{{#Wiki_filter:WASHINGTON STATE 9 lJNIVERSI1Y August 20, 2018 Document Control Desk Nuclear Science Center U.S. Nuclear Regulatory Commission Washington DC, 20555 Re: Docket No. 50-27; Facility License R-76 The Annual Report for the WSU facility, License R-76, Docket 50-27, prepared by C. Corey Hines, Associate Director and Reactor Supervisor of the WSU Facility, is hereby submitted.
{{#Wiki_filter:WASHINGTON STATE 9   lJNIVERSI1Y Nuclear Science Center August 20, 2018 Document Control Desk U.S. Nuclear Regulatory Commission Washington DC, 20555 Re: Docket No. 50-27; Facility License R-76 The Annual Report for the WSU facility, License R-76, Docket 50-27, prepared by C. Corey Hines, Associate Director and Reactor Supervisor of the WSU Facility, is hereby submitted. The report covers the operating period July 1, 2017 through June 30, 2018.
The report covers the operating period July 1, 2017 through June 30, 2018. Respectfully Submitted, Donald Wall, Ph.D. Director Enclosure Cc: C.C. Hines PO Box 641300, Pullman, WA 99164-1 300 509-335-8641 I nsc.or.wsu.edu WASHINGTON STATE UNIVERSITY TRIGA REACTOR FACILITY LICENSE R-76 FOR THE REPORTING PERIOD JULY 1, 2017 TO JUNE 30, 2018 NUCLEAR SCIENCE CENTER I Washington State University, Pullman, WA 201 8 Annual Report TABLE OF CONTENTS 1. Narrative Summary of the Year's Operation  
Respectfully Submitted, Donald Wall, Ph.D.
.................................................................
Director Enclosure Cc: C.C. Hines PO Box 641300, Pullman, WA 99164-1 300 509-335-8641 I nsc.or.wsu.edu
2 2. Energy and Cumulative Output .....................................................................................
 
2 3. Emergency Shutdowns and Inadvertent Scrams ...........................................................
WASHINGTON STATE UNIVERSITY TRIGA REACTOR FACILITY LICENSE R-76 FOR THE REPORTING PERIOD JULY 1, 2017 TO JUNE 30, 2018 NUCLEAR SCIENCE CENTER I Washington State University, Pullman, WA
2 4. Major Maintenance  
 
.........................................................................................................
201 8 Annual Report TABLE OF CONTENTS
3 5. Changes, Tests, and Experiments Performed Under 10 CFR.50.59 Criteria ..............
: 1. Narrative Summary of the Year's Operation ................................................................. 2
4 6. Radioactive Effluent Discharges  
: 2. Energy and Cumulative Output ..................................................................................... 2
....................................................................................
: 3. Emergency Shutdowns and Inadvertent Scrams ........................................................... 2
4 7. Personnel and Visitor Radiation Doses .........................................................................
: 4. Major Maintenance ......................................................................................................... 3
5 8. Reactor Facility Radiation and Contamination Levels ..................................................
: 5. Changes, Tests, and Experiments Performed Under 10 CFR.50.59 Criteria .............. 4
6 9. Environmental Monitoring Program ..............................................................................
: 6. Radioactive Effluent Discharges .................................................................................... 4
8 Washington State University Nuclear Science Center 2018 Annual Report 1. Narrative Summary of Operation for Fiscal Year 2018 A. Operating Experience Core 3 SA has accumulated 9,486 MWH from beginning of life (BOL) through June 30, 2018. During the reporting period of July l, 2017 to June 30, 2018, a total of l, 186 samples were irradiated, for 12,386 user-hours.
: 7. Personnel and Visitor Radiation Doses ......................................................................... 5
Additionally, 18 pulses greater than $1.00 of reactivity addition were performed during the reporting period. The quarterly operations summaries are shown in Table I. I B. Changes in Facility Design, Performance Characteristics, and Operating Procedures Related to Reactor Safety. No changes in design, performance characteristics, or operating procedures have occurred during the reporting period. C. Results of Surveillance Tests and Requirements All surveillance tests and requirements were performed and completed within the prescribed time period. 2. Energy and Cumulative Output The quarterly operations summaries are given in Table I. The cumulative energy output since the 1967 TRIGA fuel core was put in to service is l ,673 megawatt days (MWD). The mixed Standard Fuel and 30/20 LEU Fuel Core 35A installed in 2008 has accumulated 443 MWD. Table I Fiscal Year 2017 Summary of Reactor Operation 1 Q3 2017 Q4 2017 Q'l 2018 0.2 2018 totals Hours of Operation 354 364 380 328 1,426 Meqawatt Hours 305 307 300 238 l, 149 No. of Sample Irradiations 109 65 51 75 300 No. of Sam pies 382 227 202 375 l, l 86 No. of Commercial Irradiations 36 31 34 34 135 User Hours 3,149 3,070 3,481 2,685 12,386 No. of Pulses > $1 .00 7 8 4 l l 8 3. Emergency Shutdowns and Inadvertent Scrams There were no emergency shutdowns or unplanned shutdown periods that occurred during the reporting period. The dates and causes of the eight inadvertent scrams are listed in Table II. No scrams were due to exceeding the limiting safety system setting or safety limit. ' Number of samples and sample irradiations do not include commercial irradiations.
: 8. Reactor Facility Radiation and Contamination Levels .................................................. 6
User hours denotes the total user hours, including commercial irradiations.
: 9. Environmental Monitoring Program .............................................................................. 8 Washington State University Nuclear Science Center
Washington State University Nuclear Science Center 2 /,
 
2018 Annual Report Date 8/14/2017 1 0/31 /201 7 11 /21 /201 7 12/6/2017 3/14/2018 3/14/2018 3/14/2018 5/11/2018 Table II Inadvertent Scrams Description of Scram Indicated Pulse High Power Scram during a pulse due to an electronic
2018 Annual Report
*malfunction on the NPP-1 000. Malfunction determined, on 3/14/2018, to be a bad solder point. WSU Facility Operations was inspecting the building compressed air supply and turned an air compressor off. They did not turn it back on which resulted in a low pulse air pressure alarm while operating at 1 MW. The reactor was manually air scrammed for this reason. WSU Facility Operations returned to the facility and turned the air compressor back on. Pressure was restored to the building compressed air system and the pulse rod system. Trainee switched to pulse mode during steady state operation at 1.0 MW. Indicated Pulse High Power Scram during a pulse due to an electronic malfunction on the NPP-1 000. Malfunction was determined, on 3/14/2018, to be a bad solder point. Indicated Pulse High Power Scram during a pulse due to an electronic malfunction on the NPP-1000.
: 1.     Narrative Summary of Operation for Fiscal Year 2018 A.       Operating Experience Core 3 SA has accumulated 9,486 MWH from beginning of life (BOL) through June 30, 2018. During the reporting period of July l, 2017 to June 30, 2018, a total of l, 186 samples were irradiated, for 12,386 user-hours.
Malfunction determined, on 3/14/2018, to be a bad solder point. Indicated Pulse High Power Scram during a pulse due to an electronic malfunction on the NPP-1 000. Malfunction determined, on 3/14/2018, to be a bad solder point. Indicated Pulse High Power Scram during a pulse due to an electronic malfunction on the NPP-1 000. Malfunction determined, on 3/14/2018, to be a bad solder point. The cause of a C.I.C. High Voltage Scram could not be determined.
Additionally, 18 pulses greater than $1.00 of reactivity addition were performed during the reporting period. The quarterly operations summaries are shown in Table I.
C.I.C. high voltage output was checked and verified to be 650 Vas specified.
I B.       Changes in Facility Design, Performance Characteristics, and Operating Procedures Related to Reactor Safety.
The high voltage failure was most likely due to overheating.
No changes in design, performance characteristics, or operating procedures have occurred during the reporting period.
High voltage will continue to be monitored.
C.       Results of Surveillance Tests and Requirements All surveillance tests and requirements were performed and completed within the prescribed time period.
: 4. Major Maintenance Although they are not part of routine preventative maintenance, the below listed items were performed.
: 2.       Energy and Cumulative Output The quarterly operations summaries are given in Table I. The cumulative energy output since the 1967 TRIGA fuel core was put in to service is l ,673 megawatt days (MWD). The mixed Standard Fuel and 30/20 LEU Fuel Core 35A installed in 2008 has accumulated 443 MWD.
7/18/2017:
Table I
Selector Switch: Pulse Mode During a checkout it was found that switching the mode selector switch caused a continuous clicking sound from a relay in the console. The relay was the 5K8 relay, which controls the pulse rod firing system. The contacts on the relay were cleaned which resolved the problem. 3/14/2018:
                                                                                                                /,
NPP-7 000: Pulse Power Channel High power scram on the NPP-1 000 when firing a pulse. The NPP-1 000 was verified to be operating correctly, however a wire for the mode switch for pulse mode was loose. The wire was re-soldered and the issue was corrected.
Fiscal Year 2017 Summary of Reactor Operation 1 Q3 2017     Q4 2017     Q'l 2018       0.2 2018       totals Hours of Operation                           354         364           380           328           1,426 Meqawatt Hours                               305         307           300           238           l, 149 No. of Sample Irradiations                   109           65           51           75           300 No. of Sam pies                             382         227           202           375           l, l 86 No. of Commercial Irradiations               36           31           34           34           135 User Hours                                 3,149         3,070         3,481         2,685       12,386 No. of Pulses > $1 .00                         7           8             4             l             l8
3/15/2018:
: 3.       Emergency Shutdowns and Inadvertent Scrams There were no emergency shutdowns or unplanned shutdown periods that occurred during the reporting period. The dates and causes of the eight inadvertent scrams are listed in Table II. No scrams were due to exceeding the limiting safety system setting or safety limit.
ARMs The readouts for the area radiation monitors were difficult to see when operating the . reactor. After a 50.59 screening it was determined a 50.59 change was not required Washington State University Nuclear Science Center 3 2018 Annual Report to relocate the ARM readouts.
' Number of samples and sample irradiations do not include commercial irradiations. User hours denotes the total user hours, including commercial irradiations.
The ARM readouts were relocated to an instrument panel above the console. 6/18/2018:
Washington State University Nuclear Science Center                                                         2
Hold Up Tanks During a pre-startup check out the RO determined that the holdup waste tanks system was not energized.
 
The RO checked the indicator lights on the console to confirm the lights were working. The control system in Room 2 was checked and it was found that there was a fuse that had failed. The fuse was replaced and power was restored to the hold up tanks. 5. Changes, Tests, and Experiments Performed Under 1 O CFR 50.59 Criteria There were no changes to the facility made under 10 CFRS0.59 criteria during the 201 7-201 8 reporting year. 6. Radioactive Effluent Discharges A. Radioactive Liquid Effluent Releases The liquid effluent releases for the facility during the reporting period are provided in Table Ill. Table Ill Monthly Liquid Effluent Releases Month Volume (gallons)
2018 Annual Report Table II Inadvertent Scrams Date                                 Description of Scram Indicated Pulse High Power Scram during a pulse due to an 8/14/2017     electronic *malfunction on the NPP-1 000. Malfunction determined, on 3/14/2018, to be a bad solder point.
July 2017 0 August 0 September 0 October 0 November 0 December 0 January 2018 0 February 0 March 0 April 0 May 0 June 0 No liquid effluents were released from the storage tank during the reporting period. B. Radioactive Gaseous Effluent Release During the reporting period, no emission of a measurable quantity of gaseous or particulate material with a half-life greater than eight days was Washington State University Nuclear Science Center 4 2018 Annual Report detected.
WSU Facility Operations was inspecting the building compressed air supply and turned an air compressor off. They did not turn it back on which resulted in a low pulse air pressure alarm while operating 1 0/31 /201 7  at 1 MW. The reactor was manually air scrammed for this reason.
The argon-41 release did not exceed 20% of the effluent release limit. A total of 2.9 Ci of argon-41 was released, with an average argon-41 concentration of 1.47 x l 0*10 µCi/ml of air, after environmental dilution.
WSU Facility Operations returned to the facility and turned the air compressor back on. Pressure was restored to the building compressed air system and the pulse rod system.
The argon-41 release and the pool water analysis is used in the 2018 Annual Report for Radioactive Air Emission License (RAEL-004), stack number 7. Per COMPLY vl .7, the reactor facility (stack 7) is in compliance at level 4 with an effective dose equivalent of 8.3 x l 0*3 mrem/yr. The monthly releases from Ar-41 are summarized in Table IV. Table IV Monthly Argon-41 Releases 2 Cone. After % of DAC Month Quantity (Ci) Dilution, Limit (µCi/ml) July 2017 2.ox10*1 1.2x10*10 3.9 X l 0*3 August 2.ox10*1 1.2x10*10 4.0 X l 0*3 September 2.8x10*1 1.8 X 10*10 5.9 X l 0*3 October 2. 5 X l 0*1 1.5 X 10*10 5.0 X l 0*3 November 3.0x10*1 1.8 X l 0*10 6.1 X 10*3 December 2.ox10*1 l .2 X l 0*10 3.9 X l 0*3 January 2018 1.9 X 10*1 l . l X l 0*10 3.8 X l 0*3 February 2.5x10*1 1.7 X 10*10 5.5 X l 0*3 March 4.5 X 10*1 2.7 X l 0*10 8.9 X l 0*3 April 1.3 X l 0*1 9. l X l 0*11 3.0 X l 0*3 May 2.1x10*1 l.3x10*10 4.3 X l 0*3 June 2.2x10*1 l .4 X l 0*10 4.6x10*3 C. Radioactive Solid Waste Disposal During the reporting period, 0.88 mCi in 56.7 cubic feet of non-compacted solid waste was transferred to the WSU Radiation Safety Office for packaging and disposal.
Trainee switched to pulse mode during steady state operation at 11 /21 /201 7 1.0 MW.
: 7. Personnel and Visitor Radiation Doses The quarterly doses of the WSU Nuclear Science Center reactor staff and experimenters are given in Table V. The maximum quarterly dose to a reactor staff member was l 53 mrem, whole body. A total of 789 individual persons visited the Nuclear Science Center during the reporting period, of which 198 entered a controlled access area (CAA).3 A total of 64 group tours, consisting of 488 individuals, visited the center during the reporting 2 Quantity released based on 4500 CFM effluent of ventilation system in AUTO mode of operation.
Indicated Pulse High Power Scram during a pulse due to an 12/6/2017      electronic malfunction on the NPP-1 000. Malfunction was determined, on 3/14/2018, to be a bad solder point.
Concentration after dilution is based on l O CFR 20 effluent release limit of l .0 x lo-* µCi/ml for Ar-41 (Table 2, Col. l ), and a dilution factor of 3.4 x lo*' (WSU Technical Specifications 3.5.2). DAC limits are based on l O CFR 20 derived air concentration limit of 3.0 x lo** µCi/ml for Ar-41 (Table l, Col. 3) and a dilution factor of 3.4 x lo*'. 'A controlled access area is an area in the building where radioactive materials are used or stored and is a part of the licensed reactor facility.
Indicated Pulse High Power Scram during a pulse due to an 3/14/2018      electronic malfunction on the NPP-1000. Malfunction determined, on 3/14/2018, to be a bad solder point.
Washington State University Nuclear Science Center 5 2018 Annual Report period, also entering a CAA. All doses were less than or equal to 0.2 mrem as determined by digital pocket dosimeters.
Indicated Pulse High Power Scram during a pulse due to an 3/14/2018      electronic malfunction on the NPP-1 000. Malfunction determined, on 3/14/2018, to be a bad solder point.
Table V Quarterly Reactor and Experimenter Staff Dose 4 (in mrem) Badge No. Q3 2017 Q4 2017 Ql 2018 Q2 2018 10921 43 83 42 79 11516 18 3 M M 11205 M M ----11761 --2 2 4 11239 7 4 2 5 08141 9 3 M 105 11762 --M 4 2 10910 29 6 53 7 10916 65 13 9 153 10450 3 3 M M 11763 --3 M M 10392 7 ------11255 3 2 1 --10451 1 ------11764 --13 2 M 10641 16 50 1 --11694 6 5 1 --11765 --1 1 --11222 1 ------08594 6 3 M M 07748 1 2 M M 10643 4 3 1 --8. Reactor Facility Radiation and Contamination Levels The limit of quantification (LOQ) for building removable contamination determination survey samples as measured by liquid scintillation assay is 8.89 x 1 o-s µCi/cm 2; the survey sample data that was collected for removable contamination determination were averaged over one year. Routine building surveys showed average levels of removable activity to be less than the LOQ for all non-CAAs.
Indicated Pulse High Power Scram during a pulse due to an 3/14/2018      electronic malfunction on the NPP-1 000. Malfunction determined, on 3/14/2018, to be a bad solder point.
Routine building surveys showed average levels of removable activity to be less than the LOQ for all CAAs except the 201 Experimenters Platform and the Room 2 Cave Floor West. ' "--" denotes data not available either due to departure from the facility or new personnel starting at the facility.
The cause of a C.I.C. High Voltage Scram could not be determined.
An 'M' denotes that the dosimeter reading was less than or equal to the background radiation level for that quarter. Washington State University Nuclear Science Center 6 2018 Annual Report *-Table VI Average Removable Contamination for Weekly Monitoring in CAAs and Non-CAAs 5 Measured Location Activity Above LOQ (µCi/cm 2) 2018 M 201A M 201 Reactor Bridge Steps M 201 Sample Drop Tube M 201 Reactor Bridge South M 201 Reactor Bridge North M 201 Experimenter Platform 3.4E-07 201 Laboratory Benches .M 201 Floor South M 201-C Heat Exchanger Floor M 201 Floor North M 106 Ion Exchanger Pit M 101-A Purification Pump Pit M 101 Doorway M 101 Sample Preparation Bench M 101 Sample Drop Hood #2 M 101 Shipment Bench M 101 Hood #1 M 101 Hood #18 M 101 Hood #4 M B21 Panoramic lrradiator M B21 Floor M 2 South Floor M 2 Thermal Column M 2 Thermal Column Floor M 2 North Floor M 2 Cave Floor West 3.2E-07 2 Cave Floor East M The results for the routine area radiation surveys of the building in CAAs and CAAs are given in Table VII. The highest average dose rate for a single location in a CAA was 31 .9 mrem/hr, which occurred in Room 2 East Cave. This value is less than the limit for CAAs. The lowest average dose rate in a CAA was 0.04 mrem/hr (a level 5 Balded text indicates a non-CAA. Regular text indicates a CAA. "M" indicates the value is below the LOQ value of 8.8 x lo-* µCi/cm'. Washington State University Nuclear Science Center 7 2018 Annual Report considered background), which occurred in Room 2 Thermal Column. The average dose rate in the radiochemistry sample hoods (a non-CAA) was 0.52 mrem/hr. The East and West cave are secured storage areas and are designed to house radioactive sources and provide shielding.
C.I.C. high voltage output was checked and verified to be 650 Vas 5/11/2018 specified. The high voltage failure was most likely due to overheating. High voltage will continue to be monitored.
The space is posted as a high radiation area. Personnel do not typically work in this area and it is locked when not in use. Table VII Average Radiation Dose Rates for Weekly Monitoring in CAAs and Non-CAAs 6 Location Average Dose Rate (mrem/hr)  
: 4.     Major Maintenance Although they are not part of routine preventative maintenance, the below listed items were performed.
' Room 201 B 0.06 Room 201 A 0.04 Room 201 Bridge 1.48 Room 201 Benches 0.19 Room 201 South 0.24 Room 201 East 0.63 Room 201 C Heat Exchanger 0.05 Room 201 North 0.99 Room 1 06 Ion Exchanger Pit 2.18 Room 1 01 A Purification Pit 8.96 Sample Storage I 0.34 Room 101 Doorway 0.05 Room 101 Sample Prep Bench 0.05 Room 101 Sample Drop Hood 2 0.52 Room 101 Shipping Bench 0.04 Room 101 Hood 1 . '-0.06 Room 101 Hood 2 0.07 Room 101 Hood 4 0.08 Room B21 Panoramic lrradiator 0.04 Room 2 South 0.37 Room 2 Thermal Column 0.04 Room 2 North 0.18 Room 2 West Cave 1.87 Room 2 East Cave 31.9 . 9. Environmental Monitoring Program The environmental monitoring program is used to determine the offsite background radiation levels; thermoluminescent dosimeters (TLD's) are used to make the
7/18/2017: Selector Switch: Pulse Mode During a checkout it was found that switching the mode selector switch caused a continuous clicking sound from a relay in the console. The relay was the 5K8 relay, which controls the pulse rod firing system. The contacts on the relay were cleaned which resolved the problem.
* Balded text indicates a non-CAA. Regular text indicates a CAA. Washington State University Nuclear Science Center 8 2018 Annual Report measurements.
3/14/2018: NPP-7 000: Pulse Power Channel High power scram on the NPP-1 000 when firing a pulse. The NPP-1 000 was verified to be operating correctly, however a wire for the mode switch for pulse mode was loose. The wire was re-soldered and the issue was corrected.
The offsite radiation monitoring program is required by the Technical Specifications.
3/15/2018: ARMs The readouts for the area radiation monitors were difficult to see when operating the
The TLDs that are used for offsite monitoring are designated as TLD numbers 3, 7, 9, 15 through 35, and 39 through 44. The average background radiation level is then compared to the nearest occupied dwelling.
      . reactor. After a 50.59 screening it was determined a 50.59 change was not required Washington State University Nuclear Science Center                                       3
TLD 4, 5, 6, 8, 9, and 10 show abnormally high readings for Q3 2017, Q4 2017, Ql 201 8, and Q2 201 8 due to irradiated graphite reflector elements stored nearby in the radioactive waste shed on the north side of the facility.
 
The Radiation Safety Office has shielded the reflector barrels such that no public dose rate limits are exceeded.
2018 Annual Report to relocate the ARM readouts. The ARM readouts were relocated to an instrument panel above the console.
TLD 9 has been removed from background radiation calculations.
6/18/2018: Hold Up Tanks During a pre-startup check out the RO determined that the holdup waste tanks system was not energized. The RO checked the indicator lights on the console to confirm the lights were working. The control system in Room 2 was checked and it was found that there was a fuse that had failed. The fuse was replaced and power was restored to the hold up tanks.
Average quarterly dose rates for offsite locations are listed in Table VIII and are used to calculate the Technical Specification threshold of 20% above the background radiation level and compared to the limiting values which are listed in Table XI. The average environmental radiation levels for the closest offsite point of extended occupancy is listed in Table X. Table IX shows the quarterly environmental radiation levels for those TLD's located at onsite locations.
: 5. Changes, Tests, and Experiments Performed Under 1O CFR 50.59 Criteria There were no changes to the facility made under 10 CFRS0.59 criteria during the 201 7-201 8 reporting year.
The onsite locations are not required to be compared to background radiation levels. The closest offsite points of extended occupancy are compared in Figure 1 to both the background radiation levels and the 20% above background radiation levels. The ALARA effluent release limits in Technical Specification 3.5.2(3) specify that annual radiation exposure due to reactor operation, at the closest offsite extended occupancy, shall not, on an annual basis, exceed the average offsite background radiation by more than 20%. For the reporting period, the average background radiation dose rate for off-site locations was 0.51 mrem/day, while the average radiation dose rate at the closest extended occupancy area 600 meters away was 0.34 mrem/day.
: 6. Radioactive Effluent Discharges A.       Radioactive Liquid Effluent Releases The liquid effluent releases for the facility during the reporting period are provided in Table Ill.
This result indicates that no exposure level above normal background radiation were found, and that no dose levels exceeded Technical Specifications requirements for an offsite area of extended occupancy.
Table Ill Monthly Liquid Effluent Releases Month         Volume (gallons)
Washington State University Nuclear Science Center 9 I 2018 Annual Report Table VIII Environmental Radiation Levels at Offsite Locations of the Nuclear Science Center 7 (dose rate in mrem/day)
July 2017                 0 August                 0 September                 0 October                 0 November                 0 December                 0 January 2018                 0 February                 0 March                   0 April                 0 May                   0 June                   0 No liquid effluents were released from the storage tank during the reporting period.
L0<;:ation Q3 Q4 Ql Q2 Average 2017 2Q17 20l8 2018 Fence E of NSC 0.35 0.32 0.39 0.33 0.35 Fence, N of Rad Waste Shed 0.57 0.50 0.57 0.52 0.54 Fence directly N Rad Waste Shed 5.90 6.32 5.63 5.74 5.90 S NSC, on parking lot fence 0.32 0.34 0.37 0.32 0.34 Fence S Roundtop Dr, l O'h pole W of 0.36 0.35 0.43 0.37 0.38 pole Cl 4 Telephone pole Cl 2 0.37 0.32 0.42 0.36 0.37 Telephone pole near golf course gate 0.38 0.33 0.42 0.33 0.37 E across fairway on pine tree 0.34 0.34 0.40 0.33 0.35 Maple tree #54 along driving range 0.32 0.29 0.40 0.32 0.33 NW to fence uphill from driving range 0.45 0.42 0.48 0.34 0.42 Follow fence E to fence corner 0.38 0.36 0.42 0.44 0.40 S to lone spruce tree near water hazard 0.38 0.34 0.39 0.31 0.36 Roundtop hill park, NW fence corner 0.34 0.32 0.39 0.32 0.34 Deciduous tree edge of l 8'h green 0.36 0.36 0.42 0.40 0.39 6ft pine tree, 3rd W down cart path from 0.35 0.37 0.41 0.33 0.37 clubhouse 3rd to last tree after gap in same line of 0.30 0.36 0.39 0.31 0.34 trees SW to fence along pqth near 2nd to last 0.39 0.35 0.41 0.40 0.39 tee box at bottom hill Follow fence partway up hill after fence 0.36 0.33 0.39 0.34 0.36 turns S Follow fence, l S'h pole E after fence 0.37 0.34 0.41 0.34 0.37 turns W Follow fence about halfway between 0.35 0.36 0.41 0.34 0.37 last TLD and corner Largest bush S of NSC 0.36 0.33 0.40 0.36 0.36 2"d fence S NSC, W end at gate 0.37 0.32 0.37 0.36 0.36 S Fairway Rd, l" light post on right 0.38 0.33 0.40 0.36 0.37 S Fairway Rd, 2nd light post on right --0.33 0.39 0.33 0.35 Ellis Way and Hog Lane sign 0.29 0.35 0.36 0.33 0.34 Bottom of radio antenna hill, fence 0.36 0.34 0.39 0.34 0.36 next to shrub left of qate 3rd fence S of NSC, SE corner, cow 0.35 0.35 0.39 0.34 0.36 pasture Airport fence Wend runway at gate 0.30 0.34 0.42 0.32 0.35 Fence/entry bar E of Jewett 0.34 0.36 0.37 0.33 0.35 Observatory Granite rock Terrell Mall, hole in back 0.27 --0.42 --0.35 'Offsite defined by the Technical Specification 1.0 and 5.1. l as any location which is outside the site boundary.
B.       Radioactive Gaseous Effluent Release During the reporting period, no emission of a measurable quantity of gaseous or particulate material with a half-life greater than eight days was Washington State University Nuclear Science Center                                         4
The"--" indicates a TLD which was missing. Washington State University Nuclear Science Center 10 2018 Annual Report Table IX Environmental Radiation Levels at Onsite Locations of the Nuclear Science Center 8 (dose rate in mrem/day)
 
Location Q3 Q4 Ql Q2 Average 2017 2017 2018 2018 E lower loading dock 0.33 0.33 0.40 0.31 0.34 Pool room truck door fence S end 0.83 0.74 0.66 0.70 0.73 Pool room truck door fence N end 1.77 1.21 1.21 1.22 1.35 E wall rad waste shed 0.72 0.71 0.76 0.63 0.70 N wall rad waste shed 1.00 0.78 0.76 0.63 0.79 Cooling tower fence, NE corner 14.37 18.05 16.58 17.92 16.73 Room l 01 window 0.44 0.39 0.46 0.40 0.42 Railing next to upper liquid waste tank 0.39 0.34 0.47 0.39 0.40 Room 2 truck door fence 0.35 0.35 0.41 0.34 0.36 Transformer vault vent louvers 0.40 0.35 0.46 0.39 0.40 NSC main entrance, light fixture 0.39 0.41 0.49 0.47 0.44 NSC roof, pool room vent stack 0.33 0.33 0.37 0.34 0.34 NSC roof, guide wire E end of building 0.37 0.39 0.40 0.36 0.38 NSC roof, E pool room vent support leg 0.55 0.58 0.79 0.77 0.67
2018 Annual Report detected. The argon-41 release did not exceed 20% of the effluent release limit. A total of 2.9 Ci of argon-41 was released, with an average argon-41 concentration of 1.47 x l 0* 10 &#xb5;Ci/ml of air, after environmental dilution. The argon-41 release and the pool water analysis is used in the 2018 Annual Report for Radioactive Air Emission License (RAEL-004), stack number 7. Per COMPLY vl .7, the reactor facility (stack 7) is in compliance at level 4 with an effective dose equivalent of 8.3 x l 0*3 mrem/yr. The monthly releases from Ar-41 are summarized in Table IV.
* NSC roof, air conditioning support leg 0.34 0.33 0.40 0.41 0.37 NSC roof, W pool room vent support leg 0.70 0.74 0.85 0.60 0.72 \ Table X Environmental Radiation Levels for the Closest Offsite Point of Extended Occupancy (dose rate in mrem/day)
Table IV Monthly Argon-41 Releases 2 Cone. After
Location Q3 Q4 Ql 2017 2017 2018 Apt complex C, gas meter 0.35 0.36 0.37 Apt complex B, gas meter 0.36 0.35 0.39 l st fence S apt complex A 0.29 0.31 0.35 Table XI Background Environmental Radiation Levels (dose rate in mrem/day)
                                                                                        % of DAC Month           Quantity (Ci)             Dilution, Limit
Description Q3 Q4 Ql 2017 2017 2018 Background radiation levels 0.55 0.35 0.41 20% above background radiation 0.66 0.42 0.49 levels Q2 2018 0.33 0.32 0.32 Q2 2018 0.36 0.43
(&#xb5;Ci/ml)
July 2017           2.ox10* 1             1.2x10*10             3.9 X l 0*3 August             2.ox10* 1             1.2x10*10             4.0 X l 0*3 September           2.8x10* 1             1.8 X 10*10           5.9 X l 0*3 October             2. 5 X l 0* 1         1.5 X 10*10           5.0 X l 0*3 November             3.0x10*     1 1.8 X l 0* 10 6.1 X 10*3 December             2.ox10* 1             l .2 X l 0* 10       3.9 X l 0*3 January 2018           1.9 X 10*1           l .l X l 0* 10       3.8 X l 0*3 February           2.5x10* 1             1.7 X 10* 10       5.5 X l 0*3 March             4.5 X 10*   1 2.7 X l 0* 10       8.9 X l 0*3 April             1.3 X l 0* 1         9. l X l 0* 11       3.0 X l 0*3 May             2.1x10* 1             l.3x10*10             4.3 X l 0*3 June             2.2x10* 1             l .4 X l 0* 10       4.6x10*3 C.       Radioactive Solid Waste Disposal During the reporting period, 0.88 mCi in 56.7 cubic feet of non-compacted solid waste was transferred to the WSU Radiation Safety Office for packaging and disposal.
: 7.       Personnel and Visitor Radiation Doses The quarterly doses of the WSU Nuclear Science Center reactor staff and experimenters are given in Table V. The maximum quarterly dose to a reactor staff member was l 53 mrem, whole body.
A total of 789 individual persons visited the Nuclear Science Center during the reporting period, of which 198 entered a controlled access area (CAA). 3 A total of 64 group tours, consisting of 488 individuals, visited the center during the reporting 2
Quantity released based on 4500 CFM effluent of ventilation system in AUTO mode of operation. Concentration after dilution is based on l O CFR 20 effluent release limit of l .0 x lo-* &#xb5;Ci/ml for Ar-41 (Table 2, Col. l ), and a dilution factor of 3.4 x lo*' (WSU Technical Specifications 3.5.2). DAC limits are based on l O CFR 20 derived air concentration limit of 3.0 x lo** &#xb5;Ci/ml for Ar-41 (Table l, Col. 3) and a dilution factor of 3.4 x lo*'.
'A controlled access area is an area in the building where radioactive materials are used or stored and is a part of the licensed reactor facility.
Washington State University Nuclear Science Center                                                                   5
 
2018 Annual Report period, also entering a CAA. All doses were less than or equal to 0.2 mrem as determined by digital pocket dosimeters.
Table V Quarterly Reactor and Experimenter Staff Dose 4 (in mrem)
Badge No.         Q3 2017       Q4 2017         Ql 2018         Q2 2018 10921               43             83               42             79 11516               18               3             M             M 11205               M               M               --             --
11761               --               2               2             4 11239               7             4               2             5 08141               9             3               M             105 11762               --             M               4             2 10910               29             6               53             7 10916               65             13               9           153 10450               3             3               M             M 11763               --             3               M             M 10392               7               --             --             --
11255               3               2               1             --
10451               1               --             --             --
11764               --             13               2             M 10641             16             50               1             --
11694               6               5               1             --
11765               --             1               1             --
11222               1               --             --             --
08594               6               3               M             M 07748               1               2               M             M 10643               4               3               1             --
: 8.         Reactor Facility Radiation and Contamination Levels The limit of quantification (LOQ) for building removable contamination determination survey samples as measured by liquid scintillation assay is 8.89 x 1 o-s
          &#xb5;Ci/cm 2 ; the survey sample data that was collected for removable contamination determination were averaged over one year. Routine building surveys showed average levels of removable activity to be less than the LOQ for all non-CAAs.
Routine building surveys showed average levels of removable activity to be less than the LOQ for all CAAs except the 201 Experimenters Platform and the Room 2 Cave Floor West.
' "--" denotes data not available either due to departure from the facility or new personnel starting at the facility.
An 'M' denotes that the dosimeter reading was less than or equal to the background radiation level for that quarter.
Washington State University Nuclear Science Center                                                                 6
 
2018 Annual Report Table VI Average Removable Contamination for Weekly Monitoring in CAAs and Non-CAAs 5 Measured Location                   Activity Above
                              *-
LOQ (&#xb5;Ci/cm2 )
2018                             M 201A                             M 201 Reactor Bridge Steps                     M 201 Sample Drop Tube                       M 201 Reactor Bridge South                     M 201 Reactor Bridge North                     M 201 Experimenter Platform                 3.4E-07 201 Laboratory Benches                     .M 201 Floor South                       M 201-C Heat Exchanger Floor                   M 201 Floor North                       M 106 Ion Exchanger Pit                     M 101-A Purification Pump Pit                   M 101 Doorway                           M 101 Sample Preparation Bench                     M 101 Sample Drop Hood #2                       M 101 Shipment Bench                       M 101 Hood #1                         M 101 Hood #18                         M 101 Hood #4                         M B21 Panoramic lrradiator                     M B21 Floor                           M 2 South Floor                         M 2 Thermal Column                         M 2 Thermal Column Floor                     M 2 North Floor                         M 2 Cave Floor West                   3.2E-07 2 Cave Floor East                       M The results for the routine area radiation surveys           of the building in CAAs and non-CAAs are given in Table VII. The highest average             dose rate for a single location in a CAA was 31 .9 mrem/hr, which occurred in Room               2 East Cave. This value is less than the limit for CAAs. The lowest average dose rate             in a CAA was 0.04 mrem/hr (a level 5 Balded text indicates a non-CAA. Regular text indicates a CAA. "M" indicates the value is below the LOQ value of 8.8 x lo-* &#xb5;Ci/cm'.
Washington State University Nuclear Science Center                                                           7
 
2018 Annual Report considered background), which occurred in Room 2 Thermal Column. The average dose rate in the radiochemistry sample hoods (a non-CAA) was 0.52 mrem/hr. The East and West cave are secured storage areas and are designed to house radioactive sources and provide shielding. The space is posted as a high radiation area.
Personnel do not typically work in this area and it is locked when not in use.
Table VII Average Radiation Dose Rates for Weekly Monitoring in CAAs and Non-CAAs 6 Average Dose Rate Location (mrem/hr)
                            '       Room 201 B                           0.06 Room 201 A                           0.04 Room 201 Bridge                       1.48 Room 201 Benches                       0.19 Room 201 South                         0.24 Room 201 East                         0.63 Room 201 C Heat Exchanger                     0.05 Room 201 North                         0.99 Room 1 06 Ion Exchanger Pit                 2.18 Room 1 01 A Purification Pit               8.96 Sample Storage                       I 0.34 Room 101 Doorway                         0.05 Room 101 Sample Prep Bench                     0.05 Room 101 Sample Drop Hood 2                     0.52 Room 101 Shipping Bench                     0.04 Room 101 Hood 1                 . '-   0.06 Room 101 Hood 2                         0.07 Room 101 Hood 4                         0.08 Room B21 Panoramic lrradiator                   0.04 Room 2 South                         0.37 Room 2 Thermal Column                     0.04 Room 2 North                         0.18 Room 2 West Cave                       1.87 Room 2 East Cave                       31.9
. 9.       Environmental Monitoring Program The environmental monitoring program is used to determine the offsite background radiation levels; thermoluminescent dosimeters (TLD's) are used to make the
* Balded text indicates a non-CAA. Regular text indicates a CAA.
Washington State University Nuclear Science Center                                       8
 
2018 Annual Report I
measurements. The offsite radiation monitoring program is required by the Technical Specifications. The TLDs that are used for offsite monitoring are designated as TLD numbers 3, 7, 9, 15 through 35, and 39 through 44. The average background radiation level is then compared to the nearest occupied dwelling. TLD 4, 5, 6, 8, 9, and 10 show abnormally high readings for Q3 2017, Q4 2017, Ql 201 8, and Q2 201 8 due to irradiated graphite reflector elements stored nearby in the radioactive waste shed on the north side of the facility. The Radiation Safety Office has shielded the reflector barrels such that no public dose rate limits are exceeded. TLD 9 has been removed from background radiation calculations.
Average quarterly dose rates for offsite locations are listed in Table VIII and are used to calculate the Technical Specification threshold of 20% above the background radiation level and compared to the limiting values which are listed in Table XI. The average environmental radiation levels for the closest offsite point of extended occupancy is listed in Table X. Table IX shows the quarterly environmental radiation levels for those TLD's located at onsite locations. The onsite locations are not required to be compared to background radiation levels.
The closest offsite points of extended occupancy are compared in Figure 1 to both the background radiation levels and the 20% above background radiation levels. The ALARA effluent release limits in Technical Specification 3.5.2(3) specify that annual radiation exposure due to reactor operation, at the closest offsite extended occupancy, shall not, on an annual basis, exceed the average offsite background radiation by more than 20%. For the reporting period, the average background radiation dose rate for off-site locations was 0.51 mrem/day, while the average radiation dose rate at the closest extended occupancy area 600 meters away was 0.34 mrem/day. This result indicates that no exposure level above normal background radiation were found, and that no dose levels exceeded Technical Specifications requirements for an offsite area of extended occupancy.
Washington State University Nuclear Science Center                                         9
 
2018 Annual Report Table VIII Environmental Radiation Levels at Offsite Locations of the Nuclear Science Center 7 (dose rate in mrem/day)
Q3          Q4          Ql          Q2 L0<;:ation                                                                       Average 2017         2Q17       20l8       2018 Fence E of NSC                       0.35       0.32         0.39       0.33       0.35 Fence, N of Rad Waste Shed                     0.57       0.50         0.57       0.52       0.54 Fence directly N Rad Waste Shed                   5.90       6.32         5.63       5.74         5.90 S NSC, on parking lot fence                   0.32         0.34         0.37       0.32       0.34 Fence S Roundtop Dr, l O'h pole W of 0.36         0.35         0.43       0.37       0.38 pole Cl 4 Telephone pole Cl 2                     0.37         0.32         0.42       0.36       0.37 Telephone pole near golf course gate                 0.38         0.33         0.42       0.33       0.37 E across fairway on pine tree                 0.34         0.34         0.40       0.33       0.35 Maple tree #54 along driving range                 0.32         0.29       0.40         0.32       0.33 NW to fence uphill from driving range               0.45         0.42       0.48         0.34       0.42 Follow fence E to fence corner                 0.38         0.36       0.42         0.44       0.40 S to lone spruce tree near water hazard               0.38         0.34       0.39         0.31       0.36 Roundtop hill park, NW fence corner                 0.34         0.32       0.39         0.32       0.34 Deciduous tree edge of l 8'h green               0.36         0.36       0.42         0.40       0.39 6ft pine tree, 3rd W down cart path from 0.35         0.37       0.41         0.33       0.37 clubhouse 3rd to last tree after gap in same line of 0.30         0.36       0.39         0.31       0.34 trees SW to fence along pqth near 2nd to last 0.39         0.35       0.41         0.40       0.39 tee box at bottom hill Follow fence partway up hill after fence 0.36         0.33       0.39         0.34       0.36 turns S Follow fence, l S'h pole E after fence 0.37         0.34       0.41         0.34       0.37 turns W Follow fence about halfway between 0.35         0.36       0.41         0.34       0.37 last TLD and corner Largest bush S of NSC                     0.36         0.33       0.40         0.36       0.36 2"d fence S NSC, W end at gate                 0.37         0.32       0.37         0.36       0.36 S Fairway Rd, l" light post on right               0.38         0.33       0.40         0.36       0.37 S Fairway Rd, 2nd light post on right                 --       0.33       0.39         0.33       0.35 Ellis Way and Hog Lane sign                   0.29         0.35       0.36         0.33       0.34 Bottom of radio antenna hill, fence 0.36         0.34       0.39         0.34       0.36 next to shrub left of qate 3rd fence S of NSC, SE corner, cow 0.35         0.35       0.39         0.34       0.36 pasture Airport fence Wend runway at gate                   0.30         0.34       0.42         0.32       0.35 Fence/entry bar E of Jewett 0.34         0.36       0.37         0.33       0.35 Observatory Granite rock Terrell Mall, hole in back             0.27           --       0.42           --       0.35
'Offsite defined by the Technical Specification 1.0 and 5.1. l as any location which is outside the site boundary.
The"--" indicates a TLD which was missing.
Washington State University Nuclear Science Center                                                           10
 
2018 Annual Report Table IX Environmental Radiation Levels at Onsite Locations of the Nuclear Science Center8 (dose rate in mrem/day)
Q3         Q4           Ql         Q2 Location                                                                        Average 2017       2017         2018       2018 E lower loading dock                     0.33       0.33         0.40       0.31       0.34 Pool room truck door fence S end                   0.83       0.74         0.66       0.70       0.73 Pool room truck door fence N end                   1.77       1.21         1.21       1.22       1.35 E wall rad waste shed                     0.72       0.71         0.76       0.63       0.70 N wall rad waste shed                     1.00       0.78         0.76       0.63       0.79 Cooling tower fence, NE corner                   14.37       18.05       16.58       17.92     16.73 Room l 01 window                         0.44       0.39         0.46       0.40       0.42 Railing next to upper liquid waste tank                 0.39       0.34         0.47       0.39       0.40 Room 2 truck door fence                       0.35       0.35         0.41       0.34       0.36 Transformer vault vent louvers                     0.40       0.35         0.46       0.39       0.40 NSC main entrance, light fixture                   0.39       0.41         0.49       0.47       0.44 NSC roof, pool room vent stack                     0.33       0.33         0.37       0.34       0.34 NSC roof, guide wire E end of building                 0.37       0.39         0.40       0.36       0.38 NSC roof, E pool room vent support leg                 0.55       0.58         0.79       0.77       0.67
* NSC roof, air conditioning support leg                 0.34       0.33         0.40       0.41       0.37 NSC roof, W pool room vent support leg                   0.70       0.74         0.85       0.60       0.72
                      \
Table X Environmental Radiation Levels for the Closest Offsite Point of Extended Occupancy (dose rate in mrem/day)
Q3         Q4         Ql           Q2 Location                                                                      Average 2017        2017       2018        2018 Apt complex C, gas meter                     0.35       0.36       0.37         0.33      0.35 Apt complex B, gas meter                     0.36       0.35       0.39         0.32      0.36 l st fence S apt complex A                   0.29       0.31       0.35         0.32      0.31 Table XI Background Environmental Radiation Levels (dose rate in mrem/day)
Q3         Q4         Ql           Q2 Description                                                                      Average 2017       2017         2018        2018 Background radiation levels                   0.55       0.35       0.41         0.36      0.42 20% above background radiation levels 0.66       0.42       0.49         0.43      a.so
* Onsite defined by the Technical Specification 1.0 and 5.1.1 as any location within the site boundary.
* Onsite defined by the Technical Specification 1.0 and 5.1.1 as any location within the site boundary.
Washington State University Nuclear Science Center Average 0.35 0.36 0.31 Average 0.42 a.so 11 2018 Annual Report 0.70 0.60 \ \ \ \ \ \ 0.50 +---""'---\"=-\
Washington State University Nuclear Science Center                                                         11
______________
 
_ \ ,,,,,, ........ 0.10 0.00 \ ,,,, ........ \" Q3 2017 Q4 2017 QI 2018 Q2 2018 Average Quarter '-'-'-'-"'
2018 Annual Report 0.70
Apartment Complex A Apartment Complex B -Apartment Complex C -Background  
                  \
---20% Above Background Figure 1: Environmental radiation levels for the closest off-site point of extended occupancy as compared to background radiation levels and 20% above background radiation levels. Washington State University Nuclear Science Center 12}}
                    \
                      \
0.60
                        \
                          \
                            \
0.50 +---""'---\"=-\_ _ _ _ _ _ _ _ _ _ _ _ _ __
                                \           ,,,,,, ........
                                  \   ,,,,                 ........
                                    \"
                                                                                    '-'-'-'-"' Apartment Complex A
                                                                                    ~          Apartment Complex B
                                                                                    -         Apartment Complex C
                                                                                    -         Background
                                                                                    - - - 20% Above Background 0.10 0.00 Q3 2017        Q4 2017      QI 2018                Q2 2018 Average Quarter Figure 1: Environmental radiation levels for the closest off-site point of extended occupancy as compared to background radiation levels and 20% above background radiation levels.
Washington State University Nuclear Science Center                                                         12}}

Revision as of 17:02, 20 October 2019

Annual Report for the Wsu Facility for the Period July 1, 2017 Through June 30, 2018
ML18235A318
Person / Time
Site: Washington State University
Issue date: 08/20/2018
From: Wall D
Washington State Univ
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML18235A318 (14)


Text

WASHINGTON STATE 9 lJNIVERSI1Y Nuclear Science Center August 20, 2018 Document Control Desk U.S. Nuclear Regulatory Commission Washington DC, 20555 Re: Docket No. 50-27; Facility License R-76 The Annual Report for the WSU facility, License R-76, Docket 50-27, prepared by C. Corey Hines, Associate Director and Reactor Supervisor of the WSU Facility, is hereby submitted. The report covers the operating period July 1, 2017 through June 30, 2018.

Respectfully Submitted, Donald Wall, Ph.D.

Director Enclosure Cc: C.C. Hines PO Box 641300, Pullman, WA 99164-1 300 509-335-8641 I nsc.or.wsu.edu

WASHINGTON STATE UNIVERSITY TRIGA REACTOR FACILITY LICENSE R-76 FOR THE REPORTING PERIOD JULY 1, 2017 TO JUNE 30, 2018 NUCLEAR SCIENCE CENTER I Washington State University, Pullman, WA

201 8 Annual Report TABLE OF CONTENTS

1. Narrative Summary of the Year's Operation ................................................................. 2
2. Energy and Cumulative Output ..................................................................................... 2
3. Emergency Shutdowns and Inadvertent Scrams ........................................................... 2
4. Major Maintenance ......................................................................................................... 3
5. Changes, Tests, and Experiments Performed Under 10 CFR.50.59 Criteria .............. 4
6. Radioactive Effluent Discharges .................................................................................... 4
7. Personnel and Visitor Radiation Doses ......................................................................... 5
8. Reactor Facility Radiation and Contamination Levels .................................................. 6
9. Environmental Monitoring Program .............................................................................. 8 Washington State University Nuclear Science Center

2018 Annual Report

1. Narrative Summary of Operation for Fiscal Year 2018 A. Operating Experience Core 3 SA has accumulated 9,486 MWH from beginning of life (BOL) through June 30, 2018. During the reporting period of July l, 2017 to June 30, 2018, a total of l, 186 samples were irradiated, for 12,386 user-hours.

Additionally, 18 pulses greater than $1.00 of reactivity addition were performed during the reporting period. The quarterly operations summaries are shown in Table I.

I B. Changes in Facility Design, Performance Characteristics, and Operating Procedures Related to Reactor Safety.

No changes in design, performance characteristics, or operating procedures have occurred during the reporting period.

C. Results of Surveillance Tests and Requirements All surveillance tests and requirements were performed and completed within the prescribed time period.

2. Energy and Cumulative Output The quarterly operations summaries are given in Table I. The cumulative energy output since the 1967 TRIGA fuel core was put in to service is l ,673 megawatt days (MWD). The mixed Standard Fuel and 30/20 LEU Fuel Core 35A installed in 2008 has accumulated 443 MWD.

Table I

/,

Fiscal Year 2017 Summary of Reactor Operation 1 Q3 2017 Q4 2017 Q'l 2018 0.2 2018 totals Hours of Operation 354 364 380 328 1,426 Meqawatt Hours 305 307 300 238 l, 149 No. of Sample Irradiations 109 65 51 75 300 No. of Sam pies 382 227 202 375 l, l 86 No. of Commercial Irradiations 36 31 34 34 135 User Hours 3,149 3,070 3,481 2,685 12,386 No. of Pulses > $1 .00 7 8 4 l l8

3. Emergency Shutdowns and Inadvertent Scrams There were no emergency shutdowns or unplanned shutdown periods that occurred during the reporting period. The dates and causes of the eight inadvertent scrams are listed in Table II. No scrams were due to exceeding the limiting safety system setting or safety limit.

' Number of samples and sample irradiations do not include commercial irradiations. User hours denotes the total user hours, including commercial irradiations.

Washington State University Nuclear Science Center 2

2018 Annual Report Table II Inadvertent Scrams Date Description of Scram Indicated Pulse High Power Scram during a pulse due to an 8/14/2017 electronic *malfunction on the NPP-1 000. Malfunction determined, on 3/14/2018, to be a bad solder point.

WSU Facility Operations was inspecting the building compressed air supply and turned an air compressor off. They did not turn it back on which resulted in a low pulse air pressure alarm while operating 1 0/31 /201 7 at 1 MW. The reactor was manually air scrammed for this reason.

WSU Facility Operations returned to the facility and turned the air compressor back on. Pressure was restored to the building compressed air system and the pulse rod system.

Trainee switched to pulse mode during steady state operation at 11 /21 /201 7 1.0 MW.

Indicated Pulse High Power Scram during a pulse due to an 12/6/2017 electronic malfunction on the NPP-1 000. Malfunction was determined, on 3/14/2018, to be a bad solder point.

Indicated Pulse High Power Scram during a pulse due to an 3/14/2018 electronic malfunction on the NPP-1000. Malfunction determined, on 3/14/2018, to be a bad solder point.

Indicated Pulse High Power Scram during a pulse due to an 3/14/2018 electronic malfunction on the NPP-1 000. Malfunction determined, on 3/14/2018, to be a bad solder point.

Indicated Pulse High Power Scram during a pulse due to an 3/14/2018 electronic malfunction on the NPP-1 000. Malfunction determined, on 3/14/2018, to be a bad solder point.

The cause of a C.I.C. High Voltage Scram could not be determined.

C.I.C. high voltage output was checked and verified to be 650 Vas 5/11/2018 specified. The high voltage failure was most likely due to overheating. High voltage will continue to be monitored.

4. Major Maintenance Although they are not part of routine preventative maintenance, the below listed items were performed.

7/18/2017: Selector Switch: Pulse Mode During a checkout it was found that switching the mode selector switch caused a continuous clicking sound from a relay in the console. The relay was the 5K8 relay, which controls the pulse rod firing system. The contacts on the relay were cleaned which resolved the problem.

3/14/2018: NPP-7 000: Pulse Power Channel High power scram on the NPP-1 000 when firing a pulse. The NPP-1 000 was verified to be operating correctly, however a wire for the mode switch for pulse mode was loose. The wire was re-soldered and the issue was corrected.

3/15/2018: ARMs The readouts for the area radiation monitors were difficult to see when operating the

. reactor. After a 50.59 screening it was determined a 50.59 change was not required Washington State University Nuclear Science Center 3

2018 Annual Report to relocate the ARM readouts. The ARM readouts were relocated to an instrument panel above the console.

6/18/2018: Hold Up Tanks During a pre-startup check out the RO determined that the holdup waste tanks system was not energized. The RO checked the indicator lights on the console to confirm the lights were working. The control system in Room 2 was checked and it was found that there was a fuse that had failed. The fuse was replaced and power was restored to the hold up tanks.

5. Changes, Tests, and Experiments Performed Under 1O CFR 50.59 Criteria There were no changes to the facility made under 10 CFRS0.59 criteria during the 201 7-201 8 reporting year.
6. Radioactive Effluent Discharges A. Radioactive Liquid Effluent Releases The liquid effluent releases for the facility during the reporting period are provided in Table Ill.

Table Ill Monthly Liquid Effluent Releases Month Volume (gallons)

July 2017 0 August 0 September 0 October 0 November 0 December 0 January 2018 0 February 0 March 0 April 0 May 0 June 0 No liquid effluents were released from the storage tank during the reporting period.

B. Radioactive Gaseous Effluent Release During the reporting period, no emission of a measurable quantity of gaseous or particulate material with a half-life greater than eight days was Washington State University Nuclear Science Center 4

2018 Annual Report detected. The argon-41 release did not exceed 20% of the effluent release limit. A total of 2.9 Ci of argon-41 was released, with an average argon-41 concentration of 1.47 x l 0* 10 µCi/ml of air, after environmental dilution. The argon-41 release and the pool water analysis is used in the 2018 Annual Report for Radioactive Air Emission License (RAEL-004), stack number 7. Per COMPLY vl .7, the reactor facility (stack 7) is in compliance at level 4 with an effective dose equivalent of 8.3 x l 0*3 mrem/yr. The monthly releases from Ar-41 are summarized in Table IV.

Table IV Monthly Argon-41 Releases 2 Cone. After

% of DAC Month Quantity (Ci) Dilution, Limit

(µCi/ml)

July 2017 2.ox10* 1 1.2x10*10 3.9 X l 0*3 August 2.ox10* 1 1.2x10*10 4.0 X l 0*3 September 2.8x10* 1 1.8 X 10*10 5.9 X l 0*3 October 2. 5 X l 0* 1 1.5 X 10*10 5.0 X l 0*3 November 3.0x10* 1 1.8 X l 0* 10 6.1 X 10*3 December 2.ox10* 1 l .2 X l 0* 10 3.9 X l 0*3 January 2018 1.9 X 10*1 l .l X l 0* 10 3.8 X l 0*3 February 2.5x10* 1 1.7 X 10* 10 5.5 X l 0*3 March 4.5 X 10* 1 2.7 X l 0* 10 8.9 X l 0*3 April 1.3 X l 0* 1 9. l X l 0* 11 3.0 X l 0*3 May 2.1x10* 1 l.3x10*10 4.3 X l 0*3 June 2.2x10* 1 l .4 X l 0* 10 4.6x10*3 C. Radioactive Solid Waste Disposal During the reporting period, 0.88 mCi in 56.7 cubic feet of non-compacted solid waste was transferred to the WSU Radiation Safety Office for packaging and disposal.

7. Personnel and Visitor Radiation Doses The quarterly doses of the WSU Nuclear Science Center reactor staff and experimenters are given in Table V. The maximum quarterly dose to a reactor staff member was l 53 mrem, whole body.

A total of 789 individual persons visited the Nuclear Science Center during the reporting period, of which 198 entered a controlled access area (CAA). 3 A total of 64 group tours, consisting of 488 individuals, visited the center during the reporting 2

Quantity released based on 4500 CFM effluent of ventilation system in AUTO mode of operation. Concentration after dilution is based on l O CFR 20 effluent release limit of l .0 x lo-* µCi/ml for Ar-41 (Table 2, Col. l ), and a dilution factor of 3.4 x lo*' (WSU Technical Specifications 3.5.2). DAC limits are based on l O CFR 20 derived air concentration limit of 3.0 x lo** µCi/ml for Ar-41 (Table l, Col. 3) and a dilution factor of 3.4 x lo*'.

'A controlled access area is an area in the building where radioactive materials are used or stored and is a part of the licensed reactor facility.

Washington State University Nuclear Science Center 5

2018 Annual Report period, also entering a CAA. All doses were less than or equal to 0.2 mrem as determined by digital pocket dosimeters.

Table V Quarterly Reactor and Experimenter Staff Dose 4 (in mrem)

Badge No. Q3 2017 Q4 2017 Ql 2018 Q2 2018 10921 43 83 42 79 11516 18 3 M M 11205 M M -- --

11761 -- 2 2 4 11239 7 4 2 5 08141 9 3 M 105 11762 -- M 4 2 10910 29 6 53 7 10916 65 13 9 153 10450 3 3 M M 11763 -- 3 M M 10392 7 -- -- --

11255 3 2 1 --

10451 1 -- -- --

11764 -- 13 2 M 10641 16 50 1 --

11694 6 5 1 --

11765 -- 1 1 --

11222 1 -- -- --

08594 6 3 M M 07748 1 2 M M 10643 4 3 1 --

8. Reactor Facility Radiation and Contamination Levels The limit of quantification (LOQ) for building removable contamination determination survey samples as measured by liquid scintillation assay is 8.89 x 1 o-s

µCi/cm 2 ; the survey sample data that was collected for removable contamination determination were averaged over one year. Routine building surveys showed average levels of removable activity to be less than the LOQ for all non-CAAs.

Routine building surveys showed average levels of removable activity to be less than the LOQ for all CAAs except the 201 Experimenters Platform and the Room 2 Cave Floor West.

' "--" denotes data not available either due to departure from the facility or new personnel starting at the facility.

An 'M' denotes that the dosimeter reading was less than or equal to the background radiation level for that quarter.

Washington State University Nuclear Science Center 6

2018 Annual Report Table VI Average Removable Contamination for Weekly Monitoring in CAAs and Non-CAAs 5 Measured Location Activity Above

  • -

LOQ (µCi/cm2 )

2018 M 201A M 201 Reactor Bridge Steps M 201 Sample Drop Tube M 201 Reactor Bridge South M 201 Reactor Bridge North M 201 Experimenter Platform 3.4E-07 201 Laboratory Benches .M 201 Floor South M 201-C Heat Exchanger Floor M 201 Floor North M 106 Ion Exchanger Pit M 101-A Purification Pump Pit M 101 Doorway M 101 Sample Preparation Bench M 101 Sample Drop Hood #2 M 101 Shipment Bench M 101 Hood #1 M 101 Hood #18 M 101 Hood #4 M B21 Panoramic lrradiator M B21 Floor M 2 South Floor M 2 Thermal Column M 2 Thermal Column Floor M 2 North Floor M 2 Cave Floor West 3.2E-07 2 Cave Floor East M The results for the routine area radiation surveys of the building in CAAs and non-CAAs are given in Table VII. The highest average dose rate for a single location in a CAA was 31 .9 mrem/hr, which occurred in Room 2 East Cave. This value is less than the limit for CAAs. The lowest average dose rate in a CAA was 0.04 mrem/hr (a level 5 Balded text indicates a non-CAA. Regular text indicates a CAA. "M" indicates the value is below the LOQ value of 8.8 x lo-* µCi/cm'.

Washington State University Nuclear Science Center 7

2018 Annual Report considered background), which occurred in Room 2 Thermal Column. The average dose rate in the radiochemistry sample hoods (a non-CAA) was 0.52 mrem/hr. The East and West cave are secured storage areas and are designed to house radioactive sources and provide shielding. The space is posted as a high radiation area.

Personnel do not typically work in this area and it is locked when not in use.

Table VII Average Radiation Dose Rates for Weekly Monitoring in CAAs and Non-CAAs 6 Average Dose Rate Location (mrem/hr)

' Room 201 B 0.06 Room 201 A 0.04 Room 201 Bridge 1.48 Room 201 Benches 0.19 Room 201 South 0.24 Room 201 East 0.63 Room 201 C Heat Exchanger 0.05 Room 201 North 0.99 Room 1 06 Ion Exchanger Pit 2.18 Room 1 01 A Purification Pit 8.96 Sample Storage I 0.34 Room 101 Doorway 0.05 Room 101 Sample Prep Bench 0.05 Room 101 Sample Drop Hood 2 0.52 Room 101 Shipping Bench 0.04 Room 101 Hood 1 . '- 0.06 Room 101 Hood 2 0.07 Room 101 Hood 4 0.08 Room B21 Panoramic lrradiator 0.04 Room 2 South 0.37 Room 2 Thermal Column 0.04 Room 2 North 0.18 Room 2 West Cave 1.87 Room 2 East Cave 31.9

. 9. Environmental Monitoring Program The environmental monitoring program is used to determine the offsite background radiation levels; thermoluminescent dosimeters (TLD's) are used to make the

  • Balded text indicates a non-CAA. Regular text indicates a CAA.

Washington State University Nuclear Science Center 8

2018 Annual Report I

measurements. The offsite radiation monitoring program is required by the Technical Specifications. The TLDs that are used for offsite monitoring are designated as TLD numbers 3, 7, 9, 15 through 35, and 39 through 44. The average background radiation level is then compared to the nearest occupied dwelling. TLD 4, 5, 6, 8, 9, and 10 show abnormally high readings for Q3 2017, Q4 2017, Ql 201 8, and Q2 201 8 due to irradiated graphite reflector elements stored nearby in the radioactive waste shed on the north side of the facility. The Radiation Safety Office has shielded the reflector barrels such that no public dose rate limits are exceeded. TLD 9 has been removed from background radiation calculations.

Average quarterly dose rates for offsite locations are listed in Table VIII and are used to calculate the Technical Specification threshold of 20% above the background radiation level and compared to the limiting values which are listed in Table XI. The average environmental radiation levels for the closest offsite point of extended occupancy is listed in Table X. Table IX shows the quarterly environmental radiation levels for those TLD's located at onsite locations. The onsite locations are not required to be compared to background radiation levels.

The closest offsite points of extended occupancy are compared in Figure 1 to both the background radiation levels and the 20% above background radiation levels. The ALARA effluent release limits in Technical Specification 3.5.2(3) specify that annual radiation exposure due to reactor operation, at the closest offsite extended occupancy, shall not, on an annual basis, exceed the average offsite background radiation by more than 20%. For the reporting period, the average background radiation dose rate for off-site locations was 0.51 mrem/day, while the average radiation dose rate at the closest extended occupancy area 600 meters away was 0.34 mrem/day. This result indicates that no exposure level above normal background radiation were found, and that no dose levels exceeded Technical Specifications requirements for an offsite area of extended occupancy.

Washington State University Nuclear Science Center 9

2018 Annual Report Table VIII Environmental Radiation Levels at Offsite Locations of the Nuclear Science Center 7 (dose rate in mrem/day)

Q3 Q4 Ql Q2 L0<;:ation Average 2017 2Q17 20l8 2018 Fence E of NSC 0.35 0.32 0.39 0.33 0.35 Fence, N of Rad Waste Shed 0.57 0.50 0.57 0.52 0.54 Fence directly N Rad Waste Shed 5.90 6.32 5.63 5.74 5.90 S NSC, on parking lot fence 0.32 0.34 0.37 0.32 0.34 Fence S Roundtop Dr, l O'h pole W of 0.36 0.35 0.43 0.37 0.38 pole Cl 4 Telephone pole Cl 2 0.37 0.32 0.42 0.36 0.37 Telephone pole near golf course gate 0.38 0.33 0.42 0.33 0.37 E across fairway on pine tree 0.34 0.34 0.40 0.33 0.35 Maple tree #54 along driving range 0.32 0.29 0.40 0.32 0.33 NW to fence uphill from driving range 0.45 0.42 0.48 0.34 0.42 Follow fence E to fence corner 0.38 0.36 0.42 0.44 0.40 S to lone spruce tree near water hazard 0.38 0.34 0.39 0.31 0.36 Roundtop hill park, NW fence corner 0.34 0.32 0.39 0.32 0.34 Deciduous tree edge of l 8'h green 0.36 0.36 0.42 0.40 0.39 6ft pine tree, 3rd W down cart path from 0.35 0.37 0.41 0.33 0.37 clubhouse 3rd to last tree after gap in same line of 0.30 0.36 0.39 0.31 0.34 trees SW to fence along pqth near 2nd to last 0.39 0.35 0.41 0.40 0.39 tee box at bottom hill Follow fence partway up hill after fence 0.36 0.33 0.39 0.34 0.36 turns S Follow fence, l S'h pole E after fence 0.37 0.34 0.41 0.34 0.37 turns W Follow fence about halfway between 0.35 0.36 0.41 0.34 0.37 last TLD and corner Largest bush S of NSC 0.36 0.33 0.40 0.36 0.36 2"d fence S NSC, W end at gate 0.37 0.32 0.37 0.36 0.36 S Fairway Rd, l" light post on right 0.38 0.33 0.40 0.36 0.37 S Fairway Rd, 2nd light post on right -- 0.33 0.39 0.33 0.35 Ellis Way and Hog Lane sign 0.29 0.35 0.36 0.33 0.34 Bottom of radio antenna hill, fence 0.36 0.34 0.39 0.34 0.36 next to shrub left of qate 3rd fence S of NSC, SE corner, cow 0.35 0.35 0.39 0.34 0.36 pasture Airport fence Wend runway at gate 0.30 0.34 0.42 0.32 0.35 Fence/entry bar E of Jewett 0.34 0.36 0.37 0.33 0.35 Observatory Granite rock Terrell Mall, hole in back 0.27 -- 0.42 -- 0.35

'Offsite defined by the Technical Specification 1.0 and 5.1. l as any location which is outside the site boundary.

The"--" indicates a TLD which was missing.

Washington State University Nuclear Science Center 10

2018 Annual Report Table IX Environmental Radiation Levels at Onsite Locations of the Nuclear Science Center8 (dose rate in mrem/day)

Q3 Q4 Ql Q2 Location Average 2017 2017 2018 2018 E lower loading dock 0.33 0.33 0.40 0.31 0.34 Pool room truck door fence S end 0.83 0.74 0.66 0.70 0.73 Pool room truck door fence N end 1.77 1.21 1.21 1.22 1.35 E wall rad waste shed 0.72 0.71 0.76 0.63 0.70 N wall rad waste shed 1.00 0.78 0.76 0.63 0.79 Cooling tower fence, NE corner 14.37 18.05 16.58 17.92 16.73 Room l 01 window 0.44 0.39 0.46 0.40 0.42 Railing next to upper liquid waste tank 0.39 0.34 0.47 0.39 0.40 Room 2 truck door fence 0.35 0.35 0.41 0.34 0.36 Transformer vault vent louvers 0.40 0.35 0.46 0.39 0.40 NSC main entrance, light fixture 0.39 0.41 0.49 0.47 0.44 NSC roof, pool room vent stack 0.33 0.33 0.37 0.34 0.34 NSC roof, guide wire E end of building 0.37 0.39 0.40 0.36 0.38 NSC roof, E pool room vent support leg 0.55 0.58 0.79 0.77 0.67

  • NSC roof, air conditioning support leg 0.34 0.33 0.40 0.41 0.37 NSC roof, W pool room vent support leg 0.70 0.74 0.85 0.60 0.72

\

Table X Environmental Radiation Levels for the Closest Offsite Point of Extended Occupancy (dose rate in mrem/day)

Q3 Q4 Ql Q2 Location Average 2017 2017 2018 2018 Apt complex C, gas meter 0.35 0.36 0.37 0.33 0.35 Apt complex B, gas meter 0.36 0.35 0.39 0.32 0.36 l st fence S apt complex A 0.29 0.31 0.35 0.32 0.31 Table XI Background Environmental Radiation Levels (dose rate in mrem/day)

Q3 Q4 Ql Q2 Description Average 2017 2017 2018 2018 Background radiation levels 0.55 0.35 0.41 0.36 0.42 20% above background radiation levels 0.66 0.42 0.49 0.43 a.so

Washington State University Nuclear Science Center 11

2018 Annual Report 0.70

\

\

\

0.60

\

\

\

0.50 +---""'---\"=-\_ _ _ _ _ _ _ _ _ _ _ _ _ __

\ ,,,,,, ........

\ ,,,, ........

\"

'-'-'-'-"' Apartment Complex A

~ Apartment Complex B

- Apartment Complex C

- Background

- - - 20% Above Background 0.10 0.00 Q3 2017 Q4 2017 QI 2018 Q2 2018 Average Quarter Figure 1: Environmental radiation levels for the closest off-site point of extended occupancy as compared to background radiation levels and 20% above background radiation levels.