ML13289A226: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13289A226
| number = ML13289A226
| issue date = 05/10/2012
| issue date = 05/10/2012
| title = 6.a.ii.13 Sqn Hours of Operation Annual Air Report 2011
| title = 6.a.ii.13 SQN Hours of Operation Annual Air Report 2011
| author name = Carlin J T
| author name = Carlin J
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
| addressee name = Frazier J A
| addressee name = Frazier J
| addressee affiliation = Chattanooga-Hamilton County, TN, Air Pollution Control Bureau, NRC/NRR
| addressee affiliation = Chattanooga-Hamilton County, TN, Air Pollution Control Bureau, NRC/NRR
| docket = 05000327, 05000328
| docket = 05000327, 05000328
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Soddy Daisy, Tennessee May 10, 2012 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416  
{{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Soddy Daisy, Tennessee 37384~2000 May 10, 2012 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416


==Dear Mr. Frazier:==
==Dear Mr. Frazier:==
SEQUOYAH NUCLEAR PLANT-HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report for the hours of operation from April 1, 2011 to March 31, 2012 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-1 0200501-0BC and 4150-20200102-11 C. If you have any questions regarding this report, please contact Lynne Koby at (423)843-6713 of Sequoyah's Environmental staff. Si *ce President Sequoyah Nuclear Plant Enclosure SEQUOYAH NUCLEAR PLANT-HOURS OF OPERATION ANNUAL REPORT APRIL 1, 2011 to MARCH 31, 2012 Equipment Name Maximum Permitted Actual Hours Hours of Operation of Operation Auxiliary Boilers 2,000 (combined)
 
Boiler A 0 Hours Boiler B 0 Hours Total 2,000 (combined) 0 Hours Emergency Diesel 204 Hours 64.58 Hours Generator 1-A Emergency Diesel 204 Hours 36.53 Hours Generator 2-A Emergency Diesel 204 Hours 65.90 Hours Generator 1-B Emergency Diesel 204 Hours 37.25 Hours Generator 2-B Blackout Diesel 204 Hours 1.31 Hours Generator 1 Blackout Diesel 204 Hours 1.26 Hours Generator 2}}
SEQUOYAH NUCLEAR PLANT- HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report for the hours of operation from April 1, 2011 to March 31, 2012 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-1 0200501-0BC and 4150-20200102-11 C. If you have any questions regarding this report, please contact Lynne Koby at (423)843-6713 of Sequoyah's Environmental staff.
Si     *ce President Sequoyah Nuclear Plant Enclosure
 
SEQUOYAH NUCLEAR PLANT- HOURS OF OPERATION ANNUAL REPORT APRIL 1, 2011 to MARCH 31, 2012 Equipment Name   Maximum Permitted         Actual Hours Hours of Operation       of Operation Auxiliary Boilers       2,000 (combined)
Boiler A                                 0 Hours Boiler B                                 0 Hours Total                   2,000 (combined)           0 Hours Emergency Diesel           204 Hours             64.58 Hours Generator 1-A Emergency Diesel           204 Hours             36.53 Hours Generator 2-A Emergency Diesel           204 Hours             65.90 Hours Generator 1-B Emergency Diesel           204 Hours             37.25 Hours Generator 2-B Blackout Diesel           204 Hours             1.31 Hours Generator 1 Blackout Diesel           204 Hours             1.26 Hours Generator 2}}

Latest revision as of 13:26, 4 November 2019

6.a.ii.13 SQN Hours of Operation Annual Air Report 2011
ML13289A226
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/10/2012
From: John Carlin
Tennessee Valley Authority
To: Frazier J
Chattanooga-Hamilton County, TN, Air Pollution Control Bureau, Office of Nuclear Reactor Regulation
Shared Package
ML13289A109 List: ... further results
References
Download: ML13289A226 (2)


Text

Tennessee Valley Authority, Post Office Box 2000, Soddy Daisy, Tennessee 37384~2000 May 10, 2012 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416

Dear Mr. Frazier:

SEQUOYAH NUCLEAR PLANT- HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report for the hours of operation from April 1, 2011 to March 31, 2012 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-1 0200501-0BC and 4150-20200102-11 C. If you have any questions regarding this report, please contact Lynne Koby at (423)843-6713 of Sequoyah's Environmental staff.

Si *ce President Sequoyah Nuclear Plant Enclosure

SEQUOYAH NUCLEAR PLANT- HOURS OF OPERATION ANNUAL REPORT APRIL 1, 2011 to MARCH 31, 2012 Equipment Name Maximum Permitted Actual Hours Hours of Operation of Operation Auxiliary Boilers 2,000 (combined)

Boiler A 0 Hours Boiler B 0 Hours Total 2,000 (combined) 0 Hours Emergency Diesel 204 Hours 64.58 Hours Generator 1-A Emergency Diesel 204 Hours 36.53 Hours Generator 2-A Emergency Diesel 204 Hours 65.90 Hours Generator 1-B Emergency Diesel 204 Hours 37.25 Hours Generator 2-B Blackout Diesel 204 Hours 1.31 Hours Generator 1 Blackout Diesel 204 Hours 1.26 Hours Generator 2