* Docket No: . Date: Completed by: Robert Phillips Telephone:
* Docket No: . Date: Completed by: Robert Phillips Telephone:
Operating Status 1. Unit Name Salem No. 2 Notes 2. Reporting Period October 1995 3o Licensed Thermal Power (MWt) 3411 4o Nameplate Rating (Gross MWe) 1170 5. Design Electrical Rating (Net MWe) 1115 60 Maximum Dependable Capacity(Gross MWe) 1149 7o Maximum Dependable Capacity (Net MWe) 1106 50-311 11/10/95 339-2735 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give  
Operating Status 1. Unit Name Salem No. 2 Notes 2. Reporting Period October 1995 3o Licensed Thermal Power (MWt) 3411 4o Nameplate Rating (Gross MWe) 1170 5. Design Electrical Rating (Net MWe) 1115 60 Maximum Dependable Capacity(Gross MWe) 1149 7o Maximum Dependable Capacity (Net MWe) 1106 50-311 11/10/95 339-2735 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give
: 9. Power Level to Which Restricted, if any (Net MWe) 10. Reasons for Restrictions, if any 11. Hours in Reporting Period 12. No. of Hrs. Rx. was Critical 13. Reactor Reserve Shutdown Hrs. 14. Hours Generator On-Line 15. Unit Reserve Shutdown Hours l6o Gross Thermal Energy Generated (MWH) Gross Elec. Energy Generated (MWH) 18. Net Elec. Energy Gen. (MWH) 19. Unit Service Factor 200 Unit Availability Factor 21. Unit Capacity Factor (using MDC Net) 22. Unit Capacity Factor (using DER Net) 23. Unit Forced Outage Rate This Month 745 0 0 0 0 0 0 -4499 0 0 0 0 100 N A Year to Date 7296 2468.4 0 2261.6 0 6807220.8 2198890 2025159 31. 0 31. 0 25.1 24.9 65.1 N/A Cumulative 123169 78083.6 0 75229.5 0 187781005 78648898 74748703 61.1 61.1 54.9 54.4 24.6 24. Shutdowns scheduled over next 6 months (type, date and duration of each) Continuation of forced outage. Planned outage starts 3 November 1995. 25. If shutdown at end of Report Period, Estimated Date of Startup: To be determined.
: 9. Power Level to Which Restricted, if any (Net MWe) 10. Reasons for Restrictions, if any 11. Hours in Reporting Period 12. No. of Hrs. Rx. was Critical 13. Reactor Reserve Shutdown Hrs. 14. Hours Generator On-Line 15. Unit Reserve Shutdown Hours l6o Gross Thermal Energy Generated (MWH) Gross Elec. Energy Generated (MWH) 18. Net Elec. Energy Gen. (MWH) 19. Unit Service Factor 200 Unit Availability Factor 21. Unit Capacity Factor (using MDC Net) 22. Unit Capacity Factor (using DER Net) 23. Unit Forced Outage Rate This Month 745 0 0 0 0 0 0 -4499 0 0 0 0 100 N A Year to Date 7296 2468.4 0 2261.6 0 6807220.8 2198890 2025159 31. 0 31. 0 25.1 24.9 65.1 N/A Cumulative 123169 78083.6 0 75229.5 0 187781005 78648898 74748703 61.1 61.1 54.9 54.4 24.6 24. Shutdowns scheduled over next 6 months (type, date and duration of each) Continuation of forced outage. Planned outage starts 3 November 1995. 25. If shutdown at end of Report Period, Estimated Date of Startup: To be determined.
8-l-7.R2 NO. DATE 2692 10/01/95 F 1 2 F: Forced S: Scheduled UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH October, 1995 DURATION TYPE 1 (HOURS) REASON 2 745 A Reason A-Equipment Failure (explain)
8-l-7.R2 NO. DATE 2692 10/01/95 F 1 2 F: Forced S: Scheduled UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH October, 1995 DURATION TYPE 1 (HOURS) REASON 2 745 A Reason A-Equipment Failure (explain)
Line 33: Line 33:
* lOCFR50.59 EVALUATIONS MONTH: OCTOBER 1995 DOCKET NO: UNIT NAME: 50-311 SALEM2 11/10/95 DATE: COMPLETED BY: TELEPHONE:
* lOCFR50.59 EVALUATIONS MONTH: OCTOBER 1995 DOCKET NO: UNIT NAME: 50-311 SALEM2 11/10/95 DATE: COMPLETED BY: TELEPHONE:
R. HELLER 609-3 3 9-5162 The following items were evaluated in accordance with the provisions of the Code of Federal Regulations 10CFR50.59.
R. HELLER 609-3 3 9-5162 The following items were evaluated in accordance with the provisions of the Code of Federal Regulations 10CFR50.59.
The Station Operations Review Committee has reviewed and concurs with these evaluations.  
The Station Operations Review Committee has reviewed and concurs with these evaluations.
: 1. Design Change Packages (DCP) The reporting ofDCP related 10CFR50.59 evaluations is being modified to address these items only after they have been implemented and turned over to Operations.
: 1. Design Change Packages (DCP) The reporting ofDCP related 10CFR50.59 evaluations is being modified to address these items only after they have been implemented and turned over to Operations.
For the next several months, during this transition phase, we anticipate few new DCPs to report. 2. Safety Evaluations (S/E) 2EC-3242 "Fuel Handling Building Ventilation Upgrades " Rev.2 -The purpose of the revision to the 50.59 was to access the affects of pinning the exhaust damper shut. This modification eliminates the possibility of discharging potentially contaminated air directly to the outdoors.
For the next several months, during this transition phase, we anticipate few new DCPs to report. 2. Safety Evaluations (S/E) 2EC-3242 "Fuel Handling Building Ventilation Upgrades " Rev.2 -The purpose of the revision to the 50.59 was to access the affects of pinning the exhaust damper shut. This modification eliminates the possibility of discharging potentially contaminated air directly to the outdoors.
Line 39: Line 39:
* REFUELING INFORMATION MONTH: OCTOBER 1995 MONTH: OCTOBER 1995
* REFUELING INFORMATION MONTH: OCTOBER 1995 MONTH: OCTOBER 1995
* DOCKET NO: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
* DOCKET NO: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
50-311 SALEM2 11/10/95 R. HELLER 609-339-5162  
50-311 SALEM2 11/10/95 R. HELLER 609-339-5162
: 1. Refueling information has changed from last month: YES_K_NO 2. Scheduled date for next refueling:
: 1. Refueling information has changed from last month: YES_K_NO 2. Scheduled date for next refueling:
11/02/95 Scheduled date for restart following refueling:
11/02/95 Scheduled date for restart following refueling:
2nd quarter 1996 3. a. Will Technical Specification changes or other license amendments be required?
2nd quarter 1996 3. a. Will Technical Specification changes or other license amendments be required?
NOT DETERMINED TO DATE X b. Has the reload fuel design been reviewed by the Station Operating Review Committee?
NOT DETERMINED TO DATE X b. Has the reload fuel design been reviewed by the Station Operating Review Committee?
YES NO X If no, when is it scheduled? (to be determined)  
YES NO X If no, when is it scheduled? (to be determined)
: 5. Scheduled date(s) for submitting proposed licensing action: ___
: 5. Scheduled date(s) for submitting proposed licensing action: ___
___ _ 6. Important licensing considerations associated with refueling:  
___ _ 6. Important licensing considerations associated with refueling:
: 7. Number ofFuel Assemblies:  
: 7. Number ofFuel Assemblies:
: a. Incore b. In Spent Fuel Storage 8. Present licensed spent fuel storage capacity:
: a. Incore b. In Spent Fuel Storage 8. Present licensed spent fuel storage capacity:
Future spent fuel storage capacity:  
Future spent fuel storage capacity:
: 9. Date oflast refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
: 9. Date oflast refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
8-1-7.R4 193 556 1632 1632 March 2012   
8-1-7.R4 193 556 1632 1632 March 2012   

Revision as of 15:12, 25 April 2019

Monthly Operating Rept for Oct 1995 for Salem Unit 2. W/951114 Ltr
ML18101B102
Person / Time
Site: Salem PSEG icon.png
Issue date: 10/31/1995
From: PHILLIPS R, WARREN C
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9511200005
Download: ML18101B102 (7)


Text

, L *

  • Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn.: Document Control Desk MONTHLY OPERATING REPORT SALEMNO. 2 DOCKET NO: 50-311 November 14, 1995 In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specifications, the original copy of the monthly operating reports for the month of October are being sent to you. RH:vls Enclosures C Mr. Thomas T. Martin Sincerely yours, General Manager -Salem Operations Regional Administrator USNRC, Region I 631 Park Avenue King of Prussia, PA 19046 8-1-7.R4 0 (. t.. r..-----------v_L._ L_ '.-_,_.}_ --9511200005 951031 PDR ADDCK 05000311 R PDR The power is in your hands. 95-2168 REV. 6/94

DAILY UNIT POWER Docket No.: 50-311 Unit Name: Salem #2 . ' Date: 11/10/95 Completed by: Robert Phillips Telephone:

339-2735 Month October 1995 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET) (MWe-NET) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 P. 8.1-7 Rl

  • OPERATING DATA REPORT
  • Docket No: . Date: Completed by: Robert Phillips Telephone:

Operating Status 1. Unit Name Salem No. 2 Notes 2. Reporting Period October 1995 3o Licensed Thermal Power (MWt) 3411 4o Nameplate Rating (Gross MWe) 1170 5. Design Electrical Rating (Net MWe) 1115 60 Maximum Dependable Capacity(Gross MWe) 1149 7o Maximum Dependable Capacity (Net MWe) 1106 50-311 11/10/95 339-2735 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give

9. Power Level to Which Restricted, if any (Net MWe) 10. Reasons for Restrictions, if any 11. Hours in Reporting Period 12. No. of Hrs. Rx. was Critical 13. Reactor Reserve Shutdown Hrs. 14. Hours Generator On-Line 15. Unit Reserve Shutdown Hours l6o Gross Thermal Energy Generated (MWH) Gross Elec. Energy Generated (MWH) 18. Net Elec. Energy Gen. (MWH) 19. Unit Service Factor 200 Unit Availability Factor 21. Unit Capacity Factor (using MDC Net) 22. Unit Capacity Factor (using DER Net) 23. Unit Forced Outage Rate This Month 745 0 0 0 0 0 0 -4499 0 0 0 0 100 N A Year to Date 7296 2468.4 0 2261.6 0 6807220.8 2198890 2025159 31. 0 31. 0 25.1 24.9 65.1 N/A Cumulative 123169 78083.6 0 75229.5 0 187781005 78648898 74748703 61.1 61.1 54.9 54.4 24.6 24. Shutdowns scheduled over next 6 months (type, date and duration of each) Continuation of forced outage. Planned outage starts 3 November 1995. 25. If shutdown at end of Report Period, Estimated Date of Startup: To be determined.

8-l-7.R2 NO. DATE 2692 10/01/95 F 1 2 F: Forced S: Scheduled UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH October, 1995 DURATION TYPE 1 (HOURS) REASON 2 745 A Reason A-Equipment Failure (explain)

B-Maintenance or Test C-Refueling D-Requlatory Restriction METHOD OF SHUTTING DOWN REACTOR 4 E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

LICENSE EVENT SYSTEM REPORT # CODE 4 --------SH 3 Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Previous Outage 5-Load Reduction 9-0ther COMPONENT CODE 5 DOCKET NO. UNIT NAME DATE COMPLETED BY TELEPHONE 50-311

  • Salem #2 11-10-95 Robert Phi l ljfil. 609-339-2735 . ----.. CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE CKT BRK Breaker Failure 1-9 500KV 4 Exhibit G -Instructions for Preparation of Data Entry Sheets for Licensee Event Report CLER) File (NUREG-0161) 5 Exhibit 1 -Same Source *
  • lOCFR50.59 EVALUATIONS MONTH: OCTOBER 1995 DOCKET NO: UNIT NAME: 50-311 SALEM2 11/10/95 DATE: COMPLETED BY: TELEPHONE:

R. HELLER 609-3 3 9-5162 The following items were evaluated in accordance with the provisions of the Code of Federal Regulations 10CFR50.59.

The Station Operations Review Committee has reviewed and concurs with these evaluations.

1. Design Change Packages (DCP) The reporting ofDCP related 10CFR50.59 evaluations is being modified to address these items only after they have been implemented and turned over to Operations.

For the next several months, during this transition phase, we anticipate few new DCPs to report. 2. Safety Evaluations (S/E) 2EC-3242 "Fuel Handling Building Ventilation Upgrades " Rev.2 -The purpose of the revision to the 50.59 was to access the affects of pinning the exhaust damper shut. This modification eliminates the possibility of discharging potentially contaminated air directly to the outdoors.

There is no reduction in the margin of safety as defined in the bases for any Technical Specification. (SORC 95-125)

  • REFUELING INFORMATION MONTH: OCTOBER 1995 MONTH: OCTOBER 1995
  • DOCKET NO: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

50-311 SALEM2 11/10/95 R. HELLER 609-339-5162

1. Refueling information has changed from last month: YES_K_NO 2. Scheduled date for next refueling:

11/02/95 Scheduled date for restart following refueling:

2nd quarter 1996 3. a. Will Technical Specification changes or other license amendments be required?

NOT DETERMINED TO DATE X b. Has the reload fuel design been reviewed by the Station Operating Review Committee?

YES NO X If no, when is it scheduled? (to be determined)

5. Scheduled date(s) for submitting proposed licensing action: ___

___ _ 6. Important licensing considerations associated with refueling:

7. Number ofFuel Assemblies:
a. Incore b. In Spent Fuel Storage 8. Present licensed spent fuel storage capacity:

Future spent fuel storage capacity:

9. Date oflast refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

8-1-7.R4 193 556 1632 1632 March 2012

  • SALEM GENERATING STATION MONTHLY OPERATING

SUMMARY

-UNIT 2 NOVEMBER 1995 SALEM UNIT NO. 2 The Unit remained shutdown for the entire period. According to commitments from PSE&G and a subsequent confirmatory action letter from the NRC, both Units will remain shutdown pending completion of the following actions:

  • Appropriately address long standing equipment reliability and operability issues
  • After the work is completed, conduct a restart readiness review to determine for ourselves the ability of each Unit to operate in a safe, event free manner
  • After the restart review, meet with the NRC and communicate the results of that review