Line 3: |
| | issue date = 12/22/2015 | | | issue date = 12/22/2015 |
| | title = Transmittal of Duke Energy Carolinas Physical Security Plan, Revision 22 | | | title = Transmittal of Duke Energy Carolinas Physical Security Plan, Revision 22 |
| | author name = Nolan M C | | | author name = Nolan M |
| | author affiliation = Duke Energy Carolinas, LLC | | | author affiliation = Duke Energy Carolinas, LLC |
| | addressee name = | | | addressee name = |
|
---|
Category:Letter type:RA
MONTHYEARRA-23-0242, Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2)2024-01-10010 January 2024 Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX2024-01-0808 January 2024 Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX RA-23-0295, Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval2024-01-0404 January 2024 Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval RA-23-0320, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency2023-12-14014 December 2023 Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency RA-23-0306, Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of.2023-12-12012 December 2023 Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0288, End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report2023-11-16016 November 2023 End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report RA-23-0182, Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency2023-11-16016 November 2023 Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0304, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0)2023-11-14014 November 2023 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0) RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power2023-11-0202 November 2023 Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0275, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-10-12012 October 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-23-0268, Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan2023-09-29029 September 2023 Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan RA-23-0234, Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS)2023-09-28028 September 2023 Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS) RA-23-0230, Refuel 27 (C1 R27) Inservice Inspection (ISI) Report2023-09-25025 September 2023 Refuel 27 (C1 R27) Inservice Inspection (ISI) Report RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes2023-09-20020 September 2023 Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes RA-23-0228, Registration for Use of General License Spent Fuel Cask Number 1752023-09-14014 September 2023 Registration for Use of General License Spent Fuel Cask Number 175 RA-23-0215, Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks2023-08-28028 August 2023 Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks RA-23-0222, On-Shift Staffing Analysis (Ossa), Revision 12023-08-23023 August 2023 On-Shift Staffing Analysis (Ossa), Revision 1 RA-23-0223, Registration for Use of General License Spent Fuel Cask Numbers 173 and 1742023-08-23023 August 2023 Registration for Use of General License Spent Fuel Cask Numbers 173 and 174 RA-23-0211, Reply to a Notice of Violation (NOV) 05000270/2023010-022023-08-17017 August 2023 Reply to a Notice of Violation (NOV) 05000270/2023010-02 RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0186, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3)2023-07-18018 July 2023 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3) RA-23-0184, Registration for Use of General License Spent Fuel Cask Numbers 171 and 1722023-07-10010 July 2023 Registration for Use of General License Spent Fuel Cask Numbers 171 and 172 RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0127, 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record2023-06-28028 June 2023 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record RA-23-0146, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-06-20020 June 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-18-0007, License Amendment Application to Revise Control Room Cooling Technical Specifications2023-06-19019 June 2023 License Amendment Application to Revise Control Room Cooling Technical Specifications RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory2023-06-0707 June 2023 Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-30030 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations RA-23-0128, Refuel 32 (O1R32) Steam Generator Tube Inspection Report2023-05-18018 May 2023 Refuel 32 (O1R32) Steam Generator Tube Inspection Report RA-23-0105, Duke Energy Carolinas, LLC (Duke Energy) - Core Operating Limits Report (COLR) for Unit 1 Cycle 28 Reload Core2023-05-0404 May 2023 Duke Energy Carolinas, LLC (Duke Energy) - Core Operating Limits Report (COLR) for Unit 1 Cycle 28 Reload Core RA-23-0018, Relief Request (RA-23-0018) to Utilize Code Case N-853 PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress Corrosion Cracking Section XI, Division 12023-05-0404 May 2023 Relief Request (RA-23-0018) to Utilize Code Case N-853 PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress Corrosion Cracking Section XI, Division 1 RA-23-0118, Cycle 29, Revision 1, Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 29, Revision 1, Core Operating Limits Report (COLR) RA-23-0117, Report of Changes to Duke Energy McGuire Emergency Plan Annex2023-05-0101 May 2023 Report of Changes to Duke Energy McGuire Emergency Plan Annex RA-23-0111, Withdrawal of License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-04-27027 April 2023 Withdrawal of License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.462023-04-26026 April 2023 Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 20222023-04-26026 April 2023 Duke Energy Annual Radiological Environmental Operating Report - 2022 RA-23-0104, Response to Request for Additional Information (RAI) Regarding Oconee Unit 3, Refuel 31 (O3R31) Steam Generator Tube Inspection Report2023-04-26026 April 2023 Response to Request for Additional Information (RAI) Regarding Oconee Unit 3, Refuel 31 (O3R31) Steam Generator Tube Inspection Report RA-23-0099, Subsequent License Renewal Application Second Annual Amendment to the License Renewal Application2023-04-25025 April 2023 Subsequent License Renewal Application Second Annual Amendment to the License Renewal Application RA-23-0046, Annual Radioactive Effluent Release Report - 20222023-04-24024 April 2023 Annual Radioactive Effluent Release Report - 2022 RA-23-0042, Submittal of Updated Final Safety Analysis Report (Revision 23), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, 10 CFR 50.59 Evaluation Summary Report, and Notification of a Commitment Change2023-04-24024 April 2023 Submittal of Updated Final Safety Analysis Report (Revision 23), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, 10 CFR 50.59 Evaluation Summary Report, and Notification of a Commitment Change RA-23-0091, Submittal of Emergency Action Level (EAL) Technical Basis Document, Revision 42023-04-13013 April 2023 Submittal of Emergency Action Level (EAL) Technical Basis Document, Revision 4 RA-22-0292, License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-04-0404 April 2023 License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies RA-23-0039, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2023-03-30030 March 2023 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-23-0036, Biennial Decommissioning Financial Assurance Reports2023-03-30030 March 2023 Biennial Decommissioning Financial Assurance Reports RA-23-0040, Onsite Property Insurance Coverage2023-03-30030 March 2023 Onsite Property Insurance Coverage RA-23-0037, Duke Energy - Decommissioning Funding Plan for Independent Spent Fuel Storage Installations (Isfsis)2023-03-30030 March 2023 Duke Energy - Decommissioning Funding Plan for Independent Spent Fuel Storage Installations (Isfsis) 2024-01-08
[Table view] |
Text
M. Christopher Nolan526 South Church Street u DUKE SAFEGUARDS INFORMATION Charlotte, NC 28202 SENERGY, When separated, this page is decontrolled.
Mailing Address: Mail Code EC2ZF/P.O.
Box 1.006 Charlotte, NC 28201-1006 704-382-7426 10 CFR 50.4 10 CFR 50.54(p)10 CER 72.44(e)10 CER 72.186(b)December 22, 2015 RA-1 5-0054 ATTN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 OCONEE NUCLEAR STATION UNITS 1, 2 AND 3 DOCKET NOS. 50-269, 50-270 AND 50-287 LICENSE NOS. DPR-38, DPR-47 AND DPR-55 OCONEE INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-04 LICENSE NO. SNM-2503MCGU IRE NUCLEAR STATION UNITS 1 AND 2 DOCKET NOS. 50-369 AND 50-370 LICENSE NOS. NPF-9 AND NPF-1 7 MCGUIRE INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-38 CATAWBA NUCLEAR STATION UNITS 1 AND 2 DOCKET NOS. 50-413 AND 50-414 LICENSE NOS. NPF-35 AND NPF-52 CATAWBA INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-45
SUBJECT:
TRANSMITTAL OF DUKE ENERGY CAROLINAS PHYSICAL SECURITY PLAN, REVISION 22 In accordance with 10 CFR 50.4(b)(4)(iii), 10 CFR 50.54(p)(2) and 10 CER 72.44(e), Duke Energy Carolinas provides notification that the Duke Energy- Catawba, McGuire and Oconee SAFEGUARDS INFORMATION When separated, this page is decontrolled.'
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission RA-1 5-0054 Page 2 Site Physical Security Plan, has been revised. The effective date of implementation for Revision 22 is November 2, 2015.An evaluation of the plan revision in accordance with 10 CFR 50.54(p)(2) and 10 CFR 72.44(e)has determined that the changes incorporated do not decrease the overall level of physical protection programs and security organization performance objectives and requirements as described in paragraphs (b) through (q) of 10 CFR 73.55 and 10 CFR 72.212(b)(9).
This letter includes two enclosures which contain Safeguards Information as defined in 10 CFR 73.2 and must be protected from unauthorized disclosure in accordance with 10 CFR 73.21. Enclosure 1 contains a summary description of the Physical Security Plan revision changes. Enclosure 2 contains a copy of the Duke Energy -Catawba, McGuire and Oconee Site Physical Security Plan, Revision 22.
There are no new regulatory commitments made in this submittal.
Should there be any questions regarding this submittal, please contact Art Zaremba at (980) 373-2062.Sincerely, M. Christopher Nolan, Director Nuclear Regulatory Affairs
Enclosures:
- 1. Summary Description of Changes [SAFEGUARDS INFORMATION]
- 2. Copy of Duke Energy -Catawba, McGuire and Oconee Site Physical Security Plan, Revision 22 (composite)
[SAFEGUARDS INFORMATION]
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
SAFEG UARDS I NFORMATIO N When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission RA-1 5-00 54 Page 3 xc: (wi enclosures)
[SAFEGUARDS INFORMATION]
U.S. Nuclear Regulatory Commission
-Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 xc: (w/o enclosures)
E. G. Miller, NRR Project Manager (CNS & MNS)U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 8G9A Rockville, MD 20852-2738 R. Hall, NRR Project Manager (ONS)U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 8 B1 Rockville, MD 20852-2738 E. L. Crowe NRC Senior Resident Inspector Oconee Nuclear Station J. Zeiler NRC Senior Resident Inspector McGuire Nuclear Station G. A. Hutto NRC Senior Resident Inspector Catawba Nuclear Station SAFEGUARDS INFORMATION When separated, this page is decontrolled.
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission RA-1 5-0054 Page 4 bxc: (w/o enclosures)E.T. O'Neil T.W. King M.C. Nolan A.H. Zaremba T.J. Wadsworth J.L. Vaughan ELL File: (Corporate)
K.M. Kinard J.N. Robertson K.L. Crane (For MNS Licensing/Nuclear Records)MNS Master File 801.01 -MG02DM S.D. West C.A. Fletcher T.K. Pasour (For CNS Licensing/Nuclear Records)CNS Master File 801.01 -CN04DM R.K. Robinson C.J. Wasik J.E. Smith (For ONS Licensing/Nuclear Records)ONS Master File 801.01 -ON03DM SAFEGUARDS INFORMATION When separated, this page is decontrolled.
M. Christopher Nolan526 South Church Street u DUKE SAFEGUARDS INFORMATION Charlotte, NC 28202 SENERGY, When separated, this page is decontrolled.
Mailing Address: Mail Code EC2ZF/P.O.
Box 1.006 Charlotte, NC 28201-1006 704-382-7426 10 CFR 50.4 10 CFR 50.54(p)10 CER 72.44(e)10 CER 72.186(b)December 22, 2015 RA-1 5-0054 ATTN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 OCONEE NUCLEAR STATION UNITS 1, 2 AND 3 DOCKET NOS. 50-269, 50-270 AND 50-287 LICENSE NOS. DPR-38, DPR-47 AND DPR-55 OCONEE INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-04 LICENSE NO. SNM-2503MCGU IRE NUCLEAR STATION UNITS 1 AND 2 DOCKET NOS. 50-369 AND 50-370 LICENSE NOS. NPF-9 AND NPF-1 7 MCGUIRE INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-38 CATAWBA NUCLEAR STATION UNITS 1 AND 2 DOCKET NOS. 50-413 AND 50-414 LICENSE NOS. NPF-35 AND NPF-52 CATAWBA INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-45
SUBJECT:
TRANSMITTAL OF DUKE ENERGY CAROLINAS PHYSICAL SECURITY PLAN, REVISION 22 In accordance with 10 CFR 50.4(b)(4)(iii), 10 CFR 50.54(p)(2) and 10 CER 72.44(e), Duke Energy Carolinas provides notification that the Duke Energy- Catawba, McGuire and Oconee SAFEGUARDS INFORMATION When separated, this page is decontrolled.'
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission RA-1 5-0054 Page 2 Site Physical Security Plan, has been revised. The effective date of implementation for Revision 22 is November 2, 2015.An evaluation of the plan revision in accordance with 10 CFR 50.54(p)(2) and 10 CFR 72.44(e)has determined that the changes incorporated do not decrease the overall level of physical protection programs and security organization performance objectives and requirements as described in paragraphs (b) through (q) of 10 CFR 73.55 and 10 CFR 72.212(b)(9).
This letter includes two enclosures which contain Safeguards Information as defined in 10 CFR 73.2 and must be protected from unauthorized disclosure in accordance with 10 CFR 73.21. Enclosure 1 contains a summary description of the Physical Security Plan revision changes. Enclosure 2 contains a copy of the Duke Energy -Catawba, McGuire and Oconee Site Physical Security Plan, Revision 22.
There are no new regulatory commitments made in this submittal.
Should there be any questions regarding this submittal, please contact Art Zaremba at (980) 373-2062.Sincerely, M. Christopher Nolan, Director Nuclear Regulatory Affairs
Enclosures:
- 1. Summary Description of Changes [SAFEGUARDS INFORMATION]
- 2. Copy of Duke Energy -Catawba, McGuire and Oconee Site Physical Security Plan, Revision 22 (composite)
[SAFEGUARDS INFORMATION]
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
SAFEG UARDS I NFORMATIO N When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission RA-1 5-00 54 Page 3 xc: (wi enclosures)
[SAFEGUARDS INFORMATION]
U.S. Nuclear Regulatory Commission
-Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 xc: (w/o enclosures)
E. G. Miller, NRR Project Manager (CNS & MNS)U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 8G9A Rockville, MD 20852-2738 R. Hall, NRR Project Manager (ONS)U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 8 B1 Rockville, MD 20852-2738 E. L. Crowe NRC Senior Resident Inspector Oconee Nuclear Station J. Zeiler NRC Senior Resident Inspector McGuire Nuclear Station G. A. Hutto NRC Senior Resident Inspector Catawba Nuclear Station SAFEGUARDS INFORMATION When separated, this page is decontrolled.
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission RA-1 5-0054 Page 4 bxc: (w/o enclosures)E.T. O'Neil T.W. King M.C. Nolan A.H. Zaremba T.J. Wadsworth J.L. Vaughan ELL File: (Corporate)
K.M. Kinard J.N. Robertson K.L. Crane (For MNS Licensing/Nuclear Records)MNS Master File 801.01 -MG02DM S.D. West C.A. Fletcher T.K. Pasour (For CNS Licensing/Nuclear Records)CNS Master File 801.01 -CN04DM R.K. Robinson C.J. Wasik J.E. Smith (For ONS Licensing/Nuclear Records)ONS Master File 801.01 -ON03DM SAFEGUARDS INFORMATION When separated, this page is decontrolled.