ML17262A295: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 01/14/1991
| issue date = 01/14/1991
| title = Application for Amend to License DPR-18,changing Tech Specs to Limit Containment Internal Pressure to 1 Psig Vs 6 Psig Per Initial Condition Assumptions in Containment Integrity Analysis
| title = Application for Amend to License DPR-18,changing Tech Specs to Limit Containment Internal Pressure to 1 Psig Vs 6 Psig Per Initial Condition Assumptions in Containment Integrity Analysis
| author name = MECREDY R C
| author name = Mecredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name =  
| addressee name =  
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:UNITEDSTATESOFAMERICANUCLEARREGULATORY COMMISSION IntheMatterofRochester GasandElectricCorporation (R.E.GinnaNuclear,PowerPlant)DocketNo.50-244APPLICATION FORAMENDMENT TOOPERATING LICENSEPursuanttoSection50.90oftheregulations oftheU.S.NuclearRegulatory Commission (the"Commission"
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of Rochester Gas and Electric Corporation              Docket No. 50-244 (R.E. Ginna Nuclear, Power Plant)
),Rochester GasandElectricCorporation
APPLICATION FOR AMENDMENT TO OPERATING LICENSE Pursuant to Section 50.90 of the regulations of the U.S. Nuclear Regulatory Commission (the "Commission" ), Rochester Gas and Electric Corporation ("RG&E"), holder of Facility Operating License No. DPR-18, hereby requests    that the Technical Specifications set forth in Appendix A to that license be amended. This request for change in Technical Specifications is submitted to revise containment internal pressure limitations.
("RG&E"),
The proposed Technical Specification change is set forth in Attachment A to this Application. A safety evaluation is set forth in Attachment B. This. evaluation also demonstrates that the proposed change does not involve a significant change in the types or a significant increase in the amounts of effluents or any change in the authorized power level of the facility.           As demonstrated, in Attachment B, the proposed change does not involve a significant hazards consideration.
holderofFacilityOperating LicenseNo.DPR-18,herebyrequeststhattheTechnical Specifications setforthinAppendixAtothatlicensebeamended.ThisrequestforchangeinTechnical Specifications issubmitted torevisecontainment internalpressurelimitations.
,9i0ii8006S 9i01i4 05000244 PDR  ADOCK PDR P
TheproposedTechnical Specification changeissetforthinAttachment AtothisApplication.
 
Asafetyevaluation issetforthinAttachment B.This.evaluation alsodemonstrates thattheproposedchangedoesnotinvolveasignificant changeinthetypesorasignificant increaseintheamountsofeffluents oranychangeintheauthorized powerlevelofthefacility.
l  cl r
Asdemonstrated, inAttachment B,theproposedchangedoesnotinvolveasignificant hazardsconsideration.
I 7
,9i0ii8006S 9i01i4PDRADOCK05000244PPDR lclrI7 WHEREFORE, Applicant respectfully requeststhatAppendixAtoFacilityOperating LicenseNo.DPR-18beamended.intheformattachedheretoasAttachment A.Rochester GasandElectricCorporation ByRobertC.MecryVicePresident, GinnauclearProduction Subscribed andsworntbeforemeontllislc/ladayof~~gi/5'/t.YNNt.HAUCK~h~&geolNsw Yak,<">gi)gli"q,,MONROECOUNTY'eon~~
 
ItrIiIi1~)<llltglggg~
WHEREFORE,         Applicant respectfully requests that Appendix A to Facility Operating License No. DPR-18 be amended. in the form attached hereto as Attachment A.
;v'1~av~/>lg~~>>30~//fflI((l'Ll}}
Rochester   Gas and Electric Corporation By Robert C. Mecr y Vice President, Ginna    uclear Production Subscribed and sworn              t  before  me on    tllis lc/la day of            ~~g    i/5'/
t.YNN t. HAUCK
                          ~h~&geolNsw Yak g i) g  l i  "
q,, MONROE COUNTY
                    'eon~~
 
i I      Ii t    r    1 I
        ~)<llltglggg~
                            ;v
                            '1
~av   ~ /
    >lg~   ~>>   30
        ~// f fl I (( l'Ll}}

Latest revision as of 10:50, 4 February 2020

Application for Amend to License DPR-18,changing Tech Specs to Limit Containment Internal Pressure to 1 Psig Vs 6 Psig Per Initial Condition Assumptions in Containment Integrity Analysis
ML17262A295
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/14/1991
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17262A294 List:
References
NUDOCS 9101180068
Download: ML17262A295 (4)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of Rochester Gas and Electric Corporation Docket No. 50-244 (R.E. Ginna Nuclear, Power Plant)

APPLICATION FOR AMENDMENT TO OPERATING LICENSE Pursuant to Section 50.90 of the regulations of the U.S. Nuclear Regulatory Commission (the "Commission" ), Rochester Gas and Electric Corporation ("RG&E"), holder of Facility Operating License No. DPR-18, hereby requests that the Technical Specifications set forth in Appendix A to that license be amended. This request for change in Technical Specifications is submitted to revise containment internal pressure limitations.

The proposed Technical Specification change is set forth in Attachment A to this Application. A safety evaluation is set forth in Attachment B. This. evaluation also demonstrates that the proposed change does not involve a significant change in the types or a significant increase in the amounts of effluents or any change in the authorized power level of the facility. As demonstrated, in Attachment B, the proposed change does not involve a significant hazards consideration.

,9i0ii8006S 9i01i4 05000244 PDR ADOCK PDR P

l cl r

I 7

WHEREFORE, Applicant respectfully requests that Appendix A to Facility Operating License No. DPR-18 be amended. in the form attached hereto as Attachment A.

Rochester Gas and Electric Corporation By Robert C. Mecr y Vice President, Ginna uclear Production Subscribed and sworn t before me on tllis lc/la day of ~~g i/5'/

t.YNN t. HAUCK

~h~&geolNsw Yak g i) g l i "

q,, MONROE COUNTY

'eon~~

i I Ii t r 1 I

~)<llltglggg~

v

'1

~av ~ /

>lg~ ~>> 30

~// f fl I (( l'Ll