{{#Wiki_filter:*---Entergy GNRO-2013/00097 December 11, 2013 u.s.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Entergy Operations, Inc.P.O.Box 756 Port Gibson, MS 39150 Kevin J.Mulligan Site Vice President Grand Gulf Nuclear Station Tel.(601)437-7500  
{{#Wiki_filter:*
---Entergy                                                                     Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150 Kevin J. Mulligan Site Vice President Grand Gulf Nuclear Station Tel. (601) 437-7500 GNRO-2013/00097 December 11, 2013 u.s. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
Request to Withdraw Supplement to the License Amendment Request for Implementing a 24-Month Fuel Cycle Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29


==REFERENCE:==
==REFERENCE:==
: 1. Supplement to the License Amendment Request for Implementing a 24-Month Fuel Cycle, dated April 26, 2013 (Accession Number ML13119A102)


Request to Withdraw Supplement to the License Amendment Request for Implementing a 24-Month Fuel Cycle Grand Gulf Nuclear Station, Unit 1 Docket No.50-416 License No.NPF-29 1.Supplement to the License Amendment Request for Implementing a 24-Month Fuel Cycle, dated April 26, 2013 (Accession Number ML13119A102)
==Dear Sir or Madam:==


==Dear Sir or Madam:==
On April 26, 2013, Entergy Operations, Inc. (Grand Gulf Nuclear Station) submitted Reference 1 requesting approval of a change to the required frequency of Technical Specification Surveillance Requirement 3.7.7.2, pertaining to the Main Turbine Bypass System.
On April 26, 2013, Entergy Operations, Inc.(Grand Gulf Nuclear Station)submitted Reference 1 requesting approval of a change to the required frequency of Technical Specification Surveillance Requirement 3.7.7.2, pertaining to the Main Turbine Bypass System.On December 3, 2013, a teleconference was held between staff from the Grand Gulf Nuclear Station and the Office of Nuclear Reactor Regulation's Department of Operating Reactor Licensing to discuss the performance history of TS SA 3.7.7.2.After further consideration, Grand Gulf hereby requests withdrawal of Reference 1 from NRC review.There are no new commitments in this letter.If you have any questions or require additional information, please contact Mr.Christopher R.Robinson at 601-437-7326.
On December 3, 2013, a teleconference was held between staff from the Grand Gulf Nuclear Station and the Office of Nuclear Reactor Regulation's Department of Operating Reactor Licensing to discuss the performance history of TS SA 3.7.7.2.
Sincerely, KJMlcrr ForSa."'te.
After further consideration, Grand Gulf hereby requests withdrawal of Reference 1 from NRC review.
UiflSOn cc: u.s.Nuclear Regulatory Commission ATTN: Mr.Marc Dapas, (w/2)Regional Administrator, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 U.S.Nuclear Regulatory Commission ATTN: Mr.Alan Wang, NRR/DORL (w/2)Mail Stop OWFN 8 81 Washington, DC 20555-0001 NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150}}
There are no new commitments in this letter. If you have any questions or require additional information, please contact Mr. Christopher R. Robinson at 601-437-7326.
Sincerely, For ~(  Sa.
                                      "'te. P,cs:~et\~,
KJMlcrr                            c.~t'~ UiflSOn
 
cc: u.s. Nuclear Regulatory Commission ATTN: Mr. Marc Dapas, (w/2)
Regional Administrator, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 U. S. Nuclear Regulatory Commission ATTN: Mr. Alan Wang, NRR/DORL (w/2)
Mail Stop OWFN 8 81 Washington, DC 20555-0001 NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150}}

Latest revision as of 11:28, 4 November 2019

Request to Withdraw Supplement to the License Amendment Request for Implementing a 24-Month Fuel Cycle
ML13346A283
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 12/11/2013
From: Kevin Mulligan
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GNRO-2013/00097
Download: ML13346A283 (2)


Text

---Entergy Entergy Operations, Inc.

P.O. Box 756 Port Gibson, MS 39150 Kevin J. Mulligan Site Vice President Grand Gulf Nuclear Station Tel. (601) 437-7500 GNRO-2013/00097 December 11, 2013 u.s. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Request to Withdraw Supplement to the License Amendment Request for Implementing a 24-Month Fuel Cycle Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29

REFERENCE:

1. Supplement to the License Amendment Request for Implementing a 24-Month Fuel Cycle, dated April 26, 2013 (Accession Number ML13119A102)

Dear Sir or Madam:

On April 26, 2013, Entergy Operations, Inc. (Grand Gulf Nuclear Station) submitted Reference 1 requesting approval of a change to the required frequency of Technical Specification Surveillance Requirement 3.7.7.2, pertaining to the Main Turbine Bypass System.

On December 3, 2013, a teleconference was held between staff from the Grand Gulf Nuclear Station and the Office of Nuclear Reactor Regulation's Department of Operating Reactor Licensing to discuss the performance history of TS SA 3.7.7.2.

After further consideration, Grand Gulf hereby requests withdrawal of Reference 1 from NRC review.

There are no new commitments in this letter. If you have any questions or require additional information, please contact Mr. Christopher R. Robinson at 601-437-7326.

Sincerely, For ~( Sa.

"'te. P,cs:~et\~,

KJMlcrr c.~t'~ UiflSOn

cc: u.s. Nuclear Regulatory Commission ATTN: Mr. Marc Dapas, (w/2)

Regional Administrator, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 U. S. Nuclear Regulatory Commission ATTN: Mr. Alan Wang, NRR/DORL (w/2)

Mail Stop OWFN 8 81 Washington, DC 20555-0001 NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150