Line 3: |
Line 3: |
| | issue date = 05/23/2014 | | | issue date = 05/23/2014 |
| | title = Response to Regulatory Issue Summary 2014-05 Preparation and Scheduling of Operator Licensing Examinations | | | title = Response to Regulatory Issue Summary 2014-05 Preparation and Scheduling of Operator Licensing Examinations |
| | author name = Pierce C R | | | author name = Pierce C |
| | author affiliation = Southern Co, Southern Nuclear Operating Co, Inc | | | author affiliation = Southern Co, Southern Nuclear Operating Co, Inc |
| | addressee name = | | | addressee name = |
|
---|
Category:Letter type:NL
MONTHYEARNL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program NL-24-0259, License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes2024-09-0404 September 2024 License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes NL-24-0340, Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R322024-09-0404 September 2024 Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R32 NL-24-0334, 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc2024-09-0303 September 2024 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc NL-24-0313, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information2024-08-23023 August 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information NL-24-0321, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information2024-08-16016 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information NL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0281, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions2024-07-18018 July 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0230, Plants Units 1&2, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-3602024-06-28028 June 2024 Plants Units 1&2, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-360 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 NL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information NL-24-0229, Notice of Intent to Pursue Subsequent License Renewal2024-06-0707 June 2024 Notice of Intent to Pursue Subsequent License Renewal NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0195, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water.2024-05-0707 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water. NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0188, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint2024-04-19019 April 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint NL-24-0137, RIPE License Amendment Request to Change Containment Air Temperature Actions2024-04-19019 April 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions NL-24-0134, Renewed National Pollutant Discharge Elimination System (NPDES) Permit2024-04-12012 April 2024 Renewed National Pollutant Discharge Elimination System (NPDES) Permit NL-24-0088, Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-04-0505 April 2024 Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0092, Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R292024-03-15015 March 2024 Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R29 NL-24-0062, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-03-12012 March 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0089, Correction of Technical Specification Omission2024-03-0909 March 2024 Correction of Technical Specification Omission NL-24-0061, Cycle 32 Core Operating Limits Report Version 12024-03-0101 March 2024 Cycle 32 Core Operating Limits Report Version 1 NL-24-0067, 10 CFR 72.48(d)(2) Biennial Report2024-02-26026 February 2024 10 CFR 72.48(d)(2) Biennial Report NL-24-0051, License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-02-20020 February 2024 License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0003, Inservice Inspection Program Owners Activity Report (OAR) Supplement for Outages 1 R30 and 1 R312024-02-16016 February 2024 Inservice Inspection Program Owners Activity Report (OAR) Supplement for Outages 1 R30 and 1 R31 NL-24-0042, Response to Request for Additional Information Exemption Requests for Physical Barriers2024-02-13013 February 2024 Response to Request for Additional Information Exemption Requests for Physical Barriers NL-24-0033, Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers2024-02-0505 February 2024 Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers NL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. NL-24-0011, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-01-11011 January 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers NL-23-0908, Cycle 30 Core Operating Limits Report2023-12-13013 December 2023 Cycle 30 Core Operating Limits Report NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0877, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection2023-11-14014 November 2023 Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection 2024-09-09
[Table view] |
Text
Charles R. Pierce Regulatory Affairs Director MAY 2 3 2014 Southern Nuclear Operating Company, Inc. 40 Inverness Center Parkway Post Olfice Box 1295 Birmingham.
AL 35242 Tel 205.992.7872 Fax 205.992.7601 Docket Nos: 50-321 50-348 50-424 50-366 50-364 50-425 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant-Units 1 and 2 Edwin I. Hatch Nuclear Plant -Units 1 and 2 NL-14-0821 Vogtle Electric Generating Plant -Units 1 and 2 Response to Regulatory Issue Summary 2014-05 Preparation and Scheduling of Operator Licensing Examinations Ladies and Gentlemen:
On April 29, 2014, the Nuclear Regulatory Commission (NRC) issued Regulatory Issue Summary (RIS) 2014-05, "Preparation and Scheduling of Operator Licensing Examinations." RIS 2014-05 requests that licensees voluntarily submit projections of their site-specific operator licensing examination schedules as well as the estimated number of applicants planning to take operator licensing and generic fundamental examinations for years 2016-2019.
Southern Nuclear Operating Company (SNC) hereby provides as enclosures to this letter the requested information on NRC form 536 for Joseph M. Farley Nuclear Plant-Units 1 and 2, Edwin I. Hatch Nuclear Plant-Units 1 and 2, and Vogtle Electric Generating Plant -Units 1 and 2. The estimates provided represent SNC's current understanding, but are subject to possible change in the future. This letter does not contain NRC commitments or proprietary information.
If you have any questions regarding the material of this submittal, please contact Mr. G. K. McElroy at 205-992-7369.
Respectfully submitted, (!1{ fk. ... C. R. Pierce Regulatory Affairs Director CRP/JMC/
U.S. Nuclear Regulatory Commission NL-14-0821 Page2
Enclosures:
- 1. NRC Form 536 Operator Licensing Examination Data for Joseph M. Farley Nuclear Plant-Units 1 and 2 2. NRC Form 536 Operator Licensing Examination Data for Edwin I. Hatch Nuclear Plant -Units 1 and 2 3. NRC Form 536 Operator Licensing Examination Data for Vogtle Electric Generating Plant-Units 1 and 2 cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President
& CEO Mr. D. G. Bost, Executive Vice President
& Chief Nuclear Officer Ms. C. A. Gayheart, Vice President
-Farley Mr. D. R. Vineyard, Vice President-Hatch Mr. T. E. Tynan, Vice President-Vogtle 1 & 2 Mr. D. R. Madison, Vice President-Fleet Operations Mr. B. L. lvey, Vice President-Regulatory Affairs Mr. B. J. Adams, Vice President-Engineering Mr. R. R Martin, Regulatory Manager-Farley Mr. G. L. Johnson, Regulatory Manager-Hatch Mr. S. C. Waldrup, Regulatory Manager-Vogtle RType: Farley=CFA04.054; Hatch=CHA02.004; Vogtle=CVC7000 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. S. A. Williams, NRR Project Manager-Farley Mr. E. D. Morris, Senior Resident Inspector-Hatch Mr. L. M. Cain, Senior Resident Inspector-Vogtle 1 & 2 Mr. P. K. Niebaum, Resident Inspector-Farley Mr. J. R. Sowa, Resident Inspector-Farley Mr. R.E. Martin, NRR Project Manager-Hatch, Vogtle 1 & 2 Joseph M. Farley Nuclear Plant-Units 1 and 2 Response to Regulatory Issue Summary 2014-05 Preparation and Scheduling of Operator Licensing Examinations Enclosure 1 NRC Form 536 Operator Licensing Examination Data for Joseph M. Farley Nuclear Plant -Units 1 and 2 NRC FORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3110.0131 EXPIRES: 0913012014 (9-20H) Eslimaled buRien per response 111 comply with lllls volllnlaly infonnalian Clllleclinn ll!qiK!SI:
I hour. This infvnnallon ClOiedion is used Ill !)lan budgets and rescun:es lor operator OPERA TOR LICENSING Send Cllllllll8l1ls ragallling bvnlsn es1lmale 10 1118 lnronnatian SeMces Brandl CT*S FS3). U.S. Nuclear Regula!llly Commlss!on, DC 2055S-QI0t, or by inlemet e-EXAMINATION DATA mal 10 !nloc:ICllects.R8solll:e@nlc.p.
and ID the Desk Ofbr, Ol!!ce of lnfacma!lan and Allairs, NEOB-10202, 1315114131), O!l!ca af Management and Budget. waslingtDn.
DC Z0503. H a means used 10 lllqlose an ln!llrmation coredcn does nat disJIIaY a Cllm!llly valid OMB CIII1WI nunmer, hi NRC may not Cllltducl cr SJ)CIIalr, and a not requited 10 respgnd to. the lnilnnlllllln Cllllecticn.
FACIUTY NRC ReGION Joseph M. Farley Nuclear Plant Units 1 & 2 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 16 CY 17 CY 18 CY 19 ----ESTIMATED NUMBER OF LICENSEE-PREPARED 0 I I 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 16 CY 17 CY 18 CY 19 ----NUMBER OF REACTOR 0 6 6 0 OPERATORS NUMBER OF SENIOR REACTOR 0 7 5 0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0 I I 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS*
LIMITED PROPOSED OATES PRIMARY DATE 04/03/2017 10/0112018 AlTERNATE DATE 04/10/2011 10/08/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 16 CY 17 PROPOSED --NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 538 (9-2011)
Edwin I. Hatch Nuclear Plant -Units 1 and 2 Response to Regulatory Issue Summary 2014-05 Preparation and Scheduling of Operator Licensing Examinations Enclosure 2 NRC Form 536 Operator Licensing Examination Data for Edwin I. Hatch Nuclear Plant -Units 1 and 2 NRC FORM536 U.S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO.
EXPIRES: 09130/2014 (9-2011) Estimated burden per response to ccrnply with this vo!unlaly in!onna!ion co!lection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This informa5on co!ledion is used to plan budgets and resources fer operalof OPERA TOR LICENSING euminations.
Send conunenls regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regula!Oiy CQmmissian, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to lntocollects.Resoun:e@nrc.gov, and to the Desk Oflicler, Office Gf lnfcrmation ard Regulatory Affairs, NEOB-10202, (3150-0131), Office of Managemenlmd Washington, DC 20503. If a means used Ill imp<lse an information colleelkln dGes oot display a currently valid OMB control number, Ute NRC may not conduct ar sponsor, and a pelSOR is nGI requited to respond to, lhe lnfcrmatioo collection.
FACILITY NRC REGION Plant E. I. Hatch II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ----ESTIMATED NUMBER OF LICENSEE-PREPARED I I 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ----NUMBER OF REACTOR 7 6 7 7 OPERATORS NUMBER OF SENIOR REACTOR 5 4 4 4 OPERATORS*
INSTANT NUMBER OF SENIOR REACTOR 2 2 1 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS -LIMITED PROPOSED DATES PRIMARY DATE 06/20/2016 09/18/2017 06/18/2018 06/17/2019 ALTERNATE DATE 06/2712016 09/25/2017 06/25/2018 06/24/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED --NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 15 0 0 12 0 0 12 0 CANDIDATES NRC FORM 536 (9-2011 I Vogtle Electric Generating Plant -Units 1 and 2 Response to Regulatory Issue Summary 2014-05 Preparation and Scheduling of Operator Licensing Examinations Enclosure 3 NRC Form 536 Operator Licensing Examination Data for Vogtle Electric Generating Plant -Units 1 and 2 NRC FORM 53& U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO.
EXPIRES: 08130/21114 (09-2011)
ESIImal8d llunlen per response 1D canw will lhis d!ntay il1fllnnaiiDn ccDeclion request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This infonnation collection Is uted 1D plan lludgels am 18S01111X1S for Cjl8fldat OPERA TOR LICENSING examinations.
Send c:onmerds raganing lxl1!en es&nate ID !he lnbmalion Senices BllllCh (T .S FS3), U.S. Nucla* Reglllaby C<<nmissson.
Washlngbl.
DC 20555-00J1, 01 by lnlemat e-EXAMINATION DATA IIWIID lnfacollacts.RescurceOic.gov, a1d fD 1lle De:ik Ollter, Ollice of lllbmallon lrld Reg!Mxy ... N£()8.10Z02, (3164).0131).
Olfice lrld DC 20503. If a moans used ID Impose 111 lnbmatian caleclion does 1101 displaJ a ml OMS conllol NRC 11111 not canducl 01 sponsor, and a 1101 ruqui'Dd ID respond to, !he lnbmallon caleclon.
FACILilY I Nit\; REGIUN VOGTLE ELECTRIC GENERATING PLANT-UNITS 1&2 II 7821 RIVER ROAD WAYNESBORO, GEORGIA 30830 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ----ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRc-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ----NUMBER OF REACTOR 0 8 8 0 OPERATORS NUMBER OF SENIOR REACTOR 0 8 8 0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0 2 2 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS*
UMITED PROPOSED DATES PRIMARY DATE NA 4/1012017 9/1712018 NA ALTERNATE DATE NA 4/17-4/24/2017 9/24-10/112018 NA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED --NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 16 CANDIDATES NRC FORM53S (Q9.2.011)