|
|
(7 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 10/31/2012 | | | issue date = 10/31/2012 |
| | title = IR 05000151-12-005 (Dnms), on 07/25/2012 - 10/15/2012, University of Illinois Nuclear Reactor | | | title = IR 05000151-12-005 (Dnms), on 07/25/2012 - 10/15/2012, University of Illinois Nuclear Reactor |
| | author name = Lipa C A | | | author name = Lipa C |
| | author affiliation = NRC/RGN-III/DNMS/MCID | | | author affiliation = NRC/RGN-III/DNMS/MCID |
| | addressee name = Holm R L | | | addressee name = Holm R |
| | addressee affiliation = Univ of Illinois - Urbana - Champaign | | | addressee affiliation = Univ of Illinois - Urbana - Champaign |
| | docket = 05000151 | | | docket = 05000151 |
| | license number = R-115 | | | license number = R-115 |
| | contact person = Rodriguez L N | | | contact person = Rodriguez L |
| | document report number = IR-12-005 | | | document report number = IR-12-005 |
| | document type = Letter, Inspection Report | | | document type = Letter, Inspection Report |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:ber 31, 2012 |
| [[Issue date::October 31, 2012]]
| |
|
| |
|
| Mr. Richard Reactor Administrator 216 Talbot Laboratory 104 South Wright St.
| | ==SUBJECT:== |
| | | NRC INSPECTION REPORT 05000151/12005(DNMS) UNIVERSITY OF ILLINOIS NUCLEAR REACTOR |
| Urbana, IL 61801
| |
| | |
| SUBJECT: NRC INSPECTION REPORT 05000151/12005(DNMS) UNIVERSITY OF ILLINOIS NUCLEAR REACTOR | |
|
| |
|
| ==Dear Mr. Holm:== | | ==Dear Mr. Holm:== |
| On October 15, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the permanently shut down University of Illinois Advanced Teaching Research Isotope General Atomic (TRIGA) Nuclear Research Reactor, Urbana, Illinois. The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. Specifically, during an on-site inspection on July 23, 2012, and subsequent in-office review through October 15, 2012, the inspectors conducted independent confirmatory radiation surveys and sampling, and evaluated your contractor's decommissioning performance. At the conclusion of the on-site inspection, the inspectors discussed the interim inspection results with your decommissioning contractor. At the conclusion of the in-office review, a final telephone exit meeting was conducted with you on October 15, 2012. | | On October 15, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the permanently shut down University of Illinois Advanced Teaching Research Isotope General Atomic (TRIGA) Nuclear Research Reactor, Urbana, Illinois. The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. Specifically, during an on-site inspection on July 23, 2012, and subsequent in-office review through October 15, 2012, the inspectors conducted independent confirmatory radiation surveys and sampling, and evaluated your contractors decommissioning performance. At the conclusion of the on-site inspection, the inspectors discussed the interim inspection results with your decommissioning contractor. At the conclusion of the in-office review, a final telephone exit meeting was conducted with you on October 15, 2012. |
|
| |
|
| This inspection consisted of an examination of decommissioning activities at the site as they relate to safety and compliance with the Commission's rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection included the performance of confirmatory surveys and a selective examination of decommissioning documents. | | This inspection consisted of an examination of decommissioning activities at the site as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection included the performance of confirmatory surveys and a selective examination of decommissioning documents. |
|
| |
|
| Based on the results of this inspection, no violations were identified. | | Based on the results of this inspection, no violations were identified. |
|
| |
|
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding this inspection. | | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), |
| | | accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding this inspection. |
| Sincerely,/RA/ Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00151 License No. R-115
| |
|
| |
|
| ===Enclosure:===
| | Sincerely, |
| NRC Inspection Report No. 05000151/12005(DNMS) cc w/encl: J. Klinger, Illinois Emergency Management Agency (IEMA) | | /RA/ |
| | Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00151 License No. R-115 Enclosure: |
| | NRC Inspection Report No. 05000151/12005(DNMS) |
| | cc w/encl: J. Klinger, Illinois Emergency Management Agency (IEMA) |
| K. Horn, IEMA C. Settles, IEMA L. Prussing, Mayor, City of Urbana J. Stubbins, University of Illinois | | K. Horn, IEMA C. Settles, IEMA L. Prussing, Mayor, City of Urbana J. Stubbins, University of Illinois |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARRS-14-043, Update to Correspondence Addressees and Service Lists2014-01-29029 January 2014 Update to Correspondence Addressees and Service Lists ML13254A1712013-08-0101 August 2013 T. Smith Ltr Independent Confirmatory Survey Summary and Results for the Ford Nuclear Reactor, Revision 1, Ann Arbor, Michigan ML13137A3212013-02-25025 February 2013 University of Illinois at Urbana-Champaign, Transmittal of Signed Copy of Termination Letter for Indemnity Agreement Between Atomic Energy Commission and Board of Trustees of University of Illinois ML12363A1972013-01-17017 January 2013 R. Holm Ltr. Termination of Facility Operating License No. R-115 for University of Illinois Research Reactor ML13002A0552012-12-19019 December 2012 Annual Report: Illinois Advanced Triga Reactor IR 05000151/20120052012-10-31031 October 2012 IR 05000151-12-005 (Dnms), on 07/25/2012 - 10/15/2012, University of Illinois Nuclear Reactor ML12345A2452012-10-0909 October 2012 Letter Dated October 9, 2012, from Richard L. Holm, University of Illinois, to John B. Hickman, NRC, Regarding the Submission of Final Status Survey Report and Request for License Termination for the University of Illinois Nuclear Reactor L ML12248A0522012-08-27027 August 2012 Orau, Letter Report for Analytical Results for Twenty-Eight Soil Samples from the University of Illinois, Urbana, Illinois IR 05000151/20120042012-08-22022 August 2012 IR 05000151-12-004(DNMS), 8/13/2012, University of Illinois Reactor ML12345A2442012-07-13013 July 2012 Letter Dated July 13, 2012, from Richard L. Holm, University of Illinois, to John B. Hickman, NRC, Regarding the University of Illinois Response and Clarification to Orise Report on Independent Confirmatory Survey of the Nuclear Research La ML12355A0962012-07-13013 July 2012 Letter Dated July 13, 2012, from Richard L Holm, University of Illinois, to John Hickman, NRC, Regarding University of Illinois Response and Clarification to Orise Report of Independent Confirmatory Survey ML12226A0702012-06-28028 June 2012 Orise Final Report - Independent Confirmatory Survey of the Nuclear Research Laboratory at the University of Illinois IR 05000151/20120032012-04-26026 April 2012 IR 05000151-12-003(DNMS), on 03/03/2012, 03/05-28/2012, & 04/12/2012, Univ of Illinois Nuclear Reactor IR 05000151/20120022012-02-17017 February 2012 IR 05000151-12-002, on 01/5-6/2012 & 01/31//2012 - 2/2/2012, University of Illinois Reactor ML12055A3972012-02-0202 February 2012 Annual Report: Illinois Advanced Triga Reactor IR 05000151/20120012011-12-30030 December 2011 05000151-12-001(DNMS), on November 28 - 30 and December 14, 2011 (on-site) Through December 16, 2011 (in-office Review), University of Illinois - Nuclear Reactor Inspection Report IR 05000151/20100012011-11-22022 November 2011 University of Illinois Nuclear Reactor Inspection Report 05000151/10-001(DNMS) ML11276A0702011-09-29029 September 2011 Mip - University of Illinois Nuclear Reactor FY2012 ML1105501482011-02-18018 February 2011 Annual Report: Illinois Advanced Triga, from 01/01/2010 - 12/31/2010 ML1027806742010-10-0101 October 2010 MIP- University of Illinois Nuclear Reactor FY2011 ML1005602882010-02-26026 February 2010 Change in NRC Staff Project Management for University of Illinois Reactor Facility ML0932308532009-11-17017 November 2009 Mip - University of Illinois Nuclear Reactor FY2010 IR 05000151/20080012009-07-31031 July 2009 IR 05000151-08-001(DNMS), on 07/17/2009 for University of Illinois Nuclear Reactor ML0829801982008-10-20020 October 2008 University of Illinois Nuclear Reactor Master Inspection Plan - Fy 2009 ML0807806052008-03-10010 March 2008 Letter from Richard Holm Stating That the Decommissioning of the Nuclear Research Laboratory at the University of Illinois at Champaign-Urbana Will Commence in 2010 ML0805107332008-02-0606 February 2008 Annual Report: Illinois Advanced Triga Reactor for 2007 ML0725601242007-10-0101 October 2007 Richard L. Holm Ltr Approval of Final Status Survey Plan for the University of Illinois at Urbana-Champaign Nuclear Research Laboratory Reactor Facility ML0725500892007-08-20020 August 2007 Resubmittal of Decommissioning Plan and Final Status Survey Plan for the Nuclear Research Laboratory at the University of Illinois at Champaign-Urbana IR 05000151/20070012007-03-15015 March 2007 IR 05000151-07-01(DNMS) University of Illinois Nuclear Reactor ML0702200022007-01-26026 January 2007 National Organization of Test, Research and Training Reactors(Trtr) Input on Fingerprinting Requirements for Unescorted Access to Research and Test Reactors ML0630406982006-11-16016 November 2006 Change in NRC Staff Project Management for University of Illinois Reactor Facilities ML0629800772006-10-23023 October 2006 E-mail to Research and Test Reactor from M. Mendonca Draft Directors Decision on Uncontrolled/Unmonitored Releases ML0626904082006-09-28028 September 2006 Change in NRC Staff Project Management for University of Illinois Reactor Facilities ML0613706592006-07-25025 July 2006 Letter to Mr. Richard L. Holm from Alexander Adams Issuance of Federal Register Notice Regarding Decommissioning Amendment and Solicitation of Comments ML0609006232006-03-28028 March 2006 University of Illinois at Urbana-Champaign, Technical Specification Change and Decommissioning Plan Submittal ML0605904642006-03-20020 March 2006 Issuance of Orders Requiring Compliance with Updated Adversary Characteristic ML0705801172006-02-0606 February 2006 Annual Report: Illinois Advanced Triga Reactor, January 1, 2006-December 31, 2006 ML0522403292005-07-27027 July 2005 Issuance of Order for Assm/Ramqc Dtd July 19, 2005 ML0506703892005-02-23023 February 2005 Annual Report: Illinois Advanced Triga Reactor ML0426500202005-01-11011 January 2005 University of Illinois at Urbana-Champaign, License Amendment, Reduces Special Nuclear Material Possession Limit and Remove Requirement to Maintain Physical Security Plan ML0433802222005-01-0303 January 2005 University of Illinois at Urbana-Champaign - Amendment Administrative Requirements ML0435200982004-12-0606 December 2004 Resubmittal of Package Dated August 26, 2004: License Amendment to Reduce Allowable U-235 to 10 Grams ML0433702242004-11-22022 November 2004 Resubmittal of Package Dated September 8, 2004: Eliminate Reactor Health Physicist Position and One Hour on-call Requirement from Technical Specifications ML0430803172004-10-26026 October 2004 Response to Request for Additional Information Dated September 30, 2004 ML0427305082004-09-30030 September 2004 University of Illinois at Urbana-Champaign - Request for Additional Information Technical Specifications Administrative Changes ML0433802462004-09-0808 September 2004 Eliminate Reactor Health Physicist Position and One Hour on-call Requirement from Technical Specifications ML0424606652004-08-26026 August 2004 License Amendment to Reduce Allowable U-235 to 10 Grams ML0417501742004-07-30030 July 2004 Physical Security Plan Changes for the University of Illinois at Urbana-Champaign Nuclear Reactor Laboratory ML0420802262004-07-21021 July 2004 10 CFR 71 Subpart H Submittal of University of Illinois Nuclear Reactor Laboratory Quality Assurance Program Revision ML0420203462004-07-15015 July 2004 10 CFR 71 Subpart H Submittal of University of Illinois Nuclear Reactor Laboratory Quality Assurance Program 2014-01-29
[Table view] Category:Inspection Report
MONTHYEARIR 05000151/20120052012-10-31031 October 2012 IR 05000151-12-005 (Dnms), on 07/25/2012 - 10/15/2012, University of Illinois Nuclear Reactor IR 05000151/20120042012-08-22022 August 2012 IR 05000151-12-004(DNMS), 8/13/2012, University of Illinois Reactor IR 05000151/20120032012-04-26026 April 2012 IR 05000151-12-003(DNMS), on 03/03/2012, 03/05-28/2012, & 04/12/2012, Univ of Illinois Nuclear Reactor IR 05000151/20120022012-02-17017 February 2012 IR 05000151-12-002, on 01/5-6/2012 & 01/31//2012 - 2/2/2012, University of Illinois Reactor IR 05000151/20120012011-12-30030 December 2011 05000151-12-001(DNMS), on November 28 - 30 and December 14, 2011 (on-site) Through December 16, 2011 (in-office Review), University of Illinois - Nuclear Reactor Inspection Report IR 05000151/20100012011-11-22022 November 2011 University of Illinois Nuclear Reactor Inspection Report 05000151/10-001(DNMS) IR 05000151/20080012009-07-31031 July 2009 IR 05000151-08-001(DNMS), on 07/17/2009 for University of Illinois Nuclear Reactor IR 05000151/20070012007-03-15015 March 2007 IR 05000151-07-01(DNMS) University of Illinois Nuclear Reactor IR 05000151/20032012003-11-19019 November 2003 IR 05000151-03-201, on 09/09-11/2003, Illinois Advanced Triga Reactor. This Routine, Announced Inspection Included Onsite Review of Various Aspects of the Licensee'S Programs Concerning Operations, Emergency Preparedness, Physical Security IR 05000151/19972011997-07-24024 July 1997 Insp Rept 50-151/97-201 on 970623-26.Violations Noted.Major Areas Inspected:Organization,Periodic & Special Repts, Operations,Maint & Procedures,Requalification Training, Surveillance,Experiments,Radiation Controls & EP IR 05000151/19870011987-04-16016 April 1987 Insp Repts 50-151/87-01 & 50-356/87-01 on 870331-0402.No Violations Noted.Major Areas Inspected:Operations,Radiation Protection & Radwaste Mgt Programs IR 05000151/19860011986-11-0303 November 1986 Insp Rept 50-151/86-01 on 861008.Violation Noted:Failure to Receive Prior NRC Approval for Continued Operation W/Wiring Error in Safety Interlock IR 05000151/19850011985-06-10010 June 1985 Ack Receipt of 850418 & 0506 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-151/85-01. Deviations Contained in 10CFR2,App C 2012-08-22
[Table view] |
Text
ber 31, 2012
SUBJECT:
NRC INSPECTION REPORT 05000151/12005(DNMS) UNIVERSITY OF ILLINOIS NUCLEAR REACTOR
Dear Mr. Holm:
On October 15, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the permanently shut down University of Illinois Advanced Teaching Research Isotope General Atomic (TRIGA) Nuclear Research Reactor, Urbana, Illinois. The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. Specifically, during an on-site inspection on July 23, 2012, and subsequent in-office review through October 15, 2012, the inspectors conducted independent confirmatory radiation surveys and sampling, and evaluated your contractors decommissioning performance. At the conclusion of the on-site inspection, the inspectors discussed the interim inspection results with your decommissioning contractor. At the conclusion of the in-office review, a final telephone exit meeting was conducted with you on October 15, 2012.
This inspection consisted of an examination of decommissioning activities at the site as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection included the performance of confirmatory surveys and a selective examination of decommissioning documents.
Based on the results of this inspection, no violations were identified.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS),
accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding this inspection.
Sincerely,
/RA/
Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00151 License No. R-115 Enclosure:
NRC Inspection Report No. 05000151/12005(DNMS)
cc w/encl: J. Klinger, Illinois Emergency Management Agency (IEMA)
K. Horn, IEMA C. Settles, IEMA L. Prussing, Mayor, City of Urbana J. Stubbins, University of Illinois