| issue date = 02/21/1995
| issue date = 02/21/1995
| title = Forwards Rev 0 to Second ISI Interval Second Insp Period Third Outage 1994 Summary Rept Submittal.
| title = Forwards Rev 0 to Second ISI Interval Second Insp Period Third Outage 1994 Summary Rept Submittal.
| author name = SAGER D A
| author name = Sager D
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:PR.IVOR.lEY'ACCELERATEDRIDSPROCESSING)REGULATORYINFORMATIONDISTRIBUTXONSYSTEM(RIDS)DOCKETI05000335NOTES:ACCESSIONNBR:9502270257DOC.DATE:95/02/21NOTARIZED:NOFACIL:50-335St:LuciePlant,Unit1,FloridaPower&LightCo.AUTH.NAMEAUTHORAFFILIATIONSAGER,D.A.FloridaPower6LightCo.RECIP.NAMERECIPIENTAFFILIATIONDocumentControlBranch(DocumentControlDesk)Zpjg
{{#Wiki_filter:PR.IVOR.l                EY' ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)
ACCESSION NBR:9502270257                    DOC.DATE:     95/02/21      NOTARIZED: NO          DOCKET  I FACIL:50-335 St: Lucie Plant, Unit 1, Florida Power                          & Light  Co. 05000335 AUTH. NAME                AUTHOR AFFILIATION SAGER,D.A.               Florida        Power 6 Light Co.
RECIP.NAME                RECIPIENT AFFILIATION Document Control Branch (Document                Control Desk) Zpjg Forwards Rev              to "Second ISI Interval Second Insp Period l


==SUBJECT:==
==SUBJECT:==
ForwardsRev0to"SecondISIIntervalSecondInspPeriodThirdOutage1994SummaryReptSubmittal."DISTRIBUTIONCODE:A047DCOPIESRECEIVED:LTRlENCLLSIZE:P50TXTLE:ORSubmittal:Xnservice/Testing/RelieffromASMMCode-GL-89-04RECIPIENTIDCODE/NAMEPD2-2LANORRIS,JINTERNAL:CRXLECEXER~OlNRR7DE/EMEBOGC/HDS3EXTERNAL:LITCOBROWN,BNOACCOPIESLTTRENCL1111661111101111RECIPIENTIDCODE/NAMEPD2-2PDAEOD/SPD/RABNRR/DE/EMCBNUDOCS-ABSTRACTRES/DSIR/EIBLITCORANSOMEICNRCPDRCOPIESLTTRENCL111111111111.11YOTETOALL"RIDS"RECIPIEYTS:PLEASEHELPUSTOREDUCE~VASTE!COYTACT'I'HEDOCL'MIENCONTROLDESK,ROON!PI-37IEXT.504-70S3)TOELIXII%ATEYOURXAIIEPRO%IDISTRIBU'I'IONLISTSI'ORDOCI.'4!EX'I'SYOL'OY,"I'LI;D!TOTALNUMBEROFCOPIESREQUIRED:LTTR20ENCL19 FloridaPower5LightCompany,P.O.Box128,FortPierce,FL34954-0128February21,1995L-95-4710CFR50.55a10CFR50.36U.S.NuclearRegulatoryCommissionAttn:DocumentControlDeskWashington,DC20555Re:St.LucieUnit1DocketNo.50-3351994FallRefuelingOutageIn-ServiceInsectionSummarReortInaccordancewithArticleIWA-6000ofASMESectionXI,enclosedistheIn-ServiceInspection(ISI)SummaryReportforSt.LucieUnit11994Fallrefuelingoutage.IWA-6230requiresthereporttobesubmittedtotheauthorityhavingjurisdictionwithin90daysofcompletingthein-serviceinspectionconductedduringtheoutage.IncludedwiththeNIS-1Reportareseveralattachmentsthatincludethe1994EddyCurrentSummaryReport,1994OutageSnubberFunctionalTestingSummaryReport,andtheNIS-2Owners'eportforRepairsandReplacementsperformedsincetheprecedingsummaryreportsubmittal.TheEddyCurrentSummaryReportprovidestheinformationrequiredbySections4.4.5.5.band6.9.2oftheSt.LucieUnit1TechnicalSpecifications(TS).TheTSrequiresthesubmittaloftheSteamGeneratorTubeIn-ServiceInspectionSpecialReportwithin12monthsofcompletingthetubeinspection.Shouldtherebeanyquestions,pleasecontactus.Verytrulyyours,D.A.VicerSt.LersidentePlantDAS/grmEnclosurecc:StewartD.Ebneter,RegionalAdministrator,RegionII,USNRCSeniorResidentInspector,USNRC,St.LuciePlant9502270257950221PDRADOCK050003359PDRanFPLGroupcompany}}
0 Third Outage          1994 Summary Rept          Submittal."
DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR TXTLE: OR Submittal: Xnservice/Testing/Relief from ASMMCode  GL-89-04 ENCL  L  SIZE:    P  50 NOTES:
RECIPIENT                    COPIES                RECIPIENT          COPIES ID  CODE/NAME                LTTR ENCL          ID  CODE/NAME        LTTR ENCL PD2-2 LA                          1      1        PD2-2 PD                1    1 NORRIS,J                          1      1 INTERNAL:   CR                                6      6        AEOD/SPD/RAB            1    1 XLE CE XER~Ol                    1      1        NRR/DE/EMCB            1    1 NRR7DE/EME B                      1      1        NUDOCS-ABSTRACT        1    1 OGC/HDS3                          1      0        RES/DSIR/EIB            1    1 EXTERNAL: LITCO BROWN,B                        1      1        LITCO RANSOME I C      1    1 NOAC                              1      1        NRC PDR                .1    1 YOTE TO ALL"RIDS" RECIPIEYTS:
PLEASE HELP US TO REDUCE ~VASTE! COYTACT'I'HE DOCL'MIEN CONTROL DESK, ROON! PI -37 I EXT. 504-70S3 ) TO E LIXII%ATE YOUR XAIIE PRO%I DISTRIBU'I'ION LISTS I'OR DOCI.'4!EX'I'S YOL'OY,"I'LI;D!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                        20  ENCL    19
 
Florida Power 5 Light Company, P.O. Box 128, Fort Pierce, FL 34954-0128 February 21, 1995                          L-95-47 10 CFR 50.55a 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:     St. Lucie Unit    1 Docket No. 50-335 1994 Fall Refueling Outage In-Service Ins ection Summar        Re  ort In accordance with Article IWA-6000 of ASME Section XI, enclosed is the In-Service Inspection (ISI) Summary Report for St.Lucie Unit 1 1994 Fall refueling outage.         IWA-6230 requires the report to be submitted to the authority having jurisdiction within 90 days of completing the in-service inspection conducted during the outage.
Included with the NIS-1 Report are several attachments that include the 1994 Eddy Current Summary Report, 1994 Outage Snubber Functional Testing Summary Report, and the NIS-2 Owners'eport for Repairs and Replacements performed since the preceding summary report submittal.
The Eddy Current Summary Report provides the information required by Sections 4.4.5.5.b and 6.9.2 of the St. Lucie Unit 1 Technical Specifications (TS). The TS requires the submittal of the Steam Generator Tube In-Service Inspection Special Report within 12 months of completing the tube inspection.
Should there be any questions, please contact us.
Very    truly yours, D. A.           er Vice      r  sident St. L          e Plant DAS/grm Enclosure cc:     Stewart D. Ebneter, Regional Administrator, Region                            II,     USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 9502270257 950221 PDR      ADOCK 05000335 9                  PDR an FPL Group company}}

Latest revision as of 09:39, 29 October 2019

Forwards Rev 0 to Second ISI Interval Second Insp Period Third Outage 1994 Summary Rept Submittal.
ML17309A773
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/21/1995
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17228B027 List:
References
L-95-47, NUDOCS 9502270257
Download: ML17309A773 (2)


Text

PR.IVOR.l EY' ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)

ACCESSION NBR:9502270257 DOC.DATE: 95/02/21 NOTARIZED: NO DOCKET I FACIL:50-335 St: Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 AUTH. NAME AUTHOR AFFILIATION SAGER,D.A. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) Zpjg Forwards Rev to "Second ISI Interval Second Insp Period l

SUBJECT:

0 Third Outage 1994 Summary Rept Submittal."

DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR TXTLE: OR Submittal: Xnservice/Testing/Relief from ASMMCode GL-89-04 ENCL L SIZE: P 50 NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 1 PD2-2 PD 1 1 NORRIS,J 1 1 INTERNAL: CR 6 6 AEOD/SPD/RAB 1 1 XLE CE XER~Ol 1 1 NRR/DE/EMCB 1 1 NRR7DE/EME B 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS3 1 0 RES/DSIR/EIB 1 1 EXTERNAL: LITCO BROWN,B 1 1 LITCO RANSOME I C 1 1 NOAC 1 1 NRC PDR .1 1 YOTE TO ALL"RIDS" RECIPIEYTS:

PLEASE HELP US TO REDUCE ~VASTE! COYTACT'I'HE DOCL'MIEN CONTROL DESK, ROON! PI -37 I EXT. 504-70S3 ) TO E LIXII%ATE YOUR XAIIE PRO%I DISTRIBU'I'ION LISTS I'OR DOCI.'4!EX'I'S YOL'OY,"I'LI;D!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 19

Florida Power 5 Light Company, P.O. Box 128, Fort Pierce, FL 34954-0128 February 21, 1995 L-95-47 10 CFR 50.55a 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 1 Docket No. 50-335 1994 Fall Refueling Outage In-Service Ins ection Summar Re ort In accordance with Article IWA-6000 of ASME Section XI, enclosed is the In-Service Inspection (ISI) Summary Report for St.Lucie Unit 1 1994 Fall refueling outage. IWA-6230 requires the report to be submitted to the authority having jurisdiction within 90 days of completing the in-service inspection conducted during the outage.

Included with the NIS-1 Report are several attachments that include the 1994 Eddy Current Summary Report, 1994 Outage Snubber Functional Testing Summary Report, and the NIS-2 Owners'eport for Repairs and Replacements performed since the preceding summary report submittal.

The Eddy Current Summary Report provides the information required by Sections 4.4.5.5.b and 6.9.2 of the St. Lucie Unit 1 Technical Specifications (TS). The TS requires the submittal of the Steam Generator Tube In-Service Inspection Special Report within 12 months of completing the tube inspection.

Should there be any questions, please contact us.

Very truly yours, D. A. er Vice r sident St. L e Plant DAS/grm Enclosure cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 9502270257 950221 PDR ADOCK 05000335 9 PDR an FPL Group company