ML18151A379: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 5: | Line 5: | ||
| author name = Vegel A | | author name = Vegel A | ||
| author affiliation = NRC/RGN-IV/DRP | | author affiliation = NRC/RGN-IV/DRP | ||
| addressee name = Sawatzke B | | addressee name = Sawatzke B | ||
| addressee affiliation = Energy Northwest | | addressee affiliation = Energy Northwest | ||
| docket = 05000397 | | docket = 05000397 | ||
| license number = NPF-021 | | license number = NPF-021 | ||
| contact person = Haire M | | contact person = Haire M | ||
| case reference number = FAQ 18-03 | | case reference number = FAQ 18-03 | ||
| document type = Letter | | document type = Letter | ||
Line 19: | Line 19: | ||
==SUBJECT:== | ==SUBJECT:== | ||
ASSESSMENT FOLLOW | ASSESSMENT FOLLOW-UP LETTER FOR COLUMBIA GENERATING STATION | ||
-UP LETTER FOR COLUMBIA GENERATING STATION | |||
==Dear Mr. Sawatzke:== | ==Dear Mr. Sawatzke:== | ||
As a result of its continuous review of plant performance, the NRC updated its assessment of Columbia Generating Station. The | |||
-up assessment letter issued on November 16, 2017 (ADAMS Accession No. ML17320A265 | As a result of its continuous review of plant performance, the NRC updated its assessment of Columbia Generating Station. The NRCs evaluation consisted of a review of performance indicators and inspection results. This letter informs you of the NRCs assessment and its plans for future inspections at your facility. This letter updates the annual assessment letter issued on March 1, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18057A398), and the follow-up assessment letter issued on November 16, 2017 (ADAMS Accession No. ML17320A265), based on the NRC staffs recent decision regarding an input related to the Unplanned Scrams with Complications performance indicator for Columbia Generating Station. | ||
), based on the NRC | As described in our November 16, 2017, letter, the NRCs review of Columbia Generating Station had identified that the Unplanned Scrams with Complications performance indicator crossed the Green-to-White threshold due to two unplanned scrams with complications within a four-quarter period, specifically related to scrams that occurred in December 2016 and August 2017. As such, this performance indicator data was considered a White input into the Reactor Oversight Program (ROP) Action Matrix for the NRC to consider relative to the stations performance. Subsequently, on March 1, 2018, your staff submitted a performance indicator Frequently Asked Question (FAQ) during the monthly ROP Public Meeting with the NRC staff. | ||
In FAQ No. 18-03, your staff requested a plant-specific exemption from the guidance related to the Unplanned Scrams with Complications performance indicator due to unique circumstances surrounding the plant scram on August 20, 2017. (A summary of the meeting, including your staffs FAQ 18-03 submittal, may be found in ADAMS Package Accession No. ML18072A036). | |||
, letter, the | The request for a plant-specific exemption from counting the August 20, 2017, scram as a complicated scram was approved at a May 24, 2018, public meeting with the ROP Task Force (ADAMS Accession No. ML18144A977). However, the scram continues to count as an unplanned scram in the related performance indicator, Unplanned Scrams per 7000 Critical Hours. With the August 20, 2017, scram not counted as complicated, the Unplanned Scrams with Complications performance indicator was retroactively recalculated such that the indicator remained in the green band with only one input (the December 2016 scram) in the four quarter period of the 4th quarter 2016 through the 3rd quarter 2017; therefore, the Unplanned Scrams with Complications performance indicator is not considered a White input for the NRCs | ||
-to-White threshold due to two unplanned scrams with complications within a four-quarter period, specifically related to scrams that occurred in December 2016 and August 2017. As such, this performance indicator data was considered a White input into the Reactor Oversight Program (ROP) Action Matrix for the NRC to consider relative to the | |||
-03 submittal, may be found in ADAMS Package Accession No. ML18072A036). The request for a plant-specific exemption from counting the August 20, 2017, scram as a complicated scram was approved at a May 24, 2018, public meeting with the | B. Sawatzke 2 assessment of the stations performance during that period per the ROP Action Matrix. In our March 1, 2018, letter, the NRC indicated that we planned to conduct the Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 Inputs, however, since the performance indicator is no longer considered a White input, the NRC no longer plans to conduct that inspection. | ||
. In our March 1, 2018, letter, the NRC indicated that we planned to conduct the Inspection Procedure 95001, | As such, in consideration that (1) the Unplanned Scrams with Complications performance indicator is considered to have remained in the green band as a result of the NRCs approval of the exemption requested by your staff in FAQ 18-03, (2) all other performance indicators remain in the expected band (i.e., Green), and (3) there are no open greater-than-green findings for the station, the NRC has determined the performance at Columbia Generating Station returned to the Licensee Response Column of the ROP Action Matrix effective January 1, 2018. Therefore, the NRC plans to conduct ROP baseline inspections at your facility. | ||
As such, in consideration that (1) the Unplanned Scrams with Complications performance indicator is considered to have remained in the green band as a result of the | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
-rm/adams.html (the Public Electronic Reading Room). | |||
Please contact Mark Haire at 817-200-1148 with any questions you have regarding this letter. | Please contact Mark Haire at 817-200-1148 with any questions you have regarding this letter. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
50-397 License No. | Anton Vegel, Director Division of Reactor Projects Docket No. 50-397 License No. NPF-21 | ||
NPF-21 | |||
ML18151A379 SUNSI Review | ML18151A379 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword: | ||
By: RDA/rdr Yes No Publicly Available Sensitive NRC-002 OFFICE DRP:A/SPE DRP:A/BC DRP:D NAME RAlexander MHaire AVegel SIGNATURE /RA/ /RA/ /RA/ | |||
DATE 05/30/2018 05/30/2018 05/31/2018 May 31, 2018 Mr. Brad Sawatzke, Chief Executive Officer Energy Northwest MD 1023 P.O. Box 968 Richland, WA 99352 | |||
==SUBJECT:== | ==SUBJECT:== | ||
ASSESSMENT FOLLOW | ASSESSMENT FOLLOW-UP LETTER FOR COLUMBIA GENERATING STATION | ||
-UP LETTER FOR COLUMBIA GENERATING STATION | |||
==Dear Mr. Sawatzke:== | ==Dear Mr. Sawatzke:== | ||
As a result of its continuous review of plant performance, the NRC updated its assessment of Columbia Generating Station. The | |||
-up assessment letter issued on November 16, 2017 (ADAMS Accession No. ML17320A265 | As a result of its continuous review of plant performance, the NRC updated its assessment of Columbia Generating Station. The NRCs evaluation consisted of a review of performance indicators and inspection results. This letter informs you of the NRCs assessment and its plans for future inspections at your facility. This letter updates the annual assessment letter issued on March 1, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18057A398), and the follow-up assessment letter issued on November 16, 2017 (ADAMS Accession No. ML17320A265), based on the NRC staffs recent decision regarding an input related to the Unplanned Scrams with Complications performance indicator for Columbia Generating Station. | ||
), based on the NRC | As described in our November 16, 2017, letter, the NRCs review of Columbia Generating Station had identified that the Unplanned Scrams with Complications performance indicator crossed the Green-to-White threshold due to two unplanned scrams with complications within a four-quarter period, specifically related to scrams that occurred in December 2016 and August 2017. As such, this performance indicator data was considered a White input into the Reactor Oversight Program (ROP) Action Matrix for the NRC to consider relative to the stations performance. Subsequently, on March 1, 2018, your staff submitted a performance indicator Frequently Asked Question (FAQ) during the monthly ROP Public Meeting with the NRC staff. | ||
In FAQ No. 18-03, your staff requested a plant-specific exemption from the guidance related to the Unplanned Scrams with Complications performance indicator due to unique circumstances surrounding the plant scram on August 20, 2017. (A summary of the meeting, including your staffs FAQ 18-03 submittal, may be found in ADAMS Package Accession No. ML18072A036). | |||
, letter, the | The request for a plant-specific exemption from counting the August 20, 2017, scram as a complicated scram was approved at a May 24, 2018, public meeting with the ROP Task Force (ADAMS Accession No. ML18144A977). However, the scram continues to count as an unplanned scram in the related performance indicator, Unplanned Scrams per 7000 Critical Hours. With the August 20, 2017, scram not counted as complicated, the Unplanned Scrams with Complications performance indicator was retroactively recalculated such that the indicator remained in the green band with only one input (the December 2016 scram) in the four quarter period of the 4th quarter 2016 through the 3rd quarter 2017; therefore, the Unplanned Scrams with Complications performance indicator is not considered a White input for the NRCs | ||
-to-White threshold due to two unplanned scrams with complications within a four-quarter period, specifically related to scrams that occurred in December 2016 and August 2017. As such, this performance indicator data was considered a White input into the Reactor Oversight Program (ROP) Action Matrix for the NRC to consider relative to the | |||
-03 submittal, may be found in ADAMS Package Accession No. ML18072A036). The request for a plant-specific exemption from counting the August 20, 2017, scram as a complicated scram was approved at a May 24, 2018, public meeting with the | B. Sawatzke 2 assessment of the stations performance during that period per the ROP Action Matrix. In our March 1, 2018, letter, the NRC indicated that we planned to conduct the Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 Inputs, however, since the performance indicator is no longer considered a White input, the NRC no longer plans to conduct that inspection. | ||
. In our March 1, 2018, letter, the NRC indicated that we planned to conduct the Inspection Procedure 95001, | As such, in consideration that (1) the Unplanned Scrams with Complications performance indicator is considered to have remained in the green band as a result of the NRCs approval of the exemption requested by your staff in FAQ 18-03, (2) all other performance indicators remain in the expected band (i.e., Green), and (3) there are no open greater-than-green findings for the station, the NRC has determined the performance at Columbia Generating Station returned to the Licensee Response Column of the ROP Action Matrix effective January 1, 2018. Therefore, the NRC plans to conduct ROP baseline inspections at your facility. | ||
As such, in consideration that (1) the Unplanned Scrams with Complications performance indicator is considered to have remained in the green band as a result of the | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
-rm/adams.html (the Public Electronic Reading Room). | |||
Please contact Mark Haire at 817-200-1148 with any questions you have regarding this letter. | Please contact Mark Haire at 817-200-1148 with any questions you have regarding this letter. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
50-397 License No. | Anton Vegel, Director Division of Reactor Projects Docket No. 50-397 License No. NPF-21 | ||
NPF-21 | |||
ML18151A379 SUNSI Review | ML18151A379 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword: | ||
By: RDA/rdr Yes No Publicly Available Sensitive NRC-002 OFFICE DRP:A/SPE DRP:A/BC DRP:D NAME RAlexander MHaire AVegel SIGNATURE /RA/ /RA/ /RA/ | |||
DATE 05/30/2018 05/30/2018 05/31/2018}} |
Latest revision as of 22:50, 2 February 2020
ML18151A379 | |
Person / Time | |
---|---|
Site: | Columbia |
Issue date: | 05/31/2018 |
From: | Anton Vegel NRC/RGN-IV/DRP |
To: | Sawatzke B Energy Northwest |
Haire M | |
References | |
FAQ 18-03 | |
Download: ML18151A379 (3) | |
Text
May 31, 2018 Mr. Brad Sawatzke, Chief Executive Officer Energy Northwest MD 1023 P.O. Box 968 Richland, WA 99352
SUBJECT:
ASSESSMENT FOLLOW-UP LETTER FOR COLUMBIA GENERATING STATION
Dear Mr. Sawatzke:
As a result of its continuous review of plant performance, the NRC updated its assessment of Columbia Generating Station. The NRCs evaluation consisted of a review of performance indicators and inspection results. This letter informs you of the NRCs assessment and its plans for future inspections at your facility. This letter updates the annual assessment letter issued on March 1, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18057A398), and the follow-up assessment letter issued on November 16, 2017 (ADAMS Accession No. ML17320A265), based on the NRC staffs recent decision regarding an input related to the Unplanned Scrams with Complications performance indicator for Columbia Generating Station.
As described in our November 16, 2017, letter, the NRCs review of Columbia Generating Station had identified that the Unplanned Scrams with Complications performance indicator crossed the Green-to-White threshold due to two unplanned scrams with complications within a four-quarter period, specifically related to scrams that occurred in December 2016 and August 2017. As such, this performance indicator data was considered a White input into the Reactor Oversight Program (ROP) Action Matrix for the NRC to consider relative to the stations performance. Subsequently, on March 1, 2018, your staff submitted a performance indicator Frequently Asked Question (FAQ) during the monthly ROP Public Meeting with the NRC staff.
In FAQ No. 18-03, your staff requested a plant-specific exemption from the guidance related to the Unplanned Scrams with Complications performance indicator due to unique circumstances surrounding the plant scram on August 20, 2017. (A summary of the meeting, including your staffs FAQ 18-03 submittal, may be found in ADAMS Package Accession No. ML18072A036).
The request for a plant-specific exemption from counting the August 20, 2017, scram as a complicated scram was approved at a May 24, 2018, public meeting with the ROP Task Force (ADAMS Accession No. ML18144A977). However, the scram continues to count as an unplanned scram in the related performance indicator, Unplanned Scrams per 7000 Critical Hours. With the August 20, 2017, scram not counted as complicated, the Unplanned Scrams with Complications performance indicator was retroactively recalculated such that the indicator remained in the green band with only one input (the December 2016 scram) in the four quarter period of the 4th quarter 2016 through the 3rd quarter 2017; therefore, the Unplanned Scrams with Complications performance indicator is not considered a White input for the NRCs
B. Sawatzke 2 assessment of the stations performance during that period per the ROP Action Matrix. In our March 1, 2018, letter, the NRC indicated that we planned to conduct the Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 Inputs, however, since the performance indicator is no longer considered a White input, the NRC no longer plans to conduct that inspection.
As such, in consideration that (1) the Unplanned Scrams with Complications performance indicator is considered to have remained in the green band as a result of the NRCs approval of the exemption requested by your staff in FAQ 18-03, (2) all other performance indicators remain in the expected band (i.e., Green), and (3) there are no open greater-than-green findings for the station, the NRC has determined the performance at Columbia Generating Station returned to the Licensee Response Column of the ROP Action Matrix effective January 1, 2018. Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Mark Haire at 817-200-1148 with any questions you have regarding this letter.
Sincerely,
/RA/
Anton Vegel, Director Division of Reactor Projects Docket No. 50-397 License No. NPF-21
ML18151A379 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: RDA/rdr Yes No Publicly Available Sensitive NRC-002 OFFICE DRP:A/SPE DRP:A/BC DRP:D NAME RAlexander MHaire AVegel SIGNATURE /RA/ /RA/ /RA/
DATE 05/30/2018 05/30/2018 05/31/2018 May 31, 2018 Mr. Brad Sawatzke, Chief Executive Officer Energy Northwest MD 1023 P.O. Box 968 Richland, WA 99352
SUBJECT:
ASSESSMENT FOLLOW-UP LETTER FOR COLUMBIA GENERATING STATION
Dear Mr. Sawatzke:
As a result of its continuous review of plant performance, the NRC updated its assessment of Columbia Generating Station. The NRCs evaluation consisted of a review of performance indicators and inspection results. This letter informs you of the NRCs assessment and its plans for future inspections at your facility. This letter updates the annual assessment letter issued on March 1, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18057A398), and the follow-up assessment letter issued on November 16, 2017 (ADAMS Accession No. ML17320A265), based on the NRC staffs recent decision regarding an input related to the Unplanned Scrams with Complications performance indicator for Columbia Generating Station.
As described in our November 16, 2017, letter, the NRCs review of Columbia Generating Station had identified that the Unplanned Scrams with Complications performance indicator crossed the Green-to-White threshold due to two unplanned scrams with complications within a four-quarter period, specifically related to scrams that occurred in December 2016 and August 2017. As such, this performance indicator data was considered a White input into the Reactor Oversight Program (ROP) Action Matrix for the NRC to consider relative to the stations performance. Subsequently, on March 1, 2018, your staff submitted a performance indicator Frequently Asked Question (FAQ) during the monthly ROP Public Meeting with the NRC staff.
In FAQ No. 18-03, your staff requested a plant-specific exemption from the guidance related to the Unplanned Scrams with Complications performance indicator due to unique circumstances surrounding the plant scram on August 20, 2017. (A summary of the meeting, including your staffs FAQ 18-03 submittal, may be found in ADAMS Package Accession No. ML18072A036).
The request for a plant-specific exemption from counting the August 20, 2017, scram as a complicated scram was approved at a May 24, 2018, public meeting with the ROP Task Force (ADAMS Accession No. ML18144A977). However, the scram continues to count as an unplanned scram in the related performance indicator, Unplanned Scrams per 7000 Critical Hours. With the August 20, 2017, scram not counted as complicated, the Unplanned Scrams with Complications performance indicator was retroactively recalculated such that the indicator remained in the green band with only one input (the December 2016 scram) in the four quarter period of the 4th quarter 2016 through the 3rd quarter 2017; therefore, the Unplanned Scrams with Complications performance indicator is not considered a White input for the NRCs
B. Sawatzke 2 assessment of the stations performance during that period per the ROP Action Matrix. In our March 1, 2018, letter, the NRC indicated that we planned to conduct the Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 Inputs, however, since the performance indicator is no longer considered a White input, the NRC no longer plans to conduct that inspection.
As such, in consideration that (1) the Unplanned Scrams with Complications performance indicator is considered to have remained in the green band as a result of the NRCs approval of the exemption requested by your staff in FAQ 18-03, (2) all other performance indicators remain in the expected band (i.e., Green), and (3) there are no open greater-than-green findings for the station, the NRC has determined the performance at Columbia Generating Station returned to the Licensee Response Column of the ROP Action Matrix effective January 1, 2018. Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Mark Haire at 817-200-1148 with any questions you have regarding this letter.
Sincerely,
/RA/
Anton Vegel, Director Division of Reactor Projects Docket No. 50-397 License No. NPF-21
ML18151A379 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: RDA/rdr Yes No Publicly Available Sensitive NRC-002 OFFICE DRP:A/SPE DRP:A/BC DRP:D NAME RAlexander MHaire AVegel SIGNATURE /RA/ /RA/ /RA/
DATE 05/30/2018 05/30/2018 05/31/2018