{{#Wiki_filter:c-            ,      ,=-
{{#Wiki_filter:, = -
    +
c-
                                        -- ~ ~ ' - -                                          ^"*
+.-
SAFETY LIMITS                          LIMITING SATETY' SYSTEM SETTINGS s
^"*
SAFETY LIMITS
-- ~ ~ ' -
LIMITING SATETY' SYSTEM SETTINGS s
2.1.A (Cont'd)-
2.1.A (Cont'd)-
: 3. Turbt,ne Stop Valve Closure Scram Trip Setting 110 percent valve' closure when above 30% turbine first stage pressure.
3.
: 4. Turbine Control Va.'va Fast Closure Scram Trip Setting
Turbt,ne Stop Valve Closure Scram Trip Setting 110 percent valve' closure when above 30% turbine first stage pressure.
        .q Turbine control fluid pressure 11000 psi when above 30% turbine first stage pressure.
4.
: 5. Main Steam Line Isolation Valve closure Scram Trip Setting 110 percent valve closure in 3 out of 4 ma a steam lines, and the Reactor Mode Switch'in the "Run" position.
Turbine Control Va.'va Fast Closure Scram Trip Setting
: 6. Main Steam Line Isolation Valve Closure on Low Pressure 1825 psig when mode switch is in "Run".
.q Turbine control fluid pressure 11000 psi when above 30% turbine first stage pressure.
5.
Main Steam Line Isolation Valve closure Scram Trip Setting 110 percent valve closure in 3 out of 4 ma a steam lines, and the Reactor Mode Switch'in the "Run" position.
6.
Main Steam Line Isolation Valve Closure on Low Pressure 1825 psig when mode switch is in "Run".
Relationship of instrument water level indications to core and reactor vessel levels is illu-strated in Figure 2.1-1.
Relationship of instrument water level indications to core and reactor vessel levels is illu-strated in Figure 2.1-1.
B. Reactor Water Level Trip Settings Which Initiate Core Standby Cool-ing Systems (CSCS)
B.
Reactor Water Level Trip Settings Which Initiate Core Standby Cool-ing Systems (CSCS)
Reactor low-low water level ini-clation of CSCS systems setting shall be at or above -145.5 in.
Reactor low-low water level ini-clation of CSCS systems setting shall be at or above -145.5 in.
indicated level.-
indicated level.-
e hI p
e hI h f 298 p
h f     298 PNV     ;
PNV 9
9


I l                                                                                                     COOPER NUCLEAR STATION ~                                                         ,
I l
l                                                                                                     TABLE 4.2.B (Page 1)                                                     . ,
COOPER NUCLEAR STATION ~
CORE SPRAY SYSTEM TEST & CALIBRATION FREQUENCIES                                   [
l TABLE 4.2.B (Page 1)
l l                       ,
CORE SPRAY SYSTEM TEST & CALIBRATION FREQUENCIES
[
l l
Instrument.
Instrument.
Item                                       Item I.D. No.                   Functional Test Freq. Calibration Freq.               Check Instrument
Item Item I.D. No.
: 1.             Reactor Low Water Level                       NBI-LIS-72 A.B.C. & D                   Once/ Month (1) Once/3 Months         Once/ Day
Functional Test Freq.
: 2.               Reactor Low Pressure                         NBI-PS-52 A1,A2,C1, & C2               Once/ Month (1) Once/3 Months         None NBI-PIS-52, B & D
Calibration Freq.
: 3.             Drywell High Pressure                         PC-PS-101, A.B.C. & D                   Once/ Month (1) Once/3 Months         None ;
Check Instrument 1.
: 4.             Core Spray Pump Disch,                         CS-PS-44, A & B                         Once/ Month (1) Once/3 Months         None-Press.                                       CS-PS-37, A & B                         Once/ Month (1) Once/3 Months         None:
Reactor Low Water Level NBI-LIS-72 A.B.C. & D Once/ Month (1)
: 5.             Core Spray Pump Time Delay                     CS-TDR - Kl6, A & B                     Once/ Month (1) Once/Oper.           'None.
Once/3 Months Once/ Day 2.
Cycle (4)
Reactor Low Pressure NBI-PS-52 A1,A2,C1, & C2 Once/ Month (1)
: 6.               Emergency Bus Low Volt Relay 27XI - IF & IC                                           Once/Oper. Cycle N.A.                 None 27X2 - IF & IC                         Once/Oper. Cycle N.A.                 None
Once/3 Months None NBI-PIS-52, B & D 3.
: 7.             Aux. Bus Low Voltage Relay                     27X3 - IA & IB                         Once/Oper. Cycle N.A.                 None
Drywell High Pressure PC-PS-101, A.B.C. & D Once/ Month (1)
      ,            8.               Pump Disch. Line #.ow Press.                 CM-PS-73, A & B                         Once/3 Months   Once/3 Months         None o
Once/3 Months None ;
8 Logic (4) (6)                                                                                         ,
4.
i
Core Spray Pump Disch, CS-PS-44, A & B Once/ Month (1)
: 1.             Logic Power Monitor                                                                   Once/6 Months   N.A.                 N .?A. :
Once/3 Months None-Press.
i                   2.             Core Spray Initiation                                                                 Once/6 Months   N.A.                 N.' A. #
CS-PS-37, A & B Once/ Month (1)
: 3.             Pump & Valve (Signal Override)                                                       Once/6 Months   N.A.                 N .' A. !
Once/3 Months None:
Control                                                                                                                             *
5.
[                                                                                                                                                                       t   1 I
Core Spray Pump Time Delay CS-TDR - Kl6, A & B Once/ Month (1)
I-i 1
Once/Oper.
* I
'None.
                                                                                                                                                                        +
Cycle (4) 6.
1 1
Emergency Bus Low Volt Relay 27XI - IF & IC Once/Oper. Cycle N.A.
I t
None 27X2 - IF & IC Once/Oper. Cycle N.A.
                                                                                                                                                              ,        !    I i    !            ;
None 7.
                                                                                                                                                                      '    a
Aux. Bus Low Voltage Relay 27X3 - IA & IB Once/Oper. Cycle N.A.
                                                                                                                                                                                        /
None 8.
Pump Disch. Line #.ow Press.
CM-PS-73, A & B Once/3 Months Once/3 Months None o
8 Logic (4) (6) i 1.
Logic Power Monitor Once/6 Months N.A.
N.?A. :
i 2.
Core Spray Initiation Once/6 Months N.A.
N.' A. #
3.
Pump & Valve (Signal Override)
Once/6 Months N.A.
N.' A. !
Control
[
t 1
I I-i 1
I 1
+
1 I
t I
i
i
/
a i


r-                                                                                                                               --
r-COOPER NUCLEAR STATION
COOPER NUCLEAR STATION                                                       . s TABLE 4.2.B (Page 6)
. s TABLE 4.2.B (Page 6)
RCIC TEST & CALIBRATION FREQUENCIES Instrument l                             Item                   Item I.D. No.                     Functional Test Freq. Calibration Freq. Check l         Instrument Channels
RCIC TEST & CALIBRATION FREQUENCIES Instrument l
: 1. Reactor High Water Level           NBI-LIS-101 A & C, #2               Once/ Month (1)       Once/3 Months     Once/ Day
Item Item I.D. No.
: 2. Reactor Lee Eater Level           10A - K79 A & B 10A-                 Once/ Month (1)       N.A.             _Once/ Day               -
Functional Test Freq.
K80 A & B
Calibration Freq.
: 3. RCIC liigh Turbine Exhaust         RCIC-PS-72, A & B                   Once/ Month (1)       Once/3 Months       None -:
Check l
Instrument Channels 1.
Reactor High Water Level NBI-LIS-101 A & C, #2 Once/ Month (1)
Once/3 Months Once/ Day 2.
Reactor Lee Eater Level 10A - K79 A & B 10A-Once/ Month (1)
N.A.
_Once/ Day K80 A & B 3.
RCIC liigh Turbine Exhaust RCIC-PS-72, A & B Once/ Month (1)
Once/3 Months None -:
Press.
Press.
: 4. RCIC Low Pump Suction Press.       RCIC-PS-67-1                         Once/ Month (1)       Once/3 Months       None
4.
: 5. RCIC Steam Line Space Excess       RCIC-TS-79,         A.B.C. &   D   Once/ Month (1)       Once/Oper. Cycle     None Temp.                               RCIC-TS-80,         A,B,C, &   D   Once/ Month (1)       Once/Oper. Cycle     None RCIC-TS-81,         A B.C. 6   D   Once/ Month (1)       Once/Oper. Cycle     None RCIC-TS-82,         A,B.C. &   D   Once/ Month (1)       Once/Oper. Cycle     None
RCIC Low Pump Suction Press.
: 6. RCIC Steam Line High AP           RCIC-dPIS-83                         Once/ Month (1)       Once/3 Months       None RCIC-dPIS-84                         Once/ Month (1)       Once/3 Months       None Is       7. RCIC Steam Supply Press. Low       RCIC-PS-87, A,B,C, & D               Once/ Month (1)       Once/3 Months       Nonc Y'       8. RCIC Low Pump Disch. Flow         RCIC-FIS-57                         Once/ Mon:h (1)       Once/3 Months       None
RCIC-PS-67-1 Once/ Month (1)
: 9. Pump Disch. Line Low Pressure     CM-PS-269                           Once/3 Months         Once/3 Months       None   ,
Once/3 Months None 5.
: 10. RCIC Turbine Conditional           RCIC-TDR - K9                       Once/ Month (I)       Once/Oper. Cycle     None   !
RCIC Steam Line Space Excess RCIC-TS-79, A.B.C. & D Once/ Month (1)
Supv. Alarm Timer                                                                                                         !
Once/Oper. Cycle None Temp.
II. RCIC Steam Line liigh AP           RCIC-TLR-K-12                       Once/ Month           Once/Oper. Cycle     None   l
RCIC-TS-80, A,B,C, & D Once/ Month (1)
  '                                                    RCIC-TDR-K-32 Actuation Timer                                                          Once/ Month           Once/Oper. Cycle     None   l   I
Once/Oper. Cycle None RCIC-TS-81, A B.C. 6 D Once/ Month (1)
                                                                                                                                              '  I Logic Systems (4)(6)                                                                                                               !  +
Once/Oper. Cycle None RCIC-TS-82, A,B.C. & D Once/ Month (1)
1   i
Once/Oper. Cycle None 6.
                                                                                                                                              +   .
RCIC Steam Line High AP RCIC-dPIS-83 Once/ Month (1)
: 1. Logic Bus Power Monitor                                                 Once/6 Months               N.A.
Once/3 Months None RCIC-dPIS-84 Once/ Month (1)
: 2. RCIC Initiation                                                         Once/6 Months               N.A.                      .
Once/3 Months None Is 7.
: 3. Turbine Trip                                                             Once/6 Months               N.A.                   f   i
RCIC Steam Supply Press. Low RCIC-PS-87, A,B,C, & D Once/ Month (1)
: 4. RCIC Automatic Isolation                                               Once/6 Months               M.A.                   I   i i
Once/3 Months Nonc Y'
f! ,
8.
RCIC Low Pump Disch. Flow RCIC-FIS-57 Once/ Mon:h (1)
Once/3 Months None 9.
Pump Disch. Line Low Pressure CM-PS-269 Once/3 Months Once/3 Months None 10.
RCIC Turbine Conditional RCIC-TDR - K9 Once/ Month (I)
Once/Oper. Cycle None Supv. Alarm Timer II.
RCIC Steam Line liigh AP RCIC-TLR-K-12 Once/ Month Once/Oper. Cycle None l
Actuation Timer RCIC-TDR-K-32 Once/ Month Once/Oper. Cycle None l
I I
Logic Systems (4)(6)
+
1 i
+
1.
Logic Bus Power Monitor Once/6 Months N.A.
2.
RCIC Initiation Once/6 Months N.A.
3.
Turbine Trip Once/6 Months N.A.
f i
4.
RCIC Automatic Isolation Once/6 Months M.A.
I i
i f!
t,
t,


LIMITIND CONDITIONS FOR OPERATION
LIMITIND CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS-
                                                                                                          ~ - - ' - -
~ - - ' -
SURVEILLANCE REQUIREMENTS-
~
                                                              ~    ~
~
3.4              "
4.I'.A.2.c (Cont'd.)
                                  ,,,-                      4.I'.A.2.c (Cont'd.)
3.4 pump domineralized water into the reactor vessel from the test tank.
pump domineralized water into the reactor vessel from the test tank.
.These tests check the actuation of the explosive charge of the tested loop, proper operation of the valves, and pump operability.
                                                                  .These tests check the actuation of the explosive charge of the tested loop, proper operation of the valves, and pump operability.
The replacement charges to be
The replacement charges to be
                                                                  ' installed will be selected from l*
' installed will be selected from l*
the same manufactured batch as a previously tested charge.
the same manufactured batch as a previously tested charge.
: d. Both systems, including both ex-
d.
,                                                                  plosive valves, shall be tested in l                                                                   the course of two operating cycles.
Both systems, including both ex-plosive valves, shall be tested in l
l         B.   -Operation with Inoperable Components: B.           Surveillance with Inoperable Com-l                                                                 ponents:
the course of two operating cycles.
}         1. From and after the date that a redun-                                                                 ,
l B.
I               dant component is made or found to           1. When a component is found to be inop-             l l               be inoperable. Specification 3.4.A.1               erable, its redundant component                   l l
-Operation with Inoperable Components:
shall be considered fulfilled and                 shall be demonstrated to be operable               l cantinued operation permitted pro-                 immediately and daily thereafter vided that the component is returned               until the inoperable component is to an operable condition within                   repaired.
B.
Surveillance with Inoperable Com-l ponents:
}
1.
From and after the date that a redun-I dant component is made or found to 1.
When a component is found to be inop-l l
be inoperable. Specification 3.4.A.1 erable, its redundant component l
l shall be considered fulfilled and shall be demonstrated to be operable l
cantinued operation permitted pro-immediately and daily thereafter vided that the component is returned until the inoperable component is to an operable condition within repaired.
seven days.
seven days.
C. Sodium Pentaborate Solution                 C. Sodium Pentaborate Solution I
C.
j               At al' times when the Standby Liquid               The following tests shall be performed l
Sodium Pentaborate Solution C.
Control System is required to be op-               to verify the availability of the arable the following conditions shall             Liquid Control Solutions be mets i
Sodium Pentaborate Solution I
l         1. The net volume versus concentration           1. Volumet Check and record at least once-l               of the Liquid Control Solution in                 per day.
j At al' times when the Standby Liquid The following tests shall be performed l
Control System is required to be op-to verify the availability of the arable the following conditions shall Liquid Control Solutions be mets i
l 1.
The net volume versus concentration 1.
Volumet Check and record at least once-l of the Liquid Control Solution in per day.
the liquid control tank shall be main-tained as required in Figure 3.4.1.
the liquid control tank shall be main-tained as required in Figure 3.4.1.
: 2. The temperature of the liquid control 2.           Temperature:   Check and   < cord at least solution shall be maintained above the             once per day.
2.
The temperature of the liquid control 2.
Temperature:
Check and
< cord at least solution shall be maintained above the once per day.
curve shown in Figure 3.4.2.
curve shown in Figure 3.4.2.
: 3. Concentration: Check and           'ord at least once per month. Alu. .: heck con-centration anytime water or ooron is
3.
                                                            -108-
Concentration:
Check and
'ord at least once per month.
Alu..: heck con-centration anytime water or ooron is
-108-


h
h
                                                                                                                                                    .~.'
. ~. '
                                                                                                                                                    .        q e s   (
q e s
                                                                                                                                                ~
(
COOPER NUCLEAR STATION TABLE 3.7.1 (Page 1)
COOPER NUCLEAR STATION
PRIMARY CONTAINMENT ISOLATION VALVES                                                                         .
~
Number of Power       P.2ximum                               Action On Operated Valves       Operating       Normal                   Initiating Valve & Steam           Inboard   Outboard     Time (Sec) (1)   Position (2)             Signal (3)
TABLE 3.7.1 (Page 1)
Main Steam Isolation Valves MS-AO-80-- A.B.C. 4 D                       4                         35T55           0                                                 GC f MS-AO A.B.C. & D                                 4               35T$5           0                                                 GC ;
PRIMARY CONTAINMENT ISOLATION VALVES Number of Power P.2ximum Action On Operated Valves Operating Normal Initiating Valve & Steam Inboard Outboard Time (Sec) (1)
Drywell Floor Drain Iso. Valves                       2               15             0                                                 CC !  [,
Position (2)
RW-AO-82 RW-AO-83                                                                                                                           l Drywell Equipment Drain                               2               15             0                                                 GC +
Signal (3)
' Iso. Valves RW-AO-94, RW-AO-95                                                                                                               l m
Main Steam Isolation Valves MS-AO-80-- A.B.C. 4 D 4
8 Main Steam Line Drain                       1         1               20             0                                                 GC Valves MS-MO-74 MS-MO-77 Reactor Vater Sample Valves                 1         1               15             0                                                 GC RRV-740AV, RRV-741AV Reactor Water Cleanup System               1         1               60             0                                                 CC     ,
35T55 0
Iso. Valves R;'CU-MO-15, RWCU-MO-18                                                                                                           i r
GC f MS-AO A.B.C. & D 4
i RilR Suction Cooling Iso.                   I         1               40             C                                                 SC l   t Valve RllR-MO-17 RiiR-MO-18                                                                                                                   l
35T$5 0
GC ;
CC !
[,
Drywell Floor Drain Iso. Valves 2
15 0
RW-AO-82 RW-AO-83 l
Drywell Equipment Drain 2
15 0
GC +
l Iso. Valves RW-AO-94, RW-AO-95 m
8 Main Steam Line Drain 1
1 20 0
GC Valves MS-MO-74 MS-MO-77 Reactor Vater Sample Valves 1
1 15 0
GC RRV-740AV, RRV-741AV Reactor Water Cleanup System 1
1 60 0
CC Iso. Valves R;'CU-MO-15, RWCU-MO-18 i
r i
i RilR Suction Cooling Iso.
I 1
40 C
SC l t
Valve RllR-MO-17 RiiR-MO-18 l
[
[
RIIR Discharge to Radwaste                           2               20             C                                                 SC Iso. Valves RIIR-MO-57, R!1R-MO-67                                                                                                           l Suppression Chamber Purge &                           2               15             C                                                 SC Vent PC-245AV, PC-230MV                                                                                                                       '
l RIIR Discharge to Radwaste 2
Suppression Chamber N y Supply                       2               15             C                                                 SC .   !
20 C
PC-237AV, PC-233MV                                                                                                                         I
SC Iso. Valves RIIR-MO-57, R!1R-MO-67 Suppression Chamber Purge &
                                                                                ,               _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _}}
2 15 C
SC Vent PC-245AV, PC-230MV Suppression Chamber N Supply 2
15 C
SC.
y PC-237AV, PC-233MV I
,}}

Latest revision as of 16:00, 7 December 2024

Proposed Tech Specs Deleting 1,000 Psig Pressure Permissive from MSIV Closure Scram Trip Setting & Making Miscellaneous Editorial Corrections
ML20205P563
Person / Time
Site: Cooper 
Issue date: 11/01/1988
From:
NEBRASKA PUBLIC POWER DISTRICT
To:
Shared Package
ML20205P507 List:
References
NUDOCS 8811080218
Download: ML20205P563 (5)


Text

, = -

c-

+.-

^"*

SAFETY LIMITS

-- ~ ~ ' -

LIMITING SATETY' SYSTEM SETTINGS s

2.1.A (Cont'd)-

3.

Turbt,ne Stop Valve Closure Scram Trip Setting 110 percent valve' closure when above 30% turbine first stage pressure.

4.

Turbine Control Va.'va Fast Closure Scram Trip Setting

.q Turbine control fluid pressure 11000 psi when above 30% turbine first stage pressure.

5.

Main Steam Line Isolation Valve closure Scram Trip Setting 110 percent valve closure in 3 out of 4 ma a steam lines, and the Reactor Mode Switch'in the "Run" position.

6.

Main Steam Line Isolation Valve Closure on Low Pressure 1825 psig when mode switch is in "Run".

Relationship of instrument water level indications to core and reactor vessel levels is illu-strated in Figure 2.1-1.

B.

Reactor Water Level Trip Settings Which Initiate Core Standby Cool-ing Systems (CSCS)

Reactor low-low water level ini-clation of CSCS systems setting shall be at or above -145.5 in.

indicated level.-

e hI h f 298 p

PNV 9

I l

COOPER NUCLEAR STATION ~

l TABLE 4.2.B (Page 1)

CORE SPRAY SYSTEM TEST & CALIBRATION FREQUENCIES

[

l l

Instrument.

Item Item I.D. No.

Functional Test Freq.

Calibration Freq.

Check Instrument 1.

Reactor Low Water Level NBI-LIS-72 A.B.C. & D Once/ Month (1)

Once/3 Months Once/ Day 2.

Reactor Low Pressure NBI-PS-52 A1,A2,C1, & C2 Once/ Month (1)

Once/3 Months None NBI-PIS-52, B & D 3.

Drywell High Pressure PC-PS-101, A.B.C. & D Once/ Month (1)

Once/3 Months None ;

4.

Core Spray Pump Disch, CS-PS-44, A & B Once/ Month (1)

Once/3 Months None-Press.

CS-PS-37, A & B Once/ Month (1)

Once/3 Months None:

5.

Core Spray Pump Time Delay CS-TDR - Kl6, A & B Once/ Month (1)

Once/Oper.

'None.

Cycle (4) 6.

Emergency Bus Low Volt Relay 27XI - IF & IC Once/Oper. Cycle N.A.

None 27X2 - IF & IC Once/Oper. Cycle N.A.

None 7.

Aux. Bus Low Voltage Relay 27X3 - IA & IB Once/Oper. Cycle N.A.

None 8.

Pump Disch. Line #.ow Press.

CM-PS-73, A & B Once/3 Months Once/3 Months None o

8 Logic (4) (6) i 1.

Logic Power Monitor Once/6 Months N.A.

N.?A. :

i 2.

Core Spray Initiation Once/6 Months N.A.

N.' A. #

3.

Pump & Valve (Signal Override)

Once/6 Months N.A.

N.' A. !

Control

[

t 1

I I-i 1

I 1

+

1 I

t I

i

/

a i

r-COOPER NUCLEAR STATION

. s TABLE 4.2.B (Page 6)

RCIC TEST & CALIBRATION FREQUENCIES Instrument l

Item Item I.D. No.

Functional Test Freq.

Calibration Freq.

Check l

Instrument Channels 1.

Reactor High Water Level NBI-LIS-101 A & C, #2 Once/ Month (1)

Once/3 Months Once/ Day 2.

Reactor Lee Eater Level 10A - K79 A & B 10A-Once/ Month (1)

N.A.

_Once/ Day K80 A & B 3.

RCIC liigh Turbine Exhaust RCIC-PS-72, A & B Once/ Month (1)

Once/3 Months None -:

Press.

4.

RCIC Low Pump Suction Press.

RCIC-PS-67-1 Once/ Month (1)

Once/3 Months None 5.

RCIC Steam Line Space Excess RCIC-TS-79, A.B.C. & D Once/ Month (1)

Once/Oper. Cycle None Temp.

RCIC-TS-80, A,B,C, & D Once/ Month (1)

Once/Oper. Cycle None RCIC-TS-81, A B.C. 6 D Once/ Month (1)

Once/Oper. Cycle None RCIC-TS-82, A,B.C. & D Once/ Month (1)

Once/Oper. Cycle None 6.

RCIC Steam Line High AP RCIC-dPIS-83 Once/ Month (1)

Once/3 Months None RCIC-dPIS-84 Once/ Month (1)

Once/3 Months None Is 7.

RCIC Steam Supply Press. Low RCIC-PS-87, A,B,C, & D Once/ Month (1)

Once/3 Months Nonc Y'

8.

RCIC Low Pump Disch. Flow RCIC-FIS-57 Once/ Mon:h (1)

Once/3 Months None 9.

Pump Disch. Line Low Pressure CM-PS-269 Once/3 Months Once/3 Months None 10.

RCIC Turbine Conditional RCIC-TDR - K9 Once/ Month (I)

Once/Oper. Cycle None Supv. Alarm Timer II.

RCIC Steam Line liigh AP RCIC-TLR-K-12 Once/ Month Once/Oper. Cycle None l

Actuation Timer RCIC-TDR-K-32 Once/ Month Once/Oper. Cycle None l

I I

Logic Systems (4)(6)

+

1 i

+

1.

Logic Bus Power Monitor Once/6 Months N.A.

2.

RCIC Initiation Once/6 Months N.A.

3.

Turbine Trip Once/6 Months N.A.

f i

4.

RCIC Automatic Isolation Once/6 Months M.A.

I i

i f!

t,

LIMITIND CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS-

~ - - ' -

~

~

4.I'.A.2.c (Cont'd.)

3.4 pump domineralized water into the reactor vessel from the test tank.

.These tests check the actuation of the explosive charge of the tested loop, proper operation of the valves, and pump operability.

The replacement charges to be

' installed will be selected from l*

the same manufactured batch as a previously tested charge.

d.

Both systems, including both ex-plosive valves, shall be tested in l

the course of two operating cycles.

l B.

-Operation with Inoperable Components:

B.

Surveillance with Inoperable Com-l ponents:

}

1.

From and after the date that a redun-I dant component is made or found to 1.

When a component is found to be inop-l l

be inoperable. Specification 3.4.A.1 erable, its redundant component l

l shall be considered fulfilled and shall be demonstrated to be operable l

cantinued operation permitted pro-immediately and daily thereafter vided that the component is returned until the inoperable component is to an operable condition within repaired.

seven days.

C.

Sodium Pentaborate Solution C.

Sodium Pentaborate Solution I

j At al' times when the Standby Liquid The following tests shall be performed l

Control System is required to be op-to verify the availability of the arable the following conditions shall Liquid Control Solutions be mets i

l 1.

The net volume versus concentration 1.

Volumet Check and record at least once-l of the Liquid Control Solution in per day.

the liquid control tank shall be main-tained as required in Figure 3.4.1.

2.

The temperature of the liquid control 2.

Temperature:

Check and

< cord at least solution shall be maintained above the once per day.

curve shown in Figure 3.4.2.

3.

Concentration:

Check and

'ord at least once per month.

Alu..: heck con-centration anytime water or ooron is

-108-

h

. ~. '

q e s

(

COOPER NUCLEAR STATION

~

TABLE 3.7.1 (Page 1)

PRIMARY CONTAINMENT ISOLATION VALVES Number of Power P.2ximum Action On Operated Valves Operating Normal Initiating Valve & Steam Inboard Outboard Time (Sec) (1)

Position (2)

Signal (3)

Main Steam Isolation Valves MS-AO-80-- A.B.C. 4 D 4

35T55 0

GC f MS-AO A.B.C. & D 4

35T$5 0

GC ;

CC !

[,

Drywell Floor Drain Iso. Valves 2

15 0

RW-AO-82 RW-AO-83 l

Drywell Equipment Drain 2

15 0

GC +

l Iso. Valves RW-AO-94, RW-AO-95 m

8 Main Steam Line Drain 1

1 20 0

GC Valves MS-MO-74 MS-MO-77 Reactor Vater Sample Valves 1

1 15 0

GC RRV-740AV, RRV-741AV Reactor Water Cleanup System 1

1 60 0

CC Iso. Valves R;'CU-MO-15, RWCU-MO-18 i

r i

i RilR Suction Cooling Iso.

I 1

40 C

SC l t

Valve RllR-MO-17 RiiR-MO-18 l

[

l RIIR Discharge to Radwaste 2

20 C

SC Iso. Valves RIIR-MO-57, R!1R-MO-67 Suppression Chamber Purge &

2 15 C

SC Vent PC-245AV, PC-230MV Suppression Chamber N Supply 2

15 C

SC.