Letter Sequence RAI |
---|
|
|
MONTHYEARML0427305082004-09-30030 September 2004 University of Illinois at Urbana-Champaign - Request for Additional Information Technical Specifications Administrative Changes Project stage: RAI ML0433802222005-01-0303 January 2005 University of Illinois at Urbana-Champaign - Amendment Administrative Requirements Project stage: Other 2004-09-30
[Table View] |
|
---|
Category:Letter
MONTHYEARRS-14-043, Update to Correspondence Addressees and Service Lists2014-01-29029 January 2014 Update to Correspondence Addressees and Service Lists ML13254A1712013-08-0101 August 2013 T. Smith Ltr Independent Confirmatory Survey Summary and Results for the Ford Nuclear Reactor, Revision 1, Ann Arbor, Michigan ML13137A3212013-02-25025 February 2013 University of Illinois at Urbana-Champaign, Transmittal of Signed Copy of Termination Letter for Indemnity Agreement Between Atomic Energy Commission and Board of Trustees of University of Illinois ML12363A1972013-01-17017 January 2013 R. Holm Ltr. Termination of Facility Operating License No. R-115 for University of Illinois Research Reactor ML13002A0552012-12-19019 December 2012 Annual Report: Illinois Advanced Triga Reactor IR 05000151/20120052012-10-31031 October 2012 IR 05000151-12-005 (Dnms), on 07/25/2012 - 10/15/2012, University of Illinois Nuclear Reactor ML12345A2452012-10-0909 October 2012 Letter Dated October 9, 2012, from Richard L. Holm, University of Illinois, to John B. Hickman, NRC, Regarding the Submission of Final Status Survey Report and Request for License Termination for the University of Illinois Nuclear Reactor L ML12248A0522012-08-27027 August 2012 Orau, Letter Report for Analytical Results for Twenty-Eight Soil Samples from the University of Illinois, Urbana, Illinois IR 05000151/20120042012-08-22022 August 2012 IR 05000151-12-004(DNMS), 8/13/2012, University of Illinois Reactor ML12345A2442012-07-13013 July 2012 Letter Dated July 13, 2012, from Richard L. Holm, University of Illinois, to John B. Hickman, NRC, Regarding the University of Illinois Response and Clarification to Orise Report on Independent Confirmatory Survey of the Nuclear Research La ML12355A0962012-07-13013 July 2012 Letter Dated July 13, 2012, from Richard L Holm, University of Illinois, to John Hickman, NRC, Regarding University of Illinois Response and Clarification to Orise Report of Independent Confirmatory Survey ML12226A0702012-06-28028 June 2012 Orise Final Report - Independent Confirmatory Survey of the Nuclear Research Laboratory at the University of Illinois IR 05000151/20120032012-04-26026 April 2012 IR 05000151-12-003(DNMS), on 03/03/2012, 03/05-28/2012, & 04/12/2012, Univ of Illinois Nuclear Reactor IR 05000151/20120022012-02-17017 February 2012 IR 05000151-12-002, on 01/5-6/2012 & 01/31//2012 - 2/2/2012, University of Illinois Reactor ML12055A3972012-02-0202 February 2012 Annual Report: Illinois Advanced Triga Reactor IR 05000151/20120012011-12-30030 December 2011 05000151-12-001(DNMS), on November 28 - 30 and December 14, 2011 (on-site) Through December 16, 2011 (in-office Review), University of Illinois - Nuclear Reactor Inspection Report IR 05000151/20100012011-11-22022 November 2011 University of Illinois Nuclear Reactor Inspection Report 05000151/10-001(DNMS) ML11276A0702011-09-29029 September 2011 Mip - University of Illinois Nuclear Reactor FY2012 ML1105501482011-02-18018 February 2011 Annual Report: Illinois Advanced Triga, from 01/01/2010 - 12/31/2010 ML1027806742010-10-0101 October 2010 MIP- University of Illinois Nuclear Reactor FY2011 ML1005602882010-02-26026 February 2010 Change in NRC Staff Project Management for University of Illinois Reactor Facility ML0932308532009-11-17017 November 2009 Mip - University of Illinois Nuclear Reactor FY2010 IR 05000151/20080012009-07-31031 July 2009 IR 05000151-08-001(DNMS), on 07/17/2009 for University of Illinois Nuclear Reactor ML0829801982008-10-20020 October 2008 University of Illinois Nuclear Reactor Master Inspection Plan - Fy 2009 ML0807806052008-03-10010 March 2008 Letter from Richard Holm Stating That the Decommissioning of the Nuclear Research Laboratory at the University of Illinois at Champaign-Urbana Will Commence in 2010 ML0805107332008-02-0606 February 2008 Annual Report: Illinois Advanced Triga Reactor for 2007 ML0725601242007-10-0101 October 2007 Richard L. Holm Ltr Approval of Final Status Survey Plan for the University of Illinois at Urbana-Champaign Nuclear Research Laboratory Reactor Facility ML0725500892007-08-20020 August 2007 Resubmittal of Decommissioning Plan and Final Status Survey Plan for the Nuclear Research Laboratory at the University of Illinois at Champaign-Urbana IR 05000151/20070012007-03-15015 March 2007 IR 05000151-07-01(DNMS) University of Illinois Nuclear Reactor ML0702200022007-01-26026 January 2007 National Organization of Test, Research and Training Reactors(Trtr) Input on Fingerprinting Requirements for Unescorted Access to Research and Test Reactors ML0630406982006-11-16016 November 2006 Change in NRC Staff Project Management for University of Illinois Reactor Facilities ML0629800772006-10-23023 October 2006 E-mail to Research and Test Reactor from M. Mendonca Draft Directors Decision on Uncontrolled/Unmonitored Releases ML0626904082006-09-28028 September 2006 Change in NRC Staff Project Management for University of Illinois Reactor Facilities ML0613706592006-07-25025 July 2006 Letter to Mr. Richard L. Holm from Alexander Adams Issuance of Federal Register Notice Regarding Decommissioning Amendment and Solicitation of Comments ML0609006232006-03-28028 March 2006 University of Illinois at Urbana-Champaign, Technical Specification Change and Decommissioning Plan Submittal ML0605904642006-03-20020 March 2006 Issuance of Orders Requiring Compliance with Updated Adversary Characteristic ML0705801172006-02-0606 February 2006 Annual Report: Illinois Advanced Triga Reactor, January 1, 2006-December 31, 2006 ML0522403292005-07-27027 July 2005 Issuance of Order for Assm/Ramqc Dtd July 19, 2005 ML0506703892005-02-23023 February 2005 Annual Report: Illinois Advanced Triga Reactor ML0426500202005-01-11011 January 2005 University of Illinois at Urbana-Champaign, License Amendment, Reduces Special Nuclear Material Possession Limit and Remove Requirement to Maintain Physical Security Plan ML0433802222005-01-0303 January 2005 University of Illinois at Urbana-Champaign - Amendment Administrative Requirements ML0435200982004-12-0606 December 2004 Resubmittal of Package Dated August 26, 2004: License Amendment to Reduce Allowable U-235 to 10 Grams ML0433702242004-11-22022 November 2004 Resubmittal of Package Dated September 8, 2004: Eliminate Reactor Health Physicist Position and One Hour on-call Requirement from Technical Specifications ML0430803172004-10-26026 October 2004 Response to Request for Additional Information Dated September 30, 2004 ML0427305082004-09-30030 September 2004 University of Illinois at Urbana-Champaign - Request for Additional Information Technical Specifications Administrative Changes ML0433802462004-09-0808 September 2004 Eliminate Reactor Health Physicist Position and One Hour on-call Requirement from Technical Specifications ML0424606652004-08-26026 August 2004 License Amendment to Reduce Allowable U-235 to 10 Grams ML0417501742004-07-30030 July 2004 Physical Security Plan Changes for the University of Illinois at Urbana-Champaign Nuclear Reactor Laboratory ML0420802262004-07-21021 July 2004 10 CFR 71 Subpart H Submittal of University of Illinois Nuclear Reactor Laboratory Quality Assurance Program Revision ML0420203462004-07-15015 July 2004 10 CFR 71 Subpart H Submittal of University of Illinois Nuclear Reactor Laboratory Quality Assurance Program 2014-01-29
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML0427305082004-09-30030 September 2004 University of Illinois at Urbana-Champaign - Request for Additional Information Technical Specifications Administrative Changes ML0326613162003-09-25025 September 2003 University of Illinois at Urbana-Champaign - Request for Additional Information Security Plan Changes 2004-09-30
[Table view] |
Text
September 30, 2004 Mr. Richard L. Holm, Reactor Administrator Nuclear Reactor Laboratory University of Illinois at Urbana-Champaign 214 Nuclear Engineering Laboratory 103 South Goodwin Avenue Urbana, IL 61801-2984
SUBJECT:
UNIVERSITY OF ILLINOIS AT URBANA-CHAMPAIGN REQUEST FOR ADDITIONAL INFORMATION RE: TECHNICAL SPECIFICATIONS ADMINISTRATIVE CHANGES (TAC NO. MC4293)
Dear Mr. Holm:
We are continuing our review of changes to the technical specifications (TSs) for the University of Illinois Nuclear Reactor Laboratory which you submitted on September 8, 2004. During our review of your TSs changes, questions have arisen for which we require additional information and clarification. Please provide responses to the enclosed request for additional information within 30 days of the date of this letter. In accordance with 10 CFR 50.30(b), your response must be executed in a signed original under oath or affirmation. Following receipt of the additional information, we will continue our evaluation of your TSs changes.
If you have any questions regarding this review, please contact me at (301) 415-1127.
Sincerely,
/RA/
Alexander Adams, Jr., Senior Project Manager Research and Test Reactors Section New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No. 50-151
Enclosure:
As stated cc w/enclosure: See next page
University of Illinois Docket No. 50-151 cc:
The Honorable Tod Satterthwaite Mayor of the City of Urbana P.O. Box 219 Urbana, IL 61803 Illinois Emergency Management Agency Bureau Chief Bureau of Nuclear Facility Safety 1035 Outer Park Drive Springfield, IL 62705 Dr. James Stubbins, Head Department of Nuclear Engineering University of Illinois at Urbana-Champaign 103 South Goodwin Avenue Urbana, IL 61801-2984
September 30, 2004 Mr. Richard L. Holm, Reactor Administrator Nuclear Reactor Laboratory University of Illinois at Urbana-Champaign 214 Nuclear Engineering Laboratory 103 South Goodwin Avenue Urbana, IL 61801-2984
SUBJECT:
UNIVERSITY OF ILLINOIS AT URBANA-CHAMPAIGN REQUEST FOR ADDITIONAL INFORMATION RE: TECHNICAL SPECIFICATIONS ADMINISTRATIVE CHANGES (TAC NO. MC4293)
Dear Mr. Holm:
We are continuing our review of changes to the technical specifications (TSs) for the University of Illinois Nuclear Reactor Laboratory which you submitted on September 8, 2004. During our review of your TSs changes, questions have arisen for which we require additional information and clarification. Please provide responses to the enclosed request for additional information within 30 days of the date of this letter. In accordance with 10 CFR 50.30(b), your response must be executed in a signed original under oath or affirmation. Following receipt of the additional information, we will continue our evaluation of your TSs changes.
If you have any questions regarding this review, please contact me at (301) 415-1127.
Sincerely,
/RA/
Alexander Adams, Jr., Senior Project Manager Research and Test Reactors Section New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No. 50-151
Enclosure:
As stated cc w/enclosure: See next page DISTRIBUTION:
PUBLIC RNRP/R&TR r/f AAdams MMendonca TDragoun WBeckner OGC PMadden FGillespie DMatthews PDoyle PYoung SHolmes CBassett WEresian PIsaac GHill (2) DHughes EHylton KWitt ADAMS ACCESSION NO.: ML042730508 TEMPLATE NO.: NRR-106 OFFICE RNRP:PM RNRP:LA RNRP:SC NAME AAdams EHylton PMadden DATE 9/29/2004 9/29/2004 9/29/2004 C = COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY
REQUEST FOR ADDITIONAL INFORMATION UNIVERSITY OF ILLINOIS AT URBANA-CHAMPAIGN DOCKET NO. 50-151
- 1. The existing technical specification (TS) 6.1.1 c. requires the Reactor Health Physicist to be responsible for assuring the day to day and routine radiological safety activities at the Nuclear Reactor Laboratory. Please describe how these activities have changed with the permanent shutdown and removal of reactor fuel from the facility such that the Reactor Administrator and Radiation Safety Office staff can perform the remaining duties. Your proposed changes to the TS 6.1.1 c. removes the entire first sentence which removes all responsibility for assuring the day to day and routine radiological safety activities. Please justify deletion of this entire sentence or replace the position of Reactor Health Physicist with Reactor Administrator and Radiation Safety Office staff to reflect the transfer of responsibility as discussed in your justification.
- 2. You have proposed deleting TS 6.1.2 a.2. requiring the Reactor Health Physicist as part of the minimum staffing requirements. In addition to health physics duties, this position also has reactor operations responsibility as indicated by meeting the requirements for a Level Three individual as given in ANS/ANSI-15.4-1988. Please discuss how the change in activities at the facility following permanent reactor shutdown and removal of fuel justifies a minimum staffing of the Reactor Administrator. Please note that ANS/ANSI-15.1-1990, The Development of Technical Specifications for Research Reactors, indicates the minimum staffing requirement is for periods when the reactor is not secured. If the reactor will be shut down or secured with the removal of reactor fuel complete, the need for a TS discussing minimum staffing may be eliminated given proper justification.
- 3. You have proposed deleting from TS 6.1.2 b. the requirement for designated personnel to be reachable and respond to the facility within approximately one hour. Your justification is with the removal of all reactor fuel from the facility, accident scenarios are similar to laboratories that use radioactive material on campus and that response is covered by the campus Radiation Safety Manual. Please discuss why the Radiation Safety Manual is applicable to accident scenarios at the Nuclear Reactor Laboratory.
Please describe the response outlined by the Radiation Safety Manual and the ability of university staff responding in accordance with the Radiation Safety Manual to initiate the requirements of the reactor emergency plan if needed.