ML12030A231: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 01/25/2012
| issue date = 01/25/2012
| title = Transmittal of Final Status Survey Report, Attachment 12 - Reactor (Building 1111), for the Plum Brook Reactor Facility
| title = Transmittal of Final Status Survey Report, Attachment 12 - Reactor (Building 1111), for the Plum Brook Reactor Facility
| author name = Kolb P C
| author name = Kolb P
| author affiliation = US National Aeronautics & Space Admin (NASA)
| author affiliation = US National Aeronautics & Space Admin (NASA)
| addressee name =  
| addressee name =  
Line 13: Line 13:
| page count = 2
| page count = 2
}}
}}
=Text=
{{#Wiki_filter:National Aeronautics and Space Administration                                                                      ,eO John H. Glenn Research Center Lewis Field Plum Brook Station Sandusky, OH 44870 January 25, 2012 QD Reply to Attn of:
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
==Subject:==
Final Status Survey Report, Attachment 12, Re*actor Building (Building 1111), for the Plum Brook Reactor Facility, Licenses Nos . TR-3, Docket No. 50-30 and R-93, Docket No, 50-185 Enclosed for your review is Attachment 12 to the Final Status Survey Report supporting eventual termination of the licenses for the Plum Brook Reactor Facility.
The complete Final Status Survey Report will consist of a series of Attachments, each addressing an individual survey area or group of survey areas or environmental areas as described in our NRC approved Final Status Survey Plai . The final submission will be the main body of the Final Status Survey Report which will consolidate and summarize the details presented in the Attachments.
This Attachment addresses the Final Status Survey of th,e facility's Reactor Building. It supports our conclusion that radiological remediation of the structures and pads has been completed and the areas meet the criteria for unrestricte I release specified in 10 CFR 20.1402.
Should you have any questions or need additional infornnation, please contact me a NASA Plum Brook Station, 6100 Columbus Avenue, Sandusky Ohio 44870, or by telephone at (419) 621-3242.
NASA Decommissioning Program Manager
Enclosure
: 1. Plum Brook Reactor Facility Final Status Survey Report, Attachment 12, Reactor Building (Building 1111), revision 0, dated January 26, 2012.
cc:
USNRC/C. J. Glenn (FSME)
USNRC/J. Webb (FSME)
USNRC/J. Tapp RIII/DNMS/DB ODH/M. J. Rubadue bcc:
Q/Official File}}

Latest revision as of 10:04, 12 November 2019

Transmittal of Final Status Survey Report, Attachment 12 - Reactor (Building 1111), for the Plum Brook Reactor Facility
ML12030A231
Person / Time
Site: Plum Brook
Issue date: 01/25/2012
From: Kolb P
US National Aeronautics & Space Admin (NASA)
To:
Document Control Desk, NRC/FSME
References
Download: ML12030A231 (2)


Text

National Aeronautics and Space Administration ,eO John H. Glenn Research Center Lewis Field Plum Brook Station Sandusky, OH 44870 January 25, 2012 QD Reply to Attn of:

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

Subject:

Final Status Survey Report, Attachment 12, Re*actor Building (Building 1111), for the Plum Brook Reactor Facility, Licenses Nos . TR-3, Docket No. 50-30 and R-93, Docket No, 50-185 Enclosed for your review is Attachment 12 to the Final Status Survey Report supporting eventual termination of the licenses for the Plum Brook Reactor Facility.

The complete Final Status Survey Report will consist of a series of Attachments, each addressing an individual survey area or group of survey areas or environmental areas as described in our NRC approved Final Status Survey Plai . The final submission will be the main body of the Final Status Survey Report which will consolidate and summarize the details presented in the Attachments.

This Attachment addresses the Final Status Survey of th,e facility's Reactor Building. It supports our conclusion that radiological remediation of the structures and pads has been completed and the areas meet the criteria for unrestricte I release specified in 10 CFR 20.1402.

Should you have any questions or need additional infornnation, please contact me a NASA Plum Brook Station, 6100 Columbus Avenue, Sandusky Ohio 44870, or by telephone at (419) 621-3242.

NASA Decommissioning Program Manager

Enclosure

1. Plum Brook Reactor Facility Final Status Survey Report, Attachment 12, Reactor Building (Building 1111), revision 0, dated January 26, 2012.

cc:

USNRC/C. J. Glenn (FSME)

USNRC/J. Webb (FSME)

USNRC/J. Tapp RIII/DNMS/DB ODH/M. J. Rubadue bcc:

Q/Official File