October 1, 2010 Dr. Richard L. Holm University of Illinois at Urbana-Champaign Department of Engineering Administration 303 Engineering Hall 1308 West Green Street Urbana, IL 61801
SUBJECT:
UNIVERSITY OF ILLINOIS NUCLEAR REACTOR MASTER INSPECTION PLAN FISCAL YEAR 2011
Dear Dr. Holm:
In accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Manual, Chapter 2545, Research and Test Reactor Inspection Program, the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for the University of Illinois Nuclear Reactor. The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for fiscal year (FY) 2011, which is from October 2010 through September 2011. The plan outlines how we intend to focus our regional inspection resources to address significant ongoing decommissioning activities.
Because the FY2011 MIP is based, in part, on your proposed schedule of decommissioning activities for FY2011; the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that the FY2011 MIP remains current, we request that you keep the Materials Control, ISFSI, and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the University of Illinois Nuclear Reactor FY2011 MIP.
We currently project the region will conduct four inspections at the reactor during FY2011. You have indicated that funds for the decommissioning project have been received and that you will select a decommissioning contractor and begin work by the summer of 2011. One inspection will be conducted prior to the start of work to verify the proper organization, controls and support are in place. The subsequent inspections will be conducted once work commences to ensure decontamination and dismantlement activities are being adequately conducted. Additional inspections may be warranted, depending on specific decommissioning activities being conducted.
The following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted.
Inspection Procedure Title IP 69013 Research and Test Reactor Decommissioning IP 83801 Inspection of Final Surveys of Permanently Shutdown Reactors In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.
We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Jeremy Tapp of my staff at (630) 829-9862.
Sincerely
/RA/By George McCann Acting For/
Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket No. 050-00151 License No. R-115 cc:
C. Settles, IEMA J. Klinger, IEMA L. Peussing, Mayor, City of Urbana J. Stubbins, University of Illinois
The following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted.
Inspection Procedure Title IP 69013 Research and Test Reactor Decommissioning IP 83801 Inspection of Final Surveys of Permanently Shutdown Reactors In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.
We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Jeremy Tapp of my staff at (630) 829-9862.
Sincerely
/RA/By George McCann Acting For/
Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket No. 050-00151 License No. R-115 cc:
C. Settles, IEMA J. Klinger, IEMA L. Peussing, Mayor, City of Urbana J. Stubbins, University of Illinois DISTRIBUTION:
Docket File A. Barker, RIII B. Watson, FSME H. Logaras, RIII J. Hickman, FSME V. Mitlyng, RIII N. Orlando, FSME P. Chandrathil, RIII S. West, RIII MCID Distribution S. Reynolds, RIII
- See previous concurrence DOCUMENT NAME: G:\\Work in progress\\MIP - University of Illinois Nuclear Reactor FY2011.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl N" = No copy OFFICE RIII DNMS C
RIII DNMS C
RIII RIII NAME JETapp: jm CALipa: GMM for DATE 09/30/10 10/01/10 OFFICIAL RECORD COPY