ENS 56936: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 29: | Line 29: | ||
At approximately 1202 EST on 01/29/24, unit 2 experienced a reactor scram by a main turbine trip. All control rods inserted. Reactor core isolation cooling system (RCIC) was manually initiated for level control. HPCI was manually initiated for pressure control. Primary containment isolation system (PCIS) Group II and III isolations occurred [specified system actuation]. Investigation is ongoing. | At approximately 1202 EST on 01/29/24, unit 2 experienced a reactor scram by a main turbine trip. All control rods inserted. Reactor core isolation cooling system (RCIC) was manually initiated for level control. HPCI was manually initiated for pressure control. Primary containment isolation system (PCIS) Group II and III isolations occurred [specified system actuation]. Investigation is ongoing. | ||
The NRC Resident Inspector has been notified. | The NRC Resident Inspector has been notified. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2024/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2024/20240131en.html#en56936 | ||
}}{{unit info | }}{{unit info | ||
| Unit = 2 | | Unit = 2 | ||
Latest revision as of 07:20, 1 January 2025
| Where | |
|---|---|
| Peach Bottom Pennsylvania (NRC Region 1) | |
| Reporting | |
| 10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
| LER: | 05000277/LER-2024-001 Automatic Reactor Scram Due to an Invalid Generator Lockout |
| Time - Person (Reporting Time:+-3.5 h-0.146 days <br />-0.0208 weeks <br />-0.00479 months <br />) | |
| Opened: | Eli Digon 13:32 Jan 29, 2024 |
| NRC Officer: | Natalie Starfish |
| Last Updated: | Feb 1, 2024 |
| 56936 - NRC Website
| |