ENS 47286
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
14:20 Sep 21, 2011 | |
Title | Relay Malfunction Resulted in a Valid Undervoltage Signal |
Event Description | On 9/21/11 at 10:20 a.m. during the performance of a simulated loss of offsite power testing off the E33 4KV emergency bus, an unplanned start of the E3 Emergency Diesel Generator (EDG) occurred due to a valid bus under voltage signal caused by a relay malfunction. The bus being tested was inoperable in support of the test and was not carrying any required safety system loads at the time of the event. The EDG was secured and troubleshooting initiated. The initial determination was the EDG actuation was from an invalid signal but following further review it was determined that the relay malfunction had caused an untimely bus transfer that resulted in a valid 4KV bus under voltage condition.
The NRC Resident Inspector has been notified. |
Where | |
---|---|
Peach Bottom Pennsylvania (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
LER: | 05000277/LER-2011-003 |
Time - Person (Reporting Time:+8.47 h0.353 days <br />0.0504 weeks <br />0.0116 months <br />) | |
Opened: | Tom Dingel 22:48 Sep 21, 2011 |
NRC Officer: | Joe O'Hara |
Last Updated: | Sep 21, 2011 |
47286 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 47286\u003C/a\u003E - \u003Ca href=\"/Peach_Bottom\" title=\"Peach Bottom\"\u003EPeach Bottom\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ERelay Malfunction Resulted in a Valid Undervoltage Signal\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 47286 - Peach Bottom\n","link":"","lat":39.75920833333333,"lon":-76.26879444444444,"icon":"/w/images/b/be/Constellation_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_47286&oldid=424356"