ENS 45260
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
20:04 Aug 13, 2009 | |
Title | Potential Media Interest Due to Planned Maintenance Outage |
Event Description | On August 13, 2009, at 1304 PDT, Unit 2 was shut down in accordance with established plant procedures to perform more in-depth analysis of the main electrical transformer 'A' phase 500 kV bushing. Diablo Canyon Unit 2 was taken off line in a planned maintenance outage to investigate a power-factor condition currently identified by the 500 kV bushing monitoring instrumentation. The main electrical transformer 'A' phase 500 kV bushing will be replaced if warranted by the results of testing.
The licensee notified the NRC Resident Inspector. |
Where | |
---|---|
Diablo Canyon California (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release | |
Time - Person (Reporting Time:+-2.65 h-0.11 days <br />-0.0158 weeks <br />-0.00363 months <br />) | |
Opened: | Anthony Chitwood 17:25 Aug 13, 2009 |
NRC Officer: | Mark Abramovitz |
Last Updated: | Aug 13, 2009 |
45260 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 45260\u003C/a\u003E - \u003Ca href=\"/Diablo_Canyon\" title=\"Diablo Canyon\"\u003EDiablo Canyon\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EPotential Media Interest Due to Planned Maintenance Outage\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 45260 - Diablo Canyon\n","link":"","lat":35.21169166666667,"lon":-120.85504166666666,"icon":"/w/images/f/ff/Pacific_Gas_%26_Electric_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Hot Standby (0 %) |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_45260&oldid=425722"