ML20196B080: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 20: | Line 20: | ||
=Text= | =Text= | ||
{{#Wiki_filter:O h, | {{#Wiki_filter:O h, | ||
JUN 141988 | |||
Docket No. 50-302 | |||
License No. DPR-72 | |||
Florida Power Corporation | |||
Mr. W. S. Wilgus | |||
Vice President Nuclear Operations | |||
ATTN: Manager, Nuclear Licensing | |||
P. 0. Box 219 | |||
Crystal River, FL 32629 | |||
Gentlemen: | |||
SUBJECT: | |||
NRC INSPECTION REPORT NO. 50-302/88-14 | |||
This refers to the Nuclear Regulatory Connission (NRC) inspection conducted by | |||
T. Stetka on April 16 - May 11,1988. | |||
The inspection included a review of | |||
activities authorized for your Crystal River facility. | |||
At the conclusion of | |||
the inspection, the findings were discussed with those members of your staff | |||
identified in the enclosed inspection report. | |||
Areas examined during the inspection are identified in the report. | |||
Within | |||
these areas, the inspection consisted of selective examinations of procedures | |||
and representative records, interviews with personnel, and observation of | |||
activities in progress. | |||
The inspection findings indicate that certain activities appeared to violate | |||
NRC requirements and other activities appeared to deviate from a commitment to | |||
the NRC. | |||
The violation and deviation, with pertinent references and elements | |||
' | ' | ||
to be included in your response, are described in the enclosed Notices. | |||
Your attention is invitt- :o the unresolved item identified in the inspection | |||
report (paragraph 5.b.). | |||
This matter will be pursued during future | |||
inspections. Also, please note that paragraph 5.a. of this report includes our | |||
response to your comments contained in the LER 88-09 transmittal letter dated | |||
l In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2, | April 14, 1988. | ||
l | |||
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2, | |||
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures | |||
, | , | ||
will be placed in the NRC Public Document Room. | |||
! | ! | ||
The responses directed by this letter and the enclosures are not subject to the | |||
clearance procedures of the Office of Management and Budget as required by the | |||
Paperwork Reduction Act of 1980, Pub. L. No. 96-511. | |||
l | l | ||
l | l | ||
8806300187 880614 | |||
PDR | |||
ADOCK 05000302 | |||
I\\ | |||
Q | |||
DCD | |||
yg | |||
. | |||
, | |||
JUN 141933 | |||
Florida Power Corporation | |||
2 | |||
Should you have any questions concerning this letter, please contact us. | |||
Sincerely, | |||
Orl fnd Stened tj | |||
8 | |||
BRUCE A. WILSON | |||
Bruce A. Wilson, Chief | |||
Reactor Projects Branch 2 | |||
Division of Reactor Projects | |||
Enclosures: | |||
1. | |||
Notice of Violation | |||
2. | |||
Notice of Deviation | |||
3. | |||
NRC Inspection Report | |||
cc w/encls: | |||
P. F. McKee, Director, Nuclear Plant | |||
Operations | |||
E. C. Simpson, Director, Nuclear Site | |||
Support | |||
bec w/encls: | |||
NRC Resident inspector | |||
DRS Technical Assistant | |||
Document Control Desk | |||
State of Florida | |||
i | i | ||
l | l | ||
l | |||
06/jenjak | |||
RCr | |||
M ewis:lb | |||
' | ' | ||
06/G/88 | |||
p/88 | |||
i | i | ||
- | |||
_ | |||
. | |||
}} | }} | ||
Latest revision as of 17:31, 10 December 2024
| ML20196B080 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 06/14/1988 |
| From: | Wilson B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Wilgus W FLORIDA POWER CORP. |
| Shared Package | |
| ML20196B084 | List: |
| References | |
| NUDOCS 8806300187 | |
| Download: ML20196B080 (2) | |
See also: IR 05000302/1988014
Text
O h,
JUN 141988
Docket No. 50-302
License No. DPR-72
Florida Power Corporation
Mr. W. S. Wilgus
Vice President Nuclear Operations
ATTN: Manager, Nuclear Licensing
P. 0. Box 219
Crystal River, FL 32629
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-302/88-14
This refers to the Nuclear Regulatory Connission (NRC) inspection conducted by
T. Stetka on April 16 - May 11,1988.
The inspection included a review of
activities authorized for your Crystal River facility.
At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements and other activities appeared to deviate from a commitment to
the NRC.
The violation and deviation, with pertinent references and elements
'
to be included in your response, are described in the enclosed Notices.
Your attention is invitt- :o the unresolved item identified in the inspection
report (paragraph 5.b.).
This matter will be pursued during future
inspections. Also, please note that paragraph 5.a. of this report includes our
response to your comments contained in the LER 88-09 transmittal letter dated
April 14, 1988.
l
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
,
will be placed in the NRC Public Document Room.
!
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
l
l
8806300187 880614
ADOCK 05000302
I\\
Q
yg
.
,
JUN 141933
Florida Power Corporation
2
Should you have any questions concerning this letter, please contact us.
Sincerely,
Orl fnd Stened tj
8
BRUCE A. WILSON
Bruce A. Wilson, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosures:
1.
2.
Notice of Deviation
3.
NRC Inspection Report
cc w/encls:
P. F. McKee, Director, Nuclear Plant
Operations
E. C. Simpson, Director, Nuclear Site
Support
bec w/encls:
NRC Resident inspector
DRS Technical Assistant
Document Control Desk
State of Florida
i
l
l
06/jenjak
RCr
M ewis:lb
'
06/G/88
p/88
i
-
_
.