| event date = 06/25/2013 21:58 PDT
| event date = 06/25/2013 21:58 PDT
| last update date = 06/26/2013
| last update date = 06/26/2013
| title = Plant Shutdown Required Due To Rhr System Socket Weld Leak
| title = Plant Shutdown Required Due to Rhr System Socket Weld Leak
| event text = At 2158 PDT, plant personnel identified a through-wall leak in a Diablo Canyon Power Plant Unit 1 socket weld inside containment that provides a flow path to a relief valve that protects a common portion of both trains of the Residual heat Removal (RHR) system.  The as-found condition did not comply with the requirements of equipment control guideline 7.6 and the ASME acceptance criteria.  PG&E accordingly declared both Unit 1 trains of RHR inoperable and initiated plant shutdown at 2237 PDT in accordance with requirements of Technical Specification 3.0.3.
| event text = At 2158 PDT, plant personnel identified a through-wall leak in a Diablo Canyon Power Plant Unit 1 socket weld inside containment that provides a flow path to a relief valve that protects a common portion of both trains of the Residual heat Removal (RHR) system.  The as-found condition did not comply with the requirements of equipment control guideline 7.6 and the ASME acceptance criteria.  PG&E accordingly declared both Unit 1 trains of RHR inoperable and initiated plant shutdown at 2237 PDT in accordance with requirements of Technical Specification 3.0.3.
PG&E will complete shutdown to Mode 4 and will perform repairs to restore compliance with ASME code requirements.
PG&E will complete shutdown to Mode 4 and will perform repairs to restore compliance with ASME code requirements.

Latest revision as of 21:00, 1 March 2018

ENS 49148 +/-
Where
Diablo Canyon Pacific Gas & Electric icon.png
California (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown

10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition

10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident

10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release
Time - Person (Reporting Time:+-2.98 h-0.124 days <br />-0.0177 weeks <br />-0.00408 months <br />)
Opened: Darrell Johnson
01:59 Jun 26, 2013
NRC Officer: Donald Norwood
Last Updated: Jun 26, 2013
49148 - NRC Website