ML17229A187: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REGULATI!G INFORMATION DISTRIBUTIONISTEM
{{#Wiki_filter:CATEGORY 1 REGULATI!G INFORMATION DISTRIBUTIONISTEM .(RIDE)
.(RIDE)ACCESSION NBR:9701090061 DOC.DATE: 97/Ol/07 NOTARIZED:
ACCESSION NBR:9701090061           DOC.DATE:   97/Ol/07   NOTARIZED: NO           DOCKET  I FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power 6 Light Co.                   05000389 AUTH. NAME           AUTHOR AFFILIATION STALL,J.A.           Florida   Power 6 Light Co.
NO FACIL:50-389 St.Lucie Plant, Unit 2, Florida Power 6 Light Co.AUTH.NAME AUTHOR AFFILIATION STALL,J.A.
RECIP';NAME         RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
Florida Power 6 Light Co.RECIP';NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)DOCKET I 05000389


==SUBJECT:==
==SUBJECT:==
Responds to 961226 telcon request to clarify commitment for insulation removal on bolted connections in Class 1 systems a VT-2 visual examinations IAW w/paragraph (b)of Code Case N-533.DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:
Responds     to 961226 telcon request to clarify commitment for insulation removal on bolted connections in Class 1 systems a VT-2 visual examinations IAW w/paragraph           (b) of Code Case N-533.
Inservice/Testing/Relief from ASM Code-GL-89-04 NOTES: RECIPIENT ID CODE/NAME'D2-3 LA WIENS,L.INTERNAL: AC OCS-ABSTRACT RES/DET/EIB EXTERNAL: LITCO ANDERSON NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD2-3 PD AEOD/SPD/RAB NRR/DE/EMEB OGC/HDS3 RES/DET/EMMEB NOAC COPIES LTTR ENCL 1 1 0 D E N NOTE TO ALL"RIDS" RECIPIENTS:
DISTRIBUTION CODE: A047D       COPIES RECEIVED:LTR         ENCL       SIZE:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL.  
TITLE:   OR Submittal: Inservice/Testing/Relief from           ASM   Code GL-89-04 NOTES:
RECIPIENT           COPIES            RECIPIENT          COPIES ID CODE/NAME        LTTR ENCL        ID CODE/NAME       LTTR ENCL          0
          'D2-3   LA                             PD2-3 PD WIENS,L.
INTERNAL: AC                                       AEOD/SPD/RAB NRR/DE/EMEB OCS-ABSTRACT                      OGC/HDS3 RES/DET/EIB                            RES/DET/EMMEB EXTERNAL: LITCO ANDERSON                          NOAC                     1   1 NRC PDR D
E N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR             14   ENCL.


Florida Power&Light Company, P.O.Box128, Fort Pierce, FL34954-0128 January 7, 1997 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 L-97-4 10 CFR 50.4 10 CFR 50.55a Re: St.Lucie Unit 2 Docket No.50-389 Inservice-Inspection (ISI)Plan Second Ten-Year Interval ASME Code Case N-533-Su lement On November 19, 1996, pursuant to 10 CFR 50.55a, (Footnote 6)and 10 CFR 50.55a(a)(3), Florida Power and Light Company (FPL)requested approval to incorporate Code Case N-533, Alternative Requirements for VT-2 Visual Examination of Class I Insulated Pressure-Retaining Bolted Connections, Section XI, Division I, for use in the St.Lucie Unit 2 Ten-Year Inservice Inspection Program.The request was submitted by FPL letter L-96-304.In a telephone call on December 26, 1996, the NRC Project Manager for St.Lucie requested FPL to clarify its commitment for insulation removal on the bolted connections in Class 1 systems and VT-2 visual examinations in accordance with paragraph (b)of the Code Case.Each refueling outage, FPL will remove the insulation from the bolted connections in Class 1 systems and perform a VT-2 visual examination in accordance with paragraph (b)of the Code Case.The connections are not required to be pressurized during the visual examination and any evidence of leakage will be evaluated in accordance with IWA-5250.In addition to the requirements of paragraph (a)of the Code Case, the system pressure test and VT-2 visual examination with insulation installed on bolted joints at normal operating pressure and temperature (NOP/NOT)will include a 4-hour hold time and will be completed prior to returning the unit to service.Please contact us if there are any additional questions.
Florida Power & Light Company, P.O. Box128, Fort Pierce, FL34954-0128 January 7, 1997                             L-97-4 10 CFR 50.4 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:     St. Lucie Unit 2 Docket No. 50-389 Inservice-Inspection (ISI) Plan Second Ten- Year Interval ASME Code Case N-533 - Su         lement On November 19, 1996, pursuant to 10 CFR 50.55a, (Footnote 6) and 10 CFR 50.55a(a)(3),
Very truly yours, J.A, Stall Vice President St, Lucie Plant JAS/GRM cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant Ogoo~p 970i0900hi 970i07 PDR ADQCK 05000389 8 PDR an FPL Group company pgj I}}
Florida Power and Light Company (FPL) requested approval to incorporate Code Case N-533, I
Alternative Requirements for VT-2 Visual Examination of Class Insulated Pressure-Retaining Bolted Connections, Section XI, Division I, for use in the St. Lucie Unit 2 Ten-Year Inservice Inspection Program. The request was submitted by FPL letter L-96-304.
In a telephone call on December 26, 1996, the NRC Project Manager for St. Lucie requested FPL to clarify its commitment for insulation removal on the bolted connections in Class 1 systems and VT-2 visual examinations in accordance with paragraph (b) of the Code Case.
Each refueling outage, FPL will remove the insulation from the bolted connections in Class 1 systems and perform a VT-2 visual examination in accordance with paragraph (b) of the Code Case. The connections are not required to be pressurized during the visual examination and any evidence of leakage will be evaluated in accordance with IWA-5250. In addition to the requirements of paragraph (a) of the Code Case, the system pressure test and VT-2 visual examination with insulation installed on bolted joints at normal operating pressure and temperature (NOP/NOT) will include a 4-hour hold time and will be completed prior to returning the unit to service.
Please contact us   if there are any additional questions.
Very truly yours, J. A, Stall Vice President St, Lucie Plant JAS/GRM cc:       Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant Ogoo~p 970i0900hi 970i07 PDR     ADQCK     05000389 8                       PDR an FPL Group company
 
pgj I}}

Latest revision as of 20:57, 29 October 2019

Responds to 961226 Telcon Request to Clarify Commitment for Insulation Removal on Bolted Connections in Class 1 Systems & VT-2 Visual Examinations IAW W/Paragraph (B) of Code Case N-533
ML17229A187
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 01/07/1997
From: Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-97-4, NUDOCS 9701090061
Download: ML17229A187 (4)


Text

CATEGORY 1 REGULATI!G INFORMATION DISTRIBUTIONISTEM .(RIDE)

ACCESSION NBR:9701090061 DOC.DATE: 97/Ol/07 NOTARIZED: NO DOCKET I FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power 6 Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION STALL,J.A. Florida Power 6 Light Co.

RECIP';NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to 961226 telcon request to clarify commitment for insulation removal on bolted connections in Class 1 systems a VT-2 visual examinations IAW w/paragraph (b) of Code Case N-533.

DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: Inservice/Testing/Relief from ASM Code GL-89-04 NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0

'D2-3 LA PD2-3 PD WIENS,L.

INTERNAL: AC AEOD/SPD/RAB NRR/DE/EMEB OCS-ABSTRACT OGC/HDS3 RES/DET/EIB RES/DET/EMMEB EXTERNAL: LITCO ANDERSON NOAC 1 1 NRC PDR D

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL.

Florida Power & Light Company, P.O. Box128, Fort Pierce, FL34954-0128 January 7, 1997 L-97-4 10 CFR 50.4 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: St. Lucie Unit 2 Docket No. 50-389 Inservice-Inspection (ISI) Plan Second Ten- Year Interval ASME Code Case N-533 - Su lement On November 19, 1996, pursuant to 10 CFR 50.55a, (Footnote 6) and 10 CFR 50.55a(a)(3),

Florida Power and Light Company (FPL) requested approval to incorporate Code Case N-533, I

Alternative Requirements for VT-2 Visual Examination of Class Insulated Pressure-Retaining Bolted Connections,Section XI, Division I, for use in the St. Lucie Unit 2 Ten-Year Inservice Inspection Program. The request was submitted by FPL letter L-96-304.

In a telephone call on December 26, 1996, the NRC Project Manager for St. Lucie requested FPL to clarify its commitment for insulation removal on the bolted connections in Class 1 systems and VT-2 visual examinations in accordance with paragraph (b) of the Code Case.

Each refueling outage, FPL will remove the insulation from the bolted connections in Class 1 systems and perform a VT-2 visual examination in accordance with paragraph (b) of the Code Case. The connections are not required to be pressurized during the visual examination and any evidence of leakage will be evaluated in accordance with IWA-5250. In addition to the requirements of paragraph (a) of the Code Case, the system pressure test and VT-2 visual examination with insulation installed on bolted joints at normal operating pressure and temperature (NOP/NOT) will include a 4-hour hold time and will be completed prior to returning the unit to service.

Please contact us if there are any additional questions.

Very truly yours, J. A, Stall Vice President St, Lucie Plant JAS/GRM cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant Ogoo~p 970i0900hi 970i07 PDR ADQCK 05000389 8 PDR an FPL Group company