ML21105A360: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
(No difference)

Latest revision as of 17:13, 19 January 2022

Duties of Reactor Superintendent
ML21105A360
Person / Time
Site: MIT Nuclear Research Reactor
Issue date: 04/07/2021
From: Foster J
Massachusetts Institute of Technology (MIT)
To:
Office of Nuclear Reactor Regulation
References
Download: ML21105A360 (1)


Text

MIT* NUCLEAR REACTOR LABORATORY AN MIT INTERDEPARTMENI'AL CENTER

. John P. Foster Mail Stop: NWU-116A Phone: 617 253-4211

  • ** Director of Reactor Operations 138 Albany Street Fax: 617 324-0042
  • Cambridge, MA 02139 Email: jpfostermit.edu April 7, 2021 U. S. Nuclear Regulatory Commission Washington, DC i0555 Attn: Document Control Desk Subj~_: Duties of Reactor Superintendent

Dear Sir or Madam:

The following is provided as an item or'information. Mr. Marshall Wade has been named Reactor Superinten~ent fut the MIT Research Reactor effective April '1, 2021. He was in this position on _an interim basis and succeeds Ms. Sarah Don who has accepted a position outside_ of MIT_. Mr. Wade's education and .

experience exceed the requirements of MITR Technical Specification No. 7.1.4 (2):

Sincerely,

~ * .

Director of Reactor Operations Cc: USNRC - Senior Reactor Inspector Research and Test Reactors Section NRR/DRIP/RNRP .

USNRC - Senior Project Manager NRR/DRIP/RNRP