ML18032A066: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULATORY ORMATION DISTRIBUTION SYS 1 (RIDS)AGCESSION NBR:8302030403 DOC~DATE: 83/01/31 NOTARIZED:
{{#Wiki_filter:REGULATORY       ORMATION DISTRIBUTION SYS       1   (RIDS)
YESDOCKET FAOIL:50-387 Susquehanna Steam Electric Station~Uni,t ii Pennsylva 05000387 AUTH BYNAME AUTHOR AFFILIATION C U R T I S i N t 1'l e Pennsylvania Power 8 Light Co~tREC IP~NAME RECIPIENT AFFILIATION
AGCESSION NBR:8302030403                 DOC   DATE: 83/01/31   NOTARIZED: YES          DOCKET FAOIL:50-387 AUTH BYNAME        Susquehanna AUTHOR Steam
'SCHKENCEReA, Licensing Branch 2  
                                              ~
Electric Station~
AFFILIATION Uni,t ii   Pennsylva           05000387 C URT IS i N t 1'l e       Pennsylvania   Power 8 Light Co ~
tREC IP ~ NAME             RECIPIENT AFFILIATION
  'SCHKENCEReA,                 Licensing Branch     2


==SUBJECT:==
==SUBJECT:==
Application,to amend License NPF-14~consisting of;proposed Amend 18inevisii>g Items 2.Ag2,8.(2)8 2~Co(9)re post".fir ed loading initial test pr ogram, DISTRIBUTION
Application,to     amend License NPF-14~consisting of;proposed Amend     18inevisii>g Items 2.Ag2,8. (2) 8 2 ~ Co(9) re post".fir ed loading initial test pr ogram, DISTRIBUTION 'CODE: A046S COPIES RECEIVED:LTR l ENCL l                        SIZE .        ~,
'CODE: A046S COPIES RECEIVED:LTR ENCL SIZE~,.l l TITLE: OR Submittal'.
TITLE: OR Submittal'. TblI Action Plan Rgmt NUREG-0737 8 NUREG 0660'OTES 1cy NMSS/FCAF/PM ~                                                                       05000387 RECIPIENT        COPIES            RECIPIENT             :COPIES ID CODE/NAME         L'TTR ENCL       ID 'CODE/NAME         LTTR ENCL NRR L82 BC        01      7      7 INTERNAL: ELD/HDS4                         1      0    IE/DEP DIR     33          1             1 IE/DEP EPDS                1      1    IE/DEP/EPLB               "3 NRR PANLSON                1      1    NRR/DHFS/DEPY29                           1 NRR/DL DIR        10      1      1    NRR/DL/ADL     16         1              1 NRR/DL/ADOR        15      1      1    NRR/DL/ADSA 17                             j NRR/DL/DRAB        18      3      "3    NRR/DSI/ADRS 27             1 NRR/DS    I/AF8                    1    NRR/DS I/ASB               1              1 AB          1      1    NRR/DST DIR     30         1             j R        FI        0$      1       1   RGN1                        1             1 EXTERNAL'CRS                      30      10    10    FEMA REP DIV                1             1 INPOgJ,STARNES            1       1   LPDR            03          2              2 NRC PDR            02      1       1   NSIC            05          1             1 NT?8                        1       1 NOTE'S:
TblI Action Plan Rgmt NUREG-0737 8 NUREG 0660'OTES 1cy NMSS/FCAF/PM
,TOTAL NUMBER OF COPIES REQUIRED: LTTR                 47   ENCL   06
~RECIPIENT COPIES ID CODE/NAME L'TTR ENCL NRR L82 BC 01 7 7 RECIPIENT ID'CODE/NAME
:COPIES LTTR ENCL 05000387 INTERNAL: ELD/HDS4 IE/DEP EPDS NRR PANLSON NRR/DL DIR 10 NRR/DL/ADOR 15 NRR/DL/DRAB 18 NRR/DS I/AF8 AB R FI 0$EXTERNAL'CRS 30 INPOgJ,STARNES NRC PDR 02 NT?8 NOTE'S: 1 0 1 1 1 1 1 1 1 1 3"3 1 1 1 1 1 10 10 1 1 1 1 1 1 IE/DEP DIR 33 IE/DEP/EPLB NRR/DHFS/DEPY29 NRR/DL/ADL 16 NRR/DL/ADSA 17 NRR/DSI/ADRS 27 NRR/DS I/ASB NRR/DST DIR 30 RGN1 FEMA REP DIV LPDR 03 NSIC 05 1 1"3 1 1 1 j 1 1 1 1 j 1 1 1 1 2 2 1 1 ,TOTAL NUMBER OF COPIES REQUIRED: LTTR 47 ENCL 06 Pennsylvania Power 8 Light Company Two North Ninth Street~Allentown, PA 18101~215 I 770-5151 f Norman W.Curtis Vice President-Engineering 8 Construction-Nuclear 215/770-5381 p JAN 31 1983 Director of Nuclear Reactor Regulation Attention:
Mr.A.Schwencer, Chief Licensing Branch No.2 Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555 Docket No.50-387 FILE 841 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED AMENDMENT NO.18 TO LICENSE NO.NPF-14 ER 100450 PLA-1501


==Dear Mr.Schwencer:==
Pennsylvania Power              8  Light Company Two North Ninth Street ~ Allentown, PA 18101 ~ 215 I 770-5151 f
Norman W. Curtis Vice President-Engineering 8 Construction-Nuclear 215 / 770-5381 p
JAN 31 1983 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D. C. 20555                                            Docket No. 50-387 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED AMENDMENT NO. 18 TO LICENSE NO. NPF-14 ER  100450                            FILE 841 PLA  1501


The purpose of this letter is to request a change to Items 2.A, 2.B.2 and 2.Cs9 of License No.NPF-14.These License Conditions should read as follows: 2.A This license applies to the Susquehanna Steam Electric Station, Unit 1, a boiling water nuclear reactor and associated equipment (the facility), owned by the licenses.The facility is located in Luzerne County, Pennsylvania, and is described in the licensees'inal Safety Analysis Report as supplemented and amended through Amendment 53, and the licensees'nvironmental Report as supplemented and amended through Amendment 53.2.B.(2)PP&L, pursuant to the Act of 10 CFR Part 70, to receive, possess, and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as s'upplemented and amended through Amendment 53;2.C.(9)Initial Test Pro ram (Section 14 SER SSER/I1 pp&L shall oonduot the post-fuel-loading initial test pxogram jgd/Gd.st (set forth in Section 14 of the licensee's Final Safety yO Analysis Report, as amended through Amendment 53)without~y300'aking any major modifications of this program unless modifications have been identified and have received prior NRC approval.Major modifications are defined as: 8302030403 830i3i PDR ADOCK 05000387 P , PDR JAN 31 1983 (a)Elimination of any test identified as essential in Section 14 of the licensees'inal Safety Analysis Report, as amended through Amendment 53;(b)Modifications of test objectives, methods or acceptance criteria for any test identified as essential in Section 14 of the Licensee's Final Safety Analysis Report, as amended through Amendment 53;(c)Performance of any test at a power level different from that described in the program;and (d)Failure to complete any tests included in the described program (planned or scheduled for power levels up to the authorized power level).The justification for these changes are contained in the letters which transmitted the amendments to the staff.The letters are as follows: Amendment No.49-PLA-1183, dated 7/9/82 contains Revision No.31 to the FSAR.Amendment No.50-PLA-1196, dated 7/13/82 contains Revision No.L to the Security Plan.Amendment No.51-PLA-1355, dated 10/25/82 contains Revision No.M to the Security Plan.Amendment No.52-dated ll/2/82 contains Revision No.6 to the Emergency Plan.*Amendment No.53-PLA-1434, dated 12/17/82 contains Revision No.32 to the FSAR.The proposed change has been'etermined to be Class IV in nature and the appropriate fee is enclosed.Very truly yours, N.W.Curtis Vice President-Engineering and Construction
==Dear Mr. Schwencer:==
-Nuclear cc: R.L.Perch-NRC BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of PENNSYLVANIA POWER&LIGHT COMPANY Docket No.50-387 AMENDMENT NO.18 FACILITY OPERATING LICENSE NO.NPF-14 SUSQUEHANNA STEAM ELECTRIC STATION UNIT NO.1 Licensee, Pennsylvania Power&Light Company, hereby files Amendment No.18 to its Facility Operating License No.NPF-14 dated July 17, 1982.This amendment contains revisions to Items 2.A, 3.B.2 and 2.C.9 of the Facility Operating License.PENNSYLVANIA POWER&LIGHT COMPANY BY: N.W.Curtis Vice President-Engineering and Construction
 
-Nuclear dworg,g.e sobscrdbed before me this+f, 1983.w.g r Notary'.Public MAATHA C.'-BAR/0; Notary Pubfid AIlentow'n, Lehiph County, Pa.My Commission Expires Jan,13,198ti}}
The purpose       of this letter is to request         a change to Items 2.A, 2.B.2 and 2.Cs9   of License     No. NPF-14.     These License Conditions should read as follows:
2.A           This license applies to the Susquehanna Steam Electric Station, Unit 1, a boiling water nuclear reactor and associated equipment (the facility), owned by the licenses.
The facility is located in Luzerne County, Pennsylvania, and is described in the licensees'inal Safety Analysis Report as supplemented and amended through Amendment 53, and the licensees'nvironmental Report as supplemented and amended through Amendment 53.
2.B. (2)       PP&L, pursuant to the Act of 10 CFR Part 70, to receive, possess, and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as s'upplemented and amended through Amendment 53; 2.C.(9)       Initial Test   Pro ram (Section 14           SER   SSER /I1 pp&L shall oonduot the post-fuel-loading initial test pxogram           jgd         /Gd.st (set forth in Section 14 of the licensee's Final Safety                                     yO Analysis Report, as amended through Amendment 53) without any major modifications of this program unless
                                                                                                      ~y300'aking modifications have been identified and have received prior NRC approval. Major modifications are defined as:
8302030403     830i3i PDR ADOCK   05000387 P   ,
PDR
 
JAN 31 1983 (a) Elimination of any test identified as essential in Section 14 of the licensees'inal Safety Analysis Report, as amended through Amendment 53; (b) Modifications of test objectives, methods or acceptance criteria for any test identified as essential in Section 14 of the Licensee's Final Safety Analysis Report, as amended   through Amendment 53; (c) Performance of any   test at a power level different from that described in the program; and (d) Failure to complete any tests included in the described program (planned or scheduled for power levels up to the authorized power level).
The justification for   these changes are contained in the letters which transmitted the   amendments   to the staff. The letters are as follows:
Amendment No. 49 PLA-1183, dated 7/9/82       contains Revision No. 31 to the FSAR.
Amendment No. 50 PLA-1196, dated 7/13/82 contains       Revision No. L to the Security Plan.
Amendment No. 51 PLA-1355, dated       10/25/82 contains Revision No. M to the Security Plan.
Amendment No. 52 dated     ll/2/82 contains Revision No. 6 to the Emergency Plan.
* Amendment No. 53 PLA-1434, dated 12/17/82       contains Revision No. 32 to the FSAR.
The proposed   change has been'etermined     to be Class IV in nature and the appropriate fee is enclosed.
Very   truly yours, N. W. Curtis Vice President Engineering and Construction Nuclear cc: R. L. Perch     NRC
 
BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of PENNSYLVANIA POWER &                             Docket No. 50-387 LIGHT COMPANY AMENDMENT NO. 18 FACILITY OPERATING LICENSE NO. NPF-14 SUSQUEHANNA STEAM ELECTRIC STATION UNIT NO. 1 Licensee, Pennsylvania Power & Light Company, hereby files Amendment No.               18 to its Facility Operating License No. NPF-14 dated July 17, 1982.
This amendment contains revisions to Items 2.A, 3.B.2 and 2.C.9 of the Facility Operating License.
PENNSYLVANIA POWER & LIGHT COMPANY BY:
this+
r f,
dworg,g.e           sobscrdbed w.g Notary'. Public MAATHAC.'-BAR/0; Notary Pubfid AIlentow'n, Lehiph County, Pa.
before 1983 .
me N. W. Curtis Vice President  Engineering and Construction  Nuclear My Commission Expires Jan,13,198ti}}

Latest revision as of 00:07, 22 October 2019

Application to Amend License NPF-14,consisting of Proposed Amend 18,revising Items 2.A,2.B.(2) & 2.C.(9) Re post-fuel Loading Initial Test Program
ML18032A066
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 01/31/1983
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
PLA-1501, NUDOCS 8302030403
Download: ML18032A066 (4)


Text

REGULATORY ORMATION DISTRIBUTION SYS 1 (RIDS)

AGCESSION NBR:8302030403 DOC DATE: 83/01/31 NOTARIZED: YES DOCKET FAOIL:50-387 AUTH BYNAME Susquehanna AUTHOR Steam

~

Electric Station~

AFFILIATION Uni,t ii Pennsylva 05000387 C URT IS i N t 1'l e Pennsylvania Power 8 Light Co ~

tREC IP ~ NAME RECIPIENT AFFILIATION

'SCHKENCEReA, Licensing Branch 2

SUBJECT:

Application,to amend License NPF-14~consisting of;proposed Amend 18inevisii>g Items 2.Ag2,8. (2) 8 2 ~ Co(9) re post".fir ed loading initial test pr ogram, DISTRIBUTION 'CODE: A046S COPIES RECEIVED:LTR l ENCL l SIZE . ~,

TITLE: OR Submittal'. TblI Action Plan Rgmt NUREG-0737 8 NUREG 0660'OTES 1cy NMSS/FCAF/PM ~ 05000387 RECIPIENT COPIES RECIPIENT :COPIES ID CODE/NAME L'TTR ENCL ID 'CODE/NAME LTTR ENCL NRR L82 BC 01 7 7 INTERNAL: ELD/HDS4 1 0 IE/DEP DIR 33 1 1 IE/DEP EPDS 1 1 IE/DEP/EPLB "3 NRR PANLSON 1 1 NRR/DHFS/DEPY29 1 NRR/DL DIR 10 1 1 NRR/DL/ADL 16 1 1 NRR/DL/ADOR 15 1 1 NRR/DL/ADSA 17 j NRR/DL/DRAB 18 3 "3 NRR/DSI/ADRS 27 1 NRR/DS I/AF8 1 NRR/DS I/ASB 1 1 AB 1 1 NRR/DST DIR 30 1 j R FI 0$ 1 1 RGN1 1 1 EXTERNAL'CRS 30 10 10 FEMA REP DIV 1 1 INPOgJ,STARNES 1 1 LPDR 03 2 2 NRC PDR 02 1 1 NSIC 05 1 1 NT?8 1 1 NOTE'S:

,TOTAL NUMBER OF COPIES REQUIRED: LTTR 47 ENCL 06

Pennsylvania Power 8 Light Company Two North Ninth Street ~ Allentown, PA 18101 ~ 215 I 770-5151 f

Norman W. Curtis Vice President-Engineering 8 Construction-Nuclear 215 / 770-5381 p

JAN 31 1983 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Docket No. 50-387 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED AMENDMENT NO. 18 TO LICENSE NO. NPF-14 ER 100450 FILE 841 PLA 1501

Dear Mr. Schwencer:

The purpose of this letter is to request a change to Items 2.A, 2.B.2 and 2.Cs9 of License No. NPF-14. These License Conditions should read as follows:

2.A This license applies to the Susquehanna Steam Electric Station, Unit 1, a boiling water nuclear reactor and associated equipment (the facility), owned by the licenses.

The facility is located in Luzerne County, Pennsylvania, and is described in the licensees'inal Safety Analysis Report as supplemented and amended through Amendment 53, and the licensees'nvironmental Report as supplemented and amended through Amendment 53.

2.B. (2) PP&L, pursuant to the Act of 10 CFR Part 70, to receive, possess, and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as s'upplemented and amended through Amendment 53; 2.C.(9) Initial Test Pro ram (Section 14 SER SSER /I1 pp&L shall oonduot the post-fuel-loading initial test pxogram jgd /Gd.st (set forth in Section 14 of the licensee's Final Safety yO Analysis Report, as amended through Amendment 53) without any major modifications of this program unless

~y300'aking modifications have been identified and have received prior NRC approval. Major modifications are defined as:

8302030403 830i3i PDR ADOCK 05000387 P ,

PDR

JAN 31 1983 (a) Elimination of any test identified as essential in Section 14 of the licensees'inal Safety Analysis Report, as amended through Amendment 53; (b) Modifications of test objectives, methods or acceptance criteria for any test identified as essential in Section 14 of the Licensee's Final Safety Analysis Report, as amended through Amendment 53; (c) Performance of any test at a power level different from that described in the program; and (d) Failure to complete any tests included in the described program (planned or scheduled for power levels up to the authorized power level).

The justification for these changes are contained in the letters which transmitted the amendments to the staff. The letters are as follows:

Amendment No. 49 PLA-1183, dated 7/9/82 contains Revision No. 31 to the FSAR.

Amendment No. 50 PLA-1196, dated 7/13/82 contains Revision No. L to the Security Plan.

Amendment No. 51 PLA-1355, dated 10/25/82 contains Revision No. M to the Security Plan.

Amendment No. 52 dated ll/2/82 contains Revision No. 6 to the Emergency Plan.

  • Amendment No. 53 PLA-1434, dated 12/17/82 contains Revision No. 32 to the FSAR.

The proposed change has been'etermined to be Class IV in nature and the appropriate fee is enclosed.

Very truly yours, N. W. Curtis Vice President Engineering and Construction Nuclear cc: R. L. Perch NRC

BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of PENNSYLVANIA POWER & Docket No. 50-387 LIGHT COMPANY AMENDMENT NO. 18 FACILITY OPERATING LICENSE NO. NPF-14 SUSQUEHANNA STEAM ELECTRIC STATION UNIT NO. 1 Licensee, Pennsylvania Power & Light Company, hereby files Amendment No. 18 to its Facility Operating License No. NPF-14 dated July 17, 1982.

This amendment contains revisions to Items 2.A, 3.B.2 and 2.C.9 of the Facility Operating License.

PENNSYLVANIA POWER & LIGHT COMPANY BY:

this+

r f,

dworg,g.e sobscrdbed w.g Notary'. Public MAATHAC.'-BAR/0; Notary Pubfid AIlentow'n, Lehiph County, Pa.

before 1983 .

me N. W. Curtis Vice President Engineering and Construction Nuclear My Commission Expires Jan,13,198ti