ML070810668: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 01/09/2007
| issue date = 01/09/2007
| title = Draft - Section B Operating Exam (Folder 2)
| title = Draft - Section B Operating Exam (Folder 2)
| author name = Silk D M
| author name = Silk D
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name =  
| addressee name =  
Line 50: Line 50:
-> Initial Conditions:
-> Initial Conditions:
The plant was at 100% power with charging and letdown in a normal lineup. Moments ago the "B" Charging pump tripped and the applicable ARP's referenced.
The plant was at 100% power with charging and letdown in a normal lineup. Moments ago the "B" Charging pump tripped and the applicable ARP's referenced.
Initiating Cues: The US has directed you to perform EOP 3506, "Loss Of All Charging Pumps," beginning with step I. **** NOTES TO EVALUATOR****  
Initiating Cues: The US has directed you to perform EOP 3506, "Loss Of All Charging Pumps," beginning with step I. **** NOTES TO EVALUATOR****
: 1. Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, critical steps must be completed correctly.
: 1. Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, critical steps must be completed correctly.
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. When the student states what hidher simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?"
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. When the student states what hidher simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?"
or "What are you observing?").  
or "What are you observing?").
: 2. 3. 4of 17 PERFORMANCE INFORMATION JPM Number: S.1 Revision:
: 2. 3. 4of 17 PERFORMANCE INFORMATION JPM Number: S.1 Revision:
0 Task Title: Respond To A Loss Of All Charging Pumps (Overcurrent)
0 Task Title: Respond To A Loss Of All Charging Pumps (Overcurrent)
Line 95: Line 95:
STEP 21 GRADE STEP 22 GRADE STEP 23 GRADE STEP 24 GRADE , -J Performance Step: Check procedure entered from - ES- 7.d. 0.1, REACTOR TRIP RESPONSE Standards:
STEP 21 GRADE STEP 22 GRADE STEP 23 GRADE STEP 24 GRADE , -J Performance Step: Check procedure entered from - ES- 7.d. 0.1, REACTOR TRIP RESPONSE Standards:
Initial conditions were given at 100% power, therefore the applicant should procede to step 7.d. RNO.
Initial conditions were given at 100% power, therefore the applicant should procede to step 7.d. RNO.
Grade: SAT UNSAT Performance Step: Proceed to step 8. 7.c. RNO. Standards  
Grade: SAT UNSAT Performance Step: Proceed to step 8. 7.c. RNO. Standards
: Proceeds to step 8. Grade: SAT UNSAT Performance Step: Check Charging System 8.a. Alignment Verify charging line flow control valve - OPEN Standards  
: Proceeds to step 8. Grade: SAT UNSAT Performance Step: Check Charging System 8.a. Alignment Verify charging line flow control valve - OPEN Standards
: Observes that 3CHS*FKl21 has output and flow indicated or observes charging flow indicated on the PPC CVCS trend display. Grade: SAT UNSAT Performance Step: Verify charging header loop isolation  
: Observes that 3CHS*FKl21 has output and flow indicated or observes charging flow indicated on the PPC CVCS trend display. Grade: SAT UNSAT Performance Step: Verify charging header loop isolation
: 8. b. valves (3CHS*AV8146 or 3CHS*AV8147) - ONE OPEN Standards:
: 8. b. valves (3CHS*AV8146 or 3CHS*AV8147) - ONE OPEN Standards:
Observes that only one charging header loop isolation valve is open by observing a red indicating light for 3CHS*AV8146 and a green indicating I ig h t for 3 C H S*AV8 1 47. 11 of 17 PERFORMANCE INFORMATION JPM Number: S.l Revision:
Observes that only one charging header loop isolation valve is open by observing a red indicating light for 3CHS*AV8146 and a green indicating I ig h t for 3 C H S*AV8 1 47. 11 of 17 PERFORMANCE INFORMATION JPM Number: S.l Revision:
Line 117: Line 117:
0 'L-' Task Title: Respond To A Loss Of All Charging Pumps (Overcurrent) recorder trace or PPC CVCS trend display. Takes manual control of the charging line flow control valve and verifies throttling capability . Grade: SAT UNSAT STEP 30 Performance Step: Proceed to step 11. 9. b. GRADE Standards:
0 'L-' Task Title: Respond To A Loss Of All Charging Pumps (Overcurrent) recorder trace or PPC CVCS trend display. Takes manual control of the charging line flow control valve and verifies throttling capability . Grade: SAT UNSAT STEP 30 Performance Step: Proceed to step 11. 9. b. GRADE Standards:
Proceeds to step 1 I. Grade: SAT UNSAT STEP 31 Performance Step: Align RCS Letdown 11 .a. Check normal letdown- ISOLATED GRADE Standards:
Proceeds to step 1 I. Grade: SAT UNSAT STEP 31 Performance Step: Align RCS Letdown 11 .a. Check normal letdown- ISOLATED GRADE Standards:
Observes that letdown is isolated by .~ i-' observing green indicating lights lit and red lights out for CHS*CV8152 and CV8 1 60. Grade: SAT UNSAT STEP 32 Performance Step: Verify PZR level - GREATER THAN 11 .b. 22% GRADE Standards  
Observes that letdown is isolated by .~ i-' observing green indicating lights lit and red lights out for CHS*CV8152 and CV8 1 60. Grade: SAT UNSAT STEP 32 Performance Step: Verify PZR level - GREATER THAN 11 .b. 22% GRADE Standards
: Determines PZR level is greater than 22% by observing PZR level recorder trace or PZR level meters on MB4. Grade: SAT UNSAT STEP 33 Performance Step: Verify normal charging path I I .c. - ESTABLISHED GRADE Standards:
: Determines PZR level is greater than 22% by observing PZR level recorder trace or PZR level meters on MB4. Grade: SAT UNSAT STEP 33 Performance Step: Verify normal charging path I I .c. - ESTABLISHED GRADE Standards:
Determines a normal charging charging flow and valve lineup '4 flowpath established by observing 14 of 17 PERFORMANCE INFORMATION JPM Number: S.1 Revision:
Determines a normal charging charging flow and valve lineup '4 flowpath established by observing 14 of 17 PERFORMANCE INFORMATION JPM Number: S.1 Revision:
Line 159: Line 159:
I Reset to IC- 21 , 100% power, EOL.
I Reset to IC- 21 , 100% power, EOL.
Enter MALF EGOTB, EDG B Trip & EG08A; 0%, EDG A Load Limiter Failure Enter I/O (EG) 1A-3ENSACB-AI CLOSE - FALSE, to prevent EDG A Output breaker from closing manually Place the Simulator in Run Enter MALF EDOI , Loss of Offsite Power, run for 5 minutes, perform E-0, steps 1-3, and ECA-0.0, steps 1-4. Remove MALF EDOI Place the Simulator in Freeze. Go to run when the examinee is ready to begin The plant has experienced a Loss of Offsite Power. The A EDG started but did not load. The B EDG started and catastrophically failed. The crew responded using E-0 and ECA-0.0 and has completed ECA-0.0 through step 4. CONVEX has restored offsite power, which is available and reliable.
Enter MALF EGOTB, EDG B Trip & EG08A; 0%, EDG A Load Limiter Failure Enter I/O (EG) 1A-3ENSACB-AI CLOSE - FALSE, to prevent EDG A Output breaker from closing manually Place the Simulator in Run Enter MALF EDOI , Loss of Offsite Power, run for 5 minutes, perform E-0, steps 1-3, and ECA-0.0, steps 1-4. Remove MALF EDOI Place the Simulator in Freeze. Go to run when the examinee is ready to begin The plant has experienced a Loss of Offsite Power. The A EDG started but did not load. The B EDG started and catastrophically failed. The crew responded using E-0 and ECA-0.0 and has completed ECA-0.0 through step 4. CONVEX has restored offsite power, which is available and reliable.
The Unit Supervisor directs you to restore power to any AC emergency bus starting at ECA-0.0, step  
The Unit Supervisor directs you to restore power to any AC emergency bus starting at ECA-0.0, step
: 5. **** NOTES TO EVALUATOR****  
: 5. **** NOTES TO EVALUATOR****
: 1. Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. critical steps must be completed correctly.  
: 1. Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. critical steps must be completed correctly.
: 2. When the student states what hidher simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").  
: 2. When the student states what hidher simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").  
~~d 3of 10 PERFORMANCE INFORMATION JPM Number: s.2 Revision:
~~d 3of 10 PERFORMANCE INFORMATION JPM Number: s.2 Revision:
Line 167: Line 167:
Observes A EDG running. Observes that the EDG has NOT automatically ciose onto bus 34C. Candidate MAY observe degraded frequency Grade: SAT UNSAT Performance Step: Verify EDG output breaker - CLOSED (Step 5.b) Alternate Path Observes that Bus 34C and 340 are Standards:
Observes A EDG running. Observes that the EDG has NOT automatically ciose onto bus 34C. Candidate MAY observe degraded frequency Grade: SAT UNSAT Performance Step: Verify EDG output breaker - CLOSED (Step 5.b) Alternate Path Observes that Bus 34C and 340 are Standards:
both de-energized. The candidate may try to close the A EDG Output Breaker since it is an automatic action which did not occur. Candidate transitions to RNO column. Grade: Performance Step: (Step 5.b RNO) Standards:
both de-energized. The candidate may try to close the A EDG Output Breaker since it is an automatic action which did not occur. Candidate transitions to RNO column. Grade: Performance Step: (Step 5.b RNO) Standards:
Grade: STEP 4 LJ GRADE Performance Step: (Step 5.c) Standards  
Grade: STEP 4 LJ GRADE Performance Step: (Step 5.c) Standards
: SAT UNSAT CLOSE breaker (MB8) Candidate attempts to close the A EDG output breaker.
: SAT UNSAT CLOSE breaker (MB8) Candidate attempts to close the A EDG output breaker.
When it will not close transitions to step 5.c SAT UNSAT VerifL at least one AC emergency bus - ENERGIZED Observes that Bus 34C and 34D are both still de-energized.
When it will not close transitions to step 5.c SAT UNSAT VerifL at least one AC emergency bus - ENERGIZED Observes that Bus 34C and 34D are both still de-energized.
4 of 10 PERFORMANCE INFORMATION JPM Number:
4 of 10 PERFORMANCE INFORMATION JPM Number:
s.2 Revision:
s.2 Revision:
1 -'--' Task Title: ENERGIZE THE AC EMERGENCY BUS THROUGH THE RSSA DURING ECA - 0.0 Grade: SAT UNSAT STEP 5 Performance Step: Proceed to step 5.e (Step 5.c RNO) GRADE Standards: Candidate Proceeds to step 5.e. Grade: SAT UNSAT STEP 6 Performance Step: Check offsite power - AVAILABLE (Step 5.e) GRADE Standards  
1 -'--' Task Title: ENERGIZE THE AC EMERGENCY BUS THROUGH THE RSSA DURING ECA - 0.0 Grade: SAT UNSAT STEP 5 Performance Step: Proceed to step 5.e (Step 5.c RNO) GRADE Standards: Candidate Proceeds to step 5.e. Grade: SAT UNSAT STEP 6 Performance Step: Check offsite power - AVAILABLE (Step 5.e) GRADE Standards
: At MB8 observes any of the following: Grid frequency meter (upright) 0 Grid voltage meter (upright) RSST "available" white lights  
: At MB8 observes any of the following: Grid frequency meter (upright) 0 Grid voltage meter (upright) RSST "available" white lights  
-\-.-. (a P r0 n) Comment: This information also given in initial conditions. Candidate may choose not to verify. Grade: SAT UNSAT STEP 7 Performance Step: Using GA-3, energize emergency bus 34C or 34D through the RSST or the NSST {step 5.9 GRADE Standards: Candidate locates and opens GA binder to GA-3. GRADE Standards: The applicant should question the US which emergency bus is desired to be energized and from which offsite source. SAT UNSAT Grade: 5 of 10 PERFORMANCE INFORMATION . JPM Number: s.2 Revision:
-\-.-. (a P r0 n) Comment: This information also given in initial conditions. Candidate may choose not to verify. Grade: SAT UNSAT STEP 7 Performance Step: Using GA-3, energize emergency bus 34C or 34D through the RSST or the NSST {step 5.9 GRADE Standards: Candidate locates and opens GA binder to GA-3. GRADE Standards: The applicant should question the US which emergency bus is desired to be energized and from which offsite source. SAT UNSAT Grade: 5 of 10 PERFORMANCE INFORMATION . JPM Number: s.2 Revision:
Line 178: Line 178:
ENERGIZE THE AC EMERGENCY BUS THROUGH THE RSSA DURING ECA - 0.0 STEP 8 Performance Step: Check Energizing Bus 34C - DESIRED (step 1 of GA-3) GRADE Standards:
ENERGIZE THE AC EMERGENCY BUS THROUGH THE RSSA DURING ECA - 0.0 STEP 8 Performance Step: Check Energizing Bus 34C - DESIRED (step 1 of GA-3) GRADE Standards:
Candidate Proceeds to step 2 based on previous cue.
Candidate Proceeds to step 2 based on previous cue.
Grade: SAT UNSAT STEP 9 X Performance Step: Energize Bus 34C. (step 2.a) Place the following control switches in PU LL-TO-LOCK GRADE x Standards  
Grade: SAT UNSAT STEP 9 X Performance Step: Energize Bus 34C. (step 2.a) Place the following control switches in PU LL-TO-LOCK GRADE x Standards
: a a a a a a a a a e e e a One Train A Service Water Pump RPCCW Pump A RPCCW Pump C (Train A) Quench Spray Pump A Recirc Spray Pump A Recirc Spray Pump C SI Pump A RHR Pump A Control Building Chiller A Aux Building Filter A Charging Pump A Charging Pump C (Train A) MD AFW Pump A Locates the control switches for the following components and places the switch in stop and then in PULL-TO- LOCK. a a e a a a a a a a e 6 of 10 One Train A Service Water Pump RPCCW Pump A RPCCW Pump C (Train A) Quench Spray Pump A Recirc Spray Pump A Recirc Spray Pump C SI Pump A RHR Pump A Control Building Chiller A Aux Building Filter A Charging Pump A PERFORMANCE INFORMATION JPM Number: s .2 Revision:
: a a a a a a a a a e e e a One Train A Service Water Pump RPCCW Pump A RPCCW Pump C (Train A) Quench Spray Pump A Recirc Spray Pump A Recirc Spray Pump C SI Pump A RHR Pump A Control Building Chiller A Aux Building Filter A Charging Pump A Charging Pump C (Train A) MD AFW Pump A Locates the control switches for the following components and places the switch in stop and then in PULL-TO- LOCK. a a e a a a a a a a e 6 of 10 One Train A Service Water Pump RPCCW Pump A RPCCW Pump C (Train A) Quench Spray Pump A Recirc Spray Pump A Recirc Spray Pump C SI Pump A RHR Pump A Control Building Chiller A Aux Building Filter A Charging Pump A PERFORMANCE INFORMATION JPM Number: s .2 Revision:
I Task Title: ENERGIZE THE AC EMERGENCY BUS THROUGH THE RSSA 'd DURING ECA - 0.0 0 Charging Pump C (Train A) MDAFWPumpA Grade: SAT UNSAT STEP 10 Performance Step: Verify annunciator, "Bus 34C (step 2.b)
I Task Title: ENERGIZE THE AC EMERGENCY BUS THROUGH THE RSSA 'd DURING ECA - 0.0 0 Charging Pump C (Train A) MDAFWPumpA Grade: SAT UNSAT STEP 10 Performance Step: Verify annunciator, "Bus 34C (step 2.b)
Line 193: Line 193:
Note: Grade: STEP 16 Performance Step: (Step 2.e.3 RNO) GRADE Standards:
Note: Grade: STEP 16 Performance Step: (Step 2.e.3 RNO) GRADE Standards:
Grade: 8of 10 SAT UNSAT Energize Bus 34C from RSSA: Place RSSA sync selector switch in ON. Places or checks sync selector handle in synchronizing selector for RSSA to bus 34C and turns to ON position. Observes INCOMING voltage meter register voltage at about 125 v. SAT UNSAT CLOSE RSSA supply breaker (RSSA*34C-2) - Locates and turns RSSA*34C-2, RSSA supply breaker to the close position and releases.
Grade: 8of 10 SAT UNSAT Energize Bus 34C from RSSA: Place RSSA sync selector switch in ON. Places or checks sync selector handle in synchronizing selector for RSSA to bus 34C and turns to ON position. Observes INCOMING voltage meter register voltage at about 125 v. SAT UNSAT CLOSE RSSA supply breaker (RSSA*34C-2) - Locates and turns RSSA*34C-2, RSSA supply breaker to the close position and releases.
Observes breaker green light go OFF and red light go ON. Observes voltage on bus 34C at about 4000 v. Also may observe synchroscope RUNNING voltage go to about 125  
Observes breaker green light go OFF and red light go ON. Observes voltage on bus 34C at about 4000 v. Also may observe synchroscope RUNNING voltage go to about 125
: v. Lights come on in the Control Room SAT UNSAT Place RSSA sync selector switch in OFF. Rotates sync selector handle in synchronizing selector for RSSA to bus 34C to the OFF position.
: v. Lights come on in the Control Room SAT UNSAT Place RSSA sync selector switch in OFF. Rotates sync selector handle in synchronizing selector for RSSA to bus 34C to the OFF position.
Observes INCOMING and RUNNING voltage meters go to zero. SAT UNSAT PERFORMANCE INFORMATION JPM Number: s.2 Revision:
Observes INCOMING and RUNNING voltage meters go to zero. SAT UNSAT PERFORMANCE INFORMATION JPM Number: s.2 Revision:
Line 205: Line 205:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. critical steps must be completed Time Critical Task? YES NO X Validated Time (minutes):
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. critical steps must be completed Time Critical Task? YES NO X Validated Time (minutes):
5 -- --- /. Actual Time to Complete (minutes):
5 -- --- /. Actual Time to Complete (minutes):
Result of JPM: Result of oral questions (if applicable): Number of Questions:  
Result of JPM: Result of oral questions (if applicable): Number of Questions:
("S" for satisfactory, "U" for unsatisfactory)
("S" for satisfactory, "U" for unsatisfactory)
Number of Correct Responses:
Number of Correct Responses:
Score: Areas for Improvement:
Score: Areas for Improvement:
10 of 10 STUDENT HANDOUT JPM Number: s.2 .-4 Initial Conditions:
10 of 10 STUDENT HANDOUT JPM Number: s.2 .-4 Initial Conditions:
The plant has experienced a Loss of Offsite Power. The A EDG started but did not load. The B EDG started and catastrophically failed. The crew responded using E-0 and ECA-0.0 and has completed ECA-0.0 through step  
The plant has experienced a Loss of Offsite Power. The A EDG started but did not load. The B EDG started and catastrophically failed. The crew responded using E-0 and ECA-0.0 and has completed ECA-0.0 through step
: 4. CONVEX has restored offsite power, which is available and reliable.
: 4. CONVEX has restored offsite power, which is available and reliable.
initiating Cues: The Unit Supervisor directs you to restore power to any AC emergency bus starting at ECA-0.0, step 5. 11 of 10 JOB PERFORMANCE MEASURE APPROVAL SHEET L/' I. JPM Title: Respond to Main Steam Pressure Transmitter MSS-PT20D Failure to I OO%, Causing SG Atmospheric Relief Valve MSS-PV20 to Open (OP3353.MB5C 5-7) JPM ID Number: 2K7 NRC S.3 11. Initiated: Barry Pinkowitz Developer Ill. Reviewed:
initiating Cues: The Unit Supervisor directs you to restore power to any AC emergency bus starting at ECA-0.0, step 5. 11 of 10 JOB PERFORMANCE MEASURE APPROVAL SHEET L/' I. JPM Title: Respond to Main Steam Pressure Transmitter MSS-PT20D Failure to I OO%, Causing SG Atmospheric Relief Valve MSS-PV20 to Open (OP3353.MB5C 5-7) JPM ID Number: 2K7 NRC S.3 11. Initiated: Barry Pinkowitz Developer Ill. Reviewed:
Line 246: Line 246:
At T = 50 seconds, insert malfunction MSOSD, Severity = 100% (PRESS RLF VV PVZOD FAIL) The plant is steady state at 100% power with no equipment out of service. You are to respond to the simulator just as you would respond to the actual plant.
At T = 50 seconds, insert malfunction MSOSD, Severity = 100% (PRESS RLF VV PVZOD FAIL) The plant is steady state at 100% power with no equipment out of service. You are to respond to the simulator just as you would respond to the actual plant.
Do you have any questions?
Do you have any questions?
Are you ready to begin? Initiating Cues: You have the shift. **** NOTES TO EVALUATOR****  
Are you ready to begin? Initiating Cues: You have the shift. **** NOTES TO EVALUATOR****
: 1. Critical steps for this JPM are indicated by an "X" after the step number.
: 1. Critical steps for this JPM are indicated by an "X" after the step number.
For the student to achieve a satisfactory grade, The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. When the student states what hidher simulated action/observation would be, read the appropriate "Cue". If necessary] question the student for details of simulated actions/observations (Le. "What are you looking at?"
For the student to achieve a satisfactory grade, The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. When the student states what hidher simulated action/observation would be, read the appropriate "Cue". If necessary] question the student for details of simulated actions/observations (Le. "What are you looking at?"
or "What are you observing?").
or "What are you observing?").
critical steps must be completed correctly.  
critical steps must be completed correctly.
: 2. 3. 4 of 9 PERFORMANCE INFORMATION JPM Number: S.3 Revision:
: 2. 3. 4 of 9 PERFORMANCE INFORMATION JPM Number: S.3 Revision:
0 chg 1 Task Title:
0 chg 1 Task Title:
Start Time: ..4' Respond to Main Steam Pressure Transmitter MSS-PT20D Failure Comment: It is expected that the applicant take manual control of MSS-PIC20D  
Start Time: ..4' Respond to Main Steam Pressure Transmitter MSS-PT20D Failure Comment: It is expected that the applicant take manual control of MSS-PIC20D
("D" SG Atmospheric Relief Valve Controller) and attempt to close the "D" atmospheric relief valve. Once determined that the atmospheric relief valve will not close, it is expected that the applicant will recommend isolating the relief valve by closing 3MSS*MOVl8D.
("D" SG Atmospheric Relief Valve Controller) and attempt to close the "D" atmospheric relief valve. Once determined that the atmospheric relief valve will not close, it is expected that the applicant will recommend isolating the relief valve by closing 3MSS*MOVl8D.
It is satisfactory to reference OP 3353.MB5C 5-7 (applicable ARP) after the relief valve is isolated.
It is satisfactory to reference OP 3353.MB5C 5-7 (applicable ARP) after the relief valve is isolated.
STEP STEP GRADE 1 Performance Step: MBSC 5-7 step I Standards  
STEP STEP GRADE 1 Performance Step: MBSC 5-7 step I Standards
: Grade: 2 Performance Step: MBSC 5-7 step 2 Standards:
: Grade: 2 Performance Step: MBSC 5-7 step 2 Standards:
Grade: 5 of 9 CHECK the following steam generator pressures for proper operation of main steam pressure relief valve (MB5): 0 0 0 0 Appli 3MSS-PIC20A 3MSS-PIC20B 3MSS-PICZUC 3MSS-PIC20D ant checks SG pre ires for proper operation of SG Atmospheric Relief Valve. Observes that the process input (3MSS-PT20D) to 3MSS-PIC20D is pegged high as indicated by the controller red pointer SAT UNSAT IF pressure controller has failed, PLACE controller in "MAN" and CLOSE the valve. Applicant depresses the manual pushbutton on 3MSS-PIC20D and lowers controller output in an attempt to manually close 3MSS-PV20D.
Grade: 5 of 9 CHECK the following steam generator pressures for proper operation of main steam pressure relief valve (MB5): 0 0 0 0 Appli 3MSS-PIC20A 3MSS-PIC20B 3MSS-PICZUC 3MSS-PIC20D ant checks SG pre ires for proper operation of SG Atmospheric Relief Valve. Observes that the process input (3MSS-PT20D) to 3MSS-PIC20D is pegged high as indicated by the controller red pointer SAT UNSAT IF pressure controller has failed, PLACE controller in "MAN" and CLOSE the valve. Applicant depresses the manual pushbutton on 3MSS-PIC20D and lowers controller output in an attempt to manually close 3MSS-PV20D.
Line 263: Line 263:
0 chg I Task Title:  
0 chg I Task Title:  
.-u' Respond to Main Steam Pressure Transmitter MSS-PT20D Failure STEP 3 X GRADE GRADE X .. ---_-.-- GRADE STEP 4 X GRADE X .. ., =----- Performance Step: IF relief valve does not close, CLOSE MBSC 5-7 step 3 the following isolation valves (MB5): Standards:
.-u' Respond to Main Steam Pressure Transmitter MSS-PT20D Failure STEP 3 X GRADE GRADE X .. ---_-.-- GRADE STEP 4 X GRADE X .. ., =----- Performance Step: IF relief valve does not close, CLOSE MBSC 5-7 step 3 the following isolation valves (MB5): Standards:
0 3MSS*MOV18D, "ATMOSPHERIC RE LI E F ISOL" "SG 4" Applicant recommends to the US that the failed open relief valve be isolated by closing 3MSS*MOV18D. as the US and dir 3MSS.*'fi&P?I 8D. Standards  
0 3MSS*MOV18D, "ATMOSPHERIC RE LI E F ISOL" "SG 4" Applicant recommends to the US that the failed open relief valve be isolated by closing 3MSS*MOV18D. as the US and dir 3MSS.*'fi&P?I 8D. Standards
: Applicant depresses close pushbutton for 3MSS*MOV18D.
: Applicant depresses close pushbutton for 3MSS*MOV18D.
NOTE: 3MSS*MOV18D is a throttle valve. Applicant must hold the CLOSE pushbutton until the valve is fully shut.
NOTE: 3MSS*MOV18D is a throttle valve. Applicant must hold the CLOSE pushbutton until the valve is fully shut.
Line 311: Line 311:
The control room team entered AOP 3552, Malfunction of the Rod Drive System, and has decided that Attachment A to that procedure is to be used to recover from the misaligned rod. The lift coil fuse for rod D4 was blown, and has been replaced.
The control room team entered AOP 3552, Malfunction of the Rod Drive System, and has decided that Attachment A to that procedure is to be used to recover from the misaligned rod. The lift coil fuse for rod D4 was blown, and has been replaced.
Rod 04 has been misaligned for less than one hour.
Rod 04 has been misaligned for less than one hour.
lnitiatinq Cues: The US has directed you to complete Attachment A of AOP 3552 step I through step 7.f. '4 3 JOB PERFORMANCE MEASURE WORKSHEET SIMULATOR REQUIREMENTS:  
lnitiatinq Cues: The US has directed you to complete Attachment A of AOP 3552 step I through step 7.f. '4 3 JOB PERFORMANCE MEASURE WORKSHEET SIMULATOR REQUIREMENTS:
: 1. Reset to IC# 18. 2. Enter malfunction RD0457 Control Band "D" stuck rod "D4" 3. Place the master silence switch in the "Master Silence" position and place the simulator in "RUN". 4. Reduce turbine load by about 20 MWe using the Load Limit potentiometer to cause Control Bank D to insert. 5. Allow rod 04 to misalign by greater than 12 steps, then place Rod Bank SEL switch to MAN. 6. Allow the simulator time to stabilize prior to performing the next step. 7. Remove malfunction RD0457 to allow recovery of the rod. Approximate simulator setup time is 12 minutes. 4 PERFORMANCE tNFORMATlON Facility: Millstone Unit 3 System: 00 1 -' JPM Number: 2K7 NRC S.4 Task Title: CONTROL ROD OUT OF ALIGNMENT Denote Critical Steps with an "X" *NOTE* Critical Steps must be completed correctly to achieve a satisfactory grade Start Time: Performance Step: Obtains copy of AOP 3552 - STEP 1 GRADE Standards: Obtains a copy of AOP 3506 and refers to Attachment A, step 1. STEP 2 Performance Step: Improper rod alignment can cause fuel (Cautions prior to step 1) conjunction with plant transients. damage either directly or in Resetting ROD CONTROL URGENT FAILURE (MB4C 4-8) alarm without correcting the cause may result in dropping a group of control rods. GRADE Standards: Candidate reviews cautions.
: 1. Reset to IC# 18. 2. Enter malfunction RD0457 Control Band "D" stuck rod "D4" 3. Place the master silence switch in the "Master Silence" position and place the simulator in "RUN". 4. Reduce turbine load by about 20 MWe using the Load Limit potentiometer to cause Control Bank D to insert. 5. Allow rod 04 to misalign by greater than 12 steps, then place Rod Bank SEL switch to MAN. 6. Allow the simulator time to stabilize prior to performing the next step. 7. Remove malfunction RD0457 to allow recovery of the rod. Approximate simulator setup time is 12 minutes. 4 PERFORMANCE tNFORMATlON Facility: Millstone Unit 3 System: 00 1 -' JPM Number: 2K7 NRC S.4 Task Title: CONTROL ROD OUT OF ALIGNMENT Denote Critical Steps with an "X" *NOTE* Critical Steps must be completed correctly to achieve a satisfactory grade Start Time: Performance Step: Obtains copy of AOP 3552 - STEP 1 GRADE Standards: Obtains a copy of AOP 3506 and refers to Attachment A, step 1. STEP 2 Performance Step: Improper rod alignment can cause fuel (Cautions prior to step 1) conjunction with plant transients. damage either directly or in Resetting ROD CONTROL URGENT FAILURE (MB4C 4-8) alarm without correcting the cause may result in dropping a group of control rods. GRADE Standards: Candidate reviews cautions.
Grade: SAT UNSAT STEP 3 Performance Step: A ROD CONTROL URGENT (Note prior to step 1) FAILURE (MB4C 4-8) alarm will inhibit both manual and automatic motion for all rods controlled from the affected power cabinet. GRADE Standards:
Grade: SAT UNSAT STEP 3 Performance Step: A ROD CONTROL URGENT (Note prior to step 1) FAILURE (MB4C 4-8) alarm will inhibit both manual and automatic motion for all rods controlled from the affected power cabinet. GRADE Standards:
Line 317: Line 317:
Check Plant Conditions (Step 1.a) .d Verify operational mode - MODE 1 5 PERFORMANCE INFORMATION Facility:
Check Plant Conditions (Step 1.a) .d Verify operational mode - MODE 1 5 PERFORMANCE INFORMATION Facility:
Millstone Unit 3 System: 00 1 LJ JPM Number: 2K7 NRC S.4 Task Title:
Millstone Unit 3 System: 00 1 LJ JPM Number: 2K7 NRC S.4 Task Title:
CONTROL ROD OUT OF ALIGNMENT Denote Critical Steps with an "X" *NOTE* Critical Steps must be completed correctly to achieve a satisfactory grade (Step 1.a) GRADE Standards  
CONTROL ROD OUT OF ALIGNMENT Denote Critical Steps with an "X" *NOTE* Critical Steps must be completed correctly to achieve a satisfactory grade (Step 1.a) GRADE Standards
: Verifies that the plant is in Mode 1 based on current power level.
: Verifies that the plant is in Mode 1 based on current power level.
Grade: SAT UNSAT STEP 5 Performance Step: Identify misaligned rod(s) using: (Step 1.b) DRPl display 0 Rod Supervision on plant process computer GRADE Standards:
Grade: SAT UNSAT STEP 5 Performance Step: Identify misaligned rod(s) using: (Step 1.b) DRPl display 0 Rod Supervision on plant process computer GRADE Standards:
Line 343: Line 343:
Determine QPTR using: (Step 3.b) 0 Plant computer - Tilting Factors 0 SP 31012, Quadrant Power Tilt Ratio - OR Standards:
Determine QPTR using: (Step 3.b) 0 Plant computer - Tilting Factors 0 SP 31012, Quadrant Power Tilt Ratio - OR Standards:
Calls up PPC "Tilting Factors'' display (NSSS, page forward, F9, F2) and determines QPTR. Grade: 9 SAT UNSAT PERFORMANCE INFORMATION Facility : Millstone Unit 3 System: 001 - JPMNumber:
Calls up PPC "Tilting Factors'' display (NSSS, page forward, F9, F2) and determines QPTR. Grade: 9 SAT UNSAT PERFORMANCE INFORMATION Facility : Millstone Unit 3 System: 001 - JPMNumber:
2K7 NRC S.4 Task Title: CONTROL ROD OUT OF ALIGNMENT Denote Critical Steps with an "X *NOTE* Critical Steps must be completed correctly to achieve a satisfactory grade STEP 16 Performance Step: Check QPTR - LESS THAN OR (Step 3.c) EQUAL TO 1.09 GRADE Standards  
2K7 NRC S.4 Task Title: CONTROL ROD OUT OF ALIGNMENT Denote Critical Steps with an "X *NOTE* Critical Steps must be completed correctly to achieve a satisfactory grade STEP 16 Performance Step: Check QPTR - LESS THAN OR (Step 3.c) EQUAL TO 1.09 GRADE Standards
: Recognizes that QPTR 1.09, and proceeds to next step.
: Recognizes that QPTR 1.09, and proceeds to next step.
Grade: SAT UNSAT STEP 17 Performance Step:
Grade: SAT UNSAT STEP 17 Performance Step:
Line 386: Line 386:
Proceeds to step 6.g. Grade: SAT UNSAT STEP 32 Performance Step: Verify rod misaligned - LESS THAN v' (Step 64) 16 hours. GRADE Standards:
Proceeds to step 6.g. Grade: SAT UNSAT STEP 32 Performance Step: Verify rod misaligned - LESS THAN v' (Step 64) 16 hours. GRADE Standards:
Use information provided in the Initial Conditions.
Use information provided in the Initial Conditions.
Grade: SAT UNSAT STEP 33 X Performance Step: Move misaligned rod until affected group step counter indicates value recorded in step 5.b. (Step 6.h) GRADE X Standards  
Grade: SAT UNSAT STEP 33 X Performance Step: Move misaligned rod until affected group step counter indicates value recorded in step 5.b. (Step 6.h) GRADE X Standards
: Takes the In-Hold-Out switch to the "IN" position until the control bank D group 1 step counter is at the number that was previously recorded and than releases the switch. Grade: SAT UNSAT STEP 34 X Performance Step: Restore Rod Control System (Step 7.a) 'd Place all lift coil disconnect switches 15 PERFORMANCE INFORMATION Facility: Mitlstone Unit 3 System: 00 1 'LJ JPM Number: 2K7 NRC S.4 Task Title: CONTROL ROD OUT OF ALIGNMENT Denote Critical Steps with an "X" *NOTE* Critical Steps must be completed correctly to achieve a satisfactory grade for affected bank to ROD CONNECTED position.
: Takes the In-Hold-Out switch to the "IN" position until the control bank D group 1 step counter is at the number that was previously recorded and than releases the switch. Grade: SAT UNSAT STEP 34 X Performance Step: Restore Rod Control System (Step 7.a) 'd Place all lift coil disconnect switches 15 PERFORMANCE INFORMATION Facility: Mitlstone Unit 3 System: 00 1 'LJ JPM Number: 2K7 NRC S.4 Task Title: CONTROL ROD OUT OF ALIGNMENT Denote Critical Steps with an "X" *NOTE* Critical Steps must be completed correctly to achieve a satisfactory grade for affected bank to ROD CONNECTED position.
GRADE X Standards  
GRADE X Standards
: Returns all lift coil disconnect switches to the "Connected" position.
: Returns all lift coil disconnect switches to the "Connected" position.
Grade: SAT UNSAT STEP 35 Performance Step: Check ROD CONTROL URGENT (Step 7.b) FAILURE (MB4C 4-8) annunciator - LIT GRADE Standards:
Grade: SAT UNSAT STEP 35 Performance Step: Check ROD CONTROL URGENT (Step 7.b) FAILURE (MB4C 4-8) annunciator - LIT GRADE Standards:
Line 443: Line 443:
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution were actually being performed.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution were actually being performed.
JOB PERFORMANCE MEASURE GUIDE (Continued)
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number: 2K7 NRC S.5 *L-J Simulator Requirements:  
JPM Number: 2K7 NRC S.5 *L-J Simulator Requirements:
: 1. Initial Conditions:  
: 1. Initial Conditions:  
--<= 2. 3. 4. 5. Revision:
--<= 2. 3. 4. 5. Revision:
Line 450: Line 450:
The evaluator will acknowledge all communications to the US. lnitiatinq Cues: You are directed to carry out the first four (4) steps of E-0 from memory. The simulator will be placed in run when you are ready to begin. **** NOTES TO EVALUATOR****
The evaluator will acknowledge all communications to the US. lnitiatinq Cues: You are directed to carry out the first four (4) steps of E-0 from memory. The simulator will be placed in run when you are ready to begin. **** NOTES TO EVALUATOR****
Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actionslobservations (i.e. "What are you looking at?"
Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actionslobservations (i.e. "What are you looking at?"
or "What are you observing?").  
or "What are you observing?").
: 1. critical steps must be completed correctly.  
: 1. critical steps must be completed correctly.
: 2. 3. .v' 4 of 10 PERFORMANCE INFORMATION JPM Number: 2K7 NRC S.5 L.4' Task Title: PERFORMANCE OF THE IMMEDIATE ACTIONS IN E-0 Start Time: Revision:
: 2. 3. .v' 4 of 10 PERFORMANCE INFORMATION JPM Number: 2K7 NRC S.5 L.4' Task Title: PERFORMANCE OF THE IMMEDIATE ACTIONS IN E-0 Start Time: Revision:
0 Performance Step: Verify Reactor Trip. 1. - STEP 1 0 Check reactor trip and bypass breakers - OPEN. Check rod bottom lights - LIT. 0 Check neutron flux - D ECREAS I NG . GRADE Standards:
0 Performance Step: Verify Reactor Trip. 1. - STEP 1 0 Check reactor trip and bypass breakers - OPEN. Check rod bottom lights - LIT. 0 Check neutron flux - D ECREAS I NG . GRADE Standards:
Line 459: Line 459:
PERFORMANCE OF THE IMMEDIATE ACTIONS IN E-0 the turbine stop valves are still open. Grade: SAT UNSAT STEP 4 X Performance Step: the turbine will NOT trip, THEN 2.a.RNO Runback the turbine to close the control valves. the turbine can NOT be runback THEN CLOSE the MSlVs and MSlV bypass valves. GRADE X Standards:
PERFORMANCE OF THE IMMEDIATE ACTIONS IN E-0 the turbine stop valves are still open. Grade: SAT UNSAT STEP 4 X Performance Step: the turbine will NOT trip, THEN 2.a.RNO Runback the turbine to close the control valves. the turbine can NOT be runback THEN CLOSE the MSlVs and MSlV bypass valves. GRADE X Standards:
Rapidly rotates the load limiting control knob in the lower direction all the way to the zero position. Observes that the control valves are closing and when the controf valves are fully closed declares that the turbine is tripped. Shifts to actions in the ACTION column. Grade: SAT UNSAT Evaluator NOTE: The applicant may decide the control valves are not closing fast enough or the control valves are not fully closed. In that case he will go to 'CLOSE' on the MSIV switches and verify the MSlV Bypass valves closed. This is acceptable.
Rapidly rotates the load limiting control knob in the lower direction all the way to the zero position. Observes that the control valves are closing and when the controf valves are fully closed declares that the turbine is tripped. Shifts to actions in the ACTION column. Grade: SAT UNSAT Evaluator NOTE: The applicant may decide the control valves are not closing fast enough or the control valves are not fully closed. In that case he will go to 'CLOSE' on the MSIV switches and verify the MSlV Bypass valves closed. This is acceptable.
STEP 5 Performance Step: Verify Power to AC Emergency 3.a. Busses. a. Check AC emergency busses 34C and 34D - BOTH ENERGIZED GRADE Standards  
STEP 5 Performance Step: Verify Power to AC Emergency 3.a. Busses. a. Check AC emergency busses 34C and 34D - BOTH ENERGIZED GRADE Standards
: Determines Busses 34C And 34D are both energized by observation of the Main Board 8 emergency bus voltage indicators reading about 4160 volts OR emergency load center voltage indicators (8) reading about 480 volts.
: Determines Busses 34C And 34D are both energized by observation of the Main Board 8 emergency bus voltage indicators reading about 4160 volts OR emergency load center voltage indicators (8) reading about 480 volts.
6 of 10 PERFORMANCE INFORMATfON JPM Number: 2K7 NRC S.5 Revision:
6 of 10 PERFORMANCE INFORMATfON JPM Number: 2K7 NRC S.5 Revision:
Line 466: Line 466:
STEP 6 Performance Step: Check if SI is Actuated.
STEP 6 Performance Step: Check if SI is Actuated.
4.a. a. Verify SAFETY INJECTION ACTUATION annunciator (MB4D 1-6 or MB2B 5-9) - LIT GRADE Standards:
4.a. a. Verify SAFETY INJECTION ACTUATION annunciator (MB4D 1-6 or MB2B 5-9) - LIT GRADE Standards:
Grade: '..--C'' AT MB4 or MB2, observes that the Safety Injection Actuation annunciator is lit. SAT UNSAT STEP 7 Performance Step: By observation of ESF Group 2 Status 4. b. Panel lights, Verify both trains of SI - ACTUATED GRADE Standards  
Grade: '..--C'' AT MB4 or MB2, observes that the Safety Injection Actuation annunciator is lit. SAT UNSAT STEP 7 Performance Step: By observation of ESF Group 2 Status 4. b. Panel lights, Verify both trains of SI - ACTUATED GRADE Standards
: At MB2, observes ESF Group 2 Status Panel and determines only one train of SI has actuated. Shifts to the actions in the RNO column. Grade: SAT UNSAT STEP 8 X Performance Step: Manually initiate SI 4. b. RNO .*-.-' GRADE X Standards:
: At MB2, observes ESF Group 2 Status Panel and determines only one train of SI has actuated. Shifts to the actions in the RNO column. Grade: SAT UNSAT STEP 8 X Performance Step: Manually initiate SI 4. b. RNO .*-.-' GRADE X Standards:
At MB2 or MB4, manually actuates SI by rotating the SI actuation switch to 7 of 10 PERFORMANCE INFORMATION JPM Number: 2K7 NRC S.5 Revision:
At MB2 or MB4, manually actuates SI by rotating the SI actuation switch to 7 of 10 PERFORMANCE INFORMATION JPM Number: 2K7 NRC S.5 Revision:
Line 472: Line 472:
By observation of ESF Group 2 Status Panel determines that both trains of SI have actuated.
By observation of ESF Group 2 Status Panel determines that both trains of SI have actuated.
Standards:
Standards:
Grade: SAT UNSAT STEP 9 Performance Step: Check reactor trip and bypass 4.c. breakers - OPEN GRADE Standards  
Grade: SAT UNSAT STEP 9 Performance Step: Check reactor trip and bypass 4.c. breakers - OPEN GRADE Standards
: At MB4, observes that the reactor trip and bypass breakers are open. Grade: SAT UNSAT \.-- STEP 10 Performance Step: Reports that the first four steps of E-0 have been completed.
: At MB4, observes that the reactor trip and bypass breakers are open. Grade: SAT UNSAT \.-- STEP 10 Performance Step: Reports that the first four steps of E-0 have been completed.
GRADE Standards:
GRADE Standards:
Line 527: Line 527:
**** NOTES TO EVALUATOR**** Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, & critical steps must be completed correctly.
**** NOTES TO EVALUATOR**** Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, & critical steps must be completed correctly.
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. When the student states what hidher simulated action/observation would be, read the a p p ro p ria t e " C u e". If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?"
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. When the student states what hidher simulated action/observation would be, read the a p p ro p ria t e " C u e". If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?"
or "What are you observing?").  
or "What are you observing?").
: 1. 2. 3. 4of9 PERFORMANCE INFORMATION JPM Number: S.6 Revision:
: 1. 2. 3. 4of9 PERFORMANCE INFORMATION JPM Number: S.6 Revision:
0 L/ TaskTitle:
0 L/ TaskTitle:
Check if RCP(s) Should Be Stopped Start Time: STEP 1 Performance Step: Obtains copy of EOP 3505. GRADE Standards:
Check if RCP(s) Should Be Stopped Start Time: STEP 1 Performance Step: Obtains copy of EOP 3505. GRADE Standards:
Obtains a copy of EOP 3505, refers to Attachment "B" Step 9. Grade: SAT UNSAT STEP 2 Performance Step: Check RCP status - AT LEAST ONE Att. "8" step 9.a. RUNNING Standards  
Obtains a copy of EOP 3505, refers to Attachment "B" Step 9. Grade: SAT UNSAT STEP 2 Performance Step: Check RCP status - AT LEAST ONE Att. "8" step 9.a. RUNNING Standards
: Checks RCP breaker indications, flow, amps etc. and determines "A & "B" RCPs are running - GRADE Grade: SAT UNSAT STEP 3 Performance Step: Verify only one RCP - RUNNING Att. "B" step 9.b. GRADE S ta n da rds : Checks RCP breaker indications, flow, amps etc. and determines "A & "B" RCPs are running.
: Checks RCP breaker indications, flow, amps etc. and determines "A & "B" RCPs are running - GRADE Grade: SAT UNSAT STEP 3 Performance Step: Verify only one RCP - RUNNING Att. "B" step 9.b. GRADE S ta n da rds : Checks RCP breaker indications, flow, amps etc. and determines "A & "B" RCPs are running.
Moves to RNO column. Grade: SAT UNSAT STEP 4 X Performance Step: PERFORM the applicable action:
Moves to RNO column. Grade: SAT UNSAT STEP 4 X Performance Step: PERFORM the applicable action:
Line 539: Line 539:
Check if RCP(s) Should Be Stowed Grade: SAT UNSAT GRADE X Standards:
Check if RCP(s) Should Be Stowed Grade: SAT UNSAT GRADE X Standards:
STOPS "A RCP Comment: Examinee may elect to place the spray valve controller for "A RCP in Manual and close the valve Grade: SAT UNSAT STEP 5 Performance Step: Check the following for the running Att. "B" step 9.c. RCP 0 No. I Seal differential pressure - GREATER THAN 210 psid No. 1 Seal leakoff flow - GREATER THAN OR EQUAL TO 0.2 gpm GRADE Standards:
STOPS "A RCP Comment: Examinee may elect to place the spray valve controller for "A RCP in Manual and close the valve Grade: SAT UNSAT STEP 5 Performance Step: Check the following for the running Att. "B" step 9.c. RCP 0 No. I Seal differential pressure - GREATER THAN 210 psid No. 1 Seal leakoff flow - GREATER THAN OR EQUAL TO 0.2 gpm GRADE Standards:
Determines seal parameters are CHS-FRl56 and/or CHS-FR16O indications at MB3. .---/ satisfied by observing CHS-PI152AI Grade: SAT UNSAT STEP 6 Performance Step: Maintain RCS pressure BETWEEN Att. "B" step 9.d. 310 psia and 375 psia GRADE Standards  
Determines seal parameters are CHS-FRl56 and/or CHS-FR16O indications at MB3. .---/ satisfied by observing CHS-PI152AI Grade: SAT UNSAT STEP 6 Performance Step: Maintain RCS pressure BETWEEN Att. "B" step 9.d. 310 psia and 375 psia GRADE Standards
: Determines RCS pressure is within required band by observing RCS-PR403, RCS-P1405A, or a PPC pressure trend if established.
: Determines RCS pressure is within required band by observing RCS-PR403, RCS-P1405A, or a PPC pressure trend if established.
Grade: SAT UNSAT STEP 7 Performance Step: Reports to US that step 9 of EOP 3505 Att. "B" has been completed and the "B" RCP is running, "A' RCP has been stopped.
Grade: SAT UNSAT STEP 7 Performance Step: Reports to US that step 9 of EOP 3505 Att. "B" has been completed and the "B" RCP is running, "A' RCP has been stopped.
Line 597: Line 597:
or "What are you observing?").
or "What are you observing?").
d/ 2. 3. 5 of 16 JPM Number: PERFORMANCE INFORMATION 2K7 NRC S.7 Revision:
d/ 2. 3. 5 of 16 JPM Number: PERFORMANCE INFORMATION 2K7 NRC S.7 Revision:
0 DEPRESSURIZE THE RCS TO REFILL THE PZR ij Task Title: Start Time: Performance Step: Obtains copy of ES-I .2 - STEP 1 GRADE Standards  
0 DEPRESSURIZE THE RCS TO REFILL THE PZR ij Task Title: Start Time: Performance Step: Obtains copy of ES-I .2 - STEP 1 GRADE Standards
: Obtains a copy of ES-I .2 and refers to step IO. Grade: SAT UNSAT Comment: The heater control switches in the first JPM step may be operated in any order. STEP 2 X Performance Step: Place All PZR Heater Switches To OFF position. (ES-I .2 step IO) GRADE X Standards:
: Obtains a copy of ES-I .2 and refers to step IO. Grade: SAT UNSAT Comment: The heater control switches in the first JPM step may be operated in any order. STEP 2 X Performance Step: Place All PZR Heater Switches To OFF position. (ES-I .2 step IO) GRADE X Standards:
Rotates the "Dt PZR B/U heaters .U' control switch to "OFF." Observes the amber light goes OFF. GRADE X Standards: Rotates the "E" PZR B/U heaters control switch to "OFF." Observes the amber light goes OFF. GRADE X Standards:
Rotates the "Dt PZR B/U heaters .U' control switch to "OFF." Observes the amber light goes OFF. GRADE X Standards: Rotates the "E" PZR B/U heaters control switch to "OFF." Observes the amber light goes OFF. GRADE X Standards:
Rotates the "C" PZR Control Heaters control switch to "OFF." Observes the amber light goes OFF and the flag shifts to "green." Corn men ts : GRADE X Standards  
Rotates the "C" PZR Control Heaters control switch to "OFF." Observes the amber light goes OFF and the flag shifts to "green." Corn men ts : GRADE X Standards
: MB4A 6-4 annunciator "PZR HEATER CONTROL GROUP AUTO TRIP" will clear. The candidate should silence and clear this alarm. This action is not required to complete the critical nature of this step.
: MB4A 6-4 annunciator "PZR HEATER CONTROL GROUP AUTO TRIP" will clear. The candidate should silence and clear this alarm. This action is not required to complete the critical nature of this step.
Rotates the "A" PZR B/U heaters control switch to "OFF." Observes the amber light goes OFF. 6 of 16 PERFORMANCE INFORMATION JPM Number: 2K7 NRC S.7 Revision:
Rotates the "A" PZR B/U heaters control switch to "OFF." Observes the amber light goes OFF. 6 of 16 PERFORMANCE INFORMATION JPM Number: 2K7 NRC S.7 Revision:
Line 615: Line 615:
Grade: 8 of 16 SAT UNSAT PERFORMANCE INFORMATION JPM Number: 2K7 NRC S.7 Revision:
Grade: 8 of 16 SAT UNSAT PERFORMANCE INFORMATION JPM Number: 2K7 NRC S.7 Revision:
0 '-sj Task Title: DEPRESSURIZE THE RCS TO REFILL THE PZR STEP 6 Performance Step: Verify at least one charging pump - (Step I1 .c.2) RUNNING GRADE Standards:
0 '-sj Task Title: DEPRESSURIZE THE RCS TO REFILL THE PZR STEP 6 Performance Step: Verify at least one charging pump - (Step I1 .c.2) RUNNING GRADE Standards:
Determines that both charging pumps are running by observation of red indicating lights on / green off, amps, flow etc. Grade: SAT UNSAT -w- STEP 7 Performance Step: CLOSE charging header (Step I? .c.3) loop isolation valves 0 3CHS*AV8146 3CHS*AV8147 Standards  
Determines that both charging pumps are running by observation of red indicating lights on / green off, amps, flow etc. Grade: SAT UNSAT -w- STEP 7 Performance Step: CLOSE charging header (Step I? .c.3) loop isolation valves 0 3CHS*AV8146 3CHS*AV8147 Standards
: (___ GRADE Grade: Determines that both charging header loop isolation valves are closed by observation of green indicating lights on / red off. SAT UNSAT STEP 8 X Performance Step:
: (___ GRADE Grade: Determines that both charging header loop isolation valves are closed by observation of green indicating lights on / red off. SAT UNSAT STEP 8 X Performance Step:
Fully Open charging line flow control (Step 1 I x.4) valve. GRADE X Standards  
Fully Open charging line flow control (Step 1 I x.4) valve. GRADE X Standards
: Candidate takes manual control of and fully opens 3CHS*FCV121 by depressing the open pushbutton on 3CHS*FK121 until output is at maximum. Grade: SAT UNSAT 9of 16 PERFORMANCE INFORMATION JPM Number: 2K7 NRC S.7 Revision:
: Candidate takes manual control of and fully opens 3CHS*FCV121 by depressing the open pushbutton on 3CHS*FK121 until output is at maximum. Grade: SAT UNSAT 9of 16 PERFORMANCE INFORMATION JPM Number: 2K7 NRC S.7 Revision:
0 Task Title: Ll DEPRESSURIZE THE RCS TO REFILL THE PZR STEP - 9 X Performance Step: OPEN charging header (Step 1 I .c.5) isolation valves 0 3CHS*MV8 1 06 3CHS*MV8105 GRADE X Standards:
0 Task Title: Ll DEPRESSURIZE THE RCS TO REFILL THE PZR STEP - 9 X Performance Step: OPEN charging header (Step 1 I .c.5) isolation valves 0 3CHS*MV8 1 06 3CHS*MV8105 GRADE X Standards:
Line 631: Line 631:
Observes RCS pressure decreasing on Wide Range Loop pressure instruments:
Observes RCS pressure decreasing on Wide Range Loop pressure instruments:
RCS-P1405, P149, PI403 and P150. Grade: SAT UNSAT STEP 92 .. I GRADE \.-, STEP 13 GRADE GRADE .I 'v' Performance Step: Verify PZR level - GREATER THAN (Step 1 I .d) 25% (50% ADVERSE CTMT)
RCS-P1405, P149, PI403 and P150. Grade: SAT UNSAT STEP 92 .. I GRADE \.-, STEP 13 GRADE GRADE .I 'v' Performance Step: Verify PZR level - GREATER THAN (Step 1 I .d) 25% (50% ADVERSE CTMT)
Monitors PZR level increase by observing instruments RCS-t1459A, 460A and 461. Initial observation will indicate level is less than 25%. Shifts to the RNO column. Standards  
Monitors PZR level increase by observing instruments RCS-t1459A, 460A and 461. Initial observation will indicate level is less than 25%. Shifts to the RNO column. Standards
: Grade: SAT UNSAT Performance Step: Proceed to CAUTION prior to step 12. and, WHEN Level is GREATER THAN 25% (50% ADVERSE CTMT), THEN Perform step I I .e. Standards:
: Grade: SAT UNSAT Performance Step: Proceed to CAUTION prior to step 12. and, WHEN Level is GREATER THAN 25% (50% ADVERSE CTMT), THEN Perform step I I .e. Standards:
Standards  
Standards
: Candidate Proceeds to the caution prior to step 12. The examinee should continue to monitor pressurizer level to determine when the depressurization should be stopped. Grade: 11 of 16 SAT UNSAT   
: Candidate Proceeds to the caution prior to step 12. The examinee should continue to monitor pressurizer level to determine when the depressurization should be stopped. Grade: 11 of 16 SAT UNSAT   
'8 1088AVU+HISI PUe Vl088AW+HISE: -lo4 suoiinqysnd uado sassaidaa  
'8 1088AVU+HISI PUe Vl088AW+HISE: -lo4 suoiinqysnd uado sassaidaa
: SpiepueJS X 3avm IWSNII lVS PERFORMANCE tNFORMATtON JPM Number: 2K7 NRC S.7 Revision:
: SpiepueJS X 3avm IWSNII lVS PERFORMANCE tNFORMATtON JPM Number: 2K7 NRC S.7 Revision:
0 Task Title:
0 Task Title:
Line 691: Line 691:
Following a large break loss of coolant accident (LBLOCA), the plant has established cold leg recirculation per ES-1.3, up to and including Step 4. Shortly thereafter, symptoms of significant CTMT sump clogging appeared.
Following a large break loss of coolant accident (LBLOCA), the plant has established cold leg recirculation per ES-1.3, up to and including Step 4. Shortly thereafter, symptoms of significant CTMT sump clogging appeared.
All ECCS and RSS pumps were stopped. The crew is transitioning to ECA-1.1, Loss of . Emergency Coolant Recirculation.
All ECCS and RSS pumps were stopped. The crew is transitioning to ECA-1.1, Loss of . Emergency Coolant Recirculation.
Initiating Cues: You are to complete the steps of ECA-1.1 I starting with step 1. **** NOTES TO EVALUATOR****  
Initiating Cues: You are to complete the steps of ECA-1.1 I starting with step 1. **** NOTES TO EVALUATOR****
: 1. Critical steps for this JPM are indicated by an "X" after the step number.
: 1. Critical steps for this JPM are indicated by an "X" after the step number.
For the student to achieve a satisfactory grade, The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. When the student states what hidher simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?" or "What are you observing?").
For the student to achieve a satisfactory grade, The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. When the student states what hidher simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?" or "What are you observing?").
critical steps must be completed correctly.  
critical steps must be completed correctly.
: 2. 3. 4 of 17 PERFORMANCE INFORMATION JPM Number: S.8 Revision:
: 2. 3. 4 of 17 PERFORMANCE INFORMATION JPM Number: S.8 Revision:
0 ''d Task Title:
0 ''d Task Title:
Line 703: Line 703:
CUE:'(lf required) 5 of 17 Obtains copy of ECA-1 .I Obtains a copy of ECA-I .I and refers to the CAUTION and NOTE prior to step 1 SAT If the suction source is lost to any ECCS or containment spray pump, the pump must be stopped. Applicant reads CAUTION. SAT UNSAT If emergency coolant recirculation capability is restored during this procedure, further recovery actions should continue by going to the procedure and step in effect. Applicant reads NOTE. SAT UNSAT Continue Attempts To Restore Emergency Coolant Recirculation Equipment Applicant reads the step and proceeds to step 2. Respond as the US with ECA-1 .I will eff attempts to Restore Emergency PERFORMANCE INFORMATION JPM Number: S.8 Revision:
CUE:'(lf required) 5 of 17 Obtains copy of ECA-1 .I Obtains a copy of ECA-I .I and refers to the CAUTION and NOTE prior to step 1 SAT If the suction source is lost to any ECCS or containment spray pump, the pump must be stopped. Applicant reads CAUTION. SAT UNSAT If emergency coolant recirculation capability is restored during this procedure, further recovery actions should continue by going to the procedure and step in effect. Applicant reads NOTE. SAT UNSAT Continue Attempts To Restore Emergency Coolant Recirculation Equipment Applicant reads the step and proceeds to step 2. Respond as the US with ECA-1 .I will eff attempts to Restore Emergency PERFORMANCE INFORMATION JPM Number: S.8 Revision:
0 ii Task Title:
0 ii Task Title:
Respond To Containment Sump Blockage fant Recirculatio Grade: SAT UNSAT STEP 5 GRADE STEP 6 '-& GRADE STEP 7 Performance Step: If offsite power is lost after SI reset, Caution prior to step manual actions to restart safeguards  
Respond To Containment Sump Blockage fant Recirculatio Grade: SAT UNSAT STEP 5 GRADE STEP 6 '-& GRADE STEP 7 Performance Step: If offsite power is lost after SI reset, Caution prior to step manual actions to restart safeguards
: 2. equipment may be required.
: 2. equipment may be required.
Standards: Applicant reads the CAUTION Grade: SAT UNSAT Performance Step: RESET ESF Actuation Signals If 2. Required SI CDA LOP Standards: Applicant resets those signals NOTE: requiring reset.
Standards: Applicant reads the CAUTION Grade: SAT UNSAT Performance Step: RESET ESF Actuation Signals If 2. Required SI CDA LOP Standards: Applicant resets those signals NOTE: requiring reset.
Line 710: Line 710:
Applicant reads step and informs the 6 of 17 PERFORMANCE INFORMATION JPM Number: S.8 Revision:
Applicant reads step and informs the 6 of 17 PERFORMANCE INFORMATION JPM Number: S.8 Revision:
0 LJ' Task Title:
0 LJ' Task Title:
Respond To Containment Sump Blockage US that GA-10 must be carried out to fill the RWST. Grade: SAT UNSAT STEP 8 Performance Step: Check Quench Spray Pump 4.a. Requirements  
Respond To Containment Sump Blockage US that GA-10 must be carried out to fill the RWST. Grade: SAT UNSAT STEP 8 Performance Step: Check Quench Spray Pump 4.a. Requirements
: a. Verify Ctmt high range radiation monitors (3RMS*RE04A and NOT IN ALERT OR ALARM 3RMS*RE05A) - GRADE Standards  
: a. Verify Ctmt high range radiation monitors (3RMS*RE04A and NOT IN ALERT OR ALARM 3RMS*RE05A) - GRADE Standards
: ;li' NOTE: Determines that the CTMT high range radiation monitors are not in alert or alarm by observation of 3RMS*RE04A and *REOSA amber and red trip lights are not lit. Due to OPERABILITY concerns with respect to 3RMS*RE04A and *REOSA, the applicant may use diverse indications to determine the radiation reading inside CTMT. Performance Step: Check Ctmt spray - 1 N IT1 ATED 4.b. - STEP 9 GRADE Standards: Determines that both Quench Spray pumps are running by observation of red indicating lights on / green off, amps, flow etc. Grade: SAT UNSAT STEP 10 performance Step: Check Ctmt pressure - L-' 4.c. LESS THAN 17.5 psia. 7 of 17 PERFORMANCE INFORMATION JPM Number: S.8 Rev ision: 0 Task Title: Respond To Containment Sump Blockage  
: ;li' NOTE: Determines that the CTMT high range radiation monitors are not in alert or alarm by observation of 3RMS*RE04A and *REOSA amber and red trip lights are not lit. Due to OPERABILITY concerns with respect to 3RMS*RE04A and *REOSA, the applicant may use diverse indications to determine the radiation reading inside CTMT. Performance Step: Check Ctmt spray - 1 N IT1 ATED 4.b. - STEP 9 GRADE Standards: Determines that both Quench Spray pumps are running by observation of red indicating lights on / green off, amps, flow etc. Grade: SAT UNSAT STEP 10 performance Step: Check Ctmt pressure - L-' 4.c. LESS THAN 17.5 psia. 7 of 17 PERFORMANCE INFORMATION JPM Number: S.8 Rev ision: 0 Task Title: Respond To Containment Sump Blockage  
--e. GRADE Standards: Determines by observation that CTMT pressure is less than 17.5 psia. Grade: SAT UNSAT STEP 11 X Performance Step:
--e. GRADE Standards: Determines by observation that CTMT pressure is less than 17.5 psia. Grade: SAT UNSAT STEP 11 X Performance Step:
Line 719: Line 719:
GRADE Standards:
GRADE Standards:
0 ForpumpA-3QSS*MOV34A 0 ForpumpB-3QSS*MOV34B Depresses the 3QSS*MOV34A "CLOSE" push button. Verifies indicating lights shift to green ON, red OFF Depresses the 3 Q SS*MOV34B "CLOSE" pushbutton.
0 ForpumpA-3QSS*MOV34A 0 ForpumpB-3QSS*MOV34B Depresses the 3QSS*MOV34A "CLOSE" push button. Verifies indicating lights shift to green ON, red OFF Depresses the 3 Q SS*MOV34B "CLOSE" pushbutton.
Verifies indicating lights shift to green ON, red OFF Grade: SAT UNSAT STEP 13 Performance Step: Check Ctmt pressure - 4.f. GREATER THAN 23 psia. --.+-- GRADE Standards  
Verifies indicating lights shift to green ON, red OFF Grade: SAT UNSAT STEP 13 Performance Step: Check Ctmt pressure - 4.f. GREATER THAN 23 psia. --.+-- GRADE Standards
: Determines by observation that CTMT pressure is less than 23 psia. 8 of 17 PERFORMANCE i NFORMATlON JPM Number: S.8 Revision:
: Determines by observation that CTMT pressure is less than 23 psia. 8 of 17 PERFORMANCE i NFORMATlON JPM Number: S.8 Revision:
0 Task Title:
0 Task Title:
Line 727: Line 727:
Grade: SAT UNSAT Performance Step: STOP running CAR fans and 5.a.RNO Proceed to step 6. - STEP 16 GRADE Standards:
Grade: SAT UNSAT Performance Step: STOP running CAR fans and 5.a.RNO Proceed to step 6. - STEP 16 GRADE Standards:
At VP1 determines that CAR fans A and B are NOT running by observation of green indicating lights on / red off. Proceeds to step 6. Grade: SAT UNSAT 9 of 17 PERFORMANCE INFORMATION JPM Number: S.8 Revision:
At VP1 determines that CAR fans A and B are NOT running by observation of green indicating lights on / red off. Proceeds to step 6. Grade: SAT UNSAT 9 of 17 PERFORMANCE INFORMATION JPM Number: S.8 Revision:
0 -4 Task Title: Respond To Containment Sump Blockage STEP 17 Performance Step: Monitor Containment  
0 -4 Task Title: Respond To Containment Sump Blockage STEP 17 Performance Step: Monitor Containment
: 6. Recirculation Sump-INDICATION OF BLOCKAGE 0 RSS pumps stopped due to indications of cavitation Sump level indications NOT consistent with plant conditions GRADE Standards:
: 6. Recirculation Sump-INDICATION OF BLOCKAGE 0 RSS pumps stopped due to indications of cavitation Sump level indications NOT consistent with plant conditions GRADE Standards:
Determines that RSS pumps were stopped due to indications of cavitation.
Determines that RSS pumps were stopped due to indications of cavitation.
Line 738: Line 738:
Proceeds to step 8. Grade: SAT UNSAT GRADE - STEP 21 Performance Step: Any pump receiving suction from an affected Containment Recirculation Pump should be stopped before stopping the Containment Recirculation Pump. Step 8 CAUTIONS If any Charging Pump or Safety injection Pump loses suction or shows indications of cavitation, the pump must be stopped. GRADE Standards: Applicant reads CAUTIONS.
Proceeds to step 8. Grade: SAT UNSAT GRADE - STEP 21 Performance Step: Any pump receiving suction from an affected Containment Recirculation Pump should be stopped before stopping the Containment Recirculation Pump. Step 8 CAUTIONS If any Charging Pump or Safety injection Pump loses suction or shows indications of cavitation, the pump must be stopped. GRADE Standards: Applicant reads CAUTIONS.
Grade: SAT UNSAT STEP 22 Performance Step: CSF status trees should be monitored for information only.
Grade: SAT UNSAT STEP 22 Performance Step: CSF status trees should be monitored for information only.
Every effort should be made to address the FRGs without compromising the containment sump. Step 8 NOTES. Indications of cavitation should be monitored following any change of recirculation flow. GRADE Standards  
Every effort should be made to address the FRGs without compromising the containment sump. Step 8 NOTES. Indications of cavitation should be monitored following any change of recirculation flow. GRADE Standards
: Grade: ~e Applicant reads NOTES.
: Grade: ~e Applicant reads NOTES.
SAT UNSAT 11 of 17 PERFORMANCE JPM Number: S.8 NFORMATION Revision:
SAT UNSAT 11 of 17 PERFORMANCE JPM Number: S.8 NFORMATION Revision:
0 ..d' Task Title: Respond To Containment Sump Blockage Performance Step: 8.a. Establish Recirculation Spray Pump Recirculation Flow STEP 23 a. Verify Ctmt sump level - GREATER THAN 1.5 feet Determines by observation that CTMT sump level is greater than 1.5 feet. GRADE Standards  
0 ..d' Task Title: Respond To Containment Sump Blockage Performance Step: 8.a. Establish Recirculation Spray Pump Recirculation Flow STEP 23 a. Verify Ctmt sump level - GREATER THAN 1.5 feet Determines by observation that CTMT sump level is greater than 1.5 feet. GRADE Standards
: Grade: SAT UNSAT Performance Step: Step 8.b NOTE. 3RSS*PlA or 3RSS*P1 B are the preferred pumps due to the automatic recirculation capability.
: Grade: SAT UNSAT Performance Step: Step 8.b NOTE. 3RSS*PlA or 3RSS*P1 B are the preferred pumps due to the automatic recirculation capability.
STEP 24 GRADE Standards:
STEP 24 GRADE Standards:
Line 758: Line 758:
Rotates the control switch to the start position for one of the following:  
Rotates the control switch to the start position for one of the following:  
"A Charging Pump "B" Charging Pump 0 "ASIPump 0 "B" SI Pump Observes for proper indications of a successful pump start; red indicating light, amps, flow, etc. Also observes for signs of sump blockage.
"A Charging Pump "B" Charging Pump 0 "ASIPump 0 "B" SI Pump Observes for proper indications of a successful pump start; red indicating light, amps, flow, etc. Also observes for signs of sump blockage.
Standards  
Standards
: Grade: SAT UNSAT ., STEP 31 X Performance Step: Using Attachment A, Check minimum ---- 9.c. ECCS flow to remove decay heat- MINIMUM FLOW INDICATED GRADE X Standards  
: Grade: SAT UNSAT ., STEP 31 X Performance Step: Using Attachment A, Check minimum ---- 9.c. ECCS flow to remove decay heat- MINIMUM FLOW INDICATED GRADE X Standards
: References Attachment A to ECA-I .I and determines minimum ECCS flow to remove decay heat, based on the time from inception of the LOCA. Determines actual ECCS flow by observation of the pump flow meter and determines actual flow is sufficient to remove .decay heat. Grade: SAT UNSAT STEP 32 Performance Step: Check Charging OR SI pump(s) - 9.d. RUNNING IN RECIRCULATION ALIGNMENT .v 14 of 17 PERFORMANCE INFORMATION JPM Number: S.8 Revision:
: References Attachment A to ECA-I .I and determines minimum ECCS flow to remove decay heat, based on the time from inception of the LOCA. Determines actual ECCS flow by observation of the pump flow meter and determines actual flow is sufficient to remove .decay heat. Grade: SAT UNSAT STEP 32 Performance Step: Check Charging OR SI pump(s) - 9.d. RUNNING IN RECIRCULATION ALIGNMENT .v 14 of 17 PERFORMANCE INFORMATION JPM Number: S.8 Revision:
0 <*4 Task Title: Respond To Containment Sump Blockage GRADE Standards:
0 <*4 Task Title: Respond To Containment Sump Blockage GRADE Standards:
Determines by observation that a flowpath exists from the discharge of the running RSS pump to the suction of the running charging or SI pump, and that ECCS flow exists.
Determines by observation that a flowpath exists from the discharge of the running RSS pump to the suction of the running charging or SI pump, and that ECCS flow exists.
Grade: SAT UNSAT STEP 33 X Performance Step:
Grade: SAT UNSAT STEP 33 X Performance Step:
CLOSE recirculation spray header 9.e. isolation valve for running pump- 3RSS*MOV20A 3RSS*MOV20B 3RSS*MOV20C 3RSS*MOV20D GRADE X Standards  
CLOSE recirculation spray header 9.e. isolation valve for running pump- 3RSS*MOV20A 3RSS*MOV20B 3RSS*MOV20C 3RSS*MOV20D GRADE X Standards
: Grade: Depresses open pushbutton for the recirculation spray header isolation valve for running pump. Determines that the valve has closed by observation of green ind. light on, red Off. SAT UNSAT STEP 34 Performance Step:
: Grade: Depresses open pushbutton for the recirculation spray header isolation valve for running pump. Determines that the valve has closed by observation of green ind. light on, red Off. SAT UNSAT STEP 34 Performance Step:
Go to step 12. 9.f. GRADE Stand a rds : Applicant moves ahead to step  
Go to step 12. 9.f. GRADE Stand a rds : Applicant moves ahead to step
: 12. Grade: SAT UNSAT Grade: is concluded. . . .. . .. .. , . : ..,.c ,. ,
: 12. Grade: SAT UNSAT Grade: is concluded. . . .. . .. .. , . : ..,.c ,. ,
* SAT UNSAT L/ Stop Time: 15 of 17 JPM Number: Date Performed:
* SAT UNSAT L/ Stop Time: 15 of 17 JPM Number: Date Performed:
Line 783: Line 783:
Following a large break loss of coolant accident (LBLOCA), the plant has established cold leg recirculation per ES-1.3, up to and including Step 4. Shortly thereafter, symptoms of significant CTMT sump clogging appeared.
Following a large break loss of coolant accident (LBLOCA), the plant has established cold leg recirculation per ES-1.3, up to and including Step 4. Shortly thereafter, symptoms of significant CTMT sump clogging appeared.
Ail ECCS and RSS pumps were stopped. The crew is transitioning to ECA-1 .I, Loss of Emergency Coolant Recirculation.
Ail ECCS and RSS pumps were stopped. The crew is transitioning to ECA-1 .I, Loss of Emergency Coolant Recirculation.
Initiating Cues: The US has directed you to perform ECA-1.1, starting with step 1. ,r L-' 17 of 17 Job Performance Measure Approval Sheet U I. JPM Title: Primary Side PEO Actions on a Control Room Evacuation (Part  
Initiating Cues: The US has directed you to perform ECA-1.1, starting with step 1. ,r L-' 17 of 17 Job Performance Measure Approval Sheet U I. JPM Title: Primary Side PEO Actions on a Control Room Evacuation (Part
: 2) JPM ID Number: 2K7 NRC P.1 II. initiated:
: 2) JPM ID Number: 2K7 NRC P.1 II. initiated:
P. Maizahn Developer Ill. Reviewed:  
P. Maizahn Developer Ill. Reviewed:  
Line 829: Line 829:
Grade: Locates North doors A-24-2 [inner] & A-24-1 [outer] and simulates propping BOTH doors open - applicant explains method and component(s) used to achieve blocking OPEN SAT UNSAT Cue: Provide the following cue for each door as simulation performed:
Grade: Locates North doors A-24-2 [inner] & A-24-1 [outer] and simulates propping BOTH doors open - applicant explains method and component(s) used to achieve blocking OPEN SAT UNSAT Cue: Provide the following cue for each door as simulation performed:
Door is blocked OPEN X Performance Step: De-energize TD AFW Pump Steam (Step 8) Supply Isolation Valves 6of 13 Perform an ce I nf o r mat i o n JPM Number: P.1 Revision:
Door is blocked OPEN X Performance Step: De-energize TD AFW Pump Steam (Step 8) Supply Isolation Valves 6of 13 Perform an ce I nf o r mat i o n JPM Number: P.1 Revision:
0 Task Title: Primarv Side PEO Actions on a Control Room Evacuation (Part  
0 Task Title: Primarv Side PEO Actions on a Control Room Evacuation (Part
: 2) 'i/ For 3MSS*MOVl7A, Place breaker 32-4U-R5H to OFF For 3MSS*MOV17B, Place breaker For 3MSS*MOVl7D, Place breaker 32-4T-R6E to OFF 32-4T-R6H to OFF GRADE X Standards: Locates breaker R5H on MCC 4U (ESF Bldg 36') and simulates placing the breaker in the OFF position [3MSS*MOVl7A]
: 2) 'i/ For 3MSS*MOVl7A, Place breaker 32-4U-R5H to OFF For 3MSS*MOV17B, Place breaker For 3MSS*MOVl7D, Place breaker 32-4T-R6E to OFF 32-4T-R6H to OFF GRADE X Standards: Locates breaker R5H on MCC 4U (ESF Bldg 36') and simulates placing the breaker in the OFF position [3MSS*MOVl7A]
GRADE X Standards: Locates breaker R6E on MCC 4T (ESF Bldg 36') and simulates placing the breaker the OFF position [3MSS*MOV17B]
GRADE X Standards: Locates breaker R6E on MCC 4T (ESF Bldg 36') and simulates placing the breaker the OFF position [3MSS*MOV17B]
X Standards: Locates breaker R6H on MCC 4T (ESF Bldg 36') and simulates placing the breaker in the OFF position - GRADE 4 [3MSS*MOV17D3' Grade: SAT UNSAT Cue: As each breaker is located, provide the following cue: Breaker as-found is ON/CLOSED As each breaker is simulated operated, provide the following cue: Cue: Breaker is in the OFF position STEP 5 X Performance Step: Block Open the TD AFW pump (Step 91 Cubicle Doors Door SF 1 Door SF-24-2 7 of 13   
X Standards: Locates breaker R6H on MCC 4T (ESF Bldg 36') and simulates placing the breaker in the OFF position - GRADE 4 [3MSS*MOV17D3' Grade: SAT UNSAT Cue: As each breaker is located, provide the following cue: Breaker as-found is ON/CLOSED As each breaker is simulated operated, provide the following cue: Cue: Breaker is in the OFF position STEP 5 X Performance Step: Block Open the TD AFW pump (Step 91 Cubicle Doors Door SF 1 Door SF-24-2 7 of 13   
~-_ - Performance Information JPM Number: P.l Revision:
~-_ - Performance Information JPM Number: P.l Revision:
0 'd Task Title: Primary Side PEO Actions on a Control Room Evacuation (Part  
0 'd Task Title: Primary Side PEO Actions on a Control Room Evacuation (Part
: 2) GRADE X Standards: Simulates blocking open the TD AFW pump area outside door and the door to MOW7 A, B & D - student explains method and component(s) used to achieve blocking OPEN Grade: SAT UNSAT I Cue: You have material to block doors open I Cue: As each door is simulated blocked open, provide the following cue: The door is blocked OPEN Corn men ts : Location for steps 6 - 9 is ESF Bldg.
: 2) GRADE X Standards: Simulates blocking open the TD AFW pump area outside door and the door to MOW7 A, B & D - student explains method and component(s) used to achieve blocking OPEN Grade: SAT UNSAT I Cue: You have material to block doors open I Cue: As each door is simulated blocked open, provide the following cue: The door is blocked OPEN Corn men ts : Location for steps 6 - 9 is ESF Bldg.
TD AFW pump valve room 24'. STEP 6 Performance Step: Verify TD AFW Pump Steam ---- (Step IO) Isolation Valves - OPEN 3MSS*MOV17A 3MSS*MOVl7B 3MSS*MOV17D Checks SG A TD AFW Pump Non- Return Valve 3MSS*MOV17A OPEN.
TD AFW pump valve room 24'. STEP 6 Performance Step: Verify TD AFW Pump Steam ---- (Step IO) Isolation Valves - OPEN 3MSS*MOV17A 3MSS*MOVl7B 3MSS*MOV17D Checks SG A TD AFW Pump Non- Return Valve 3MSS*MOV17A OPEN.
Line 845: Line 845:
0 ''LJ Task Title: Primarv Side PEO Actions on a Control Room Evacuation (Part 2) L clockwise direction.
0 ''LJ Task Title: Primarv Side PEO Actions on a Control Room Evacuation (Part 2) L clockwise direction.
I GRADE STEP 7 GRADE -w= Standards:
I GRADE STEP 7 GRADE -w= Standards:
Rotates the handwheel in the counterclockwise direction until the valve is fully open. Cue: Valve handwheel rotates in the counterclockwise direction, eventually some resistance is met and the valve comes to a hard stop. Grade: SAT UNSAT Performance Step: Checks SG B TD AFW Pump Non- (Step IO) Return valve 3MSS*MOV17B OPEN. Standards  
Rotates the handwheel in the counterclockwise direction until the valve is fully open. Cue: Valve handwheel rotates in the counterclockwise direction, eventually some resistance is met and the valve comes to a hard stop. Grade: SAT UNSAT Performance Step: Checks SG B TD AFW Pump Non- (Step IO) Return valve 3MSS*MOV17B OPEN. Standards
: Locates valve 3MSS*MOV17B and checks the position indicator (rod). Manually checks valve position by engaging the manual handwheel.
: Locates valve 3MSS*MOV17B and checks the position indicator (rod). Manually checks valve position by engaging the manual handwheel.
OR Cue: Stem position rod is as you see it. ---THIS STEP IS COMPLETE---
OR Cue: Stem position rod is as you see it. ---THIS STEP IS COMPLETE---
Line 852: Line 852:
Rotates the handwheel in the clockwise direction to confirm the valve is open. Cue: Valve handwheel rotates in the clockwise direction.
Rotates the handwheel in the clockwise direction to confirm the valve is open. Cue: Valve handwheel rotates in the clockwise direction.
GRADE Standards:
GRADE Standards:
Rotates the handwheel in the counterclockwise direct ion u n ti I the valve is fully open. Cue: Valve handwheef rotates in the counterclockwise direction, eventually some resistance is met and the vatve comes to a hard stop. 9 of 13 Performance Information JPM Number: P.1 Revision : 0 L,' Task Title: Primary Side PEO Actions on a Control Room Evacuation (Part  
Rotates the handwheel in the counterclockwise direct ion u n ti I the valve is fully open. Cue: Valve handwheef rotates in the counterclockwise direction, eventually some resistance is met and the vatve comes to a hard stop. 9 of 13 Performance Information JPM Number: P.1 Revision : 0 L,' Task Title: Primary Side PEO Actions on a Control Room Evacuation (Part
: 2) Grade: SAT UNSAT STEP 8 Performance Step: Checks SG D TD AM Pump Non- (Step IO)
: 2) Grade: SAT UNSAT STEP 8 Performance Step: Checks SG D TD AM Pump Non- (Step IO)
Return valve 3MSS*MOV17D OPEN. GRADE Standards:
Return valve 3MSS*MOV17D OPEN. GRADE Standards:
Line 863: Line 863:
Cue: GRADE Standards: Rotates the handwheel in the counterclockwise direction until the valve is fully open. Cue: Valve handwheel rotates in the counterclockwise direction, eventually some resistance is met and the valve comes to a hard stop.
Cue: GRADE Standards: Rotates the handwheel in the counterclockwise direction until the valve is fully open. Cue: Valve handwheel rotates in the counterclockwise direction, eventually some resistance is met and the valve comes to a hard stop.
Grade: SAT UNSAT STEP 9 Performance Step: Perform the Following: (Step 11) a. Establish communication with the ASP operator 10 of 13 Perform an ce I nfo r m at ion JPM Number: P.1 Revision:
Grade: SAT UNSAT STEP 9 Performance Step: Perform the Following: (Step 11) a. Establish communication with the ASP operator 10 of 13 Perform an ce I nfo r m at ion JPM Number: P.1 Revision:
0 "W; Task Title: Primarv Side PEO Actions on a Control Room Evacuation (Part  
0 "W; Task Title: Primarv Side PEO Actions on a Control Room Evacuation (Part
: 2) b. Report Attachment A complete c. Provide support as required GRADE Standards:
: 2) b. Report Attachment A complete c. Provide support as required GRADE Standards:
Locates phone or walkie-talkie and simulates establishing communication with ASP operator GRADE Standards:
Locates phone or walkie-talkie and simulates establishing communication with ASP operator GRADE Standards:
Line 913: Line 913:
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?'' or "What are you observing?").  
If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?'' or "What are you observing?").
: 2. 3. 4of 13 PERFORMANCE INFORMATION JPM Number:
: 2. 3. 4of 13 PERFORMANCE INFORMATION JPM Number:
2K7 NRC P.2 Revision:
2K7 NRC P.2 Revision:
Line 938: Line 938:
Cue: The green light illuminates and the red light goes dark. Grade: SAT UNSAT 6of 13 PERFORMANCE INFORMATION JPM Number: 2K7 NRCE Revision:
Cue: The green light illuminates and the red light goes dark. Grade: SAT UNSAT 6of 13 PERFORMANCE INFORMATION JPM Number: 2K7 NRCE Revision:
0 Task Title: LOCAL ACTIONS ON LOSS OF INSTRUMENT AIR .*L/ STEP 4 X GRADE Performance Step: OPEN service air to instrument air Att. A Step 1.d cross-connect valve (3IAS-AOV14).
0 Task Title: LOCAL ACTIONS ON LOSS OF INSTRUMENT AIR .*L/ STEP 4 X GRADE Performance Step: OPEN service air to instrument air Att. A Step 1.d cross-connect valve (3IAS-AOV14).
Standards  
Standards
: Locates valve 31AS-AOVI 4 control switch (on IAS Panel) and checks valve position indicating tights. GRADE X Cue: The green light is illuminated and the red light is dark. Opens valve by positioning switch to the "OPEN" position. The green light goes dark and the red light illuminates.
: Locates valve 31AS-AOVI 4 control switch (on IAS Panel) and checks valve position indicating tights. GRADE X Cue: The green light is illuminated and the red light is dark. Opens valve by positioning switch to the "OPEN" position. The green light goes dark and the red light illuminates.
Standards:
Standards:
Cue: Grade: SAT UNSAT 7 of 13 JPM Number: PERFORMANCE INFORMATION 2K7 NRC P.2 Revision:
Cue: Grade: SAT UNSAT 7 of 13 JPM Number: PERFORMANCE INFORMATION 2K7 NRC P.2 Revision:
0 L/ Task Title: LOCAL ACTIONS ON LOSS OF INSTRUMENT AIR STEP 5 GRADE -e Performance Step: Verify the following tnstrument Air AH. A Step 2 Dryer Annunciators - NOT LIT 0 AIR DRYER REACTIVATION BLOWER (IS 3-2) 0 AIR DRYER HEATER TEMP HI (IS 3-3) 0 AIR DRYER DISCHARGE MOIST HI (IS 3-4) 0 ALARM BLOWER FAILURE (Dryer Skid, 3 IAS-PNLCP  
0 L/ Task Title: LOCAL ACTIONS ON LOSS OF INSTRUMENT AIR STEP 5 GRADE -e Performance Step: Verify the following tnstrument Air AH. A Step 2 Dryer Annunciators - NOT LIT 0 AIR DRYER REACTIVATION BLOWER (IS 3-2) 0 AIR DRYER HEATER TEMP HI (IS 3-3) 0 AIR DRYER DISCHARGE MOIST HI (IS 3-4) 0 ALARM BLOWER FAILURE (Dryer Skid, 3 IAS-PNLCP
: 1) Comments:
: 1) Comments:
The examinee may verify the alarm status in any order. Standards  
The examinee may verify the alarm status in any order. Standards
: Locates panel IS (Turbine Building 14' elev. SW corner facing west wall) and verifies the alarms are not lit (alarm windows dark). Cue: Alarm widows 3-2, 3-3 and 3-4 are not lit. Com men ts : The examinee may elect to perform an alarm panel lamp test, if so provide the following cue: Cue: The lamp test is satisfactory, all lamps illuminated as expected.
: Locates panel IS (Turbine Building 14' elev. SW corner facing west wall) and verifies the alarms are not lit (alarm windows dark). Cue: Alarm widows 3-2, 3-3 and 3-4 are not lit. Com men ts : The examinee may elect to perform an alarm panel lamp test, if so provide the following cue: Cue: The lamp test is satisfactory, all lamps illuminated as expected.
GRADE Standards:
GRADE Standards:
Locates panel CP1 (behind air dryer) and verifies the alarms are not lit (alarm windows dark). Cue: Alarm widow "ALARM BLOWER FAILURE" is not lit. Grade: SAT UNSAT 8of13 PERFORMANCE INFORMATION JPM Number: 2K7 NRC P.2 Revision:
Locates panel CP1 (behind air dryer) and verifies the alarms are not lit (alarm windows dark). Cue: Alarm widow "ALARM BLOWER FAILURE" is not lit. Grade: SAT UNSAT 8of13 PERFORMANCE INFORMATION JPM Number: 2K7 NRC P.2 Revision:
0 Task Title: LOCAL ACTIONS ON LOSS OF INSTRUMENT AIR STEP 6 X Performance Step: Verify Instrument Air Filter Differential Att. A Step 3 Pressure - LESS THAN 4 psid. GRADE Standards  
0 Task Title: LOCAL ACTIONS ON LOSS OF INSTRUMENT AIR STEP 6 X Performance Step: Verify Instrument Air Filter Differential Att. A Step 3 Pressure - LESS THAN 4 psid. GRADE Standards
: Locates air filter differential pressure gauge (31AS-PDISl6) (East of air dryer) and verifies differential pressure reading. The gauge indicates pegged high. Cue: Grade: SAT UNSAT STEP 7 X Performance Step: &ing OP3332A, Instrument Air System, Alternate in-service instrument air filters. Att. A Step 3 RNO GRADE Standards:
: Locates air filter differential pressure gauge (31AS-PDISl6) (East of air dryer) and verifies differential pressure reading. The gauge indicates pegged high. Cue: Grade: SAT UNSAT STEP 7 X Performance Step: &ing OP3332A, Instrument Air System, Alternate in-service instrument air filters. Att. A Step 3 RNO GRADE Standards:
Implements the RNO and obtains U' OP3332A, Instrument Air System, in order to swap filters. Provide examinee with a copy of OP 3332A Cue: Grade: SAT UNSAT STEP 8 Performance Step: Applicant finds correct section relating to filter swap. GRADE Standards: Applicant opens 3332A to section 4.6, Alternating In-Service Instrument Air Filters. Cue: Inform the examinee that filter 2A is in service and to PLACE filter 28 in service Grade: SAT UNSAT 9 of 13 PERFORMANCE INFORMATION JPM Number: 2K7 NRC P.2 Revision:
Implements the RNO and obtains U' OP3332A, Instrument Air System, in order to swap filters. Provide examinee with a copy of OP 3332A Cue: Grade: SAT UNSAT STEP 8 Performance Step: Applicant finds correct section relating to filter swap. GRADE Standards: Applicant opens 3332A to section 4.6, Alternating In-Service Instrument Air Filters. Cue: Inform the examinee that filter 2A is in service and to PLACE filter 28 in service Grade: SAT UNSAT 9 of 13 PERFORMANCE INFORMATION JPM Number: 2K7 NRC P.2 Revision:
Line 960: Line 960:
SAT UNSAT k/-,' STEP 11 X Performance Step: Open 31AS-VI 9, filter 2B outlet OP 3332 4.6.2.c isolation.
SAT UNSAT k/-,' STEP 11 X Performance Step: Open 31AS-VI 9, filter 2B outlet OP 3332 4.6.2.c isolation.
10 of 13 PERFORMANCE INFORMATION JPM Number: 2K7 NRC P.2 Revision:
10 of 13 PERFORMANCE INFORMATION JPM Number: 2K7 NRC P.2 Revision:
0 LOCAL ACTIONS ON LOSS OF INSTRUMENT AIR if Task Title: GRADE Standards  
0 LOCAL ACTIONS ON LOSS OF INSTRUMENT AIR if Task Title: GRADE Standards
: Locates and rotates 3IAS-VI9 in the counterclockwise direction until fully open. Cue: GRADE Standards:
: Locates and rotates 3IAS-VI9 in the counterclockwise direction until fully open. Cue: GRADE Standards:
Cue: Grade: Valve hand wheel rotates freely until some resistance is met. Valve hand wheel comes to a hard stop. Rotates the handwheel in the clockwise direction 1/4 of I turn. Handwheel has been rotated 1/4 turn in the clockwise direction.
Cue: Grade: Valve hand wheel rotates freely until some resistance is met. Valve hand wheel comes to a hard stop. Rotates the handwheel in the clockwise direction 1/4 of I turn. Handwheel has been rotated 1/4 turn in the clockwise direction.
Line 970: Line 970:
OP 3332 4.6.2.e GRADE Standards:
OP 3332 4.6.2.e GRADE Standards:
Cue: Grade: STEP 14 Performance Step: Att. A Step 3 GRADE Standards:
Cue: Grade: STEP 14 Performance Step: Att. A Step 3 GRADE Standards:
Cue: Grade: STEP 15 Perform a nce Step  
Cue: Grade: STEP 15 Perform a nce Step
: Close 3IAS-V2O, filter 2A inlet isolation.
: Close 3IAS-V2O, filter 2A inlet isolation.
Locates and rotates 31AS-V-20 in the clockwise direction until fully closed.
Locates and rotates 31AS-V-20 in the clockwise direction until fully closed.
Valve hand wheel rotates freely until some resistance is met. Valve hand wheel comes to a hard stop. SAT UNSAT Verify Instrument Air Filter Differential Pressure - LESS THAN 4 psid. Locates air filter differential pressure gauge (3IAS-PDIS16) (East of air dryer) and verifies differential pressure reading. Filter DP reads 0.25 psid SAT UNSAT Notify the Control Room that Attachment A of AOP 3562 is complete.
Valve hand wheel rotates freely until some resistance is met. Valve hand wheel comes to a hard stop. SAT UNSAT Verify Instrument Air Filter Differential Pressure - LESS THAN 4 psid. Locates air filter differential pressure gauge (3IAS-PDIS16) (East of air dryer) and verifies differential pressure reading. Filter DP reads 0.25 psid SAT UNSAT Notify the Control Room that Attachment A of AOP 3562 is complete.
12 of 13 PERFORMANCE NFORMATION JPM Number: 2K7 NRC P.2 Revision:
12 of 13 PERFORMANCE NFORMATION JPM Number: 2K7 NRC P.2 Revision:
0 u Task Title: LOCAL ACTIONS ON LOSS OF INSTRUMENT AIR GRADE Standards  
0 u Task Title: LOCAL ACTIONS ON LOSS OF INSTRUMENT AIR GRADE Standards
: Examinee reports to the US that instrument and service air compressor are running and supplying the instrument air header and that the filter and dryer checks are complete as specified in AOP 3562, Attachment A. The 2A filter had a high DP and filter 2B was placed in service. Grade: SAT UNSAT Terminating Cue: The evaluation for this JPM is concluded. Stop Time:
: Examinee reports to the US that instrument and service air compressor are running and supplying the instrument air header and that the filter and dryer checks are complete as specified in AOP 3562, Attachment A. The 2A filter had a high DP and filter 2B was placed in service. Grade: SAT UNSAT Terminating Cue: The evaluation for this JPM is concluded. Stop Time:
130f 13 VERIFICATION OF JPM COMPLETION JPM Number: 2K7 NRC P.2 Revision:  
130f 13 VERIFICATION OF JPM COMPLETION JPM Number: 2K7 NRC P.2 Revision:  
Line 993: Line 993:
lnitia ti n g Cues : P.2 A loss of instrument air has occurred and the Control Room Team is carrying out the actions of AOP 3562, Loss of instrument Air. Steps 1 and 2.a are complete, but instrument air pressure continues to decrease.
lnitia ti n g Cues : P.2 A loss of instrument air has occurred and the Control Room Team is carrying out the actions of AOP 3562, Loss of instrument Air. Steps 1 and 2.a are complete, but instrument air pressure continues to decrease.
Actions in accordance with the "Response Not Obtained" column are required. The US has directed you to locally start air compressors and perform filter and dryer checks using Attachment A of AOP 3562, Loss of Instrument Air. 15 of 13 JOB PERFORMANCE MEASURE APPROVAL SHEET  
Actions in accordance with the "Response Not Obtained" column are required. The US has directed you to locally start air compressors and perform filter and dryer checks using Attachment A of AOP 3562, Loss of Instrument Air. 15 of 13 JOB PERFORMANCE MEASURE APPROVAL SHEET  
-_ I. JPM Title: Cross-Connect Service Water to East Switchgear Vent i I a t io n 'd JPM ID Number: 2K7 NRC P.3 Revision:  
-_ I. JPM Title: Cross-Connect Service Water to East Switchgear Vent i I a t io n 'd JPM ID Number: 2K7 NRC P.3 Revision:
: 11. Initiated:
: 11. Initiated:
c c c D. Minnich t 3 I Developer I I I. Reviewed: - Technical Reviewer IV. Approved: Cognizant Plant Supervisor (optional) q6~- T. uterman Nuclear Training Supervisor 0 12/8/06 Date //2f/7 Date Date 1 of9 JOB PERFORMANCE MEASURE APPROVAL SHEET i_/  
c c c D. Minnich t 3 I Developer I I I. Reviewed: - Technical Reviewer IV. Approved: Cognizant Plant Supervisor (optional) q6~- T. uterman Nuclear Training Supervisor 0 12/8/06 Date //2f/7 Date Date 1 of9 JOB PERFORMANCE MEASURE APPROVAL SHEET i_/  
Line 1,017: Line 1,017:
The crew is controlling the plant from the Auxiliary Shutdown Panel in accordance with EOP 3509. I. initiating Cues: The US has directed you to perform local actions to align ventilation for the East Switchgear Room by performing Steps 42.a and b of EOP 3509.1. You have two PA 8235 keys and a locked valve key.  
The crew is controlling the plant from the Auxiliary Shutdown Panel in accordance with EOP 3509. I. initiating Cues: The US has directed you to perform local actions to align ventilation for the East Switchgear Room by performing Steps 42.a and b of EOP 3509.1. You have two PA 8235 keys and a locked valve key.  
**** NOTESTO EVALUATOR**** Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. When the student states what hidher simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?"
**** NOTESTO EVALUATOR**** Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. When the student states what hidher simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?"
or "What are you observing?"). -l. critical steps must be completed correctly.  
or "What are you observing?"). -l. critical steps must be completed correctly.
: 2. 3. 4 of 9 PERFORMANCE INFORMATION JPM Number: P.3 Revision:
: 2. 3. 4 of 9 PERFORMANCE INFORMATION JPM Number: P.3 Revision:
0 Task Title: Cross-Connect Service Water to East Switchaear Ventilation Start Time:
0 Task Title: Cross-Connect Service Water to East Switchaear Ventilation Start Time:
Line 1,024: Line 1,024:
Cue: Locates 32-2T (34 in E. Switchgear Room 4'-6" elev and simulates inserting PA 8235 key into key lock and turning clockwise to START, verifies green indicating light OFF, red light ON. Locates 32-2T (3M) in E. Switchgear Room. 4'-6" elev, and simulates inserting PA 8235 key into key lock and turning clockwise to START, verifies green indicating light OFF, red light ON. 5of9 PERFORMANCE INFORMATION JPM Number: P.3 Revision:
Cue: Locates 32-2T (34 in E. Switchgear Room 4'-6" elev and simulates inserting PA 8235 key into key lock and turning clockwise to START, verifies green indicating light OFF, red light ON. Locates 32-2T (3M) in E. Switchgear Room. 4'-6" elev, and simulates inserting PA 8235 key into key lock and turning clockwise to START, verifies green indicating light OFF, red light ON. 5of9 PERFORMANCE INFORMATION JPM Number: P.3 Revision:
0 Task Title: L.-J STEP 2 Cross-Connect Service Water to East Switchgear Ventilation GRADE .I '--- STEP 3 Grade: Note: SAT UNSAT The following step de-energizes the Train A HVK isolation valves to/from East Switchgear Room to ensure they are closed. (Train 8 valves were de- energized in an earlier procedure step which de-energized 34D.)
0 Task Title: L.-J STEP 2 Cross-Connect Service Water to East Switchgear Ventilation GRADE .I '--- STEP 3 Grade: Note: SAT UNSAT The following step de-energizes the Train A HVK isolation valves to/from East Switchgear Room to ensure they are closed. (Train 8 valves were de- energized in an earlier procedure step which de-energized 34D.)
X Performance Step: Cross-connect service water to the (EOP 3509.1, switchgear room ACUs Step 42.b.l) I) At 3SCV*PNLRI(O) (Control Building 4'-6") Place breakers 19 and 22 to OFF X Standards  
X Performance Step: Cross-connect service water to the (EOP 3509.1, switchgear room ACUs Step 42.b.l) I) At 3SCV*PNLRI(O) (Control Building 4'-6") Place breakers 19 and 22 to OFF X Standards
: Locates 3SCV*PNLRI(O) in E. Switchgear Room, opens panel door, simulates sliding breakers 19 and 22 to the OFF position.
: Locates 3SCV*PNLRI(O) in E. Switchgear Room, opens panel door, simulates sliding breakers 19 and 22 to the OFF position.
Grade: SAT UNSAT X Performance Step: 2) Locally Open service water cross- (EOP 3509.1, Step 42.b.2) connect valves (Control Building 4'-6")
Grade: SAT UNSAT X Performance Step: 2) Locally Open service water cross- (EOP 3509.1, Step 42.b.2) connect valves (Control Building 4'-6")

Revision as of 04:18, 13 July 2019

Draft - Section B Operating Exam (Folder 2)
ML070810668
Person / Time
Site: Oregon State University
Issue date: 01/09/2007
From: David Silk
Operations Branch I
To:
Dominion Nuclear Connecticut
Sykes, Marvin D.
Shared Package
ML060800095 List:
References
Download: ML070810668 (145)


Text

JOB PERFORMANCE MEASURE APPROVAL SHEET d I. JPM Title: Respond To A Loss Of All Charging Pumps (Overcurrent)

Revision:

0 JPM ID Number: 2K7 NRC S.l II. Initiated:

Developer I I I. Reviewed:

\ Technical Reviewer IV. Approved:

.. Afw Cognizant Plant Supervisor (optional)

Nuclear Training Supervisor 12/8/06 Date Date Date flw la7 Date 1 of 17 JOB PERFORMANCE MEASURE APPROVAL SHEET

SUMMARY

OF CHANGES 2 of 17 JOB PERFORMANCE MEASURE GUIDE Faciiity: Millstone Unit 3 JPM ID Number: 2K7 NRC S.1 -4 Applicant:

Revision:

0 Task Title: Respond To A Loss Of All Charging Pumps (Overcurrent)

System: 004 Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes):

10 Task Number@):

344-05-036 Applicabfe To:

SRO X RO X PEO WA Number: APE: 022 AA2.02 WA Rating: 3.2 / 3.7 004-A4.08 3.8 f 3.4 Method of Testinlq: Simulated Performance:

Actu a1 Performance:

X Location:

Class room: Simulator:

X In-Plant: - -' Task Standards:

All critical steps are performed satisfactorily.

All sequential steps are performed in proper procedural sequence. Required Materials:

None. General

References:

EOP 3506 Rev. 009-00 ***READ TO THE STUDENT***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective(s) for this JPM will be satisfied.

You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution were actually being performed. -v' 3 of 17 JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number: 2K7 NRC S.l Revision:

0 Simulator Requirements:

ii A. Reset to any 100% Power IC B. Insert I10 [CVl3CHS*AV8149C CLOSE OFF (FALSE) C. Place simulator in "RUN" D. Ensure The "B" charging pump is running. Ensure CHS*AV8149C will not close. E. Insert MALF CV11 B, Charging Pump "B" Overcurrent trip. F. Acknowledge annunciators, then place simulator in "FREEZE" G. Place simulator in "RUN" after the operator receives instructions. Approximate Simulator setup time is 10 minutes

-> Initial Conditions:

The plant was at 100% power with charging and letdown in a normal lineup. Moments ago the "B" Charging pump tripped and the applicable ARP's referenced.

Initiating Cues: The US has directed you to perform EOP 3506, "Loss Of All Charging Pumps," beginning with step I. **** NOTES TO EVALUATOR****

1. Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, critical steps must be completed correctly.

The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. When the student states what hidher simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?"

or "What are you observing?").

2. 3. 4of 17 PERFORMANCE INFORMATION JPM Number: S.1 Revision:

0 Task Title: Respond To A Loss Of All Charging Pumps (Overcurrent)

W Start Time: STEP I GRADE STEP 2 GRADE STEP 3 GRADE -e STEP 4 GRADE performance Step: Obtains copy of EOP 3506 Standards:

Obtains a copy of EOP 3506 and refers to step I Grade: SAT UNSAT Performance Step: The Foldout page must be open. Note prior to step 1 Standards: Opens foldout page and reviews Grade: SAT UNSAT Performance Step:. Verify Charging Pumps - NONE EOP 3506, step 1. RUNNING Standards:

Determines that no charging pumps are running by observation of indicating lights, amps, flow etc. Grade: SAT UNSAT Performance Step: Check Reactor- NOT TRIPPED 2. Standards:

At Main Board 4 determines that the reactor trip breakers are closed observation of red indicating lights on, DRPl indication, etc. Grade: SAT UNSAT STEP 5 Performance Step: Check Busses 34C And 34D - 3. BOTH ENERGIZED GRADE Standards:

Determines Busses 34C And 34D are both energized by observation of the Main Board 8 emergency bus voltage ../- 5 of 17 PERFORMANCE INFORMATION JPM Number: S.l Revision:

0 Respond To A Loss Of All Charging Pumps (Overcurrent)

"4 Task Title: indicators reading about 4160 volts OR emergency load center voltage indicators (8) reading about 480 volts. Grade: SAT UNSAT STEP 6 Performance Step: Isolate Letdown 4.a. CLOSE letdown orifice isolation valves GRADE Standards:

Depresses close pushbuttons for CHS"AV8149C.

Determines that 8149C has not closed by observation of red indicating light on, green off, and transitions to RNO column. Grade: SAT UNSAT CLOSE Ctmt letdown isolation valves: STEP 7 X Performance Step: 4.a. RNO L-" 3CHS*CV8152 0 3CHS*CV8160 GRADE X Standards:

Depresses close pushbuttons for CHS*CV8152 and CV8160 GRADE Standards:

Checks position indicating lights and determines valves have closed by red ind. lights off, green on Grade: SAT UNSAT STEP 8 Performance Step: Verify excess letdown and reactor 4.b. head vent isolation valves - CLOSED GRADE Standards:

Checks red indicating lights off

/ green on for head vent and excess letdown isolations 4 Grade: SAT UNSAT 6 of 17 PERFORMANCE INFORMATION JPM Number: s.l Revision:

0 '.- Task Title:

Respond To A Loss Of All Charging Pumps (Overcurrent)

STEP 9 GRADE STEP 10 GRADE STEP 11 GRADE Performance Step: Check For Loss Of Charging Pump 5.a. Suction Check previously running charging pump -ANY OF THE FOLLOWING FLUCTUATING PRIOR TO PUMP TRIP Charging flow - OR 0 RCP seal supply flows - OR 0 Charging pump discharge pressure - OR 0 Charging pump amps Standards:

The applicant should question the US if there were any indications of Grade: Performance Step: 5.a. RNO Standards:

Grade: performance Step: 5.c. Standards:

SAT UNSAT Proceed to step 5.c. Proceeds to step 5.c. SAT UNSAT Check indications of pump cavitation or gas binding - REPORTED FROM FIELD The applicant may question the US if there were any indications of cavitation 7 of 17 PERFORMANCE INFORMATION JPM Number: S.l Revision:

0 L--f Task Title: Respond To A Loss Of All Charging Pumps (Overcurrent) 12 - Performance Step: Proceed to step 5.f. - STEP 5.c. RNO Standards:

Proceeds to step 5.f. _c_ - GRADE Grade: SAT UNSAT STEP 13 - Performance Step: Verify charging pump suction 5.f. 0 Check VCT to charging isolation valves (3CHS*LCVI 12B and 3CHS*LCV112C) - OPEN GRADE Standards:

e Check at least one RWST to charging isolation valve (3CHS*LCVl12D or 3CHS*LCV112E) - OPEN Determines that both VCT to charging isolation valves (3CHS*LCV112B and 3CHS*LCV112C) are open by checking red indicating lights on

/ green off. Grade: SAT UNSAT STEP 14 Performance Step: Check RCPs For A Loss Of AH 6. a. Seal Cooling Check any RCP 0 Thermal barrier cooling (CCP) - LOST - OR 0 Seal injection flow - LESS THAN 6 gpm 8of 17 PERFORMANCE INFORMATION JPM Number: S.l Revision:

0 Task Title: 4 Respond To A Loss Of All Charging Pumps (Overcurrent)

GRADE Standards:

Determines that there is adequate Thermaf barrier cooling by observing thermal barrier flow low annunciators not in alarm. . Grade: GRADE Standards:

SAT UNSAT Determines that there is NO seal injection flow by observation of sea! injection flowrate indicators CHS- Fi145A, 144A, 143A, and 142A on MB3. Grade: SAT UNSAT STEP 15 Performance Step: Check affected RCP(s) - 6.b. RUNNING GRADE Standards:

Determines that all RCPs are running by observation of red indicating lights on / green off, amps, flow etc. v Grade: SAT UNSAT STEP 16 X Performance Step: Check affected RCPs #I seal inlet 6.c. temperatures - ANY GREATER THAN OR EQUAL TO 230 OF) (PPC, NSSS screen 15) GRADE X Standards:

At any PPC AYDIN terminal, calls up NSSS screen 15 and determines that all RCP #I seal inlet temperatures are less than 230 degrees. Grade: SAT UNSAT STEP 17 Performance Step: Proceed to step 7. 6.c. RNO u GRADE Standards:

Proceeds to step 7. 9 of 17 PERFORMANCE INFORMATION JPM Number: S.1 Revision:

0 'u' Task Title: Respond To A Loss Of All Charging Pumps (Overcurrent)

Grade: SAT UNSAT STEP 18 GRADE STEP 19 '. ., L-, GRADE STEP 20 GRADE Performance Step: Check If A Charging Pump Should Be 7.a. Started Verify charging pump operation - NONE RUNNING Standards:

Determines that no charging pumps are running by observation of indicating lights, amps, flow etc. Grade: SAT UNSAT Performance Step: Check RCPs -ALL RUNNING 7. b. Standards:

Determines that all RCPs are running by observation of red indicating lights on / green off, amps, flow etc. - Grade: SAT UNSAT X Performance Step: START one charging pump 7.c. X Standards:

Rotates the control switch for the "A charging pump to the start position. Observes for proper indications of a successful pump start; red indicating light, amps, flow, etc. Standards:

Grade: SAT UNSAT 10 of -17 PERFORMANCE INFORMATION JPM Number: S.l Revision:

0 Task Title: '.u' Respond To A Loss Of All Charging Pumps (Overcurrent)

STEP 21 GRADE STEP 22 GRADE STEP 23 GRADE STEP 24 GRADE , -J Performance Step: Check procedure entered from - ES- 7.d. 0.1, REACTOR TRIP RESPONSE Standards:

Initial conditions were given at 100% power, therefore the applicant should procede to step 7.d. RNO.

Grade: SAT UNSAT Performance Step: Proceed to step 8. 7.c. RNO. Standards

Proceeds to step 8. Grade: SAT UNSAT Performance Step: Check Charging System 8.a. Alignment Verify charging line flow control valve - OPEN Standards
Observes that 3CHS*FKl21 has output and flow indicated or observes charging flow indicated on the PPC CVCS trend display. Grade: SAT UNSAT Performance Step: Verify charging header loop isolation
8. b. valves (3CHS*AV8146 or 3CHS*AV8147) - ONE OPEN Standards:

Observes that only one charging header loop isolation valve is open by observing a red indicating light for 3CHS*AV8146 and a green indicating I ig h t for 3 C H S*AV8 1 47. 11 of 17 PERFORMANCE INFORMATION JPM Number: S.l Revision:

0 'L.J Task Title:

Respond To A Loss Of All Charging Pumps (Overcurrent)

Grade: SAT UNSAT STEP 25 Performance Step: Verify charging header isolation valves 8.c. (3CHS*MV8106 and 3CHS*MV8105) - OPEN GRADE Standards:

Observes that both charging header isolation valves are open by observing red indicating lights lit and green lights out for 3CHS*MV8106 and 3CHS*MV8105.

Grade: SAT UNSAT STEP 26 Performance Step: Verify charging pump recirculation 8.d. isolation valves - OPEN 3CHS*MV8111A 3CHS*MV81 I I B 3CHS*MV81 I IC 3CHS*MV81 IO .~ -...-- GRADE Standards:

Observes that all charging pump recirculation isolation valves are open by observing red indicating lights lit and green lights out for 3CHS*MV81-l IA, B, C and 3CHS*MV81 IO. Grade: SAT UNSAT STEP 27 Performance Step: Verify charging pump miniflow 8.e. isolation valves to RWST (3CHS*MV8511A and 3CHS*MV8511 B) - CLOSED GRADE Standards:

Observes that both charging pump miniflow isolation valves to RWST are closed by observing green indicating lights lit and red lights out for 12 of 17 PERFORMANCE INFORMATION JPM Number: S.l Revision:

0 "---' Task Title:

Respond To A Loss Of All Charging Pumps (Overcurrent) 3CHS*MV851

?A and 3CHS*MV8511 B. Grade: SAT UNSAT STEP 28 Performance Step: Verify RCP seal supply valve 8.f. (3CHS*HCV182) - OPEN GRADE Standards:

Observes that the seal supply valve 3CHS*HCVl82 is open by observing meter needle on CHS-HC182 indicating open (I 00%). Grade: SAT UNSAT Performance Step: Verify seal injection flow to RCPs with unisolated seals - 8.g. BETWEEN 8 and 13 gpm STEP 29 ----->- GRADE Standards:

Determines seal injection flow to All RCPs is between 8 and 13 gpm by observing flowrates on seal injection flowrate indicators CHS-F1145A, 144A, 143A, and 142A.

Grade: SAT UNSAT STEP 30 Performance Step: Verify Charging Flow Check charging flow 9.a. ii GRADE Standards:

13 of 17 Check PZR level - STABLE OR I NC REASl NG Check charging flow control valve - CAPABLE OF BEING THROTTLED Determines PZR level is stable or increasing by observing PZR level PERFORMANCE INFORMATION JPM Number:

S.1 Revision:

0 'L-' Task Title: Respond To A Loss Of All Charging Pumps (Overcurrent) recorder trace or PPC CVCS trend display. Takes manual control of the charging line flow control valve and verifies throttling capability . Grade: SAT UNSAT STEP 30 Performance Step: Proceed to step 11. 9. b. GRADE Standards:

Proceeds to step 1 I. Grade: SAT UNSAT STEP 31 Performance Step: Align RCS Letdown 11 .a. Check normal letdown- ISOLATED GRADE Standards:

Observes that letdown is isolated by .~ i-' observing green indicating lights lit and red lights out for CHS*CV8152 and CV8 1 60. Grade: SAT UNSAT STEP 32 Performance Step: Verify PZR level - GREATER THAN 11 .b. 22% GRADE Standards

Determines PZR level is greater than 22% by observing PZR level recorder trace or PZR level meters on MB4. Grade: SAT UNSAT STEP 33 Performance Step: Verify normal charging path I I .c. - ESTABLISHED GRADE Standards:

Determines a normal charging charging flow and valve lineup '4 flowpath established by observing 14 of 17 PERFORMANCE INFORMATION JPM Number: S.1 Revision:

0 Task Title: Respond To A Loss Of Ail Charging Pumps (Overcurrent)

L' Grade: SAT UNSAT STEP 34 - Performance Step: Using GA-I 3, Establish normal 1 I .d. letdown Standards:

informs the US that normal letdown needs to be established - GRADE Grade: SAT UNSAT Stop Time:

'---' 15 of 17 VERIFICATION OF JPM COMPLETION JPM Number: 2K7 NRC S.l Date Performed:

'i/ Student: Evaluator:

Revision:

0 ~~ For the student to achieve a satisfactory grade, correctly.

If task is Time Critical, it MUST be compfeted within the specified time to achieve a satisfactory grade. critical steps must be completed Time Critical Task? YES NO X Validated Time (minutes):

IO --: Actual Time to Complete (minutes):

Result of JPM: (14~" for satisfactory, liU" for unsatisfactory)

Result of oral questions (if applicable): Number of Questions:

Number of Correct Responses:

Score: Areas for Improvement:

16 of 17 STUDENT HANDOUT JPM Number: s.1 .*4 Initial Conditions: The plant was at 100% power with charging and letdown in a normal lineup. Moments ago the "B" Charging pump tripped and the applicable ARP's referenced.

Initiating Cues: The US has directed you to perform EOP 3506, "Loss Of All Charging Pumps," beginning with step I. 17 of 17 JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM Title: ENERGIZE THE AC EMERGENCY BUS THROUGH THE RSSA DURING ECA - 0.0 '%d JPM ID Number: 2K7 NRC S.2 II. Initiated: Steve Jackson D eve I o p e r I I I. Reviewed:

Technical Reviewer IV. Approved:

Nuclear Training Manager Revision:

1 611 2/02 Date Date -&!dm- Date i 1 of 10 JOB PERFORMANCE MEASURE GUIDE Facility: Millstone Unit 3 Student: JPM ID Number: 2K7 NRC S.2 Revision:

1 '4 Task Title: ENERGIZE THE AC EMERGENCY BUS THROUGH THE RSSA DURING ECA - 0.0 System: AC Electrical Distribution (62) Safety Function: Electrical (6) Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes):

5 Alternate Path? Yes Task Number(s):

000-05-097 Applicable To: SRO X RO PEO KIA Number: 062. A2.0 5 K/A Rating: 2.9 / 3.3 Method of Testing: Simulated Performance: Actual Performance:

X Location : Classroom: Simulator:

X In-Plant:

dl Task Standards:

Respond to a Loss of All AC Power Required Materials:

ECA-0.0, Loss of All AC Power, Rev. 020-01 EOP 35 General Attachment, GA-3; Energizing 4.16 KV Bus From Offsite Power, Rev.

001 General

References:

None ***READ TO THE STUDENT***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.

You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

J 2of 10 JOB PERFORMANCE MEASURE GUIDE (Continued)

.. JPM Number: s.2 LJ Simulator Reauirements:

'l . 2. 3. Initial Conditions:

Initiating Cues: -. -- 4. 5. 6. 7. Revision:

I Reset to IC- 21 , 100% power, EOL.

Enter MALF EGOTB, EDG B Trip & EG08A; 0%, EDG A Load Limiter Failure Enter I/O (EG) 1A-3ENSACB-AI CLOSE - FALSE, to prevent EDG A Output breaker from closing manually Place the Simulator in Run Enter MALF EDOI , Loss of Offsite Power, run for 5 minutes, perform E-0, steps 1-3, and ECA-0.0, steps 1-4. Remove MALF EDOI Place the Simulator in Freeze. Go to run when the examinee is ready to begin The plant has experienced a Loss of Offsite Power. The A EDG started but did not load. The B EDG started and catastrophically failed. The crew responded using E-0 and ECA-0.0 and has completed ECA-0.0 through step 4. CONVEX has restored offsite power, which is available and reliable.

The Unit Supervisor directs you to restore power to any AC emergency bus starting at ECA-0.0, step

5. **** NOTES TO EVALUATOR****
1. Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. critical steps must be completed correctly.
2. When the student states what hidher simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").

~~d 3of 10 PERFORMANCE INFORMATION JPM Number: s.2 Revision:

1 'ii Task Title: ENERGIZE THE AC EMERGENCY BUS THROUGH THE RSSA DURING ECA - 0.0 Start Time: STEP 1 STEP 2 GRADE .. 'u" STEP 3 GRADE - X X Performance Step: Try To Restore Power To Any AC (ECA-0.0 Step 5.a) Emergency Bus: START at least one EDG (MB8) Standards:

Observes A EDG running. Observes that the EDG has NOT automatically ciose onto bus 34C. Candidate MAY observe degraded frequency Grade: SAT UNSAT Performance Step: Verify EDG output breaker - CLOSED (Step 5.b) Alternate Path Observes that Bus 34C and 340 are Standards:

both de-energized. The candidate may try to close the A EDG Output Breaker since it is an automatic action which did not occur. Candidate transitions to RNO column. Grade: Performance Step: (Step 5.b RNO) Standards:

Grade: STEP 4 LJ GRADE Performance Step: (Step 5.c) Standards

SAT UNSAT CLOSE breaker (MB8) Candidate attempts to close the A EDG output breaker.

When it will not close transitions to step 5.c SAT UNSAT VerifL at least one AC emergency bus - ENERGIZED Observes that Bus 34C and 34D are both still de-energized.

4 of 10 PERFORMANCE INFORMATION JPM Number:

s.2 Revision:

1 -'--' Task Title: ENERGIZE THE AC EMERGENCY BUS THROUGH THE RSSA DURING ECA - 0.0 Grade: SAT UNSAT STEP 5 Performance Step: Proceed to step 5.e (Step 5.c RNO) GRADE Standards: Candidate Proceeds to step 5.e. Grade: SAT UNSAT STEP 6 Performance Step: Check offsite power - AVAILABLE (Step 5.e) GRADE Standards

At MB8 observes any of the following: Grid frequency meter (upright) 0 Grid voltage meter (upright) RSST "available" white lights

-\-.-. (a P r0 n) Comment: This information also given in initial conditions. Candidate may choose not to verify. Grade: SAT UNSAT STEP 7 Performance Step: Using GA-3, energize emergency bus 34C or 34D through the RSST or the NSST {step 5.9 GRADE Standards: Candidate locates and opens GA binder to GA-3. GRADE Standards: The applicant should question the US which emergency bus is desired to be energized and from which offsite source. SAT UNSAT Grade: 5 of 10 PERFORMANCE INFORMATION . JPM Number: s.2 Revision:

1 '.d Task Title:

ENERGIZE THE AC EMERGENCY BUS THROUGH THE RSSA DURING ECA - 0.0 STEP 8 Performance Step: Check Energizing Bus 34C - DESIRED (step 1 of GA-3) GRADE Standards:

Candidate Proceeds to step 2 based on previous cue.

Grade: SAT UNSAT STEP 9 X Performance Step: Energize Bus 34C. (step 2.a) Place the following control switches in PU LL-TO-LOCK GRADE x Standards

a a a a a a a a a e e e a One Train A Service Water Pump RPCCW Pump A RPCCW Pump C (Train A) Quench Spray Pump A Recirc Spray Pump A Recirc Spray Pump C SI Pump A RHR Pump A Control Building Chiller A Aux Building Filter A Charging Pump A Charging Pump C (Train A) MD AFW Pump A Locates the control switches for the following components and places the switch in stop and then in PULL-TO- LOCK. a a e a a a a a a a e 6 of 10 One Train A Service Water Pump RPCCW Pump A RPCCW Pump C (Train A) Quench Spray Pump A Recirc Spray Pump A Recirc Spray Pump C SI Pump A RHR Pump A Control Building Chiller A Aux Building Filter A Charging Pump A PERFORMANCE INFORMATION JPM Number: s .2 Revision:

I Task Title: ENERGIZE THE AC EMERGENCY BUS THROUGH THE RSSA 'd DURING ECA - 0.0 0 Charging Pump C (Train A) MDAFWPumpA Grade: SAT UNSAT STEP 10 Performance Step: Verify annunciator, "Bus 34C (step 2.b)

UNDERVOLTAGE" (MB8A 3-12)

-- NOT LIT - GRADE Standards: Observes annunciator MB8A 3-12, "Bus 34C UNDERVOLTAGE" not lit on MB8A. Grade: SAT UNSAT STEP 11 X Performance Step: Press "BYPASS" for 34C undervoltage (Step 2.c) block pushbutton. (MB8R)

.~ - GRADE X Standards:

Locates pushbutton on MB8R, pushes button and observes white light go off. Grade: SAT UNSAT STEP 12 Performance Step: Check undervoltage block white light - (Step 2.d) NOT LIT. GRADE Standards: Observes white light NOT LIT on pushbutton on MB8R Grade: SAT UNSAT STEP 13 Performance Step:

Check energizing Bus 34C (Step 2.e) from Bus 34A - DESIRED GRADE Standards:

Candidate Proceeds to step 2.e.RNO based on previous cue. o Bus 34C with the RSST. CUE (if espond as the US to restore PO 7 of 10 PERFORMANCE INFORMATION JPM Number: S.2 Revision:

1 ENERGIZE THE AC EMERGENCY BUS THROUGH THE RSSA i_/ Task Title:

~~ DURING ECA - 0.0 Grade: STEP 14 X Performance Step: (Step 2.e.l RNO) GRADE X Standards:

Grade: STEP 15 X Performance Step: (Step 2.e.2 RNO) -/' GRADE X Standard:

Standards:

Note: Grade: STEP 16 Performance Step: (Step 2.e.3 RNO) GRADE Standards:

Grade: 8of 10 SAT UNSAT Energize Bus 34C from RSSA: Place RSSA sync selector switch in ON. Places or checks sync selector handle in synchronizing selector for RSSA to bus 34C and turns to ON position. Observes INCOMING voltage meter register voltage at about 125 v. SAT UNSAT CLOSE RSSA supply breaker (RSSA*34C-2) - Locates and turns RSSA*34C-2, RSSA supply breaker to the close position and releases.

Observes breaker green light go OFF and red light go ON. Observes voltage on bus 34C at about 4000 v. Also may observe synchroscope RUNNING voltage go to about 125

v. Lights come on in the Control Room SAT UNSAT Place RSSA sync selector switch in OFF. Rotates sync selector handle in synchronizing selector for RSSA to bus 34C to the OFF position.

Observes INCOMING and RUNNING voltage meters go to zero. SAT UNSAT PERFORMANCE INFORMATION JPM Number: s.2 Revision:

1 ENERGIZE THE AC EMERGENCY BUS THROUGH THE RSSA \4 Task Title:

DURING ECA - 0.0 STEP 17 Performance Step: (Step 2.e.4 RNO) Comments:

Proceed to step 2.g. When candidate reads step 2.e.4 RNO go to terminating cue and end the JPM. Terminating Cue: The evaluation for this JPM is concluded.

Stop Time: 9oflO JPM Number: Date Performed:

Student: Evaluator:

.-4 VERIFICATION OF JPM COMPLETION s.2 Revision:

1 For the student to achieve a satisfactory grade, correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. critical steps must be completed Time Critical Task? YES NO X Validated Time (minutes):

5 -- --- /. Actual Time to Complete (minutes):

Result of JPM: Result of oral questions (if applicable): Number of Questions:

("S" for satisfactory, "U" for unsatisfactory)

Number of Correct Responses:

Score: Areas for Improvement:

10 of 10 STUDENT HANDOUT JPM Number: s.2 .-4 Initial Conditions:

The plant has experienced a Loss of Offsite Power. The A EDG started but did not load. The B EDG started and catastrophically failed. The crew responded using E-0 and ECA-0.0 and has completed ECA-0.0 through step

4. CONVEX has restored offsite power, which is available and reliable.

initiating Cues: The Unit Supervisor directs you to restore power to any AC emergency bus starting at ECA-0.0, step 5. 11 of 10 JOB PERFORMANCE MEASURE APPROVAL SHEET L/' I. JPM Title: Respond to Main Steam Pressure Transmitter MSS-PT20D Failure to I OO%, Causing SG Atmospheric Relief Valve MSS-PV20 to Open (OP3353.MB5C 5-7) JPM ID Number: 2K7 NRC S.3 11. Initiated: Barry Pinkowitz Developer Ill. Reviewed:

Paul Malzahn Technical Reviewer IV. Approved:

NA Cognizant Plant Supervisor (optional)

Trad Horner Nuclear Training Supervisor Revision:

0 chg 1 13 Sept 2004 Date 03/13/04 Date Date 09/14/04 Date 1 of9 JOB PERFORMANCE MEASURE APPROVAL SHEET 12/27/06 Revised JPM to correspond to the standard NTP format. DLM

SUMMARY

OF CHANGES Rev 0 change 1 --/- .e' 2of9 JOB PERFORMANCE MEASURE GUIDE Facility:

Millstone Unit 3 Applicant:

.'d JPM ID Number: 2K7 NRC S.3 Revision:

0 chg 1 Task Title: Respond to Main Steam Pressure Transmitter MSS-PT20D Failure to 1 OO%, Causing SG Atmospheric Relief Valve MSS-PV20 to Open System: 039 Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes):

10 for RO / 15 for SRO Task Number(s):

Applicable To: SRO X RO X PEO K/A Number: 039 A4.07 041 A4.06 K/A Rating: 2.8 I2.9 3.1 /2.9 Method of Testing: Simulated Performance:

Actual Performance:

X Location: Classroom: Simulator:

X In-Plant:

J Task Standards:

0 Applicant closes isolation valve 3MSS*MOV18D 0 Applicant recognizes both instrument failure and component failure. Required Materials:

None. General

References:

OP 3353.MB5C 5-7, MAIN STEAM RELIEF W NOT CLOSED, rev 003-07 ***READ TO THE STUDENT***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective(s) for this JPM will be satisfied.

You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution were actually being performed.

3 of 9 JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number: 2K7 NRC S.3 Revision:

0 Simulator Requirements:

L.J A. Reset to IC 18 or any other 100% Power IC. C. Place simulator in "RUN" D. Ensure plant is stable and computer point alarms enabled. F. Acknowledge annunciators, then place simulator in 'IF RE EZE" G. Place simulator in "RUN" after the operator receives instructions.

Simulator Instruction:

v' Initial Conditions:

Approximate Simulator setup time is 5 minutes T = 0 seconds: Candidate takes the shift. At T = 45 seconds. insert malfunction MS'?ID, Severitv = 100%. (MS PRESSURE TRANS FAIL MSS-PT20D)

At T = 50 seconds, insert malfunction MSOSD, Severity = 100% (PRESS RLF VV PVZOD FAIL) The plant is steady state at 100% power with no equipment out of service. You are to respond to the simulator just as you would respond to the actual plant.

Do you have any questions?

Are you ready to begin? Initiating Cues: You have the shift. **** NOTES TO EVALUATOR****

1. Critical steps for this JPM are indicated by an "X" after the step number.

For the student to achieve a satisfactory grade, The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. When the student states what hidher simulated action/observation would be, read the appropriate "Cue". If necessary] question the student for details of simulated actions/observations (Le. "What are you looking at?"

or "What are you observing?").

critical steps must be completed correctly.

2. 3. 4 of 9 PERFORMANCE INFORMATION JPM Number: S.3 Revision:

0 chg 1 Task Title:

Start Time: ..4' Respond to Main Steam Pressure Transmitter MSS-PT20D Failure Comment: It is expected that the applicant take manual control of MSS-PIC20D

("D" SG Atmospheric Relief Valve Controller) and attempt to close the "D" atmospheric relief valve. Once determined that the atmospheric relief valve will not close, it is expected that the applicant will recommend isolating the relief valve by closing 3MSS*MOVl8D.

It is satisfactory to reference OP 3353.MB5C 5-7 (applicable ARP) after the relief valve is isolated.

STEP STEP GRADE 1 Performance Step: MBSC 5-7 step I Standards

Grade: 2 Performance Step: MBSC 5-7 step 2 Standards:

Grade: 5 of 9 CHECK the following steam generator pressures for proper operation of main steam pressure relief valve (MB5): 0 0 0 0 Appli 3MSS-PIC20A 3MSS-PIC20B 3MSS-PICZUC 3MSS-PIC20D ant checks SG pre ires for proper operation of SG Atmospheric Relief Valve. Observes that the process input (3MSS-PT20D) to 3MSS-PIC20D is pegged high as indicated by the controller red pointer SAT UNSAT IF pressure controller has failed, PLACE controller in "MAN" and CLOSE the valve. Applicant depresses the manual pushbutton on 3MSS-PIC20D and lowers controller output in an attempt to manually close 3MSS-PV20D.

SAT UNSAT PERFORMANCE iNFORMATlON JPM Number:

S.3 Revision:

0 chg I Task Title:

.-u' Respond to Main Steam Pressure Transmitter MSS-PT20D Failure STEP 3 X GRADE GRADE X .. ---_-.-- GRADE STEP 4 X GRADE X .. ., =----- Performance Step: IF relief valve does not close, CLOSE MBSC 5-7 step 3 the following isolation valves (MB5): Standards:

0 3MSS*MOV18D, "ATMOSPHERIC RE LI E F ISOL" "SG 4" Applicant recommends to the US that the failed open relief valve be isolated by closing 3MSS*MOV18D. as the US and dir 3MSS.*'fi&P?I 8D. Standards

Applicant depresses close pushbutton for 3MSS*MOV18D.

NOTE: 3MSS*MOV18D is a throttle valve. Applicant must hold the CLOSE pushbutton until the valve is fully shut.

Standards:

Checks position indicating lights and determines valve has closed by green indicating light on, red off. Grade: SAT UNSAT NOTE: , SRO Applicants continue:

Performance Step: MB5C 5-7 step 4 Refer To Technical Specification 3.7.1.6 and DETERMINE Limiting Condition for Operation.

Standards:

SRO Applicant refers to Technical Specifications and enters LCO Action 3.7.1.6.a. (7 day allowed outage time)

SRO applicant should state or otherwise indicate recognition of LCO NOTE TO EXAMINER:

6 of 9 PERFORMANCE INFORMATION JPM Number: S.3 Revision:

0 chg 1 id' Task Title:

Respond to Main Steam Pressure Transmitter MSS-PT20D Failure requirement.

Grade: SAT UNSAT STEP 5 Performance Step: If failure is due to an instrument MB5C 5-7 step 4 problem, Go To AOP 3571.

GRADE Standards:

SRO applicant obtains AOP 3571. GRADE Standards:

SRO applicant recognizes that all actions as specified in AOP 3571 for a failure of 3MSS-PT20D are complete with the exception of notifying I & C Department.

Grade: SAT UNSAT 6 Performance Step: Request I&C Department perform -. -' STEP AOP 3571, Att. I Step 3. instrument. corrective maintenance on failed GRADE Standards:

SRO Applicant should state or otherwise demonstrate request for I&C action on failed instrument 3MSS-PT20D. Grade: SAT UNSAT uation for this J Stop Time:

7 of 9 VERIFICATION OF JPM COMPLETION JPM Number: 2K7 NRC S.3 Wj Date Performed:

Student: Eva1 uator: Revision:

0 chg I For the student to achieve a satisfactory grade, correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

critical steps must be completed Time Critical Task? Validated Time (m in u tes) : YES NO X 10 for RO / 15 for SRO Actual Time to Complete (minutes):

Result of JPM: ("S" for satisfactory, "U" for unsatisfactory)

Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score: Areas for Improvement:

8 of 9

'.d' JPM Number: Initial Conditions:

initiating Cues: STUDENT HANDOUT s.3 The plant is steady state at 100% power with no equipment out of service. You are to respond to the simulator just as you would respond to the actual plant.

Do you have any questions?

Are you ready to begin? You have the shift. 9of9 JOB PERFORMANCE MEASURE WORKSHEET LJ 1. JPM Title: CONTROL ROD OUT OF ALIGNMENT ID Number: 2K7 NRC S.4 Revision:

1 ch 3 [Change 2, 09/24/2003, J. Deveau] [Change 3, R.J. Acquaro, 5/30/06] II. Initiated: R.L. Lueneburq Develop e r I I I. Reviewed : R. Royce .< --_-- Technical Reviewer R. Carr Instructional Reviewer IV. Approved: Barrv Pinkowitz Operations Manager Dave Lazarony Nuclear Training Supervisor 5/15/97 Date 6/13/97 Date 6/13/97 Date 06/13/97 Date 06/13/97 Date 1 JOB PERFORMANCE MEASURE WORKSHEET

=d Change 1 Update to procedure rev 4. Barry Pinkowitz 08/04/2003 Change2 Update to procedure rev 5 01. John Deveau 09/24/2003 Change 3 05/30/2006 Update to procedure rev 007-00 and other minor enhancements.

R.J. Acquaro 2 JOB PERFORMANCE MEASURE WORKSHEET JPM Tracking Number: 2K7 NRC S.4 Validation Time:

.-- minutes Task Title: CONTROL ROD OUT OF ALIGNMENT Time Critical Task: ( )YES ( X ) NO Task Number: 344*05*030 and 344*05*041 System: 001 , Control Rod Drive System WA Number: 00 I -A2.03 WA Rating: 3.5 i 4.2 Appficabfe Methods of Testinq Simulate Performance Actua I Perform an ce X Classroom Simulator X Plant Task Standards:

Satisfactorily recover from a misaligned control rod using AOP 3552 Attachment A Required Materials: Shutdown margin calcu Iation

'U General

References:

AOP 3552, Rev. 007-00 READ TO THE EXAMINEE I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.

You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports and log entries as if the evolution was actually being performed.

Initial Conditions:

A problem in the EHC circuit caused a momentary runback of the turbinelgenerator. During the subsequent insertion of the reactor control rods, rod D4 in Control Bank ,D was observed to be misaligned.

The control room team entered AOP 3552, Malfunction of the Rod Drive System, and has decided that Attachment A to that procedure is to be used to recover from the misaligned rod. The lift coil fuse for rod D4 was blown, and has been replaced.

Rod 04 has been misaligned for less than one hour.

lnitiatinq Cues: The US has directed you to complete Attachment A of AOP 3552 step I through step 7.f. '4 3 JOB PERFORMANCE MEASURE WORKSHEET SIMULATOR REQUIREMENTS:

1. Reset to IC# 18. 2. Enter malfunction RD0457 Control Band "D" stuck rod "D4" 3. Place the master silence switch in the "Master Silence" position and place the simulator in "RUN". 4. Reduce turbine load by about 20 MWe using the Load Limit potentiometer to cause Control Bank D to insert. 5. Allow rod 04 to misalign by greater than 12 steps, then place Rod Bank SEL switch to MAN. 6. Allow the simulator time to stabilize prior to performing the next step. 7. Remove malfunction RD0457 to allow recovery of the rod. Approximate simulator setup time is 12 minutes. 4 PERFORMANCE tNFORMATlON Facility: Millstone Unit 3 System: 00 1 -' JPM Number: 2K7 NRC S.4 Task Title: CONTROL ROD OUT OF ALIGNMENT Denote Critical Steps with an "X" *NOTE* Critical Steps must be completed correctly to achieve a satisfactory grade Start Time: Performance Step: Obtains copy of AOP 3552 - STEP 1 GRADE Standards: Obtains a copy of AOP 3506 and refers to Attachment A, step 1. STEP 2 Performance Step: Improper rod alignment can cause fuel (Cautions prior to step 1) conjunction with plant transients. damage either directly or in Resetting ROD CONTROL URGENT FAILURE (MB4C 4-8) alarm without correcting the cause may result in dropping a group of control rods. GRADE Standards: Candidate reviews cautions.

Grade: SAT UNSAT STEP 3 Performance Step: A ROD CONTROL URGENT (Note prior to step 1) FAILURE (MB4C 4-8) alarm will inhibit both manual and automatic motion for all rods controlled from the affected power cabinet. GRADE Standards:

Candidate reviews note. Grade: SAT UNSAT STEP 4 Performance Step:

Check Plant Conditions (Step 1.a) .d Verify operational mode - MODE 1 5 PERFORMANCE INFORMATION Facility:

Millstone Unit 3 System: 00 1 LJ JPM Number: 2K7 NRC S.4 Task Title:

CONTROL ROD OUT OF ALIGNMENT Denote Critical Steps with an "X" *NOTE* Critical Steps must be completed correctly to achieve a satisfactory grade (Step 1.a) GRADE Standards

Verifies that the plant is in Mode 1 based on current power level.

Grade: SAT UNSAT STEP 5 Performance Step: Identify misaligned rod(s) using: (Step 1.b) DRPl display 0 Rod Supervision on plant process computer GRADE Standards:

Checks the DRPI display and calls up .--_---^ PPC "Rod Supervision" display (NSSS, page forward, F6, F2) and identifies rod D4 as the only affected rod. Grade: SAT UNSAT STEP 6 Performance Step: Check ROD CONTROL URGENT (Step 1s) FAILURE (MB4C 4-8) annunciator - LIT GRADE Standards: Checks Main Board annunciator MB4C 4-8 NOT LIT. Takes RNO action. Grade: SAT UNSAT STEP 7 Performance Step: Proceed to step I .o (Step 1 .c RNO) ~.\/ 6 PERFORMANCE INFORMATION . Cue: (If Required)

Inform the candidate that the lift coil fuse for rod D4 was blown and has been replaced by I&C. Facility: Millstone Unit 3 System: 001 '.e' JPM Number: 2K7 NRC S.4 Task Title:

CONTROL ROD OUT OF ALIGNMENT Denote Critical Steps with an "X" *NOTE* Critical Steps must be completed correctly to achieve a satisfactory grade GRADE Standards:

Proceeds to step 1 .o Grade: SAT UNSAT STEP 8 Performance Step:

Request I&C verify affected rod lift coil (Step 1.0) fuse - NOT BLOWN GRADE Standards:

Recognizes from Initial Conditions that the lift coil fuse for rod D4 was blown and has been replaced by I&C. Grade: SAT UNSAT STEP 9 Performance Step: Verify Reactivity Control Systems (Step 2.a) Limits Using TRM, Appendix 8.1, COLR, Check all shutdown rods - WITHDRAWN TO GREATER THAN OR EQUAL TO THE SHUTDOWN INSERTION LIMIT GRADE Standards:

Refers to theTRM and verifies that the shutdown rods are greater than the listed insertion limit of 220 steps. Grade: SAT UNSAT STEP 10 Performance Step:

Checks rods -AT LEAST ONE ROD LY' 7 PERFORMANCE INFORMATION

.'d Facility:

JPM Number: Task Title:

Millstone Unit 3 2K7 NRC S.4 CONTROL ROD OUT OF ALIGNMENT System: 00 I Denote Critical Steps with an "X" *NOTE* Critical Steps must be completed correctly to achieve a satisfactory grade (Step 2.b) MISALIGNED BY MORE THAN +_ 12 STEPS FROM ITS GROUP STEP COUNTER. GRADE Standards:

Checks DRPl and/or the PPC "Rod Supervision" display and verifies that rod D4 is out of alignment by more than 12 steps.

Grade: SAT UNSAT STEP 11 Performance Step: Checks rods - A MAXIMUM OF ONE ROD MISALIGNED BY MORE THAN rt 12 STEPS FROM ITS GROUP STEP COUNTER. (Step 2.c) .--- GRADE Standards: Checks DRPI and/or the PPC "Rod Supervision" display, and verifies that ONLY rod D4 is out of alignment by more than 12 steps. Grade: SAT UNSAT Performance Step: Notify Reactor Engineering. (Step 2.d) STEP 12 GRADE Standards:

Informs the US that D4 is misaligned more than 12 steps from its group and to notify Reactor Engineering.

Candidate may call RE directly which is acceptable.

Grade: SAT UNSAT '- STEP 13 Performance Step: Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, using OP 3209B, (Step 2.e) Shutdown Margin, Determine 8

PERFORMANCE INFORMATION Facility: Millstone Unit 3 System: 00 I JPM Number:

2K7 NRC S.4 Task Title:

Ll CONTROL ROD OUT OF ALIGNMENT Denote Critical Steps with an "XI' *NOTE* Critical Steps must be completed correctly to achieve a satisfactory grade L Cue: As US, inform Candidate that Shutdown Margin has been determined to be adequate for present dant conditions.

GRADE Grade: SAT UNSAT -,' STEP 14 GRADE STEP 15 GRADE Shutdown Margin in Modes I and 2 with an inoperable rod. Standards: Informs the US that Shutdown Margin in Modes 1 and 2 with an inoperable rod must be determined within 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Performance Step: Verify Power Distribution Limits (Step 3.a) Verify reactor power - GREATER THAN 50%. Standards:

Checks the power range meters on MB4 and determines that reactor power is greater than 50%. Grade: SAT UNSAT Performance Step:

Determine QPTR using: (Step 3.b) 0 Plant computer - Tilting Factors 0 SP 31012, Quadrant Power Tilt Ratio - OR Standards:

Calls up PPC "Tilting Factors display (NSSS, page forward, F9, F2) and determines QPTR. Grade: 9 SAT UNSAT PERFORMANCE INFORMATION Facility : Millstone Unit 3 System: 001 - JPMNumber:

2K7 NRC S.4 Task Title: CONTROL ROD OUT OF ALIGNMENT Denote Critical Steps with an "X *NOTE* Critical Steps must be completed correctly to achieve a satisfactory grade STEP 16 Performance Step: Check QPTR - LESS THAN OR (Step 3.c) EQUAL TO 1.09 GRADE Standards

Recognizes that QPTR 1.09, and proceeds to next step.

Grade: SAT UNSAT STEP 17 Performance Step:

Check QPTR - LESS THAN OR (Step 3.d) EQUAL TO 1.02 GRADE Standards:

Recognizes that QPTR provided indicates

< 'l.02, and proceeds to next step, .\-' Grade: SAT UNSAT STEP 18 Performance Step: Using TRM, Appendix 8.1, COLR, (Step 3.e) Check AFD -WITHIN LIMITS Cue: Inform the candidate that AFD is within the limits specified in the TRM. GRADE Standards:

AFD within limits, candidate proceeds to next step. Grade: SAT UNSAT STEP 19 Performance Step:

Check If Power Should Be Reduced (Step 4.a) If necessary, Request Reactor Engineering determine time rod has been misaligned.

L..J 10 PERFORMANCE INFORMATION Facility: Millstone Unit 3 System: 00 1 JPM Number: 2K7 NRC S.4 ' -4' Task Title:

CONTROL ROD OUT OF ALIGNMENT Denote Critical Steps with an "X" *NOTE* Critical Steps must be completed correctly to achieve a satisfactory grade Standards:

Questions the US how long the rod has been misaligned.

The candidate may contact RE directly to determine time rod has been misaligned.

lnform the examinee that the rod has been misaligned for 25 minutes. - GRADE Cue: Grade: SAT UNSAT STEP 20 - Performance Step: Check rod misaligned - GREATER (Step 4. b) THAN 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Standards:

Grade: SAT UNSAT Candidate proceeds to step 4.b. RNO. - GRADE i__; STEP 21 Performance Step:

Perform the applicable action: (Step 4.b RNO) 0 performing rod alignment within I hour is desired (T/S 3.1.3.1 ACTION b.1 or T/S 3.1.3.5 ACTION a), THEN Proceed to NOTE prior to step 5 GRADE Standards: Examinee proceeds to step 5. Grade: SAT UNSAT STEP 22 Performance Step:

A ROD CONTROL URGENT (Notes prior to step 5) FAILURE (MB4C 4-8) alarm will occur during recovery unless the affected rod is in Shutdown Bank C, D, or E. '.----=' 11 PERFORMANCE INFORMATION Facility: Millstone Unit 3 JPM Number:

2K7 NRC S.4 i_i System : 001 Task Title: CONTROL ROD OUT OF ALIGNMENT Denote Critical Steps with an "X *NOTE* Critical Steps must be completed correctly to achieve a satisfactory grade If the affected rod is in a Control Bank, a ROD CONTROL BANKS LIMIT LO (MB4C 3-9) alarm and ROD CONTROL BANKS LIMIT LO LO (MB4C 4-9) alarm may occur during recovery and remain in alarm until the P/A converter is reset.

Therefore, response to these alarms is not appropriate during this period.

__. GRADE STEP 23 =**- GRADE STEP 24 X GRADE X .I -w- Standards:

Grade: Performance Step: (Step 5.a) Standards:

Candidate review notes.

SAT UNSAT Establish Conditions For Rod Alignment Verify cause of the misaligned rod - CORRECTED.

Recognizes that cause has been corrected from information provided in the Initial Conditions.

If questioned as the US Drovide the followina Cue: Cue (if required):

Inform the candidate that the lift coil fuse for rod D4 was blown, and has been replaced.

Grade: SAT UNSAT Performance Step: Record affected group step counter (Step 5.b) position.

Standards: Notes the position of the control bank D group 1 step counter and records that number in Step 5.b. 12 PERFORMANCE Facility: Millstone Unit 3 JPM Number: 2K7 NRC S.4 NFORMATION System: 00 1 Task Title: CONTROL ROD OUT OF ALIGNMENT Denote Critical Steps with an "X *NOTE* Critical Steps must be completed correctly to achieve a satisfactory grade Grade: SAT UNSAT STEP 25 Performance Step: Align control rod disconnect switches: (Step 5.c.l) Unlock and Open control rod disconnect switch box (BOX 3RDS- HDSBOXI, CAT 60, Key #I 8 in CO key locker) GRADE STEP 26 X I inform examinee that the rod control disconnect box is unlocked.

I Cue: Standards:

Grade: Perform an ce Step : (Step 5.c.2) GRADE X Standards:

STEP 27 X GRADE X .u' Grade: Perform an c e Step : (Step 5.d)

Standards:

Locates and opens control rod disconnect switch box.

SAT UNSAT Place each rod disconnect switch for the affected bank, except the misaligned rod, to the ROD DISCONNECTED position.

Positions all of the disconnect switches for the control bank D rods with the exception of rod D4 "up" to the ROD DISCONNECT position.

SAT UNSAT Place control rod bank SEL switch to affected bank position. Places the control bank SEL switch to the CBD position.

13 PERFORMANCE INFORMATION Facility:

Millstone Unit 3 System: 00 1 "---' JPM Number: 2K7 NRC S.4 Task Title: CONTROL ROD OUT OF ALIGNMENT Denote Critical Steps with an "X" *NOTE* Critical Steps must be completed correctly to achieve a satisfactory grade Grade: SAT UNSAT STEP 28 Performance Step: Align Rod (Step 6.a) Using DRPI display, Check misaligned rod - HIGHER THAN ASSOCIATED BANK. that rod D4 is higher than the remaining rods in control bank D. GRADE Standards:

Checks the DRPI display and verifies Grade: SAT UNSAT STEP 29 X Performance Step: Insert misaligned rod until next lower d' (Step 6.b) position DRPf LED just changes state. GRADE X Sta nda rds : Takes the In-Hold-Out switch to the "IN" position until the next lower position LED for rod 04 comes on, then releases the switch. Comment: Grade: This action will cause main board annunciator MB4C 4-8 to alarm. The examinee should silence and acknowledge the alarm.

This is not required to satisfy the critical nature of the step.

SAT UNSAT STEP 30 X Performance Step: Reset affected group step counter to a (Step 6.c) value of 2 steps higher than affected rod's indicated DRPI position. - GRADE X Standards:

Resets the control bank D group 1 step counter to a position that 14 PERFORMANCE INFORMATION Facility: Millstone Unit 3 --' JPM Number: 2K7 NRC S.4 System: 00 1 Task Title: CONTROL ROD OUT OF ALIGNMENT Denote Critical Steps with an "X" *NOTE* Critical Steps must be completed correctly to achieve a satisfactory grade corresponds to 2 steps higher than the DRPI indication for rod D4. Grade: SAT UNSAT STEP 31 Performance Step: Proceed to step 6.g. (Step 6.d) GRADE Standards:

Proceeds to step 6.g. Grade: SAT UNSAT STEP 32 Performance Step: Verify rod misaligned - LESS THAN v' (Step 64) 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br />. GRADE Standards:

Use information provided in the Initial Conditions.

Grade: SAT UNSAT STEP 33 X Performance Step: Move misaligned rod until affected group step counter indicates value recorded in step 5.b. (Step 6.h) GRADE X Standards

Takes the In-Hold-Out switch to the "IN" position until the control bank D group 1 step counter is at the number that was previously recorded and than releases the switch. Grade: SAT UNSAT STEP 34 X Performance Step: Restore Rod Control System (Step 7.a) 'd Place all lift coil disconnect switches 15 PERFORMANCE INFORMATION Facility: Mitlstone Unit 3 System: 00 1 'LJ JPM Number: 2K7 NRC S.4 Task Title: CONTROL ROD OUT OF ALIGNMENT Denote Critical Steps with an "X" *NOTE* Critical Steps must be completed correctly to achieve a satisfactory grade for affected bank to ROD CONNECTED position.

GRADE X Standards

Returns all lift coil disconnect switches to the "Connected" position.

Grade: SAT UNSAT STEP 35 Performance Step: Check ROD CONTROL URGENT (Step 7.b) FAILURE (MB4C 4-8) annunciator - LIT GRADE Standards:

Observes that annunciator MB4C 4-8 IS LIT. ----- Grade: SAT UNSAT STEP 36 X Performance Step:

Press ROD DRIVE RESET (Step 7.c) GRADE X Standards:

Presses the ROD DRIVE RESET pushbutton on MB4. Comments: This action will cause annunciator MB4C 4-8 to clear. The candidate should reset this alarm.

This is not required to complete the critical task of the step.

Grade: SAT UNSAT STEP 37 Performance Step: Place control rod bank SEL switch in (Step 7.d) MAN - GRADE Standards:

Rotates the control bank SEL switch to the MAN position.

16 PERFORMANCE INFORMATION Facility:

Millstone Unit 3 JPM Number: 2K7 NRC 5.4 .. System: 001 Task Title: CONTROL ROD OUT OF ALIGNMENT Denote Critical Steps with an "X" *NOTE* Critical Steps must be completed correctly to achieve a satisfactory grade Grade: SAT UNSAT STEP 38 Performance Step: Check affected rod in a - CONTROL (Step 7.e) BANK GRADE Standards:

Examinee determines that rod D4 is in a control bank.

Grade: SAT UNSAT STEP 39 Performance Step: Check affected rod in GROUP 1 (Step 7.9 ---. GRADE Standards:

Examinee determines that D4 is a Group 1 rod. Grade: SAT UNSAT Term i nat i ng Cue: concluded. The evaluation for this JPM is Stop Time: 17 VERtFlCATlON OF COMPLETION JPM Number: 2K7 NRC S.4 Date Performed:

'4 Student: Evaluator:

Revision:

1 chg 3 For the student to achieve a satisfactory grade, correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. critical steps must be completed Time Critical Task?

YES NO X Validated Time (minutes):

9 Actual Time to Complete (minutes):

Result of JPM: ("S" for satisfactory, "U" for unsatisfactory)

Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score: Areas for Improvement:

18 EXAMINEE HANDOUT INITIAL CONDITIONS AND INITIATING CUES JPM Tracking Number: 2K7 NRC S.4 Initial Conditions:

A problem in the EHC circuit caused a momentary runback of the turbine/generator.

During the subsequent insertion of the reactor control rods, rod D4 in Control Bank D was observed to be misaligned.

The control room team entered AOP 3552, Malfunction of the Rod Drive System, and has decided that Attachment A to that procedure is to be used to recover from the misaligned rod. The lift coil fuse for rod D4 was blown and has been replaced.

Rod D4 has been misaligned for less than one hour.

d' Initiating Cues: The US has directed you to complete Attachment A of AOP 3552 step 1 through step 7.f. 19

__ JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title: PERFORMANCE OF THE IMMEDIATE ACTIONS IN E-0 'd JPM ID Number: 2K7 NRC S.5 II. Initiated:

Dave Minnich D eve I o p e r 111. Reviewed:

-.J Technical Reviewer IV. Approved:

Ma Cognizant Plant Supervisor (optional)

Nuclear Training S u pehisor Revision:

0 12/2 1 /06 Date Date Date ,(l.llo? Date 1 of 10 JOB PERFORMANCE MEASURE APPROVAL SHEET

SUMMARY

OF CHANGES L-' 2 of IO JOB PERFORMANCE MEASURE GUIDE Facility: Millstone Unit 3 JPM ID Number: 'U 2K7 NRC S.5 Student: Revision:

0 Task Title: PERFORMANCE OF THE IMMEDIATE ACTIONS IN E-0 System: 012 Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes):

5 Task Number(s):

000*05*084 Applicable To: SRO RO PEO WA Number: 01 2-A4.01 01 3-A4.03 EPE: 007-EA2.02 K/A Rating: 4.5 / 4.5 4.5 14.7 4.3 14.6 Method of Testinn: Simulated Performance:

Actual Performance:

X .~ --- Location : Classroom: Simulator:

X In-Plant:

Task Standards: Satisfactorily complete the first 4 steps in E-0 from memory including any applicable RNO actions. Required Materials: None.

General

References:

EOP 35, E-0, Rev. 022 ***READ TO THE STUDENT***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective(s) for this JPM will be satisfied.

You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution were actually being performed.

JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number: 2K7 NRC S.5 *L-J Simulator Requirements:

1. Initial Conditions:

--<= 2. 3. 4. 5. Revision:

0 Reset to IC-I 8 or any other 100% power certified IC. Ensure the turbine is on the Load Limit. Enter malfunctions TC03 (turbine fails to trip), RP07A ("A" train of SI fails to auto actuate) and RCOSB to cause the "B" RCP to trip. Place the simulator in run. Place the master silence switch in the "silence" position. After the reactor has tripped, place the simulator in "freeze".

Place the simulator in "run" after the examinee has read and understands the Initial conditions and initiating cues. Approximate simulator setup time is 5-7 minutes. Just seconds ago, while the plant was operating at 100% power, the "B" RCP tripped. The US has placed the master silence switch in the "silence" position.

The evaluator will acknowledge all communications to the US. lnitiatinq Cues: You are directed to carry out the first four (4) steps of E-0 from memory. The simulator will be placed in run when you are ready to begin. **** NOTES TO EVALUATOR****

Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actionslobservations (i.e. "What are you looking at?"

or "What are you observing?").

1. critical steps must be completed correctly.
2. 3. .v' 4 of 10 PERFORMANCE INFORMATION JPM Number: 2K7 NRC S.5 L.4' Task Title: PERFORMANCE OF THE IMMEDIATE ACTIONS IN E-0 Start Time: Revision:

0 Performance Step: Verify Reactor Trip. 1. - STEP 1 0 Check reactor trip and bypass breakers - OPEN. Check rod bottom lights - LIT. 0 Check neutron flux - D ECREAS I NG . GRADE Standards:

Grade: --' Observes that the reactor trip breakers are open, all the rod bottom lights are lit and that reactor power is decreasing. Reports that the reactor is tripped. SAT UNSAT STEP 2 Performance Step: Verify Turbine Trip.

2.a. a. Check all turbine stop valves - CLOSED. GRADE Standards: Looks at the stop valve meter indications on the EHC insert on MB7 and observes that all of the turbine stop vahes are open. Shifts to the actions in the RNO column. Grade: SAT UNSAT STEP 3 X Performance Step: TRIP the turbine. 2.a.RNO GRADE x Standards: Pushes the turbine trip push-button on the EHC insert. Looks at the stop valve meter indications on the EHC insert on MB7 and observes that all of LJ' 5of10 PERFORMANCE INFORMATION JPM Number: 2K7 NRC S.5 Revision:

0 .-' Task Title:

PERFORMANCE OF THE IMMEDIATE ACTIONS IN E-0 the turbine stop valves are still open. Grade: SAT UNSAT STEP 4 X Performance Step: the turbine will NOT trip, THEN 2.a.RNO Runback the turbine to close the control valves. the turbine can NOT be runback THEN CLOSE the MSlVs and MSlV bypass valves. GRADE X Standards:

Rapidly rotates the load limiting control knob in the lower direction all the way to the zero position. Observes that the control valves are closing and when the controf valves are fully closed declares that the turbine is tripped. Shifts to actions in the ACTION column. Grade: SAT UNSAT Evaluator NOTE: The applicant may decide the control valves are not closing fast enough or the control valves are not fully closed. In that case he will go to 'CLOSE' on the MSIV switches and verify the MSlV Bypass valves closed. This is acceptable.

STEP 5 Performance Step: Verify Power to AC Emergency 3.a. Busses. a. Check AC emergency busses 34C and 34D - BOTH ENERGIZED GRADE Standards

Determines Busses 34C And 34D are both energized by observation of the Main Board 8 emergency bus voltage indicators reading about 4160 volts OR emergency load center voltage indicators (8) reading about 480 volts.

6 of 10 PERFORMANCE INFORMATfON JPM Number: 2K7 NRC S.5 Revision:

0 'LJ Task Title:

PERFORMANCE OF THE IMMEDIATE ACTIONS IN E-0 Grade: Note: SAT UNSAT An Si will have actuated due to the turbine not tripping.

STEP 6 Performance Step: Check if SI is Actuated.

4.a. a. Verify SAFETY INJECTION ACTUATION annunciator (MB4D 1-6 or MB2B 5-9) - LIT GRADE Standards:

Grade: '..--C AT MB4 or MB2, observes that the Safety Injection Actuation annunciator is lit. SAT UNSAT STEP 7 Performance Step: By observation of ESF Group 2 Status 4. b. Panel lights, Verify both trains of SI - ACTUATED GRADE Standards

At MB2, observes ESF Group 2 Status Panel and determines only one train of SI has actuated. Shifts to the actions in the RNO column. Grade: SAT UNSAT STEP 8 X Performance Step: Manually initiate SI 4. b. RNO .*-.-' GRADE X Standards:

At MB2 or MB4, manually actuates SI by rotating the SI actuation switch to 7 of 10 PERFORMANCE INFORMATION JPM Number: 2K7 NRC S.5 Revision:

0 L/ Task Title: PERFORMANCE OF THE IMMEDIATE ACTIONS IN E-0 the actuate position.

By observation of ESF Group 2 Status Panel determines that both trains of SI have actuated.

Standards:

Grade: SAT UNSAT STEP 9 Performance Step: Check reactor trip and bypass 4.c. breakers - OPEN GRADE Standards

At MB4, observes that the reactor trip and bypass breakers are open. Grade: SAT UNSAT \.-- STEP 10 Performance Step: Reports that the first four steps of E-0 have been completed.

GRADE Standards:

Informs the examiner that he has completed the first four (4) steps of E- O and that a safety injection has occurred.

Grade: SAT UNSAT Terminating Cue: The evaluation for this JPM is concluded.

Stop Time: 8 of 10 JPM Number: Date Performed:

Student: Evaluator:

LJ VERIFICATION OF JPM COMPLETION . 2K7 NRC S.5 Revision:

0 For the student to achieve a satisfactory grade, correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

critical steps must be completed Time Critical Task?

YES NO X Validated Time (minutes):

5 Actual Time to Complete (minutes):

.~ ----- Result of JPM: ('S' for satisfactory, "U" for unsatisfactory)

Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score: Areas for Improvement:

9 of IO Candid ate HAN DO UT JPM Number: 2K7 NRC S.5 >d' Initial Conditions:

Just seconds ago, while the plant was operating at 100% power, the "By' RCP tripped. The US has placed the master silence switch in the "silence" position.

The evaluator will acknowledge all communications to the US. Initiating Cues: You are directed to carry out the first four (4) steps of E-0 from memory. The simulator will be placed in "run" when you are ready to begin. 10 of 10

____ - JOB PERFORMANCE MEASURE APPROVAL SHEET \ I. JPM Title: Check if RCP(s) Should Be Stopped JPM ID Number: 2K7 NRC S.6 I!. Initiated:

P. Malzahn Developer Ill. Reviewed:

R. McDonald Tech n ica I Reviewer b-, IV. Approved:

J. Groaan Cognizant Plant Supervisor (optional) T. Kulterman Nuclear Training Supervisor Revision:

0 6/2 010 5 Date 6/30/05 Date 6/30/05 Date 711 /05 Date 1 of9 JOB PERFORMANCE MEASURE APPROVAL SHEET

SUMMARY

OF CHANGES 2 of 9 JOB PERFORMANCE MEASURE GUIDE Facility: Millstone Unit 3 Student: JPM ID Number: 2K7 NRC S.6 Revision:

0 LJ Task Title:

Check If RCP(s) Should Be Stopped System: 002 Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes):

5 Task Number(s):

344-05-033 Applicable To: SRO X RO X PEO WA Number: 002-A2.04 KIA Rating: 4.3 / 4.6 Method of Testing: Simulated Performance: Actual Performance:

X Locat ion : -= Classroom: Simulator:

X ln-Plant:

Task Standards:

All critical steps are performed satisfactorily.

All sequential steps are performed in proper procedural sequence. Required Materials:

None. General

References:

EOP 3505 Rev. 010-02 ***READ TO THE STUDENT***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectivets) for this JPM will be satisfied. You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution were actually being performed.

3of9 JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number: S.6 Revision:

0 Simulator Requirements:

A. Reset to IC 29 or equivalent (Mode 5, 170" - 180"F, steam bubble in PZR, 2 RHR trains in service) B. Insert Malfunctions RHOIA, RHOIB (RHR PIA and B trip) C. Place the "A" RHR pp control switch in P-T-L and place a yellow caution tag on the switch. D. Place simulator in "RUN" and verify "A" & "B" RCPs running and RHR pumps off/tripped.

E. Adjust Charging flow if necessary to maintain RCS pressure between 310 and 375 psia. E. Place simulator in "FREEZE".

F. Place simulator in "RUN" after candidate receives instructions.

Approximate Simulator setup time is 10 minutes Initial Conditions:

The plant is in Mode 5 with a steam bubble in the PZR and "A" & "B" RCPs in service. The "A RHR pump is out of service due to a breaker problem. Several minutes ago the "B" RHR pump tripped and the crew entered EOP 3505, Loss Of Shutdown Cooling And/or RCS Inventory. Attachment "B," Loss of Shutdown Cooling And/or RCS Inventory During Mode 5, has been completed through step 8 and all S/G's have been verified available.

Initiating Cues: The US has directed you to perform step 9 of EOP 3505 Att. "B," Check if RCP(s) .Should Be Stopped.

        • NOTES TO EVALUATOR**** Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, & critical steps must be completed correctly.

The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. When the student states what hidher simulated action/observation would be, read the a p p ro p ria t e " C u e". If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?"

or "What are you observing?").

1. 2. 3. 4of9 PERFORMANCE INFORMATION JPM Number: S.6 Revision:

0 L/ TaskTitle:

Check if RCP(s) Should Be Stopped Start Time: STEP 1 Performance Step: Obtains copy of EOP 3505. GRADE Standards:

Obtains a copy of EOP 3505, refers to Attachment "B" Step 9. Grade: SAT UNSAT STEP 2 Performance Step: Check RCP status - AT LEAST ONE Att. "8" step 9.a. RUNNING Standards

Checks RCP breaker indications, flow, amps etc. and determines "A & "B" RCPs are running - GRADE Grade: SAT UNSAT STEP 3 Performance Step: Verify only one RCP - RUNNING Att. "B" step 9.b. GRADE S ta n da rds : Checks RCP breaker indications, flow, amps etc. and determines "A & "B" RCPs are running.

Moves to RNO column. Grade: SAT UNSAT STEP 4 X Performance Step: PERFORM the applicable action:

Att. "B" step 9.b. RNO *- IF PZR steam bubble is established, THEN STOP all but RCP 2 0 - IF PZR is solid, THEN STOP all but one RCP GRADE Standards:

Determines from initiating cue and/or PZR liquid/vapor space temperatures that PZR steam bubble established e 5 of 9 PERFORMANCE INFORMATION JPM Number: S.6 Revis ion:

0 %-d Task Title:

Check if RCP(s) Should Be Stowed Grade: SAT UNSAT GRADE X Standards:

STOPS "A RCP Comment: Examinee may elect to place the spray valve controller for "A RCP in Manual and close the valve Grade: SAT UNSAT STEP 5 Performance Step: Check the following for the running Att. "B" step 9.c. RCP 0 No. I Seal differential pressure - GREATER THAN 210 psid No. 1 Seal leakoff flow - GREATER THAN OR EQUAL TO 0.2 gpm GRADE Standards:

Determines seal parameters are CHS-FRl56 and/or CHS-FR16O indications at MB3. .---/ satisfied by observing CHS-PI152AI Grade: SAT UNSAT STEP 6 Performance Step: Maintain RCS pressure BETWEEN Att. "B" step 9.d. 310 psia and 375 psia GRADE Standards

Determines RCS pressure is within required band by observing RCS-PR403, RCS-P1405A, or a PPC pressure trend if established.

Grade: SAT UNSAT STEP 7 Performance Step: Reports to US that step 9 of EOP 3505 Att. "B" has been completed and the "B" RCP is running, "A' RCP has been stopped.

GRADE Standards: Reports completion to US L--j 6 of 9 PERFORMANCE INFORMATION JPM Number: S.6 Revision:

0 .L.-,,' Task Title: Check if RCP(s) Should Be Stopped Grade: SAT UNSAT Terminating Cue: The evaluation for this JPM is concluded.

Stop Time: 7 of 9 JPM Number: Date Performed:

Student: Evaluator:

.'kJ VERIFICATION OF JPM COMPLETION 2K7 NRC S.6 Revision:

0 ~ For the student to achieve a satisfactory grade, correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. critical steps must be completed Time Critical Task?

YES NO X Validated Time (minutes):

5 ..-,~ Actual Time to Complete (minutes):

Result of JPM: ("S" for satisfactory, "U" for unsatisfactory)

Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score: Areas for Improvement:

8of9 STUDENT HANDOUT JPM Number: S.6 Ll, Initial Conditions: The plant is in Mode 5 with a steam bubble in the PZR and "A & "B" RCPs in service. The "A" RHR pump is out of service due to a breaker problem. Several minutes ago the "8" RHR pump tripped and the crew entered EOP 3505, Loss Of Shutdown Cooling And/or RCS Inventory. Attachment "B," Loss of Shutdown Cooling And/or RCS Inventory During Mode 5, has been completed through step 8 and all S/G's have been verified available.

initiating Cues: The US has directed you to perform step 9 of EOP 3505 Att. "B," Check if RCP(s) Should Be Stopped. 9of9 JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM Title:

DEPRESSURIZE THE RCS TO REFILL THE PZR I '4 JPM ID Number: 2K7 NRC S.7 Revision:

0 II. Initiated:

"4 !. D. Minnich Developer D. Minnich n&G 3 Developer

&' Ill. Reviewed: Technical Reviewer IV. Approved Cognizant Plant Supervisor (optionat) Nuclear Training Supervisor 12/27/06 Date Date Date 1 of 16 JOB PERFORMANCE MEASURE APPROVAL WORKSHEET

SUMMARY

OF CHANGES Change Description Date 2 of 16 JOB PERFORMANCE MEASURE GUIDE '..J '-- Facility:

Millstone Unit 3 Candidate:

JPM ID Number: 2K7 NRC S.7 Revision:

0 Task Title: DEPRESSURIZE THE RCS TO REFILL THE PZR System: 010 Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes):

5 Task Number(s):

000-05-050 Applicable To: SRO X RO X PEO WA Number: 01 0-A2.03 009-EAI .

15 KIA Rating: 4.1 14.2 3.9 14.1 Method of Testinq: Simulated Performance:

Actual Performance:

X Location: Classroom: Simulator:

X In-Plant: Task Standards: Depressurize the RCS to refill the PZR as specified in ES-1.2, steps 10and 11. Required Materials:

None General

References:

ES-1.2, Post LOCA Cooldown and Depressurization, Rev. 01 5-00 ~~ ***READ TO THE STUDENT***

I will explain the initiat conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.

You may use any approved reference material normally available in the Control Room, including fogs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

3of 16 JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number: 2K7 NRC S.7 LJ Revision:

0 \-- Simulator Requirements:

I 2 Insert the following I/Os: Reset to IC-79, trip from 100% power, Post-LOCA cooldown conditions.

3 (RC) 3RCS*PCV455A OPEN TO FALSE 4 (RC) 3RCS*PCV455A RED TO FALSE 5 (RC) 3RCS*PCV455A GREEN TO FALSE 6 (RC) 3RCS*PCV456 OPEN TO FALSE 7 (RC) 3RCS*MV8000 RED TO FALSE 8 (RC) 3RCS*MV8000 GREEN TO FALSE Roll the following recorders forward:

e Pressurizer level. RCS wide range pressure.

10 Place the simulator in "RUN" and perform the following manual actions: 0 Acknowledge/clear all alarms. 9 Throttle AFW flow to 100 gpm for each S/G. NOTE: Move through this setup expeditiously to avoid pressurizer refill above 25% before the candidate gets to the depressurization step. Acknowiedge/clear associated alarms. 0 Place the simulator in "FREEZE."

Ensure key for 3RCS*AV8145 inserted for valve operation Hang a yellow tag on 3RCS*MV8000 I1 After the examinee has received the initial conditions and initiating cues, place the simulator in "RUN." Approximate simulator setup time is 5 minutes. Initial Conditions:

Following a loss of coolant accident which resulted in a safety injection, the Control Room Team has worked through the EOPs and is currently carrying out the actions in ES-1.2, Post LOCA Cooldown and Depressurization.

The "A" PORV is out of service due to an electrical short in the control circuitry.

lnitiatinq Cues: The US has directed you to depressurize the RCS to refill the PZR using ES-I .2, steps 10 and 11. ****NOTES TO EVALUATOR

        • I. Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, 4 of 16 ii critical steps must be completed correctly.

JOB PERFORMANCE MEASURE GUIDE (Continued)

The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. When the student states what hidher simulated action/observation would be, read the appropriate "Cue".

If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?"

or "What are you observing?").

d/ 2. 3. 5 of 16 JPM Number: PERFORMANCE INFORMATION 2K7 NRC S.7 Revision:

0 DEPRESSURIZE THE RCS TO REFILL THE PZR ij Task Title: Start Time: Performance Step: Obtains copy of ES-I .2 - STEP 1 GRADE Standards

Obtains a copy of ES-I .2 and refers to step IO. Grade: SAT UNSAT Comment: The heater control switches in the first JPM step may be operated in any order. STEP 2 X Performance Step: Place All PZR Heater Switches To OFF position. (ES-I .2 step IO) GRADE X Standards:

Rotates the "Dt PZR B/U heaters .U' control switch to "OFF." Observes the amber light goes OFF. GRADE X Standards: Rotates the "E" PZR B/U heaters control switch to "OFF." Observes the amber light goes OFF. GRADE X Standards:

Rotates the "C" PZR Control Heaters control switch to "OFF." Observes the amber light goes OFF and the flag shifts to "green." Corn men ts : GRADE X Standards

MB4A 6-4 annunciator "PZR HEATER CONTROL GROUP AUTO TRIP" will clear. The candidate should silence and clear this alarm. This action is not required to complete the critical nature of this step.

Rotates the "A" PZR B/U heaters control switch to "OFF." Observes the amber light goes OFF. 6 of 16 PERFORMANCE INFORMATION JPM Number: 2K7 NRC S.7 Revision:

0 Task Title: .-4 DEPRESSURIZE THE RCS TO REFILL THE PZR GRADE X Standards:

Rotates the "B" PZR B/U heaters control switch to "OFF." Observes the amber light goes OFF.

Grade: SAT UNSAT Comments:

When the last PZR B/U heaters control switch is taken to "OFF", MB4A 6-3 annunciator "PZR HEATER BACKUP GROUP AUTO TRIP" will clear. The examinee should acknowledge and clear this alarm. This action is not required to complete the critical nature of this step. Comment: .I .. .I -.".-- Prior to completing the depressurization, the examinee should check containment temperature and radiation levels to ensure that adverse CTMT conditions do not exist. Since CTMT conditions are not adverse, this action is not critical to the successful completion of the JPM. STEP 3 Performance Step: Depressurize RCS to refill PZR. (Step l't.a) Check normal PZR spray - AVAILABLE GRADE Standards:

Observes that no RCPs are running and therefore normal PZR spray is not available. Shifts to the Response Not Obtained column.

Grade: 7of 16 SAT UNSAT PERFORMANCE INFORMATION JPM Number: 2K7 NRC S.7 Revision:

0 DEPRESSURIZE THE RCS TO REFILL THE PZR --4 Task Title: STEP 4 X PerfOrmance step: Perform the applicable action: (step 1 I .a RNO) Comments:

GRADE X Standards:

GRADE X Standards:

L= STEP 5 Grade: Performance Step: 0- IF a PZR PORV is available, THEN Depressurize RCS using one PZR PORV and Proceed to step A1 .d. 0 E a PZR PORV is NOT available, THEN Proceed to step I1 .c. The candidate should determine that the "A PORV is out of service. Candidate takes the control switch for the "B" PORV to the OPEN pckition. Candidate determines that the "B" PORV will not open and proceeds to step 11 .c. SAT UNSAT Use auxiliary spray: (step 1 1 .c. I) Verify at least one SIH pump - RUNNING GRADE Standards: Determines that both SI pumps are running by observation of red indicating lights on / green off, amps, flow etc.

Grade: 8 of 16 SAT UNSAT PERFORMANCE INFORMATION JPM Number: 2K7 NRC S.7 Revision:

0 '-sj Task Title: DEPRESSURIZE THE RCS TO REFILL THE PZR STEP 6 Performance Step: Verify at least one charging pump - (Step I1 .c.2) RUNNING GRADE Standards:

Determines that both charging pumps are running by observation of red indicating lights on / green off, amps, flow etc. Grade: SAT UNSAT -w- STEP 7 Performance Step: CLOSE charging header (Step I? .c.3) loop isolation valves 0 3CHS*AV8146 3CHS*AV8147 Standards

(___ GRADE Grade: Determines that both charging header loop isolation valves are closed by observation of green indicating lights on / red off. SAT UNSAT STEP 8 X Performance Step:

Fully Open charging line flow control (Step 1 I x.4) valve. GRADE X Standards

Candidate takes manual control of and fully opens 3CHS*FCV121 by depressing the open pushbutton on 3CHS*FK121 until output is at maximum. Grade: SAT UNSAT 9of 16 PERFORMANCE INFORMATION JPM Number: 2K7 NRC S.7 Revision:

0 Task Title: Ll DEPRESSURIZE THE RCS TO REFILL THE PZR STEP - 9 X Performance Step: OPEN charging header (Step 1 I .c.5) isolation valves 0 3CHS*MV8 1 06 3CHS*MV8105 GRADE X Standards:

Depresses open pushbuttons for 3CHS*MV8106 and 3CHS*MV8105.

GRADE Standards:

Checks position indicating lights and determines valves have opened by red indicating lights on, green off. Grade: SAT UNSAT STEP 10 X Performance Step: Unlock and OPEN auxiliary spray (Step I1 .c.6) valve 'v' (3 R C S"AV8 1 4 5) GRADE X Standards:

Obtains and inserts key into the 3RCS*AV8145 control switch and rotates clockwise to the open position.

GRADE Standards:

Checks position indicating lights and determines valve has opened by red indicating light on, green off. Grade: SAT UNSAT STEP 11 Performance Step: CLOSE both charging pump cold leg (Step 11 .c.7) injection valves 0 3SIH*MV8801A 3SIH*MV8801 B GRADE X Standards:

LJ Depresses close pushbuttons for 3SIH*MV8801A and 3SIH*MV8801 B. 10 of 16 PERFORMANCE INFORMATION JPM Number: 2K7 NRC S.7 Revision:

0 Task Title: '4 DEPRESSURIZE THE RCS TO REFILL THE PZR GRADE Standards:

Checks position indicating lights and determines valves have closed by green indicating lights on, red off. GRADE Standards:

Observes RCS pressure decreasing on Wide Range Loop pressure instruments:

RCS-P1405, P149, PI403 and P150. Grade: SAT UNSAT STEP 92 .. I GRADE \.-, STEP 13 GRADE GRADE .I 'v' Performance Step: Verify PZR level - GREATER THAN (Step 1 I .d) 25% (50% ADVERSE CTMT)

Monitors PZR level increase by observing instruments RCS-t1459A, 460A and 461. Initial observation will indicate level is less than 25%. Shifts to the RNO column. Standards

Grade: SAT UNSAT Performance Step: Proceed to CAUTION prior to step 12. and, WHEN Level is GREATER THAN 25% (50% ADVERSE CTMT), THEN Perform step I I .e. Standards:

Standards

Candidate Proceeds to the caution prior to step 12. The examinee should continue to monitor pressurizer level to determine when the depressurization should be stopped. Grade: 11 of 16 SAT UNSAT

'8 1088AVU+HISI PUe Vl088AW+HISE: -lo4 suoiinqysnd uado sassaidaa

SpiepueJS X 3avm IWSNII lVS PERFORMANCE tNFORMATtON JPM Number: 2K7 NRC S.7 Revision:

0 Task Title:

DEPRESSURIZE THE RCS TO REFILL THE PZR -..j indicating lights on, green off. Grade: SAT UNSAT Performance Step: CLOSE auxiliary spray valve (Step I1 .e.2) (3 RCS*AV8 I 4 5). - STEP 16 X Standards:

Rotates key in the 3RCS*AV8145 - GRADE control switch counter- clockwise to the closed position.

Standards:

Checks position indicating lights and determines valve has closed by green indicating light on, red off. - GRADE ..-.' Grade: SAT UNSAT STEP 17 Performance Step: CLOSE charging header isolation (Step I1 .e.3) valves. GRADE X Standards:

Depresses close pushbuttons for 3CHS*MV8106 and 3CHS*MV8105.

GRADE Standards:

Checks position indicating lights and determines valves have closed by green indicating lights on, red off. Grade: SAT UNSAT STEP -I8 Performance Step: Proceed to CAUTION prior to step 12. (Step I1 .e.4) GRADE Standards: Candidate proceeds to CAUTION prior ..-J to step 12. Grade: SAT UNSAT 13 of 16 PERFORMANCE INFORMATION JPM Number: 2K7 NRC S.7 Revision:

0 Task Title:

DEPRESSURIZE THE RCS TO REFILL THE PZR W STEP I9 GRADE Performance Step: Inform the US that the RCS has been depressurized and the pressurizer refilled in accordance with ES-1.2. Standards:

Reports to the US that Steps 10 and 1 I of ES-1.2 have been completed. Pressurizer level is greater than 25% and the depressurization has been . stopped. Grade: SAT UNSAT -.J Stop Time: 14 of 16 JPM Number: Date Performed:

Candidate:

Evaluator:

VERIFICATION OF JPM COMPLETION 2K7 NRC S.7 Revision:

0 For the student to achieve a satisfactory grade, correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. critical steps must be completed Time Critical Task?

YES NO X Vaiidated Time (minutes):

xx Actual Time to Complete (minutes):

Result of JPM: ("S" for satisfactory, "U" for unsatisfactory)

Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score: Areas for Improvement:

15 of 16 Candidate HANDOUT JPM Number: **L/ s.7 Initial Conditions: Following a loss of coolant accident which resulted in a safety injection, the Control Room Team has worked through the EOPs and is currently carrying out the actions in ES-1.2, Post LOCA Cooldown and Depressurization.

The "A PORV is out of service due to an electrical short in the control circuitry.

Initiating Cue: The US has directed you to depressurize the RCS to refill the PZR using ES-1.2, steps 10 and I 1. 16 of 16 JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title: Respond To Containment Sump Blockage 'd JPM ID Number: 2K7 NRC S.8 II. Initiated: I I I. Reviewed: - Technical Reviewer IV. Approved:

i Cognizant Plant Supervisor (optional)

Nuclear Training Supervisor 1 of 17 Revision:

12/13/06 Date Date Date 0 Date

. .. JOB PERFORMANCE MEASURE APPROVAL SHEET

SUMMARY

OF CHANGES 2 of 17 JOB PERFORMANCE MEASURE GUIDE Facility:

Millstone Unit 3 JPM ID Number: 2K7 NRC S.8 'd Applicant:

Revision:

0 Task Title: Respond To Containment Sump Blockage System: 026 Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes):

X Task Number(s): 000-05-130 Applicable To:

SRO X RO x PEO WA Number: EPE: El 1 EA1 .I K/A Rating: 3.9 / 4.0 026-A2.07 3.9 t 3.6 2.1.25 2.8 i 3.1 Method of Testing: Simulated Performance: Actual Performance:

X Location: Classroom: Simulator:

X In-Plant: -u- Task Standards: All critical steps are performed satisfactorily.

All sequential steps are performed in proper procedural sequence.

Required Materials:

None. General

References:

ECA-1. I, Loss of Emergency Coolant Recirculation, Rev 01 5-00 ***READ TO THE STUDENT***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective(s) for this JPM will be satisfied. You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution were actually being performed.

3 of 17 JOB PERFORMANCE MEASURE GUIDE (Continued)

., ---- JPM Number: 2K7 NRC S.8 Revision:

0 Simulator Reauirements:

A. Reset to 1'2-18, MOL, 100% power. B. Insert Malfunction RC02C at 100% C. Allow Sim to run until "RWST LO LO LEVEL RHR PUMPS OFF" annunciator lights. RWST level should be around 520,000 gal. D. Complete Cold Leg Recirculation alignment per ES-1.3 E. IO (CV) 3CHS*LCV112D "Green" to "OFF" F. 10 (CV) 3CHS*LCVl12E "Green" to "OFF" G. Turn on all power lockout switches on MB2R H. Ensure Containment Pressure less than 23 psia I. Insert malfunction CH08 at 80% severity J. When RSS pump cavitation is evident, reset SI, then LOP and CDA then stop all ECCS and RSS pumps. K. Acknowledge all annunciators and go to freeze L. Remove malfunction CH08. M. Place simulator in "RUN" after the operator receives instructions. Approximate Simulator setup time is 30 minutes Initial Conditions:

Following a large break loss of coolant accident (LBLOCA), the plant has established cold leg recirculation per ES-1.3, up to and including Step 4. Shortly thereafter, symptoms of significant CTMT sump clogging appeared.

All ECCS and RSS pumps were stopped. The crew is transitioning to ECA-1.1, Loss of . Emergency Coolant Recirculation.

Initiating Cues: You are to complete the steps of ECA-1.1 I starting with step 1. **** NOTES TO EVALUATOR****

1. Critical steps for this JPM are indicated by an "X" after the step number.

For the student to achieve a satisfactory grade, The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. When the student states what hidher simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?" or "What are you observing?").

critical steps must be completed correctly.

2. 3. 4 of 17 PERFORMANCE INFORMATION JPM Number: S.8 Revision:

0 d Task Title:

Respond To Containment Sump Blockage Start Time: STEP 1 Performance Step: Standards:

GRADE Grade: STEP 2 GRADE .--' STEP 3 GRADE STEP 4 GRADE W Performance Step: Caution prior to step 1. Standards:

Grade: Performance Step: Note prior to step 1. Standards:

Grade: Pe rfo r m a nce Step : Step 1 RNO Standards:

CUE:'(lf required) 5 of 17 Obtains copy of ECA-1 .I Obtains a copy of ECA-I .I and refers to the CAUTION and NOTE prior to step 1 SAT If the suction source is lost to any ECCS or containment spray pump, the pump must be stopped. Applicant reads CAUTION. SAT UNSAT If emergency coolant recirculation capability is restored during this procedure, further recovery actions should continue by going to the procedure and step in effect. Applicant reads NOTE. SAT UNSAT Continue Attempts To Restore Emergency Coolant Recirculation Equipment Applicant reads the step and proceeds to step 2. Respond as the US with ECA-1 .I will eff attempts to Restore Emergency PERFORMANCE INFORMATION JPM Number: S.8 Revision:

0 ii Task Title:

Respond To Containment Sump Blockage fant Recirculatio Grade: SAT UNSAT STEP 5 GRADE STEP 6 '-& GRADE STEP 7 Performance Step: If offsite power is lost after SI reset, Caution prior to step manual actions to restart safeguards

2. equipment may be required.

Standards: Applicant reads the CAUTION Grade: SAT UNSAT Performance Step: RESET ESF Actuation Signals If 2. Required SI CDA LOP Standards: Applicant resets those signals NOTE: requiring reset.

SI, CDA and LOP have already been reset as part of simulator setup.

The applicant may reset all signals regardless of status -this is not an error. Grade: SAT UNSAT Performance Step: Add Makeup To RWST 3.a. Using GA-IO, Fill the RWST as required while continuing with this procedure WHEN RWST level has increased to greater than 100,000 gal THEN Consult ADTS to determine what flow path should be established for injection GRADE Standards:

Applicant reads step and informs the 6 of 17 PERFORMANCE INFORMATION JPM Number: S.8 Revision:

0 LJ' Task Title:

Respond To Containment Sump Blockage US that GA-10 must be carried out to fill the RWST. Grade: SAT UNSAT STEP 8 Performance Step: Check Quench Spray Pump 4.a. Requirements

a. Verify Ctmt high range radiation monitors (3RMS*RE04A and NOT IN ALERT OR ALARM 3RMS*RE05A) - GRADE Standards
;li' NOTE: Determines that the CTMT high range radiation monitors are not in alert or alarm by observation of 3RMS*RE04A and *REOSA amber and red trip lights are not lit. Due to OPERABILITY concerns with respect to 3RMS*RE04A and *REOSA, the applicant may use diverse indications to determine the radiation reading inside CTMT. Performance Step: Check Ctmt spray - 1 N IT1 ATED 4.b. - STEP 9 GRADE Standards: Determines that both Quench Spray pumps are running by observation of red indicating lights on / green off, amps, flow etc. Grade: SAT UNSAT STEP 10 performance Step: Check Ctmt pressure - L-' 4.c. LESS THAN 17.5 psia. 7 of 17 PERFORMANCE INFORMATION JPM Number: S.8 Rev ision: 0 Task Title: Respond To Containment Sump Blockage

--e. GRADE Standards: Determines by observation that CTMT pressure is less than 17.5 psia. Grade: SAT UNSAT STEP 11 X Performance Step:

STOP both quench spray 4.d. pumps and place in AUTO GRADE X Standards:

Stops the "A" and "6" quench spray pumps by rotating each control switch to the stop position.

Grade: SAT UNSAT STEP 12 Performance Step: CLOSE quench spray 4.e. pump(s) discharge valves - ...-- GRADE Standards:

GRADE Standards:

0 ForpumpA-3QSS*MOV34A 0 ForpumpB-3QSS*MOV34B Depresses the 3QSS*MOV34A "CLOSE" push button. Verifies indicating lights shift to green ON, red OFF Depresses the 3 Q SS*MOV34B "CLOSE" pushbutton.

Verifies indicating lights shift to green ON, red OFF Grade: SAT UNSAT STEP 13 Performance Step: Check Ctmt pressure - 4.f. GREATER THAN 23 psia. --.+-- GRADE Standards

Determines by observation that CTMT pressure is less than 23 psia. 8 of 17 PERFORMANCE i NFORMATlON JPM Number: S.8 Revision:

0 Task Title:

Respond To Containment Sump Blockage Grade: SAT UNSAT STEP 14 Performance Step: Proceed to step 5. and, IF Ctmt pressure increases to 23 psia, THEN Realign quench spray system to establish only one quench spray pump running 4.f. RNO Standards:

Proceeds to step 5. - GRADE Grade: SAT UNSAT Performance Step: Verify CAR Fan Status 5.a. a. Check Ctmt WR sump level (RSS*Ll22A or LESS THAN 4 ft - STEP 15 RSS*L122B) - L-' GRADE Standards:

Determines that Ctmt WR sump level is greater than 4 ft by direct observation of RSS*L122A and RSS*Li22B.

Grade: SAT UNSAT Performance Step: STOP running CAR fans and 5.a.RNO Proceed to step 6. - STEP 16 GRADE Standards:

At VP1 determines that CAR fans A and B are NOT running by observation of green indicating lights on / red off. Proceeds to step 6. Grade: SAT UNSAT 9 of 17 PERFORMANCE INFORMATION JPM Number: S.8 Revision:

0 -4 Task Title: Respond To Containment Sump Blockage STEP 17 Performance Step: Monitor Containment

6. Recirculation Sump-INDICATION OF BLOCKAGE 0 RSS pumps stopped due to indications of cavitation Sump level indications NOT consistent with plant conditions GRADE Standards:

Determines that RSS pumps were stopped due to indications of cavitation.

As given in the CUE, RSS pumps were stopped due to sump blockage indications.

NOTE: Grade: SAT UNSAT STEP 18 Performance Step: The charging and SI pumps should be NOTE prior to step 7. stopped on alternate ECCS trains when possible.

GRADE Standards:

Applicant reads NOTE. Grade: SAT UNSAT STEP 19 Performance Step: Establish One Train Of ECCS 7.a. Flow a. Check ECCS pumps - TWO TRAINS RUNNING GRADE Standards: Determines that all ECCS pumps are off by observation of green indicating lights on / red off. Proceeds to step 7.a. RNO. LJ Grade: SAT UNSAT 10 of 17 PERFORMANCE INFORMATION JPM Number: S.8 Revision:

0 LJ Task Title:

Respond To Containment Sump Blockage STEP 20 - Performance Step: Go To step 8. 7.a.RNO Standards:

Proceeds to step 8. Grade: SAT UNSAT GRADE - STEP 21 Performance Step: Any pump receiving suction from an affected Containment Recirculation Pump should be stopped before stopping the Containment Recirculation Pump. Step 8 CAUTIONS If any Charging Pump or Safety injection Pump loses suction or shows indications of cavitation, the pump must be stopped. GRADE Standards: Applicant reads CAUTIONS.

Grade: SAT UNSAT STEP 22 Performance Step: CSF status trees should be monitored for information only.

Every effort should be made to address the FRGs without compromising the containment sump. Step 8 NOTES. Indications of cavitation should be monitored following any change of recirculation flow. GRADE Standards

Grade: ~e Applicant reads NOTES.

SAT UNSAT 11 of 17 PERFORMANCE JPM Number: S.8 NFORMATION Revision:

0 ..d' Task Title: Respond To Containment Sump Blockage Performance Step: 8.a. Establish Recirculation Spray Pump Recirculation Flow STEP 23 a. Verify Ctmt sump level - GREATER THAN 1.5 feet Determines by observation that CTMT sump level is greater than 1.5 feet. GRADE Standards

Grade: SAT UNSAT Performance Step: Step 8.b NOTE. 3RSS*PlA or 3RSS*P1 B are the preferred pumps due to the automatic recirculation capability.

STEP 24 GRADE Standards:

Grade: Applicant reads NOTE. SAT UNSAT Recirculation Spray Pump RUNNING -ONLY ONE PUMP Performance Step: 8.b. STEP 25 GRADE Standards:

Determines by observation that NO Recirculation Spray Pumps are running. Grade: SAT UNSAT X Performance Step: 8.b.RNO Start or stop recirculation spray pumps to obtain one running. STEP 26 Rotates the control switch for either the "A" or "B" RSS pump to the start position. Observes for proper indications of a successfuf pump start; red indicating GRADE Stand a rds : X Standards:

12 of 17 PERFORMANCE INFORMATION JPM Number: S.8 Revision:

0 Task Title: Respond To Containment Sump Blockage light, amps, flow, etc. Also observes for signs of sump blockage.

Grade: SAT UNSAT STEP 27 Performance Step: Verify RSS pump has been in 8.c. operation - AT LEAST TWO MINUTES GRADE Stand a rds : Applicant starts a timer to track length of time the RSS pump has been running. RSS pump has b minutes. Grade: SAT UNSAT ---' STEP 28 GRADE STEP 29 GRADE Performance Step: Establish ECCS Flow from 9.a. Sump. Check charging and SI pump- SUCTION ALIGNED TO RUNNING RSS PUMP Standards:

Determines by observation that a flowpath exists from the discharge of the running RSS pump to the suction of the charging and SI pumps. Grade: SAT UNSAT Performance Step: Check Charging OR SI pump - 9.b. ONLY ONE RUNNING Standards:

Determines by observation that NO Charging OR SI pumps are running.

Grade: SAT UNSAT 13 of 17 PERFORMANCE INFORMATION JPM Number:

S.8 Revision:

0 i/' Task Title:

Respond To Containment Sump Blockage STEP 30 X Performance Step: START or STOP charging and SI 9.b.RNO pumps to establish only one running.

GRADE X Standards:

Rotates the control switch to the start position for one of the following:

"A Charging Pump "B" Charging Pump 0 "ASIPump 0 "B" SI Pump Observes for proper indications of a successful pump start; red indicating light, amps, flow, etc. Also observes for signs of sump blockage.

Standards

Grade: SAT UNSAT ., STEP 31 X Performance Step: Using Attachment A, Check minimum ---- 9.c. ECCS flow to remove decay heat- MINIMUM FLOW INDICATED GRADE X Standards
References Attachment A to ECA-I .I and determines minimum ECCS flow to remove decay heat, based on the time from inception of the LOCA. Determines actual ECCS flow by observation of the pump flow meter and determines actual flow is sufficient to remove .decay heat. Grade: SAT UNSAT STEP 32 Performance Step: Check Charging OR SI pump(s) - 9.d. RUNNING IN RECIRCULATION ALIGNMENT .v 14 of 17 PERFORMANCE INFORMATION JPM Number: S.8 Revision:

0 <*4 Task Title: Respond To Containment Sump Blockage GRADE Standards:

Determines by observation that a flowpath exists from the discharge of the running RSS pump to the suction of the running charging or SI pump, and that ECCS flow exists.

Grade: SAT UNSAT STEP 33 X Performance Step:

CLOSE recirculation spray header 9.e. isolation valve for running pump- 3RSS*MOV20A 3RSS*MOV20B 3RSS*MOV20C 3RSS*MOV20D GRADE X Standards

Grade: Depresses open pushbutton for the recirculation spray header isolation valve for running pump. Determines that the valve has closed by observation of green ind. light on, red Off. SAT UNSAT STEP 34 Performance Step:

Go to step 12. 9.f. GRADE Stand a rds : Applicant moves ahead to step

12. Grade: SAT UNSAT Grade: is concluded. . . .. . .. .. , . : ..,.c ,. ,
  • SAT UNSAT L/ Stop Time: 15 of 17 JPM Number: Date Performed:

Student: Evaluator:

VERIFICATION OF JPM COMPLETION 2K7 NRC S.8 Revision:

0 For the student to achieve a satisfactory grade, correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

critical steps must be completed Time Critical Task? YES NO X Validated Time (minutes):

15 -- Actual Time to Complete (minutes):

Result of JPM: ("S" for satisfactory, "U" for unsatisfactory)

Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score: Areas for Improvement:

16 of 17 STUDENT HANDOUT 'i/ JPM Number: S.8 Initial Conditions:

Following a large break loss of coolant accident (LBLOCA), the plant has established cold leg recirculation per ES-1.3, up to and including Step 4. Shortly thereafter, symptoms of significant CTMT sump clogging appeared.

Ail ECCS and RSS pumps were stopped. The crew is transitioning to ECA-1 .I, Loss of Emergency Coolant Recirculation.

Initiating Cues: The US has directed you to perform ECA-1.1, starting with step 1. ,r L-' 17 of 17 Job Performance Measure Approval Sheet U I. JPM Title: Primary Side PEO Actions on a Control Room Evacuation (Part

2) JPM ID Number: 2K7 NRC P.1 II. initiated:

P. Maizahn Developer Ill. Reviewed:

~-.' Dave Minnich Technical Reviewer IV. Approved:

N/A Cognizant Plant Supervisor (optional)

Tim Kulterman Nuclear Training Supervisor Rev: 0 6/19/06 Date 06/19/06 Date Date 06/20/06 Date 1 of 13 Job Performance Measure Approval Sheet Change

SUMMARY

OF CHANGES Description Date 2 of 13 Job Performance Measure Guide Facility: Millstone Unit 3 JPM ID Number: '.-' 2K7 NRC P.l Student: Revision:

0 Task Title: Primaw Side PEO Actions on a Control Room Evacuation (Part 2) System: 062 Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes):

20 Task Number@):

000-05-171 Applicable To:

SRO X RO X PEO X WA Number: 062-A4.04 WA Rating: 2.6 / 2.7 APE-068-MI.

14 4.2 14.4 APE-068-AAI .

10 3.7 13.9 ., Method of Testing: Simulated Performance:

X Actual Performance:

.~ --- Location: Classroom: Simulator:

In-Plant:

X Task Standards:

Satisfactorily complete primary side PEO actions on a control room evacuation IAW 3509.1 Att. A, steps 6 - 11 Required Materials:

None General

References:

EOP 3509.1, Attachment A, rev. 01 1-02 ***READ TO THE STUDENT***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfulty, the objectives for this JPM will be satisfied.

You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

.-4. 3 of 13 Job Performance Measure Guide JPM Number: P.1 .L/' Initial Conditions:

Initiating Cues: Revision:

0 A fire event has occurred requiring shut down outside the control room. The control room team is carrying out actions of EOP 3509.1 , Control Room, Cable Spreading Area, or Instrument Rack Room Fire. The US directs you to perform primary side PEO actions on a control room evacuation IAW EOP 3509.1, Attachment A, steps 6 through I1 only, after referring to the "Appendix "R" Lighting Illuminated Path" maps at the end of the attachment. Another operator is performing steps 1 through 5. You have the locked valve key.

        • NOTES TO EVALUATOR****

I. Critical steps for this JPM are indicated by an "X after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. 2. When the student states what hidher simulated action/observation would be, read the appropriate "Cue." 3. If necessary, question the student for details of simulated actions/observations (Le., "What are you looking at?"

or "What are you observing?").

4of 13 Performance Information JPM Number: P.l Revision:

0 Task Title: Primary Side PEO Actions on a Control Room Evacuation (Part 2) i/ Start Time: Comments : Direction to refer to maps is step 1 of Attachment A and was included as part of initiating cue. Examinee may elect to review all steps prior to step 6 (Step 1) STEP 1 Performance Step:

Refer to "Appendix R" Lighting Illuminated Path" maps at end of attachment prior to performing local actions. GRADE Standards: Locates maps at end of attachment and reviews. Cue: When examinee reviews maps provide the following cue, "Adequate emergency lighting is in operation to allow the use of normal accesslegress paths". Grade: SAT UNSAT STEP 2 X Performance Step: Verify Reactor Tripped (Step 6) a. Check Reactor Trip and Bypass Breakers - OPEN GRADE X Standards:

GRADE X Standards: Locates reactor trip breakers, 3RPS*SWGR-I

& -21 [West MCC*SWGR, Aux Bldg 46'1 Locates OPEN I CLOSED position indicating flags for each breaker and determines TRIP breakers indicate CLOSED. Proceeds to RNO column. (Step 6.a. RNO) TRIP the reactor trip and bypass breakers.

5of 13 Performance information JPM Number: P.l Revision:

0 Task Title: Primary Side PEO Actions on a Control Room Evacuation (Part 2) ..4 GRADE X GRADE STEP 3 Standards:

Locates red TRIP push button (PB) and simulates pushing TRIP PB. [RNO direction]

Standards:

Locates breaker flag indication; both trip breakers are OPEN Grade: SAT UNSAT Cue: Upon arrival at the TRIP & BYPASS breakers, TRIP breaker flags indicate CLOSED; BYPASS breakers indicate OPEN Cue: Breaker TRIPIOPEN flag appears AFTER candidate simulates pushing TRIP PBs on breaker front panel Comments:

X Performance Step: (Step 7) RNO must be performed Block Open Auxiliary Building North Doors to Outside on El. 24'-6" Door A 1 Door A-24-2 GRADE X Standards:

Grade: Locates North doors A-24-2 [inner] & A-24-1 [outer] and simulates propping BOTH doors open - applicant explains method and component(s) used to achieve blocking OPEN SAT UNSAT Cue: Provide the following cue for each door as simulation performed:

Door is blocked OPEN X Performance Step: De-energize TD AFW Pump Steam (Step 8) Supply Isolation Valves 6of 13 Perform an ce I nf o r mat i o n JPM Number: P.1 Revision:

0 Task Title: Primarv Side PEO Actions on a Control Room Evacuation (Part

2) 'i/ For 3MSS*MOVl7A, Place breaker 32-4U-R5H to OFF For 3MSS*MOV17B, Place breaker For 3MSS*MOVl7D, Place breaker 32-4T-R6E to OFF 32-4T-R6H to OFF GRADE X Standards: Locates breaker R5H on MCC 4U (ESF Bldg 36') and simulates placing the breaker in the OFF position [3MSS*MOVl7A]

GRADE X Standards: Locates breaker R6E on MCC 4T (ESF Bldg 36') and simulates placing the breaker the OFF position [3MSS*MOV17B]

X Standards: Locates breaker R6H on MCC 4T (ESF Bldg 36') and simulates placing the breaker in the OFF position - GRADE 4 [3MSS*MOV17D3' Grade: SAT UNSAT Cue: As each breaker is located, provide the following cue: Breaker as-found is ON/CLOSED As each breaker is simulated operated, provide the following cue: Cue: Breaker is in the OFF position STEP 5 X Performance Step: Block Open the TD AFW pump (Step 91 Cubicle Doors Door SF 1 Door SF-24-2 7 of 13

~-_ - Performance Information JPM Number: P.l Revision:

0 'd Task Title: Primary Side PEO Actions on a Control Room Evacuation (Part

2) GRADE X Standards: Simulates blocking open the TD AFW pump area outside door and the door to MOW7 A, B & D - student explains method and component(s) used to achieve blocking OPEN Grade: SAT UNSAT I Cue: You have material to block doors open I Cue: As each door is simulated blocked open, provide the following cue: The door is blocked OPEN Corn men ts : Location for steps 6 - 9 is ESF Bldg.

TD AFW pump valve room 24'. STEP 6 Performance Step: Verify TD AFW Pump Steam ---- (Step IO) Isolation Valves - OPEN 3MSS*MOV17A 3MSS*MOVl7B 3MSS*MOV17D Checks SG A TD AFW Pump Non- Return Valve 3MSS*MOV17A OPEN.

GRADE Standards:

Locates valve 3MSS*MOV17A and checks the position indicator (rod). Manually checks valve position by engaging the manual handwheel.

OR Cue: Stem position rod is as you see it. ---THIS STEP IS COMPLETE---

OR OR Cue: The MOV clutch is disengaged.

GRADE Standards:

L.-f' Rotates the handwheel in the clockwise direction to confirm the valve is open. I Cue: Valve handwheel rotates in the 8 of I3 Performance information JPM Number: P.l Revision:

0 LJ Task Title: Primarv Side PEO Actions on a Control Room Evacuation (Part 2) L clockwise direction.

I GRADE STEP 7 GRADE -w= Standards:

Rotates the handwheel in the counterclockwise direction until the valve is fully open. Cue: Valve handwheel rotates in the counterclockwise direction, eventually some resistance is met and the valve comes to a hard stop. Grade: SAT UNSAT Performance Step: Checks SG B TD AFW Pump Non- (Step IO) Return valve 3MSS*MOV17B OPEN. Standards

Locates valve 3MSS*MOV17B and checks the position indicator (rod). Manually checks valve position by engaging the manual handwheel.

OR Cue: Stem position rod is as you see it. ---THIS STEP IS COMPLETE---

OR OR Cue: The MOV clutch is disengaged.

GRADE Standards:

Rotates the handwheel in the clockwise direction to confirm the valve is open. Cue: Valve handwheel rotates in the clockwise direction.

GRADE Standards:

Rotates the handwheel in the counterclockwise direct ion u n ti I the valve is fully open. Cue: Valve handwheef rotates in the counterclockwise direction, eventually some resistance is met and the vatve comes to a hard stop. 9 of 13 Performance Information JPM Number: P.1 Revision : 0 L,' Task Title: Primary Side PEO Actions on a Control Room Evacuation (Part

2) Grade: SAT UNSAT STEP 8 Performance Step: Checks SG D TD AM Pump Non- (Step IO)

Return valve 3MSS*MOV17D OPEN. GRADE Standards:

Locates valve 3MSS*MOV170 and checks the position indicator (rod). Manually checks valve position by engaging the manual handwheel.

OR Cue: Stem position rod is as you see it.

---THIS STEP IS COMPLETE---

OR OR Cue: The MOV clutch is disengaged.

GRADE Standards:

Rotates the handwheel in the --- clockwise direction to confirm the valve is open. Valve handwheel rotates in the clockwise direction.

Cue: GRADE Standards: Rotates the handwheel in the counterclockwise direction until the valve is fully open. Cue: Valve handwheel rotates in the counterclockwise direction, eventually some resistance is met and the valve comes to a hard stop.

Grade: SAT UNSAT STEP 9 Performance Step: Perform the Following: (Step 11) a. Establish communication with the ASP operator 10 of 13 Perform an ce I nfo r m at ion JPM Number: P.1 Revision:

0 "W; Task Title: Primarv Side PEO Actions on a Control Room Evacuation (Part

2) b. Report Attachment A complete c. Provide support as required GRADE Standards:

Locates phone or walkie-talkie and simulates establishing communication with ASP operator GRADE Standards:

Simulates communicating Attachment A steps 6 through I1 are complete Grade: SAT UNSAT Terminating Cue: The evaluation for this JPM is concluded Stop Time: 11 of 13 JPM Number: Date Performed:

Student: Evaluator:

'-e' Verification of JPM Completion P. 1 Revision:

0 For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

If task is Time Criticat, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? YES NO X Validated Time (minutes):

20 Actual Time to Complete (minutes):

Result of JPM: ("S" for satisfactory, "U" for unsatisfactory)

Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score: Areas for Improvement:

12 of 13 Student Hand Out JPM Number: P.l -4 Initial Conditions:

A fire event has occurred requiring shut down outside the control room. The control room team is carrying out actions of EOP 3509.1, Control Room, Cable Spreading Area, or Instrument Rack Room Fire. Initiating Cues: The US directs you to perform primary side PEO actions on a control room evacuation IAW EOP 3509.1, Attachment A, steps 6 through 1 I only, after referring to the "Appendix "R" Lighting Illuminated Path" maps at the end of the attachment.

Another operator is performing steps I through 5. You have the locked valve key.

13 of 13 JOB PERFORMANCE MEASURE APPROVAL WORKSHEET LJ I. JPM Title: LOCAL ACTIONS ON LOSS OF INSTRUMENT AIR JPM ID Number: 2K7 NRC P.2 . 11. Initiated:

J. William Cote Developer I I I. Reviewed: Rich Carr Technical Reviewer IV. Approved:

W. Hoffner Cognizant Plant Supervisor (optional)

Tim Kulterman Nuclear Training Supervisor Revision:

O/C h 1 ch 1 R. McDonald 2/1 o/oo Date _. 12/18/01 Date 1 2/20/0 I Date 12/19/01 Date 1 of 13 JOB PERFORMANCE MEASURE APPROVAL WORKSHEET Chanae Descrbtion

SUMMARY

OF CHANGES Date of Chanae 1. Revised task description and updated to new Drocedure revision.

rim 9/3/04 2 of 13 JOB PERFORMANCE MEASURE GUIDE Facility: Millstone Unit 3

'*L/ Student: JPM ID Number: 2K7 NRC P.2 Revision:

0 Task Title:

LOCAL ACTIONS ON LOSS OF INSTRUMENT AIR System: 0 Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes):

12 Task Number(s): 344-05-017 Applicable To: SRO X RO X PEO X WA Number: 065-AA1.04 KIA Rating: 3.5/3.4 Method of TestinQ: Simulated Performance:

X Actual Performance:

'd Location: Classroom: Simulator:

In-Plant:

X Task Standards: Satisfactorily perform the local actions on a loss of instrument air as specified in AOP 3562, Loss of Instrument Air, Attachment A and OP 3332A, Instrument Air System.. Required Materials: None General

References:

AOP 3562 (Rev 005), Loss of Instrument Air, & OP3332A Rev (0 1 5) ***READ TO THE STUDENT***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.

You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

...J 3of 13 JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number: P.2 ii Revision:

0 Simulator Requirements:

None: In-plant JPM initial Conditions:

A loss of instrument air has occurred and the Control Room Team is carrying out the actions of AOP 3562, Loss of Instrument Air. Steps 1 and 2.a are complete, but instrument air pressure continues to decrease. Actions in accordance with the "Response Not Obtained" column are required.

Initiating Cues: The US has directed you to locally start air compressors and perform filter and dryer checks using Attachment A of AOP 3562, Loss of Instrument Air. **** NOTES TO EVALUATOR

        • 1. Critical steps for this JPM are indicated by an "X" after the step number.

For the student to achieve a satisfactory grade, Att critical steps must be completed correctly.

The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.

When the student states what his/her simulated action/observation would be, read the appropriate "Cue".

If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at? or "What are you observing?").

2. 3. 4of 13 PERFORMANCE INFORMATION JPM Number:

2K7 NRC P.2 Revision:

0 LOCAL ACTIONS ON LOSS OF INSTRUMENT AIR '-4 Task Title:

Start Time: STEP 1 Performance Step:

Place both instrument air compressor Att. A Step 1 .a control switches to CS (continuous service).

Comments : AOP 3562 step 2a RNO has an operator locally place instrument air compressor control switches to CS (continuous service).

GRADE Standards:

Locates the control switch for 3IAS-CIA (Turbine Building 14' elev. SW corner on top of panels) and checks the switch position.

The control switch is already in the CS position.

Cue: GRADE +' Standards:

Locates the control switch for 3lAS-CIB (Turbine Building 14' elev. SW corner on top of panels) and checks the switch position.

The control switch is already in the CS position.

Cue: Corn men ts : The instrument air compressor switches addressed in this step may be operated in any order. Grade: SAT UNSAT 5of 13 PERFORMANCE INFORMATION JPM Number: 2K7 NRC P.2 Revision:

0 Task Title: LOCAL ACTlONS ON LOSS OF INSTRUMENT AIR -L.-,.' STEP 2 GRADE X - STEP 3 .-J' GRADE GRADE X Performance Step: Place the service air compressor Att. A Step I. b control switch to CS (continuous service).

Standards:

Locates the control switch for 3SAS-C? (Turbine Building 14' elev. SW corner on top of panels) and checks the switch position.

Cue: The control switch is already in the CS position.

Grade: Performance Step: Att. A Step 1 .c Standards:

SAT UNSAT CLOSE service air header supply valve (3SAS-AOV33).

Locates valve 3SAS-AOV33 control switch (on IAS Panel) and checks valve position indicating lights.

Cue: The green light is dark and the red light is illuminated.

Standards: Closes valve by positioning switch to the "CLOSE" position.

Cue: The green light illuminates and the red light goes dark. Grade: SAT UNSAT 6of 13 PERFORMANCE INFORMATION JPM Number: 2K7 NRCE Revision:

0 Task Title: LOCAL ACTIONS ON LOSS OF INSTRUMENT AIR .*L/ STEP 4 X GRADE Performance Step: OPEN service air to instrument air Att. A Step 1.d cross-connect valve (3IAS-AOV14).

Standards

Locates valve 31AS-AOVI 4 control switch (on IAS Panel) and checks valve position indicating tights. GRADE X Cue: The green light is illuminated and the red light is dark. Opens valve by positioning switch to the "OPEN" position. The green light goes dark and the red light illuminates.

Standards:

Cue: Grade: SAT UNSAT 7 of 13 JPM Number: PERFORMANCE INFORMATION 2K7 NRC P.2 Revision:

0 L/ Task Title: LOCAL ACTIONS ON LOSS OF INSTRUMENT AIR STEP 5 GRADE -e Performance Step: Verify the following tnstrument Air AH. A Step 2 Dryer Annunciators - NOT LIT 0 AIR DRYER REACTIVATION BLOWER (IS 3-2) 0 AIR DRYER HEATER TEMP HI (IS 3-3) 0 AIR DRYER DISCHARGE MOIST HI (IS 3-4) 0 ALARM BLOWER FAILURE (Dryer Skid, 3 IAS-PNLCP

1) Comments:

The examinee may verify the alarm status in any order. Standards

Locates panel IS (Turbine Building 14' elev. SW corner facing west wall) and verifies the alarms are not lit (alarm windows dark). Cue: Alarm widows 3-2, 3-3 and 3-4 are not lit. Com men ts : The examinee may elect to perform an alarm panel lamp test, if so provide the following cue: Cue: The lamp test is satisfactory, all lamps illuminated as expected.

GRADE Standards:

Locates panel CP1 (behind air dryer) and verifies the alarms are not lit (alarm windows dark). Cue: Alarm widow "ALARM BLOWER FAILURE" is not lit. Grade: SAT UNSAT 8of13 PERFORMANCE INFORMATION JPM Number: 2K7 NRC P.2 Revision:

0 Task Title: LOCAL ACTIONS ON LOSS OF INSTRUMENT AIR STEP 6 X Performance Step: Verify Instrument Air Filter Differential Att. A Step 3 Pressure - LESS THAN 4 psid. GRADE Standards

Locates air filter differential pressure gauge (31AS-PDISl6) (East of air dryer) and verifies differential pressure reading. The gauge indicates pegged high. Cue: Grade: SAT UNSAT STEP 7 X Performance Step: &ing OP3332A, Instrument Air System, Alternate in-service instrument air filters. Att. A Step 3 RNO GRADE Standards:

Implements the RNO and obtains U' OP3332A, Instrument Air System, in order to swap filters. Provide examinee with a copy of OP 3332A Cue: Grade: SAT UNSAT STEP 8 Performance Step: Applicant finds correct section relating to filter swap. GRADE Standards: Applicant opens 3332A to section 4.6, Alternating In-Service Instrument Air Filters. Cue: Inform the examinee that filter 2A is in service and to PLACE filter 28 in service Grade: SAT UNSAT 9 of 13 PERFORMANCE INFORMATION JPM Number: 2K7 NRC P.2 Revision:

0 Task Title:

i.../ LOCAL ACTIONS ON LOSS OF INSTRUMENT AIR STEP 9 X Performance Step: Throttle open 3IAS-VI 8, filter 2B inlet OP 3332 4.6.2.a is0 la t ion. GRADE Standards:

Locates 3IAS-VI 8 and slowly throttles open on 3IAS-VI 8 until air equalizes.

Cue: Grade: Slight air noise is heard and slowly fades away SAT UNSAT STEP 10 X Performance Step: WHEN filter pressure equalizes with OP 3332 4.6.2.b the instrument air header pressure, fully OPEN 31AS-VI 8, filter 2B inlet isolation.

--' GRADE Standards:

Rotates 3IAS-VI8 in the counterclockwise direction until fully open. Cue: Valve hand wheel rotates freely until some resistance is met. Valve hand wheel comes to a hard stop. GRADE Standards:

Rotates the handwheel in the clockwise direction 1/4 of 1 turn Cue: Grade: Handwheet has been rotated 1/4 turn in the clockwise direction.

SAT UNSAT k/-,' STEP 11 X Performance Step: Open 31AS-VI 9, filter 2B outlet OP 3332 4.6.2.c isolation.

10 of 13 PERFORMANCE INFORMATION JPM Number: 2K7 NRC P.2 Revision:

0 LOCAL ACTIONS ON LOSS OF INSTRUMENT AIR if Task Title: GRADE Standards

Locates and rotates 3IAS-VI9 in the counterclockwise direction until fully open. Cue: GRADE Standards:

Cue: Grade: Valve hand wheel rotates freely until some resistance is met. Valve hand wheel comes to a hard stop. Rotates the handwheel in the clockwise direction 1/4 of I turn. Handwheel has been rotated 1/4 turn in the clockwise direction.

SAT UNSAT STEP 12 X Performance Step: Close 31AS-V2?, filter 2A outlet OP 3332 4.6.2.d isolation.

GRADE Standards: Locates and rotates 31AS-V21 in the clockwise direction until fully closed.

Cue: Valve hand wheel rotates freely until some resistance is met. Valve hand wheel comes to a hard stop.

Grade: SAT UNSAT 11 of 13 PERFORMANCE INFORMATION 1 PM Number: 2K7 IRC P.2 Revision:

0 Task Title: LOCAL ACTIONS ON LOSS OF INSTRUMENT AIR 'ii' STEP 13 X Performance Step:

OP 3332 4.6.2.e GRADE Standards:

Cue: Grade: STEP 14 Performance Step: Att. A Step 3 GRADE Standards:

Cue: Grade: STEP 15 Perform a nce Step

Close 3IAS-V2O, filter 2A inlet isolation.

Locates and rotates 31AS-V-20 in the clockwise direction until fully closed.

Valve hand wheel rotates freely until some resistance is met. Valve hand wheel comes to a hard stop. SAT UNSAT Verify Instrument Air Filter Differential Pressure - LESS THAN 4 psid. Locates air filter differential pressure gauge (3IAS-PDIS16) (East of air dryer) and verifies differential pressure reading. Filter DP reads 0.25 psid SAT UNSAT Notify the Control Room that Attachment A of AOP 3562 is complete.

12 of 13 PERFORMANCE NFORMATION JPM Number: 2K7 NRC P.2 Revision:

0 u Task Title: LOCAL ACTIONS ON LOSS OF INSTRUMENT AIR GRADE Standards

Examinee reports to the US that instrument and service air compressor are running and supplying the instrument air header and that the filter and dryer checks are complete as specified in AOP 3562, Attachment A. The 2A filter had a high DP and filter 2B was placed in service. Grade: SAT UNSAT Terminating Cue: The evaluation for this JPM is concluded. Stop Time:

130f 13 VERIFICATION OF JPM COMPLETION JPM Number: 2K7 NRC P.2 Revision:

'W '0 Date Performed:

Student: Evaluator:

For the student to achieve a satisfactory grade, correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

critical steps must be completed Time Critical Task?

YES NO X Validated Time (minutes):

u' Actual Time to Complete (minutes):

12 Result of JPM: ("S" for satisfactory, "U" for unsatisfactory)

Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score: Areas for Improvement:

14 of 13 STUDENT HANDOUT JPM Number: *.-.-/' Initial Conditions:

lnitia ti n g Cues : P.2 A loss of instrument air has occurred and the Control Room Team is carrying out the actions of AOP 3562, Loss of instrument Air. Steps 1 and 2.a are complete, but instrument air pressure continues to decrease.

Actions in accordance with the "Response Not Obtained" column are required. The US has directed you to locally start air compressors and perform filter and dryer checks using Attachment A of AOP 3562, Loss of Instrument Air. 15 of 13 JOB PERFORMANCE MEASURE APPROVAL SHEET

-_ I. JPM Title: Cross-Connect Service Water to East Switchgear Vent i I a t io n 'd JPM ID Number: 2K7 NRC P.3 Revision:

11. Initiated:

c c c D. Minnich t 3 I Developer I I I. Reviewed: - Technical Reviewer IV. Approved: Cognizant Plant Supervisor (optional) q6~- T. uterman Nuclear Training Supervisor 0 12/8/06 Date //2f/7 Date Date 1 of9 JOB PERFORMANCE MEASURE APPROVAL SHEET i_/

SUMMARY

OF CHANGES 2of9 JOB PERFORMANCE MEASURE GUIDE Facility: Millstone Unit 3 e JPM ID Number: 2K7 NRC P.3 Student: Revision:

0 Task Title: Cross-Connect Service Water to East Switchgear Ventilation System: 076 Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes):

12 Task Number@):

000-05-171 Applicable To: SRO X RO X PEO X WA Number: 076 K1.19 APE: 068 AI .21 K/A Rating: 3.6 I 3.7 3.9 14.1 Method of Testing: Simufated Performance:

X Actua I Pe rfo rma nce: Location: Classroom: Simulator: In-Plant:

X Task Standards:

All critical steps are performed satisfactorily. All sequential steps are performed in proper procedural sequence. Required Materials:

PA 8235 Keys and a Locked Valve Key General

References:

EOP 3509.1, Rev. 1 1-02 ***READ TO THE STUDENT***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective(s) for this JPM will be satisfied. You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution were actually being performed.

3 of 9 JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number: 2K7 NRC P.3 i_/ Revision:

0 Initial Conditions:

A fire occurred in the MP3 Control Room requiring evacuation.

The crew is controlling the plant from the Auxiliary Shutdown Panel in accordance with EOP 3509. I. initiating Cues: The US has directed you to perform local actions to align ventilation for the East Switchgear Room by performing Steps 42.a and b of EOP 3509.1. You have two PA 8235 keys and a locked valve key.

        • NOTESTO EVALUATOR**** Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. When the student states what hidher simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?"

or "What are you observing?"). -l. critical steps must be completed correctly.

2. 3. 4 of 9 PERFORMANCE INFORMATION JPM Number: P.3 Revision:

0 Task Title: Cross-Connect Service Water to East Switchaear Ventilation Start Time:

Comment: STEP 1 X Performance Step: (EOP 3509.1, If examinee asks for current ACU indicating light status, provide the following; cubicle 3J, green light lit, cubicle 3M, red light tit. Steps 1 and 2 of this JPM are bulleted procedure steps and can be performed in either order. ., GRADE X Standards:

.\A' At MCC 32-2T, using PA 8235 keys, START east switchgear ACUs Step 42.a) 0 East Switchgear air conditioning unit (3HVC*ACU3A) at cubicle 3J 0 East Switchgear air conditioning unit (3HVC*ACU4A) at cubicle 3M Cue: GRADE Standards:

Cue: Locates 32-2T (34 in E. Switchgear Room 4'-6" elev and simulates inserting PA 8235 key into key lock and turning clockwise to START, verifies green indicating light OFF, red light ON. Locates 32-2T (3M) in E. Switchgear Room. 4'-6" elev, and simulates inserting PA 8235 key into key lock and turning clockwise to START, verifies green indicating light OFF, red light ON. 5of9 PERFORMANCE INFORMATION JPM Number: P.3 Revision:

0 Task Title: L.-J STEP 2 Cross-Connect Service Water to East Switchgear Ventilation GRADE .I '--- STEP 3 Grade: Note: SAT UNSAT The following step de-energizes the Train A HVK isolation valves to/from East Switchgear Room to ensure they are closed. (Train 8 valves were de- energized in an earlier procedure step which de-energized 34D.)

X Performance Step: Cross-connect service water to the (EOP 3509.1, switchgear room ACUs Step 42.b.l) I) At 3SCV*PNLRI(O) (Control Building 4'-6") Place breakers 19 and 22 to OFF X Standards

Locates 3SCV*PNLRI(O) in E. Switchgear Room, opens panel door, simulates sliding breakers 19 and 22 to the OFF position.

Grade: SAT UNSAT X Performance Step: 2) Locally Open service water cross- (EOP 3509.1, Step 42.b.2) connect valves (Control Building 4'-6")

3SWP*V745 3SWP*V747 3SWP*V744

3SWP*V746 GRADE X Standards:

Locates each valve and using locked valve key unlocks and removes chain. Rotates valve handwheel (or handle) in counter clockwise direction until valve comes to a hard stop. Comment: Valve should be positioned

% turn closed from the full open position in accordance with Ops guidance for keeping manual valves off the 6of9 PERFORMANCE f NFORMATION JPM Number: P.3 Revision:

0 'L..' Task Title: Cross-Connect Service Water to East Switchgear Ventilation backseat. Positioning valve off of the backseat is not a critical task.

Grade: SAT UNSAT Terminating Cue: The evaluation for this JPM is concluded. Stop Time:

7 of 9 VERIFICATION OF JPM COMPLETION JPM Number: P.3 Revision:

0 Date Performed:

>4 Student: Eva ha tor: For the student to achieve a satisfactory grade, correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

critical steps must be completed Time Critical Task? YES NO X Validated Time (minutes):

12 .-J' Actual Time to Complete (minutes):

Result of JPM: ("S" for satisfactory, "U" for unsatisfactory)

Result of oral questions (if applicable): Number of Questions:

Number of Correct Responses:

Score: Areas for Improvement:

8of9 STUDENT HANDOUT JPM Number: P.3 L./' Initial Conditions:

A fire occurred in the MP3 Control Room requiring evacuation.

The crew is controlling the plant from the Auxiliary Shutdown Panel in accordance with EOP 3509.1. Initiating Cues: The US has directed you to perform local actions to align ventilation for the East Switchgear Room by performing Steps 42.a and b of EOP 3509.1. You have two PA 8235 keys and a locked valve key. 9 of 9