05000313/FIN-2014003-01: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 12: | Line 12: | ||
| identified by = NRC | | identified by = NRC | ||
| Inspection procedure = IP 71111.08 | | Inspection procedure = IP 71111.08 | ||
| Inspector = M Young, N Greene, P Jayroe, R Latta, A Fairbanks, B Baca, B Tindell, G Werner, J Melfi, J O, | | Inspector = M Young, N Greene, P Jayroe, R Latta, A Fairbanks, B Baca, B Tindell, G Werner, J Melfi, J O'Donnell, L Carson, L Ricketson | ||
| CCA = H.1 | | CCA = H.1 | ||
| INPO aspect = LA.1 | | INPO aspect = LA.1 |
Latest revision as of 23:21, 21 February 2018
Site: | Arkansas Nuclear |
---|---|
Report | IR 05000313/2014003 Section 1R08 |
Date counted | Jun 30, 2014 (2014Q2) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.08 |
Inspectors (proximate) | M Young N Greene P Jayroe R Latta A Fairbanks B Baca B Tindell G Werner J Melfi J O'Donnell L Carson L Ricketson |
Violation of: | 10 CFR 50.55a |
CCA | H.1, Resources |
INPO aspect | LA.1 |
' | |