IR 05000271/2011011: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 12/22/2011 | | issue date = 12/22/2011 | ||
| title = Official Exhibit - NYS000459-00-BD01 - IR 05000271-11-011; 10/17/2011 - 12/11/2011; Vermont Yankee Nuclear Power Station; Review of License Renewal Activities. | | title = Official Exhibit - NYS000459-00-BD01 - IR 05000271-11-011; 10/17/2011 - 12/11/2011; Vermont Yankee Nuclear Power Station; Review of License Renewal Activities. | ||
| author name = Conte R | | author name = Conte R | ||
| author affiliation = NRC/RGN-III/DRS/EB1 | | author affiliation = NRC/RGN-III/DRS/EB1 | ||
| addressee name = Wamser C | | addressee name = Wamser C | ||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:==SUBJECT:== | ||
VERMONT YANKEE NUCLEAR POWER STATION - NRC INTEGRATED INSPECTION REPORT 0500027 1 t2ol 1 01 1 | |||
==Dear Mr. Wamser:== | ==Dear Mr. Wamser:== | ||
Revision as of 13:59, 20 June 2019
| ML15331A160 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee |
| Issue date: | 12/22/2011 |
| From: | Conte R NRC/RGN-III/DRS/EB1 |
| To: | Wamser C Entergy Nuclear Operations |
| SECY RAS | |
| References | |
| RAS 23737, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01 IR-11-011 | |
| Download: ML15331A160 (12) | |
Text
SUBJECT:
VERMONT YANKEE NUCLEAR POWER STATION - NRC INTEGRATED INSPECTION REPORT 0500027 1 t2ol 1 01 1
Dear Mr. Wamser:
on october 20,2011, the U.S. NuclearRegulatory Commission (NRC) completed an inspection at the Vermont Yankee Nuclear Power Staiion. the enctosed report documbnts the results ofthe inspection, which were discussed on october 20, and December z 2011, wrth you and other members of your staff.This inspection was an examination of activities under your renewed operating license related to the completion of commitments made during the renewed lic"nre apptication f,rocess and compliance with the conditions of your licenie. Under the renewed operating license, entry into the period of extended opelations is planned for March 22,2012. Th; inap;tion was directed toward those activities and facilities accessible during the refueling outate. -witnin these areas,the inspection involved examination of selected proc6dur"s and representative records, observations of activities, and interviews with personnel.
on the basis of the samples selected for review, there were no findings identified during this inspection'
We plan to continue to review Commitment Nos. 6, 12,aid 2s, along with your process for commitment change management during future planned license renewal team inspections, prior to March 22.20112. tn accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/Z,tr*J>M Richard J. Conte, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-271 License No. DPR-28 Enclosure:
NRC lnspection Report 0500027 1 1201 101 1 cc w/enclosure:
Distribution via ListServ