ENS 56936: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 29: Line 29:
At approximately 1202 EST on 01/29/24, unit 2 experienced a reactor scram by a main turbine trip. All control rods inserted. Reactor core isolation cooling system (RCIC) was manually initiated for level control. HPCI was manually initiated for pressure control. Primary containment isolation system (PCIS) Group II and III isolations occurred [specified system actuation]. Investigation is ongoing.
At approximately 1202 EST on 01/29/24, unit 2 experienced a reactor scram by a main turbine trip. All control rods inserted. Reactor core isolation cooling system (RCIC) was manually initiated for level control. HPCI was manually initiated for pressure control. Primary containment isolation system (PCIS) Group II and III isolations occurred [specified system actuation]. Investigation is ongoing.
The NRC Resident Inspector has been notified.
The NRC Resident Inspector has been notified.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2024/20240202en.html#en56936
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2024/20240131en.html#en56936
}}{{unit info
}}{{unit info
| Unit = 2
| Unit = 2

Latest revision as of 07:20, 1 January 2025

ENS 56936 +/-
Where
Peach Bottom Constellation icon.png
Pennsylvania (NRC Region 1)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
LER: 05000277/LER-2024-001
Automatic Reactor Scram Due to an Invalid Generator Lockout
Time - Person (Reporting Time:+-3.5 h-0.146 days <br />-0.0208 weeks <br />-0.00479 months <br />)
Opened: Eli Digon
13:32 Jan 29, 2024
NRC Officer: Natalie Starfish
Last Updated: Feb 1, 2024
56936 - NRC Website
Loading map...