ML15077A409: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15077A409
| number = ML15077A409
| issue date = 03/25/2015
| issue date = 03/25/2015
| title = Edwin I. Hatch Nuclear Plant, Units 1 and 2 - Acceptance Review License Amendment Request (TAC Nos. MF5579 and MF5580)
| title = Acceptance Review License Amendment Request
| author name = Martin R E
| author name = Martin R
| author affiliation = NRC/NRR/DORL/LPLII-1
| author affiliation = NRC/NRR/DORL/LPLII-1
| addressee name = Pierce C R
| addressee name = Pierce C
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000321, 05000366
| docket = 05000321, 05000366
| license number = DPR-057, NPF-005
| license number = DPR-057, NPF-005
| contact person = Martin R E
| contact person = Martin R
| case reference number = TAC MF5579, TAC MF5580
| case reference number = TAC MF5579, TAC MF5580
| document type = Acceptance Review Letter
| document type = Acceptance Review Letter
| page count = 3
| page count = 3
| project = TAC:MF5580, TAC:MF5579
| project = TAC:MF5579, TAC:MF5580
| stage = Acceptance Review
| stage = Acceptance Review
}}
}}


=Text=
=Text=
{{#Wiki_filter:Mr. C. R. Pierce Regulatory Affairs Director UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 25, 2015 Southern Nuclear Operating Company, Inc. P. 0. Box 1295/Bin -038 Birmingham, AL 35201-1295  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 25, 2015 Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Company, Inc.
P. 0. Box 1295/Bin - 038 Birmingham, AL 35201-1295


==SUBJECT:==
==SUBJECT:==
EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 -ACCEPTANCE REVIEW LICENSE AMENDMENT REQUEST (TAC NOS. MF5579AND MF5580)  
EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 - ACCEPTANCE REVIEW LICENSE AMENDMENT REQUEST (TAC NOS. MF5579AND MF5580)


==Dear Mr. Pierce:==
==Dear Mr. Pierce:==
By letter dated January 13, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15014A411), the Southern Nuclear Operating Company, Inc. (SNC), submitted a license amendment request (LAR) for the Edwin I. Hatch Nuclear Plant, Unit 1 and Unit 2, Technical Specifications (TS) that would revise or add Surveillance Requirements to verify that the system locations susceptible to gas accumulation are sufficiently filled with water and to provide allowances which permit performance of the verification. The changes are being made to address the concerns discussed in Generic Letter 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems." *
 
* The purpose of this correspondence is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this request. The acceptance review was performed to determine if there is sufficient techn.ical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR}, an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating .characteristics, unusual or novel design features, and principal safety considerations.
By letter dated January 13, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15014A411), the Southern Nuclear Operating Company, Inc.
C.R. Pierce The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to continue its detailed technical review . and make an independent assessment regarding .the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified in "requests for additional information" despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence. Docket Nos.: 50-321 and 50-366 cc: Distribution via Listserv Sincerely, Robert Martin, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation C.R. Pierce  The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to continue its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified in "requests for additional information" despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
(SNC), submitted a license amendment request (LAR) for the Edwin I. Hatch Nuclear Plant, Unit 1 and Unit 2, Technical Specifications (TS) that would revise or add Surveillance Requirements to verify that the system locations susceptible to gas accumulation are sufficiently filled with water and to provide allowances which permit performance of the verification. The changes are being made to address the concerns discussed in Generic Letter 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems."                                         *
* Docket Nos.: 50-321 and 50-366 cc: Distribution via Listserv DISTRIBUTION: PUBLIC LPL2-1 R/F RidsAcrsAcnw MailCTR Resource RidsNrrLASFigueroa Resource RidsRgn2MailCenter Resource ADAMS Accession No.: ML 15077A409 Sincerely, /RA/ Robert Martin, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsNrrDorllpl2-1 Resource RidsNrrPMHatch Resource OFFICE NRR/LPLll-1/PM NRR/LPLll-1/LA. NRR/LPLll-1/BC NRR/LPLll-1/PM NAME RMartin SFigueroa RPascarelli RMartin DATE 03/25/15 03/23/15 03/25/15 03/25/15 OFFICIAL RECORD COPY 
* The purpose of this correspondence is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this request. The acceptance review was performed to determine if there is sufficient techn.ical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
}}
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR}, an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating .characteristics, unusual or novel design features, and principal safety considerations.
 
C.R. Pierce                                   The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to continue its detailed technical review .
and make an independent assessment regarding .the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified in "requests for additional information" despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
Sincerely, a~~Robert Martin, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-321 and 50-366 cc: Distribution via Listserv
 
ML15077A409 OFFICE NRR/LPLll-1/PM           NRR/LPLll-1/LA. NRR/LPLll-1/BC     NRR/LPLll-1/PM NAME       RMartin               SFigueroa           RPascarelli         RMartin DATE       03/25/15             03/23/15           03/25/15           03/25/15}}

Latest revision as of 15:06, 19 March 2020

Acceptance Review License Amendment Request
ML15077A409
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/25/2015
From: Martin R
Plant Licensing Branch II
To: Pierce C
Southern Nuclear Operating Co
Martin R
References
TAC MF5579, TAC MF5580
Download: ML15077A409 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 25, 2015 Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Company, Inc.

P. 0. Box 1295/Bin - 038 Birmingham, AL 35201-1295

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 - ACCEPTANCE REVIEW LICENSE AMENDMENT REQUEST (TAC NOS. MF5579AND MF5580)

Dear Mr. Pierce:

By letter dated January 13, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15014A411), the Southern Nuclear Operating Company, Inc.

(SNC), submitted a license amendment request (LAR) for the Edwin I. Hatch Nuclear Plant, Unit 1 and Unit 2, Technical Specifications (TS) that would revise or add Surveillance Requirements to verify that the system locations susceptible to gas accumulation are sufficiently filled with water and to provide allowances which permit performance of the verification. The changes are being made to address the concerns discussed in Generic Letter 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems." *

  • The purpose of this correspondence is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this request. The acceptance review was performed to determine if there is sufficient techn.ical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR}, an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating .characteristics, unusual or novel design features, and principal safety considerations.

C.R. Pierce The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to continue its detailed technical review .

and make an independent assessment regarding .the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified in "requests for additional information" despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.

Sincerely, a~~Robert Martin, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-321 and 50-366 cc: Distribution via Listserv