ML13289A226: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML13289A226 | | number = ML13289A226 | ||
| issue date = 05/10/2012 | | issue date = 05/10/2012 | ||
| title = 6.a.ii.13 | | title = 6.a.ii.13 SQN Hours of Operation Annual Air Report 2011 | ||
| author name = Carlin J | | author name = Carlin J | ||
| author affiliation = Tennessee Valley Authority | | author affiliation = Tennessee Valley Authority | ||
| addressee name = Frazier J | | addressee name = Frazier J | ||
| addressee affiliation = Chattanooga-Hamilton County, TN, Air Pollution Control Bureau, NRC/NRR | | addressee affiliation = Chattanooga-Hamilton County, TN, Air Pollution Control Bureau, NRC/NRR | ||
| docket = 05000327, 05000328 | | docket = 05000327, 05000328 | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Soddy Daisy, Tennessee May 10, 2012 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416 | {{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Soddy Daisy, Tennessee 37384~2000 May 10, 2012 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416 | ||
==Dear Mr. Frazier:== | ==Dear Mr. Frazier:== | ||
SEQUOYAH NUCLEAR PLANT-HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report for the hours of operation from April 1, 2011 to March 31, 2012 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-1 0200501-0BC and 4150-20200102-11 C. If you have any questions regarding this report, please contact Lynne Koby at (423)843-6713 of Sequoyah's Environmental staff. Si *ce President Sequoyah Nuclear Plant Enclosure SEQUOYAH NUCLEAR PLANT-HOURS OF OPERATION ANNUAL REPORT APRIL 1, 2011 to MARCH 31, 2012 Equipment Name Maximum Permitted Actual Hours Hours of Operation of Operation Auxiliary Boilers 2,000 (combined) | |||
Boiler A 0 Hours Boiler B 0 Hours Total 2,000 (combined) 0 Hours Emergency Diesel 204 Hours 64.58 Hours Generator 1-A Emergency Diesel 204 Hours 36.53 Hours Generator 2-A Emergency Diesel 204 Hours 65.90 Hours Generator 1-B Emergency Diesel 204 Hours 37.25 Hours Generator 2-B Blackout Diesel 204 Hours 1.31 Hours Generator 1 Blackout Diesel 204 Hours 1.26 Hours Generator 2}} | SEQUOYAH NUCLEAR PLANT- HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report for the hours of operation from April 1, 2011 to March 31, 2012 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-1 0200501-0BC and 4150-20200102-11 C. If you have any questions regarding this report, please contact Lynne Koby at (423)843-6713 of Sequoyah's Environmental staff. | ||
Si *ce President Sequoyah Nuclear Plant Enclosure | |||
SEQUOYAH NUCLEAR PLANT- HOURS OF OPERATION ANNUAL REPORT APRIL 1, 2011 to MARCH 31, 2012 Equipment Name Maximum Permitted Actual Hours Hours of Operation of Operation Auxiliary Boilers 2,000 (combined) | |||
Boiler A 0 Hours Boiler B 0 Hours Total 2,000 (combined) 0 Hours Emergency Diesel 204 Hours 64.58 Hours Generator 1-A Emergency Diesel 204 Hours 36.53 Hours Generator 2-A Emergency Diesel 204 Hours 65.90 Hours Generator 1-B Emergency Diesel 204 Hours 37.25 Hours Generator 2-B Blackout Diesel 204 Hours 1.31 Hours Generator 1 Blackout Diesel 204 Hours 1.26 Hours Generator 2}} |
Latest revision as of 13:26, 4 November 2019
Text
Tennessee Valley Authority, Post Office Box 2000, Soddy Daisy, Tennessee 37384~2000 May 10, 2012 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416
Dear Mr. Frazier:
SEQUOYAH NUCLEAR PLANT- HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report for the hours of operation from April 1, 2011 to March 31, 2012 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-1 0200501-0BC and 4150-20200102-11 C. If you have any questions regarding this report, please contact Lynne Koby at (423)843-6713 of Sequoyah's Environmental staff.
Si *ce President Sequoyah Nuclear Plant Enclosure
SEQUOYAH NUCLEAR PLANT- HOURS OF OPERATION ANNUAL REPORT APRIL 1, 2011 to MARCH 31, 2012 Equipment Name Maximum Permitted Actual Hours Hours of Operation of Operation Auxiliary Boilers 2,000 (combined)
Boiler A 0 Hours Boiler B 0 Hours Total 2,000 (combined) 0 Hours Emergency Diesel 204 Hours 64.58 Hours Generator 1-A Emergency Diesel 204 Hours 36.53 Hours Generator 2-A Emergency Diesel 204 Hours 65.90 Hours Generator 1-B Emergency Diesel 204 Hours 37.25 Hours Generator 2-B Blackout Diesel 204 Hours 1.31 Hours Generator 1 Blackout Diesel 204 Hours 1.26 Hours Generator 2