02B IMF TC03 ZDIHSTG010 NORM 1                                         N (BOP,SRO)     Switch Bus 156 Electrical Lineup TS (SRO)         Notified that SI pump failed ASME 2        None surveillance C (BOP,SRO) 1C CD/CB pp Trip requiring entry to 3        IMF FW22C                        R 1BOA SEC-1 and Turbine Runback (RO, SRO)
Switch Bus 156 Electrical Lineup 2 None TS (SRO) Notified that SI pump failed ASME surveillance 3 IMF FW22C C (BOP,SRO)
I (RO, SRO) TS 4        MF RX18A 630                                      1A TCOLD RTD Fail High (SRO)
R  (RO, SRO) 1C CD/CB pp Trip requiring entry to 1BOA SEC-1 and Turbine Runback 4 MF RX18A 630 I (RO, SRO) TS (SRO) 1A TCOLD RTD Fail High 5 IMF RX04D 0 30 I (BOP,SRO)
Feedwater flow channel 1FT-521 fails 5       IMF RX04D 0 30                   I (BOP,SRO)
Feedwater flow channel 1FT
Low 6       MF CV16 0                       I (RO, SRO)     VCT Level Channel LT-112 Fail Low 7       MF CH08 60 120                   TS (SRO)         CNMT Pressure 1PT-936 Fail High ATWS 8       MF TH16C                         M (ALL)         1C RCP Trip with Rx Trip Breakers Fail To Open Failure of Main Turbine to Trip on 9       Pre-load                         C (ALL) auto signal or manual push button
-521 fails Low 6 MF CV16 0 I (RO, SRO)
*         (N)ormal,   (R)eactivity, (I)nstrument,   (C)omponent, (M)ajor
VCT Level Channel LT
-112 Fail Low 7 MF CH08 60 120 TS (SRO) CNMT Pressure 1PT
-936 Fail High 8 MF TH16C M (ALL) ATWS 1C RCP Trip with Rx Trip Breakers Fail To Open 9 Pre-load C (ALL) Failure of Main Turbine to Trip on auto signal or manual push button
  * (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,   (M)ajor


Appendix D Scenario Outline Form ES-D-1   Facility: _Byron Nuclear Station Scenario No.: __
Appendix D                                   Scenario Outline                               Form ES-D-1 Facility: _Byron Nuclear Station           Scenario No.: __3__                Op-Test No.: _2013301_
3__  Op-Test No.:
Examiners:     _D. McNeil__________________ Operators:           _____________________________
_2013301_  Examiners:
_R. Baker___________________                       _____________________________
_D. McNeil__________________
_B. Palagi__________________                       _____________________________
Operators:
Initial Conditions: __IC-16, 56% power, steady state, equilibrium xenon, BOL____________________
_____________________________
_________________________________________________________________________________
_R. Baker___________________
_____________________________
_B. Palagi__________________
_____________________________
Initial Conditions: __
IC-16 , 56% power, steady state, equilibrium xenon, BOL____________________ _________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
Turnover: Unit 1 is at 56% power, steady state, equilibrium xenon, BOL CB D is at XXX steps and boron concentration is 998 ppm. Preconditioned to 100% power at 6400 EFPH. Online risk is yellow. 1A CS pp is O.O.S. for a motor lube oil change and is scheduled to be released at the end of shift. It is expected that Power Team will call for the unit to be ramped to 880 MWe at 0.2MW/min.____________________ Event No. Malf. No. Event Type*
Turnover: Unit 1 is at 56% power, steady state, equilibrium xenon, BOL CB D is at XXX steps and boron concentration is 998 ppm. Preconditioned to 100% power at 6400 EFPH. Online risk is yellow. 1A CS pp is O.O.S. for a motor lube oil change and is scheduled to be released at the end of shift. It is expected that Power Team will call for the unit to be ramped to 880 MWe at 0.2MW/min.____________________
Event Description Preload IOR ZDI1CS01PB PTL IRF CS05 OVER IMF CH01B IMF CH01C Preload 1A CS pp O.O.S.
Event                                                                            Event Malf. No.                 Event Type*
Prevents 1B CS pp from Auto start 1B RCFC fails to start in Lo Speed 1C RCFC fails to start in Lo Speed 1 None (from 10 5 cert) N (BOP, SRO)
No.                                                                        Description Preload     IOR ZDI1CS01PB PTL                   Preload       1A CS pp O.O.S.
R (RO, SRO)
IRF CS05 OVER                                      Prevents 1B CS pp from Auto start IMF CH01B                                          1B RCFC fails to start in Lo Speed IMF CH01C                                          1C RCFC fails to start in Lo Speed 1             None (from 10-1-5 cert)           N (BOP, SRO)     Ramp unit up R (RO, SRO) 2             IMF RD13AK08                     TS (SRO)         DRPI failure (1 rod) in CB A for 1 train 3             MF CV07A 80 60                   C (RO, SRO)       RCP Seal Injection Filter Clogged 4             MF RX13A 100                     I (RO, SRO) TS   Pzr LT-459A Fail High (controlling (SRO)            channel) 5             IMF FW02A                         C (BOP, SRO)     1B TDFP Trip with 1A MFP available for manual start 6             IMF RX01K 0-(from 10-1-1         I (BOP, SRO)     Steam Generator 1D controlling cert)                            TS (SRO)         Steam Pressure channel fails low requiring Manual control of 1D SG Main Feed Reg Valve. Enter Tech Spec 3.3.2 for actions.
Ramp unit up 2 IMF RD13AK08 TS (SRO) DRPI failure (1 rod) in CB A for 1 train 3 MF CV07A 80 60 C (RO, SRO)
7             MF MS07D 4 240                   M (ALL)           1D Steam Line Break inside CNMT 8             (Preloaded)                       C (SRO,           CS Pumps Auto Start Failure, Manual MF CS01A                          CREW)            Start required; 1A CS pump fail to RF CS05 OVER                                        start.
RCP Seal Injection Filter Clogged 4 MF RX13A 100 I (RO, SRO) TS (SRO) Pzr LT-459A Fail High (controlling channel) 5 IMF FW02A C (BOP, SRO
IMF CH01B IMF CH01C                                          1B RCFC fails to start in Lo Speed 1C RCFC fails to start in Lo Speed
) 1B TDFP Trip with 1A MFP available for manual start 6 IMF RX01K 0
*         (N)ormal,   (R)eactivity, (I)nstrument,   (C)omponent,   (M)ajor}}
-(from 10-1-1 cert) I (BOP, SRO) TS (SRO) Steam Generator 1D controlling Steam Pressure channel fails low requiring Manual control of 1D SG Main Feed Reg Valve. Enter Tech Spec 3.3.2 for actions.
7 MF MS07D 4 240 M (ALL) 1D Steam Line Break inside CNMT 8 (Preloaded)
MF CS01A RF CS05 OVER IMF CH01B IMF CH01C C (SRO, CREW) CS Pumps Auto Start Failure, Manual Start required; 1A CS pump fail to start.
1B RCFC fails to start in Lo Speed 1C RCFC fails to start in Lo Speed
  * (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,   (M)ajor}}

Revision as of 20:19, 4 November 2019

2013 Byron Nuclear Station Initial License Examination Simulator Scenario D-1 Forms
ML13114A746
Person / Time
Site: Byron  Constellation icon.png
Issue date: 04/29/2013
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
References
50-454/13-301, 50-455/13-301
Download: ML13114A746 (3)


Text

Appendix D Scenario Outline Form ES-D-1 Facility: _Byron Nuclear Station Scenario No.: __1__ Op-Test No.: _2013301_

Examiners: _D. McNeil__________________ Operators: _____________________________

_R. Baker___________________ _____________________________

_B. Palagi_________________ _____________________________

Initial Conditions: __IC-22____________________________________________________________

_________________________________________________________________________________

_________________________________________________________________________________

Turnover: Unit 1 is at 100% power, steady state, equilibrium xenon, MOL. Unit output is 1230 MW. ___

Boron concentration is 888 ppm. Online risk is green. A TV/GV surveillance is scheduled to be ___

performed. The unit will be ramped to 89% power at 3MW/min for the surveillance._______________

Event Malf. No. Event Type* Event No. Description Preload IMF RP26C ESF relay failure of 1A RH pump IMF RP28C ESF relay failure of 1B RH pump Trgset 4 zdi1fw012c(1).gt.0 Trg 4 dor zlo1fw012c1 Trgset 5 fwv1fw012c.gt.0.9 Trg 5 ior zlo1fw012c1 off 1 R (RO) (SRO) N Ramp down for TV/GV Surveillance (BOP, SRO) 2 IMF PA0253 ON TS (SRO) S/G PORV 1MS018A Inop IOR ZDI1MS018A CLS 3 IMF FW16 0 I (BOP, SRO) 1PT508 fails low 4 IMF CV10 200 180 134 C (RO, SRO) 1CV121 slowly fails open. Manual control is available.

5 IMF RX10A 0 30 I (RO, SRO) TS 1PT 505 fails low (SRO) 6 ED11D TS (SRO) Loss of IB 114 due to a bus fault.

Tech Spec 3.8.9 required shutdown within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 7 Ramp fwv1FW012C 1 1 C (BOP, SRO) 1FW012C recirc fails open 08:00:00 8 MF TH04C 540000 M (all) LB LOCA terminating in transfer to Cold Leg Recic 9 Pre-load C (all) ESF relay failure of 1A & B RH pumps

- manual start required

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Facility: _Byron Nuclear Station Scenario No.: __2__ Op-Test No.: _2013301_

Examiners: _D. McNeil__________________ Operators: _____________________________

_R. Baker___________________ _____________________________

_B. Palagi__________________ _____________________________

Initial Conditions: __IC-22, 75% power, steady state, MOL___________________________________

_________________________________________________________________________________

_________________________________________________________________________________

Turnover: Unit 1 is at 76% power, steady state, MOL, CB D is @ 141 steps and boron concentration is 998 ppm.. Online risk is green. Crew is to switch Bus 156 from SAT to UAT following ACB 1561 ____

maintenance. 1D CD/CB pump is OOS for maintenance..____________________________________

Event Event Malf. No. Event Type*

No. Description ZDI 1CD05PD PTL ZLO1CB113DOPN OFF ZLO1CB113DCLS OFF ZDI1CB113D CLS Turbine fails to AUTO trip from Rx trip Preload ZDI1CD05PDB PTL Manual Turbine trip PB fails to trip IMF RP02A turbine IMF RP02B IMF TC03 ZDIHSTG010 NORM 1 N (BOP,SRO) Switch Bus 156 Electrical Lineup TS (SRO) Notified that SI pump failed ASME 2 None surveillance C (BOP,SRO) 1C CD/CB pp Trip requiring entry to 3 IMF FW22C R 1BOA SEC-1 and Turbine Runback (RO, SRO)

I (RO, SRO) TS 4 MF RX18A 630 1A TCOLD RTD Fail High (SRO)

Feedwater flow channel 1FT-521 fails 5 IMF RX04D 0 30 I (BOP,SRO)

Low 6 MF CV16 0 I (RO, SRO) VCT Level Channel LT-112 Fail Low 7 MF CH08 60 120 TS (SRO) CNMT Pressure 1PT-936 Fail High ATWS 8 MF TH16C M (ALL) 1C RCP Trip with Rx Trip Breakers Fail To Open Failure of Main Turbine to Trip on 9 Pre-load C (ALL) auto signal or manual push button

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Facility: _Byron Nuclear Station Scenario No.: __3__ Op-Test No.: _2013301_

Examiners: _D. McNeil__________________ Operators: _____________________________

_R. Baker___________________ _____________________________

_B. Palagi__________________ _____________________________

Initial Conditions: __IC-16, 56% power, steady state, equilibrium xenon, BOL____________________

_________________________________________________________________________________

_________________________________________________________________________________

Turnover: Unit 1 is at 56% power, steady state, equilibrium xenon, BOL CB D is at XXX steps and boron concentration is 998 ppm. Preconditioned to 100% power at 6400 EFPH. Online risk is yellow. 1A CS pp is O.O.S. for a motor lube oil change and is scheduled to be released at the end of shift. It is expected that Power Team will call for the unit to be ramped to 880 MWe at 0.2MW/min.____________________

Event Event Malf. No. Event Type*

No. Description Preload IOR ZDI1CS01PB PTL Preload 1A CS pp O.O.S.

IRF CS05 OVER Prevents 1B CS pp from Auto start IMF CH01B 1B RCFC fails to start in Lo Speed IMF CH01C 1C RCFC fails to start in Lo Speed 1 None (from 10-1-5 cert) N (BOP, SRO) Ramp unit up R (RO, SRO) 2 IMF RD13AK08 TS (SRO) DRPI failure (1 rod) in CB A for 1 train 3 MF CV07A 80 60 C (RO, SRO) RCP Seal Injection Filter Clogged 4 MF RX13A 100 I (RO, SRO) TS Pzr LT-459A Fail High (controlling (SRO) channel) 5 IMF FW02A C (BOP, SRO) 1B TDFP Trip with 1A MFP available for manual start 6 IMF RX01K 0-(from 10-1-1 I (BOP, SRO) Steam Generator 1D controlling cert) TS (SRO) Steam Pressure channel fails low requiring Manual control of 1D SG Main Feed Reg Valve. Enter Tech Spec 3.3.2 for actions.

7 MF MS07D 4 240 M (ALL) 1D Steam Line Break inside CNMT 8 (Preloaded) C (SRO, CS Pumps Auto Start Failure, Manual MF CS01A CREW) Start required; 1A CS pump fail to RF CS05 OVER start.

IMF CH01B IMF CH01C 1B RCFC fails to start in Lo Speed 1C RCFC fails to start in Lo Speed

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor