ML17237A046: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 35: Line 35:
: 12. WESTINGHOUSE ELECTRIC CO LLC                                      Page 1of1 Document ID                  1      2        3        4      5    6        7        8        9        10    11      12 LICN  ~ MC - MNS-TS-3.6.10 - 001 - ISSUED.      FYIIE    FYIIE    FYIIE    FYIIE  FYIIE R&AIE  FYIIE  PRINTILP FYIIE      R&AIE  R&AIE  R&AIE LICN - MC - MNS-TS-3.7.9 - 002 - ISSUED        FYIIE    FYIIE    FYIIE    FYIIE  FYIIE ~&AIE  FYIIE  PRINTILP FYIIE      R&AIE  R&AIE  R&AIE Remarks:
: 12. WESTINGHOUSE ELECTRIC CO LLC                                      Page 1of1 Document ID                  1      2        3        4      5    6        7        8        9        10    11      12 LICN  ~ MC - MNS-TS-3.6.10 - 001 - ISSUED.      FYIIE    FYIIE    FYIIE    FYIIE  FYIIE R&AIE  FYIIE  PRINTILP FYIIE      R&AIE  R&AIE  R&AIE LICN - MC - MNS-TS-3.7.9 - 002 - ISSUED        FYIIE    FYIIE    FYIIE    FYIIE  FYIIE ~&AIE  FYIIE  PRINTILP FYIIE      R&AIE  R&AIE  R&AIE Remarks:


AVS
AVS 3.6.10 3.6 CONTAINMENT SYSTEMS 3.6.1 O Annulus Ventilation System (AVS)
* 3.6.10 3.6 CONTAINMENT SYSTEMS 3.6.1 O Annulus Ventilation System (AVS)
LCO 3.6.10            Two AVS trains shall be OPERABLE.
LCO 3.6.10            Two AVS trains shall be OPERABLE.
APPLICABILITY:        MODES 1, 2, 3, and 4.
APPLICABILITY:        MODES 1, 2, 3, and 4.
Line 42: Line 41:
B.      One or more AVS            B.1    Restore AVS train(s) heater ?days train(s) heater                  to OPERABLE status.
B.      One or more AVS            B.1    Restore AVS train(s) heater ?days train(s) heater                  to OPERABLE status.
inoperable.
inoperable.
* OR 8.2    Initiate action in accordance with            7 days Specification 5.6.6.
OR 8.2    Initiate action in accordance with            7 days Specification 5.6.6.
C.      Required Action and        C.1      Be in MODE 3.              6 hours associated Completion Time not met.              AND C.2      Be in MODE 5 .            36 hours
C.      Required Action and        C.1      Be in MODE 3.              6 hours associated Completion Time not met.              AND C.2      Be in MODE 5 .            36 hours
* McGuire Units 1 and 2                  3.6.10-1                  Amendment Nos. 184/166
* McGuire Units 1 and 2                  3.6.10-1                  Amendment Nos. 184/166


AVS 3.6.10 SURVEILLANCE REQUIREMENTS SR 3.6.10.1 SURVEILLANCE Operate each AVS train    for~ 15 continuous minutes.
AVS 3.6.10 SURVEILLANCE REQUIREMENTS SR 3.6.10.1 SURVEILLANCE Operate each AVS train    for~ 15 continuous minutes.
FREQUENCY In accordance with the Surveillance
FREQUENCY In accordance with the Surveillance Frequency Control Program SR 3.6.10.2 Perform required AVS filter testing in accordance with the    In accordance with Ventilation Filter Testing Program (VFTP).                  the VFTP SR 3.6.10.3 Verify each AVS train actuates on an actual or simulated      In accordance with actuation signal.                                          the Surveillance Frequency Control Program SR 3.6.10.4  Verify each AVS filter cooling bypass valve can be          In accordance with opened.                                                    the Surveillance Frequency Control Program SR 3.6.10.5 Verify each AVS train flow rate cfm.
* Frequency Control Program SR 3.6.10.2 Perform required AVS filter testing in accordance with the    In accordance with Ventilation Filter Testing Program (VFTP).                  the VFTP SR 3.6.10.3 Verify each AVS train actuates on an actual or simulated      In accordance with actuation signal.                                          the Surveillance Frequency Control Program SR 3.6.10.4  Verify each AVS filter cooling bypass valve can be          In accordance with opened.                                                    the Surveillance Frequency Control Program SR 3.6.10.5 Verify each AVS train flow rate cfm.
is~ 7200 cfm and :s; 8800  In accordance with the Surveillance Frequency Control Program McGuire Units 1 and 2                    3.6.10-2                    Amendment Nos. 296/275
is~ 7200 cfm and :s; 8800  In accordance with the Surveillance Frequency Control Program
* CRAVS 3.7.9
* McGuire Units 1 and 2                    3.6.10-2                    Amendment Nos. 296/275
* CRAVS
* 3.7.9
: 3. 7 PLANT SYSTEMS 3.7.9 Control Room Area Ventilation System (CRAVS)
: 3. 7 PLANT SYSTEMS 3.7.9 Control Room Area Ventilation System (CRAVS)
LCO 3.7.9                Two CRAVS trains shall be OPERABLE.
LCO 3.7.9                Two CRAVS trains shall be OPERABLE.
Line 69: Line 65:
McGuire Units 1 and 2                              3.7.9-1                      Amendment No. 282/261
McGuire Units 1 and 2                              3.7.9-1                      Amendment No. 282/261


CRAVS
CRAVS 3.7.9 CONDITION                  REQUIRED ACTION              COMPLETION TIME D. Required Action and      D.1    Place OPERABLE CRAVS        Immediately associated Completion          train in emergency mode.
* 3.7.9 CONDITION                  REQUIRED ACTION              COMPLETION TIME D. Required Action and      D.1    Place OPERABLE CRAVS        Immediately associated Completion          train in emergency mode.
Time of Condition A not met in MODE 5 or 6, or  OR during movement of irradiated fuel          D.2.1  Suspend CORE                Immediately assemblies, or during            ALTERATIONS.
Time of Condition A not met in MODE 5 or 6, or  OR during movement of irradiated fuel          D.2.1  Suspend CORE                Immediately assemblies, or during            ALTERATIONS.
CORE ALTERATIONS.
CORE ALTERATIONS.
Line 77: Line 72:
or 6, or during movement of irradiated  AND OR fuel assemblies, or during CORE ALTERATIONS.
or 6, or during movement of irradiated  AND OR fuel assemblies, or during CORE ALTERATIONS.
E.2    Suspend movement of irradiated fuel assemblies.
E.2    Suspend movement of irradiated fuel assemblies.
Immediately
Immediately One or more CRAVS trans inoperable due to an inoperable CRE boundary in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
* One or more CRAVS trans inoperable due to an inoperable CRE boundary in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
Two CRAVS trains        F.1    Enter LCO 3.0.3.            Immediately inoperable in MODE 1, 2, 3, or 4 (for reasons other than Condition B).
Two CRAVS trains        F.1    Enter LCO 3.0.3.            Immediately inoperable in MODE 1, 2, 3, or 4 (for reasons other than Condition B).
(continued)
(continued)
McGuire Units 1 and 2                3.7.9-2                    Amendment Nos. 249/229
McGuire Units 1 and 2                3.7.9-2                    Amendment Nos. 249/229
* CRAVS
 
* 3.7.9 CONDITION                            REQUIRED ACTION                    COMPLETION TIME G.      One or more CRAVS              G.1      Restore CRAVS train(s)            7 days train(s) heater                          heater to OPERABLE inoperable.                              status.
CRAVS 3.7.9 CONDITION                            REQUIRED ACTION                    COMPLETION TIME G.      One or more CRAVS              G.1      Restore CRAVS train(s)            7 days train(s) heater                          heater to OPERABLE inoperable.                              status.
G.2      Initiate action in                ?days accordance with Specification 5.6.6.
G.2      Initiate action in                ?days accordance with Specification 5.6.6.
     --------------~-------------~---------~~--~-~-~NOTE---------------~-----~----------------------------~-------
     --------------~-------------~---------~~--~-~-~NOTE---------------~-----~----------------------------~-------
   * 'A' Train CRAVS is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS
   * 'A' Train CRAVS is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005 .
* from the SNSWP supply piping is not available will be limited to a 72 hour completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005 .
* McGuire Units 1 and 2                          3.7.9-3                        Amendment No. 282/261
* McGuire Units 1 and 2                          3.7.9-3                        Amendment No. 282/261


CRAVS
CRAVS 3.7.9 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                  FREQUENCY SR 3.7.9.1    Operate each CRAVS train for :2:: 15 continuous minutes. In accordance with the Surveillance Frequency Control Pro ram SR 3.7.9.2    Perform required CRAVS filter testing in accordance with  In accordance with the Ventilation Filter Testing Program (VFTP).            the VFTP SR 3. 7.9.3  Verify each CRAVS train actuates on an actual or          In accordance with simulated actuation signal.                              the Surveillance Frequency Control Program SR 3.7.9.4    Perform required CRE unfiltered air inleakage testing in  In accordance with accordance with the Control Room Envelope Habitability    the Control Room Program.                                                  Envelope Habitability Program McGuire Units 1 and 2                    3.7.9-4                  Amendment No. 296/275
* 3.7.9 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                  FREQUENCY SR 3.7.9.1    Operate each CRAVS train for :2:: 15 continuous minutes. In accordance with the Surveillance Frequency Control Pro ram SR 3.7.9.2    Perform required CRAVS filter testing in accordance with  In accordance with the Ventilation Filter Testing Program (VFTP).            the VFTP SR 3. 7.9.3  Verify each CRAVS train actuates on an actual or          In accordance with simulated actuation signal.                              the Surveillance Frequency Control Program SR 3.7.9.4    Perform required CRE unfiltered air inleakage testing in  In accordance with accordance with the Control Room Envelope Habitability    the Control Room Program.                                                  Envelope Habitability Program
* McGuire Units 1 and 2                    3.7.9-4                  Amendment No. 296/275
                                                                                             *}}
                                                                                             *}}

Latest revision as of 12:05, 4 February 2020

Document Transmittal Form Regarding Technical Specification Changes - Amendment Nos. 296/275
ML17237A046
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 08/17/2017
From:
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML17237A046 (7)


Text

Date: 8[17[2017 Distribution: Duke Energy Document Transmittal #: TR-NUC-MC-006874

1. Boyer, Robert P
2. Gardner, Troy R DOCUMENTTRANSMITTALFORM

Purpose:

Issue

3. Howell, Pamela T Released By:

Facility: MCGUIRE NUCLEAR STATION Duke Energx

4. Mc Ginnis, Vickie L
5. OPS HUMAN PERFORMANCE - SUBJECT 13225 Hagers Fer~ Road Technical Sgecification Changes - Amendment Nos.296[275 Document Management
6. OPS TRNG MGR.
7. QATS- MG02DM
8. RESIDENT NRC INSPECT Huntersville, NC 28078
9. SERV BLDG FILE ROOM - MNSDCRM@duke-energx.com
10. U S NUC REG WASHINGTON, DC V
11. USNRC -
12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1 Document ID 1 2 3 4 5 6 7 8 9 10 11 12 LICN ~ MC - MNS-TS-3.6.10 - 001 - ISSUED. FYIIE FYIIE FYIIE FYIIE FYIIE R&AIE FYIIE PRINTILP FYIIE R&AIE R&AIE R&AIE LICN - MC - MNS-TS-3.7.9 - 002 - ISSUED FYIIE FYIIE FYIIE FYIIE FYIIE ~&AIE FYIIE PRINTILP FYIIE R&AIE R&AIE R&AIE Remarks:

AVS 3.6.10 3.6 CONTAINMENT SYSTEMS 3.6.1 O Annulus Ventilation System (AVS)

LCO 3.6.10 Two AVS trains shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One AVS train A.1 Restore AVS train to 7 days inoperable. OPERABLE status.

B. One or more AVS B.1 Restore AVS train(s) heater ?days train(s) heater to OPERABLE status.

inoperable.

OR 8.2 Initiate action in accordance with 7 days Specification 5.6.6.

C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND C.2 Be in MODE 5 . 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

  • McGuire Units 1 and 2 3.6.10-1 Amendment Nos. 184/166

AVS 3.6.10 SURVEILLANCE REQUIREMENTS SR 3.6.10.1 SURVEILLANCE Operate each AVS train for~ 15 continuous minutes.

FREQUENCY In accordance with the Surveillance Frequency Control Program SR 3.6.10.2 Perform required AVS filter testing in accordance with the In accordance with Ventilation Filter Testing Program (VFTP). the VFTP SR 3.6.10.3 Verify each AVS train actuates on an actual or simulated In accordance with actuation signal. the Surveillance Frequency Control Program SR 3.6.10.4 Verify each AVS filter cooling bypass valve can be In accordance with opened. the Surveillance Frequency Control Program SR 3.6.10.5 Verify each AVS train flow rate cfm.

is~ 7200 cfm and :s; 8800 In accordance with the Surveillance Frequency Control Program McGuire Units 1 and 2 3.6.10-2 Amendment Nos. 296/275

  • CRAVS 3.7.9
3. 7 PLANT SYSTEMS 3.7.9 Control Room Area Ventilation System (CRAVS)

LCO 3.7.9 Two CRAVS trains shall be OPERABLE.


NOTE-----------------------------------------------

The control room envelope (CRE) boundary may be opened intermittently under administrative control.

APPLICABILITY: MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One CRAVS train A.1 Restore CRAVS train to 7 days*

inoperable for reasons OPERABLE status .

  • B.

other than Condition B.

One or more CRAVS trains inoperable due to inoperable CRE B.1 Initiate action to implement mitigating actions.

Immediately boundary in MODE 1,2,3, or4.

AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> B.2 Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits.

AND 90 days B.3 Restore CRE boundary to OPERABLE status.

C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A or B AND not met in MODE 1, 2, 3, or4. C.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)

McGuire Units 1 and 2 3.7.9-1 Amendment No. 282/261

CRAVS 3.7.9 CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 Place OPERABLE CRAVS Immediately associated Completion train in emergency mode.

Time of Condition A not met in MODE 5 or 6, or OR during movement of irradiated fuel D.2.1 Suspend CORE Immediately assemblies, or during ALTERATIONS.

CORE ALTERATIONS.

AND D.2.2. Suspend movement of Immediately irradiated fuel assemblies.

E. Two CRAVS trains E.1 Suspend CORE Immediately inoperable in MODE 5 ALTERATIONS.

or 6, or during movement of irradiated AND OR fuel assemblies, or during CORE ALTERATIONS.

E.2 Suspend movement of irradiated fuel assemblies.

Immediately One or more CRAVS trans inoperable due to an inoperable CRE boundary in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.

Two CRAVS trains F.1 Enter LCO 3.0.3. Immediately inoperable in MODE 1, 2, 3, or 4 (for reasons other than Condition B).

(continued)

McGuire Units 1 and 2 3.7.9-2 Amendment Nos. 249/229

CRAVS 3.7.9 CONDITION REQUIRED ACTION COMPLETION TIME G. One or more CRAVS G.1 Restore CRAVS train(s) 7 days train(s) heater heater to OPERABLE inoperable. status.

G.2 Initiate action in ?days accordance with Specification 5.6.6.


~-------------~---------~~--~-~-~NOTE---------------~-----~----------------------------~-------

  • 'A' Train CRAVS is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005 .
  • McGuire Units 1 and 2 3.7.9-3 Amendment No. 282/261

CRAVS 3.7.9 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.9.1 Operate each CRAVS train for :2:: 15 continuous minutes. In accordance with the Surveillance Frequency Control Pro ram SR 3.7.9.2 Perform required CRAVS filter testing in accordance with In accordance with the Ventilation Filter Testing Program (VFTP). the VFTP SR 3. 7.9.3 Verify each CRAVS train actuates on an actual or In accordance with simulated actuation signal. the Surveillance Frequency Control Program SR 3.7.9.4 Perform required CRE unfiltered air inleakage testing in In accordance with accordance with the Control Room Envelope Habitability the Control Room Program. Envelope Habitability Program McGuire Units 1 and 2 3.7.9-4 Amendment No. 296/275