ML18009A461: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
#REDIRECT [[LIC-17-0076, Fort Calhoun Station, Unit 1 and Independent Spent Fuel Storage Installation Emergency Plan Update]]
{{Adams
| number = ML18009A461
| issue date = 12/18/2017
| title = Fort Calhoun Station, Unit 1 and Independent Spent Fuel Storage Installation Emergency Plan Update
| author name = Blome B H
| author affiliation = Omaha Public Power District
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NMSS, NRC/NRR
| docket = 05000285, 07200054
| license number = DPR-040
| contact person =
| case reference number = LIC-17-0076
| document type = Emergency Preparedness-Review of Emergency Plan Changes, Letter, License-Dry Cask, ISFSI, (Amend) DKT 72
| page count = 2
}}
 
=Text=
{{#Wiki_filter:-~ **** , ._.._ -_. Omaha Public PowerCJistrict December 18, 2017 LIC-17-0076 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285 Fort Calhoun Station Independent Spent Fuel Storage Installation NRC Docket No. 72-054
 
==SUBJECT:==
Emergency Plan Update 10 CFR 72.44(f) 10 CFR 50.54(q) 10 CFR 50, Appendix E 10 CFR 50.4(b)(5)
In accordance with 10 CFR 72.44(f), 10 CFR 50.54(q), 10 CFR 50, Appendix E, Section V, and 10 CFR ' 50.4{b){5), please find procedure EP-FC-1001 Rev 3 enclosed for the Document Control Desk (holder of Copy 165) and the NRC Region IV Branch 1 Secretary (holder of Copies 154 and 155). REMOVE SECTION INSERT SECTION EP-FC-1001 Rev 2 issued 07/28/2017 EP-FC-1001 Rev 3 issued 12/13/2017 This change was reviewed and does not constitute a decrease in effectiveness.
No commitments are made in this letter. If you have any questions regarding the previous transmittal, please contact Mr. Jason Fickbohm at 402-533-7560.
Sincerely, Bradley H. Blome Director -Licensing and Reg Assurance BHB/mec c: NRC Region IV Plant Support Branch 1 Secretary (2 sets) J. Kim, NRC Senior Project Manager (w/o enclosures)
Emergency Planning Department (w/o enclosures)
Fort Calhoun Station, PO Box 550 Fort Calhoun, NE 68023/9610 Power Lane, Blair, NE 68008 EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 1 of 1 Rev. 9 Radiological Emergency Emergency Plan Emergency Planning Forms !XI D Implementing Procedures D Response Plan (RERP) (EPIP) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/
Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s)
/ information are forwarded for your manual: REMOVE SECTION INSERT SECTION EP-FC-1001 Rev 2 issued 07/28/2017 EP-FC-1001 Rev 3 issued 12/13/2017 Summary of Changes: Fort Calhoun Station has entered into the decommissioning process on site. With that, changes to document and procedure titles are taking place. This change is being made to update the Emergency Plan to reference the recent change from the Updated Safety Analysis Report (USAR) to the Defueled Safety Analysis Report (DSAR) recently issued at FCS. Additionally, training and RP procedure changes have been made to transition into the decommissioned training process. The term TLD's was updated to DLR's and organization position title changes were also made. Updating the emergency plan to correctly reference the currently issued procedures, terms, and titles in no way reduces the effectiveness of the FCS Emergency Plan. Recently FCS implemented strategies associated with the Fukushima Near-Term task force recommendations in Order EA-12-049 that implements various FLEX/SAFER strategies for beyond design bases external events. Due to FCS ceasing operations and entering a permanently shut down/defueled condition FCS had asked for relief for Order EA-12-049 due to the minimal rusk present under current conditions.
On June 14, 2017 (NRC-17-031) the NRC withdrew in its entirety Order EA-12-049 for FCS based on information provided by FCS. Due to the removal of any FLEX/SAFER ties and commitments references to INPO are being removed from this procedure.
The FLEX ties were the last applicable portion of the INPO Letters of Agreement as FCS is no longer an operating plant nor an active member of INPO. Revising the plan to reflect the current and relevant Letters of Agreement in no way reduces the effectiveness of the Emergency Plan. ---!/ Manager -Site Emergency Planning I hereby acknowledg6 receipt of the above documents/information and have included them in my assigned manuals. Signature:
Date: -Please sign above and return by: 02/13/2018 Mary Cooper Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 15th Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address:}}

Revision as of 17:54, 15 March 2019

Fort Calhoun Station, Unit 1 and Independent Spent Fuel Storage Installation Emergency Plan Update
ML18009A461
Person / Time
Site: Fort Calhoun  Omaha Public Power District icon.png
Issue date: 12/18/2017
From: Blome B H
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
LIC-17-0076
Download: ML18009A461 (2)


Text

-~ **** , ._.._ -_. Omaha Public PowerCJistrict December 18, 2017 LIC-17-0076 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285 Fort Calhoun Station Independent Spent Fuel Storage Installation NRC Docket No.72-054

SUBJECT:

Emergency Plan Update 10 CFR 72.44(f) 10 CFR 50.54(q) 10 CFR 50, Appendix E 10 CFR 50.4(b)(5)

In accordance with 10 CFR 72.44(f), 10 CFR 50.54(q), 10 CFR 50, Appendix E, Section V, and 10 CFR ' 50.4{b){5), please find procedure EP-FC-1001 Rev 3 enclosed for the Document Control Desk (holder of Copy 165) and the NRC Region IV Branch 1 Secretary (holder of Copies 154 and 155). REMOVE SECTION INSERT SECTION EP-FC-1001 Rev 2 issued 07/28/2017 EP-FC-1001 Rev 3 issued 12/13/2017 This change was reviewed and does not constitute a decrease in effectiveness.

No commitments are made in this letter. If you have any questions regarding the previous transmittal, please contact Mr. Jason Fickbohm at 402-533-7560.

Sincerely, Bradley H. Blome Director -Licensing and Reg Assurance BHB/mec c: NRC Region IV Plant Support Branch 1 Secretary (2 sets) J. Kim, NRC Senior Project Manager (w/o enclosures)

Emergency Planning Department (w/o enclosures)

Fort Calhoun Station, PO Box 550 Fort Calhoun, NE 68023/9610 Power Lane, Blair, NE 68008 EP-1 Confirmation of Transmittal for Emergency Planning Documents/Information Page 1 of 1 Rev. 9 Radiological Emergency Emergency Plan Emergency Planning Forms !XI D Implementing Procedures D Response Plan (RERP) (EPIP) (EPF) D Emergency Planning Department Manual D Other Emergency Planning Document(s)/

Information (EPDM) Date: Transmitted to: Name: Document Control Desk Copy No: 165 Date: Plant Support Branch Secretary Copy No: 154 Plant Support Branch Secretary Copy No: 155 The following document(s)

/ information are forwarded for your manual: REMOVE SECTION INSERT SECTION EP-FC-1001 Rev 2 issued 07/28/2017 EP-FC-1001 Rev 3 issued 12/13/2017 Summary of Changes: Fort Calhoun Station has entered into the decommissioning process on site. With that, changes to document and procedure titles are taking place. This change is being made to update the Emergency Plan to reference the recent change from the Updated Safety Analysis Report (USAR) to the Defueled Safety Analysis Report (DSAR) recently issued at FCS. Additionally, training and RP procedure changes have been made to transition into the decommissioned training process. The term TLD's was updated to DLR's and organization position title changes were also made. Updating the emergency plan to correctly reference the currently issued procedures, terms, and titles in no way reduces the effectiveness of the FCS Emergency Plan. Recently FCS implemented strategies associated with the Fukushima Near-Term task force recommendations in Order EA-12-049 that implements various FLEX/SAFER strategies for beyond design bases external events. Due to FCS ceasing operations and entering a permanently shut down/defueled condition FCS had asked for relief for Order EA-12-049 due to the minimal rusk present under current conditions.

On June 14, 2017 (NRC-17-031) the NRC withdrew in its entirety Order EA-12-049 for FCS based on information provided by FCS. Due to the removal of any FLEX/SAFER ties and commitments references to INPO are being removed from this procedure.

The FLEX ties were the last applicable portion of the INPO Letters of Agreement as FCS is no longer an operating plant nor an active member of INPO. Revising the plan to reflect the current and relevant Letters of Agreement in no way reduces the effectiveness of the Emergency Plan. ---!/ Manager -Site Emergency Planning I hereby acknowledg6 receipt of the above documents/information and have included them in my assigned manuals. Signature:

Date: -Please sign above and return by: 02/13/2018 Mary Cooper Fort Calhoun Station, FC-2-1 Omaha Public Power District 444 South 15th Street Mall Omaha, NE 68102-2247 NOTE: If the document(s)/information contained in this transmittal is no longer requested or needed by the recipient, or has been transferred to another individuals, please fill out the information below. D Document(s)/lnformation No Longer Requested/Needed D Document(s)/lnformation Transferred to: Name: Mailing Address: