| issue date = 06/15/1995
| issue date = 06/15/1995
| title = Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.8.1.1.2.e.7 to Reduce Duration of Surveillance Testing for EDGs During Refueling Operations from 24 H to 8 H
| title = Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.8.1.1.2.e.7 to Reduce Duration of Surveillance Testing for EDGs During Refueling Operations from 24 H to 8 H
| author name = FITZPATRICK E
| author name = Fitzpatrick E
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name =  
| addressee name =  
Line 14: Line 14:
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 10
| page count = 10
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:RIORITY]ACCELERATED RIDSPROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9506200465 DOC.DATE:
{{#Wiki_filter:RIORITY ACCELERATED RIDS PROCESSING
95/06/15NOTARIZED:
                                                                      ]
YESDOCKETgFACIL:50-315 DonaldC.CookNuclearPowerPlant,Unit1,IndianaM0500031550-316DonaldC.CookNuclearPowerPlant,Unit2,IndianaM05000316AUTH.NAMEAUTHORAFFILIATION FITZPATRICK,E.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
IndianaMichiganPowerCo.(formerly Xndiana&MichiganEleF'ECIP.NAME RECIPIENT AFFILIATION DocumentControlBranch(Document ControlDesk)R
ACCESSION NBR:9506200465                 DOC.DATE: 95/06/15        NOTARIZED: YES      DOCKET g FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M                    05000315 50-316 Donald C. Cook Nuclear Power Plant,                   Unit 2, Indiana M 05000316 AUTH. NAME            AUTHOR AFFILIATION FITZPATRICK,E.       Indiana Michigan Power Co.             (formerly Xndiana & Michigan Ele RECIPIENT AFFILIATION                                                  F'ECIP.NAME Document Control Branch (Document Control Desk)                       R


==SUBJECT:==
==SUBJECT:==
Application foramendstolicensesDPR-58&DPR-74,revising TS4.8.1.1.2.e.7 toreducedurationofsurveillance testingforEDGsduringrefueling operations from24hto8h.DISTR1BUTION CODE:AOOIDCOPIESRECEIVED:LTR IENCLgSIZE:TITLE:ORSubmittal:
Application for amends to licenses DPR-58 & DPR-74,revising TS 4.8.1.1.2.e.7 to reduce duration of surveillance testing for EDGs during refueling operations from 24 h to 8 h.
GeneralDistribution NOTES0INTERNALRECIPIENT IDCODE/NAME PD3-1LAHICKMAN,J 1EECENTER1CBNRR/DSSA/SRXB OGC/HDS2COPIESLTTRENCL111111111110RECIPIENT IDCODE/NAME PD3-1PDNRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT COPIESLTTRENCL11111111EXTERNAL:
DISTR1BUTION CODE: AOOID TITLE:  OR COPIES RECEIVED:LTR Submittal: General Distribution I ENCL g  SIZE:             0 NOTES RECIPIENT                COPIES              RECIPIENT        COPIES ID  CODE/NAME              LTTR ENCL          ID  CODE/NAME     LTTR ENCL PD3-1 LA                        1      1      PD3-1 PD              1    1 HICKMAN,J                       1      1 INTERNAL    1E E CENTER        1          1      1      NRR/DE/EMCB           1    1 CB              1      1      NRR/DSSA/SPLB         1    1 NRR/DSSA/SRXB                  1      1      NUDOCS-ABSTRACT       1    1 OGC/HDS2                        1      0 EXTERNAL: NOAC                            1      1      NRC PDR              1    1 D
NOAC11NRCPDR11DCUNNOTETOALL"RIDS"RECIPIENTS:
C U
PLEASEHELPUSTOREDUCEKVASTE!CONTACTTHEDOCUiIENT CONTROLDESK,ROOMPI-37(EXT.504-2083)TOELIS!!NATE YOUR4AMLFROMDISTRIBUTION LISTSI'ORDOCUMENTS YOUDON"I'EED!TOTALNUMBEROFCOPIESREQUIRED:
N NOTE TO ALL"RIDS" RECIPIENTS:
LTTR12ENCL11
PLEASE HELP US TO REDUCE KVASTE! CONTACT THE DOCUiIENT CONTROL DESK, ROOM PI-37 (EXT. 504-2083 ) TO ELIS!!NATE YOUR 4AML FROM DISTRIBUTION LISTS I'OR DOCUMENTS YOU DON "I'EED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                    12  ENCL    11


IndianaMicIdganPowerCompany~ŽP.O.Box16631Columbus, OH43216June15,1995AEP:NRC:0896V DocketNos.:50-31550-316U.S.NuclearRegulatory Commission ATTN:DocumentControlDeskWashington, D.C.20555Gentlemen:
Indiana MicIdgan Power Company    ~'
DonaldC.CookNuclearPlantUnits1and2TECHNICAL SPECIFICATION CHANGESTOMODIFYSURVEILLANCE TESTINGOFTHEEMERGENCY DIESELGENERATORS DURINGREFUELING Thisletteranditsattachments constitute anapplication foramendment tothetechnical specifications (T/Ss)forDonaldC.CookNuclearPlantUnits1and2.Specifically, weareproposing toimplement changestomodifysurveillance testingfortheemergency dieselgenerators (EDGs)duringrefueling operations.
P.O. Box 16631 Columbus, OH 43216 June 15, 1995                                            AEP:NRC:0896V Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
Attachment 1providesadetaileddescription oftheproposedchanges,thejustification forthechanges,andourdetermination ofnosignificant hazardsconsideration performed pursuantto10CFR50.92.Attachment 2containstheexistingT/Spagesmarkedtoreflecttheproposedchanges.Attachment 3containstheproposedT/Spages.Attachment 4providesatechnical evaluation report.Inaddition, thisisacostbeneficial licensing action(CBLA)submittal andrepresents ahighpriorityitemsinceitwill,onceapproved, resultinasignificant reduction inoperating cost.Thelifetimecostsavingassociated withthisCBLAisapproximately
Donald C. Cook Nuclear Plant Units    1 and 2 TECHNICAL SPECIFICATION CHANGES TO MODIFY SURVEILLANCE TESTING OF THE EMERGENCY DIESEL GENERATORS DURING REFUELING This    letter  and  its attachments constitute an application for amendment      to    the    technical specifications       (T/Ss)   for Donald C. Cook Nuclear Plant Units 1 and 2. Specifically, we are proposing to implement changes to modify surveillance testing for the emergency diesel generators              (EDGs)   during refueling operations.
$600,000,asdetailedinAttachment 5.Webelievethattheproposedchangeswillnotresultin(1)asignificant changeinthetypesofanyeffluentthatmaybereleasedoffsite,or(2)asignificant increaseinindividual orcumulative occupational radiation exposure.
Attachment 1 provides a detailed description of the proposed changes, the justification for the changes, and our determination of no significant hazards consideration performed pursuant to 10 CFR 50.92. Attachment 2 contains the existing T/S pages marked to reflect the proposed changes.           Attachment 3 contains the proposed T/S pages.       Attachment 4 provides a technical evaluation report.
l9506200465 950b15PDRADOCK05000315pPDR Il'rp-<<
In addition, this is a cost beneficial licensing action (CBLA) submittal and represents a high priority item since        it will, once approved, result in a significant reduction in operating cost.
U.S.NuclearRegulatory Commission Page2AEP:NRC:0896V TheseproposedchangeshavebeenreviewedbythePlantNuclearSafetyReviewCommittee andwillbereviewedbytheNuclearSafetyandDesignReviewCommittee atitsnextregularly scheduled meeting.Incompliance withtherequirements of10CFR50'1(b)(1),
The lifetime cost          saving associated with this CBLA is approximately $ 600,000, as detailed in Attachment 5.
copiesofthisletteranditsattachments havebeentransmitted totheMichiganPublicServiceCommission andtotheMichiganDepartment ofPublicHealth.Thisletterissubmitted pursuantto10CFR50.30(b)and,assuch,anoathstatement isattached.
We  believe that the proposed changes will not result in (1) a significant change in the types of any effluent that may be released offsite, or (2) a significant increase in individual or cumulative occupational radiation exposure.
Sincerely, VicePresident SWORNTOANDSUBSCRIBED BEFOREMETHIS~begDAYOF~..1995NoaryPubliccadAttachments T
9506200465 950b15 PDR  ADOCK 05000315 l p                    PDR
U.S.NuclearRegulatory Commission Page3AEP:NRC:0896V CC:A.A.BlindG.CharnoffJ.B.MartinNFEMSectionChiefNRCResidentInspector
 
-BridgmanJ.R.Padgett ATTACHMENT 1TOAEP:NRC:0896V DESCRIPTION ANDJUSTIFICATION OFCHANGES10CFR50.92ANALYSISFORCHANGESTOTHEDONALDC.COOKNUCLEARPLANTUNITS1AND2TECHNICAL SPECIFICATIONS Attachment 1toAEP:NRC:0896V Page1A.DESCRIPTION OFCHANGESThechangesproposedbythisletterinvolvetheemergency dieselgenerator (EDG)18month24hoursurveillance test.Thechangesaredescribed individually asfollows:Emergency DieselGenerator Surveillance Requirements T/S:4.8.1.1.2.e.7 (Units1and2)Page:3/48-6(Units1and2)1)Reducethedurationofthesurveillance testfrom24hoursto8hours.2)Modifythefootnoteassociated withtheasteriskattheendof4.8.1.1.2.e.7 toreflectthereduction ofthesurveillance testfrom24hoursto8hours.B.JUSTIFICATION FORCHANGESTheproposedchangesinvolvethe18month24hourEDGsurveillance whichisimplemented byplantprocedure.
Il rp -<<
Theproposedchangesaredesignedtoreduceoperating costs,increaseoutagescheduling flexibility, reduceshutdownrisk,andincreasediesellife.Reducingthesurveillance timefrom24to8hourswouldsignificantly improveoutageperformance withoutreducingEDGreliability.
 
Basedonexamination ofCookNuclearPlanttestdata.from'1974 to1994,itisclearthatextensive runtimesbeyond.the..''pointwheretheEDG'i'ssta'rted, loa'dedto:3500KW, andachievesane'quilibrium
U.S. Nuclear Regulatory Commission                   AEP:NRC:0896V Page 2 These proposed changes have been reviewed by the Plant Nuclear Safety Review Committee and will be reviewed by the Nuclear Safety and Design Review Committee at its next regularly scheduled meeting.
.condition provide'ittleinsightregarding EDG.reliability.
In compliance with the requirements of 10 CFR 50 '1(b)(1), copies of this letter and its attachments have been transmitted to the Michigan Public Service Commission and to the Michigan Department of Public Health.
Theenginesteady-state characteristics areachievedinapproximately'2 ho'ursandthedominantfailuremodesoftheEDGareexpectedtooccur.wi'thinthisperiod.Xnaddition, r'eviewofthe'4.hour,te'st "data'rom1974'to1994does'not.;indicate~he,discovery
This  letter is  submitted pursuant to  10 CFR  50.30(b) and, as such, an oath statement    is attached.
.ofanyabnoraral conditions thatwould'have'je'opardized'the'
Sincerely, Vice President SWORN TO AND SUBSCRIBED BEFORE ME THIS  ~beg  DAY OF    ~. . 1995 No ary Public cad Attachments
'ieselfromcompleting itsmissionduringanactualemergency demand.Therefore, asdescribed inAttachment 4,reduction ofthetestdurationfroma24toan8hourperiodwillmaintainanequivalent levelofconfidence inEDGreliability andmayactuallyimproveoverallEDGreliability.
 
Attachment 1toAEP:NRC:0896V Page2C.10CFR502CRITERIAPer10CFR50.92,aproposedchangedoesnotinvolveasignificant hazardsconsideration ifthechangedoesnot:involveasignificant increaseintheprobability orconsequences ofanaccidentpreviously evaluated, createthepossibility ofanewordifferent kindofaccidentfromanyaccidentpreviously evaluated, orinvolveasignificant reduction inamarginofsafety.Criterion 1ThesafetyfunctionoftheEDGsistosupplyacelectrical powertoplantsafetysystemswheneverthepreferred acpowersupplyisunavailable.
T U.S. Nuclear Regulatory Commission       AEP:NRC:0896V Page 3 CC:   A. A. Blind G. Charnoff J. B. Martin NFEM Section Chief NRC Resident Inspector - Bridgman J. R. Padgett
Throughsurveillance requirements, theabilityoftheEDGstomeettheirloadandtimingrequirements istestedandthequalityofthefuelandtheavailability ofthefuelsupplyaremonitored.
 
Reduction ofthe24hourrunto8hourswillnotreducethesurveillance factorsunderconsideration andwillsufficiently exercisetheEDGanditssupportsystemstoidentifypotential conditions thatcouldleadtoperformance degradation (SeeAttachment 4).Basedontheseconsiderations, itisconcluded thattheproposedchangesdonotinvolveasignificant increase'n theprobability orconsequences ofanaccidentpreviously evaluated.
ATTACHMENT 1 TO AEP:NRC:0896V DESCRIPTION AND JUSTIFICATION OF CHANGES 10 CFR 50.92 ANALYSIS FOR CHANGES TO THE DONALD C. COOK NUCLEAR PLANT UNITS 1 AND 2 TECHNICAL SPECIFICATIONS to  AEP:NRC:0896V                                         Page 1 A.       DESCRIPTION OF CHANGES The changes      proposed by this letter involve the emergency diesel generator (EDG) 18 month 24 hour surveillance test. The changes are described individually as follows:
0Criterion 2Theproposedchangesdonotinvolvephysicalchangestotheplantorchanges.in'lantoperating
Emergency Diesel Generator        Surveillance Requirements T/S:   4.8.1.1.2.e.7 (Units    1 and 2)
.configuration.
Page:   3/4 8-6 (Units  1 and  2)
Thechangesonlyinvolvethereduction of'18moth24:hourEDG.survei3.lanpe testdur'ation, Thus,',it.
: 1)     Reduce the duration    of the surveillance test from  24 hours to 8 hours.
is'"~'.concluded thatthe.proposedchanges.donot'create'he possibility of".anewordifferent kindofaccidentfromanyaccidentpreviously evaluated.
: 2)     Modify the footnote associated with the asterisk at the end of 4.8.1.1.2.e.7 to reflect the reduction of the surveillance test from 24 hours to 8 hours.
Criterion 3Althoughthedurationofthe18month24hourEDGsurveillance testwouldbereduce'd, theEDGcomponents willcontinuetobesufficiently exercised suchthattheabilitytodetectincipient anddegradedconditions willbemaintained (SeeAttachment 4,Figure2).Theproposedchangeshavebeendetermined tobecompatible withourplantoperating experience andcommensurate withpastsurveillance testresults.Basedontheseconsiderations, itisconcluded thattheproposedchangesdonotinvolveasignificant reduction inamarginofsafety.}}
B.       JUSTIFICATION       FOR CHANGES The proposed changes involve the 18 month 24 hour EDG surveillance which is implemented by plant procedure. The proposed changes are designed to reduce operating costs, increase outage scheduling flexibility, reduce shutdown risk, and increase diesel life.
Reducing the surveillance time from 24 to 8 hours would significantly improve outage performance without reducing EDG reliability. Based on examination of Cook Nuclear Plant test data
        .from'1974 to 1994,       it is clear that extensive run times beyond .the point where the EDG 'i's sta'rted, loa'ded to:3500KW, and achieves an e'quilibrium reliability.
                        . condition The engine provide 'ittle    insight regarding EDG.
steady-state characteristics are achieved in approximately'2 ho'urs and the dominant failure modes of the EDG are expected to occur. wi'thin this period. Xn addition, r'eview of the'4 .hour,te'st data'rom 1974 'to 1994 does 'not.; indicate ~he, discovery .of any abnoraral conditions that would'have'je'opardized'the' from completing its mission during an actual emergency          'iesel demand.     Therefore, as described in Attachment 4, reduction of the test duration from a 24 to an 8 hour period will maintain an equivalent level of confidence in EDG reliability and may actually improve    overall  EDG  reliability.
 
Attachment     1  to  AEP:NRC:0896V                                                 Page 2 C.       10 CFR 50      2  CRITERIA Per 10 CFR 50.92, a proposed change does not involve a        significant hazards consideration      if the change does not:
involve a      significant increase in the probability or consequences    of an accident previously evaluated, create the possibility of a new or different kind of accident from any accident previously evaluated, or involve  a significant reduction in  a margin  of safety.
Criterion     1 The  safety function of the EDGs is to supply ac electrical power to plant safety systems whenever the preferred ac power supply is unavailable.
Through surveillance requirements, the ability of the EDGs to meet their load and timing requirements is tested and the quality of the fuel and the availability of        the  fuel supply are monitored. Reduction of the 24 hour run    to 8 hours will not reduce the surveillance factors under consideration and will sufficiently exercise the EDG and its support systems to identify potential conditions that could lead to performance degradation (See Attachment 4). Based on these considerations, concluded that the proposed changes do not involve a significant it is increase'n the probability or consequences of an accident previously evaluated.
0 Criterion    2 The proposed        changes  do not involve physical changes to the plant or changes. in'lant      operating .configuration. The changes only involve the reduction of'18 moth 24:hour EDG.survei3.lanpe test dur'ation, Thus,',it. is'"
~ '.
concluded that the. proposed changes. do not'create'he possibility of".a new or different kind of accident from any accident previously evaluated.
Criterion     3 Although the duration of the 18 month 24 hour EDG surveillance test would be reduce'd, the EDG components will continue to be sufficiently exercised such that the ability to detect incipient and degraded conditions will be maintained (See Attachment 4, Figure 2). The proposed changes have been determined to be compatible with our plant operating experience and commensurate with past surveillance test results.                 Based on these considerations,       it  is concluded that the proposed changes do not involve a significant reduction in a margin of safety.}}

Latest revision as of 01:20, 4 February 2020

Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.8.1.1.2.e.7 to Reduce Duration of Surveillance Testing for EDGs During Refueling Operations from 24 H to 8 H
ML17332A799
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/15/1995
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17332A800 List:
References
AEP:NRC:0896V, AEP:NRC:896V, NUDOCS 9506200465
Download: ML17332A799 (10)


Text

RIORITY ACCELERATED RIDS PROCESSING

]

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9506200465 DOC.DATE: 95/06/15 NOTARIZED: YES DOCKET g FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH. NAME AUTHOR AFFILIATION FITZPATRICK,E. Indiana Michigan Power Co. (formerly Xndiana & Michigan Ele RECIPIENT AFFILIATION F'ECIP.NAME Document Control Branch (Document Control Desk) R

SUBJECT:

Application for amends to licenses DPR-58 & DPR-74,revising TS 4.8.1.1.2.e.7 to reduce duration of surveillance testing for EDGs during refueling operations from 24 h to 8 h.

DISTR1BUTION CODE: AOOID TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution I ENCL g SIZE: 0 NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 LA 1 1 PD3-1 PD 1 1 HICKMAN,J 1 1 INTERNAL 1E E CENTER 1 1 1 NRR/DE/EMCB 1 1 CB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS2 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D

C U

N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE KVASTE! CONTACT THE DOCUiIENT CONTROL DESK, ROOM PI-37 (EXT. 504-2083 ) TO ELIS!!NATE YOUR 4AML FROM DISTRIBUTION LISTS I'OR DOCUMENTS YOU DON "I'EED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL 11

Indiana MicIdgan Power Company ~'

P.O. Box 16631 Columbus, OH 43216 June 15, 1995 AEP:NRC:0896V Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

Donald C. Cook Nuclear Plant Units 1 and 2 TECHNICAL SPECIFICATION CHANGES TO MODIFY SURVEILLANCE TESTING OF THE EMERGENCY DIESEL GENERATORS DURING REFUELING This letter and its attachments constitute an application for amendment to the technical specifications (T/Ss) for Donald C. Cook Nuclear Plant Units 1 and 2. Specifically, we are proposing to implement changes to modify surveillance testing for the emergency diesel generators (EDGs) during refueling operations.

Attachment 1 provides a detailed description of the proposed changes, the justification for the changes, and our determination of no significant hazards consideration performed pursuant to 10 CFR 50.92. Attachment 2 contains the existing T/S pages marked to reflect the proposed changes. Attachment 3 contains the proposed T/S pages. Attachment 4 provides a technical evaluation report.

In addition, this is a cost beneficial licensing action (CBLA) submittal and represents a high priority item since it will, once approved, result in a significant reduction in operating cost.

The lifetime cost saving associated with this CBLA is approximately $ 600,000, as detailed in Attachment 5.

We believe that the proposed changes will not result in (1) a significant change in the types of any effluent that may be released offsite, or (2) a significant increase in individual or cumulative occupational radiation exposure.

9506200465 950b15 PDR ADOCK 05000315 l p PDR

Il rp -<<

U.S. Nuclear Regulatory Commission AEP:NRC:0896V Page 2 These proposed changes have been reviewed by the Plant Nuclear Safety Review Committee and will be reviewed by the Nuclear Safety and Design Review Committee at its next regularly scheduled meeting.

In compliance with the requirements of 10 CFR 50 '1(b)(1), copies of this letter and its attachments have been transmitted to the Michigan Public Service Commission and to the Michigan Department of Public Health.

This letter is submitted pursuant to 10 CFR 50.30(b) and, as such, an oath statement is attached.

Sincerely, Vice President SWORN TO AND SUBSCRIBED BEFORE ME THIS ~beg DAY OF ~. . 1995 No ary Public cad Attachments

T U.S. Nuclear Regulatory Commission AEP:NRC:0896V Page 3 CC: A. A. Blind G. Charnoff J. B. Martin NFEM Section Chief NRC Resident Inspector - Bridgman J. R. Padgett

ATTACHMENT 1 TO AEP:NRC:0896V DESCRIPTION AND JUSTIFICATION OF CHANGES 10 CFR 50.92 ANALYSIS FOR CHANGES TO THE DONALD C. COOK NUCLEAR PLANT UNITS 1 AND 2 TECHNICAL SPECIFICATIONS to AEP:NRC:0896V Page 1 A. DESCRIPTION OF CHANGES The changes proposed by this letter involve the emergency diesel generator (EDG) 18 month 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> surveillance test. The changes are described individually as follows:

Emergency Diesel Generator Surveillance Requirements T/S: 4.8.1.1.2.e.7 (Units 1 and 2)

Page: 3/4 8-6 (Units 1 and 2)

1) Reduce the duration of the surveillance test from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
2) Modify the footnote associated with the asterisk at the end of 4.8.1.1.2.e.7 to reflect the reduction of the surveillance test from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

B. JUSTIFICATION FOR CHANGES The proposed changes involve the 18 month 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> EDG surveillance which is implemented by plant procedure. The proposed changes are designed to reduce operating costs, increase outage scheduling flexibility, reduce shutdown risk, and increase diesel life.

Reducing the surveillance time from 24 to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> would significantly improve outage performance without reducing EDG reliability. Based on examination of Cook Nuclear Plant test data

.from'1974 to 1994, it is clear that extensive run times beyond .the point where the EDG 'i's sta'rted, loa'ded to:3500KW, and achieves an e'quilibrium reliability.

. condition The engine provide 'ittle insight regarding EDG.

steady-state characteristics are achieved in approximately'2 ho'urs and the dominant failure modes of the EDG are expected to occur. wi'thin this period. Xn addition, r'eview of the'4 .hour,te'st data'rom 1974 'to 1994 does 'not.; indicate ~he, discovery .of any abnoraral conditions that would'have'je'opardized'the' from completing its mission during an actual emergency 'iesel demand. Therefore, as described in Attachment 4, reduction of the test duration from a 24 to an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period will maintain an equivalent level of confidence in EDG reliability and may actually improve overall EDG reliability.

Attachment 1 to AEP:NRC:0896V Page 2 C. 10 CFR 50 2 CRITERIA Per 10 CFR 50.92, a proposed change does not involve a significant hazards consideration if the change does not:

involve a significant increase in the probability or consequences of an accident previously evaluated, create the possibility of a new or different kind of accident from any accident previously evaluated, or involve a significant reduction in a margin of safety.

Criterion 1 The safety function of the EDGs is to supply ac electrical power to plant safety systems whenever the preferred ac power supply is unavailable.

Through surveillance requirements, the ability of the EDGs to meet their load and timing requirements is tested and the quality of the fuel and the availability of the fuel supply are monitored. Reduction of the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> run to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> will not reduce the surveillance factors under consideration and will sufficiently exercise the EDG and its support systems to identify potential conditions that could lead to performance degradation (See Attachment 4). Based on these considerations, concluded that the proposed changes do not involve a significant it is increase'n the probability or consequences of an accident previously evaluated.

0 Criterion 2 The proposed changes do not involve physical changes to the plant or changes. in'lant operating .configuration. The changes only involve the reduction of'18 moth 24:hour EDG.survei3.lanpe test dur'ation, Thus,',it. is'"

~ '.

concluded that the. proposed changes. do not'create'he possibility of".a new or different kind of accident from any accident previously evaluated.

Criterion 3 Although the duration of the 18 month 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> EDG surveillance test would be reduce'd, the EDG components will continue to be sufficiently exercised such that the ability to detect incipient and degraded conditions will be maintained (See Attachment 4, Figure 2). The proposed changes have been determined to be compatible with our plant operating experience and commensurate with past surveillance test results. Based on these considerations, it is concluded that the proposed changes do not involve a significant reduction in a margin of safety.