| Line 19: |
Line 19: |
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 July 30, 2012 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023) | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 July 30, 2012 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023) |
| Richland, WA 99352-0968 | | Richland, WA 99352-0968 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE COLUMBIA GENERATING STATION (TAC NO. ME7905) | | REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE COLUMBIA GENERATING STATION (TAC NO. ME7905) |
|
| |
|
| ==Dear Mr. Reddemann:== | | ==Dear Mr. Reddemann:== |
| | | By {{letter dated|date=January 31, 2012|text=letter dated January 31, 2012}} (Agencywide Documents Access and Management System (ADAMS) Accession No. ML120400144), Energy Northwest submitted a license amendment request (LAR). The LAR included an affidavit dated January 5, 2012, executed by Mr. Edward D. Schrull, of GE Hitachi Nuclear Energy Americas LLC (GEH) requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: |
| By letter dated January 31, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML120400144), Energy Northwest submitted a license amendment request (LAR). The LAR included an affidavit dated January 5, 2012, executed by Mr. Edward D. Schrull, of GE Hitachi Nuclear Energy Americas LLC (GEH) requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: | |
| NEDC-33694P, Revision 1, "Columbia Generating Station Power Range Neutron Monitoring System Diversity and Defense-in-Depth (D3) Analysis," January 2012 A nonproprietary copy of this document has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the NRC Library at ADAMS Accession No. ML12040A076. | | NEDC-33694P, Revision 1, "Columbia Generating Station Power Range Neutron Monitoring System Diversity and Defense-in-Depth (D3) Analysis," January 2012 A nonproprietary copy of this document has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the NRC Library at ADAMS Accession No. ML12040A076. |
| The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: | | The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: |
| : a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies; | | : a. |
| : b. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product. | | Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies; |
| We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. | | : b. |
| | Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product. |
| | We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. |
|
| |
|
| M. Reddemann -2 Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. | | M. Reddemann |
| | -2 Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. |
| Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. | | Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. |
| If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. | | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. |
| If you have any questions regarding this matter, I may be reached at 301-415-1056 or via e-mail at lauren.gibson@nrc.gov. | | If you have any questions regarding this matter, I may be reached at 301-415-1056 or via e-mail at lauren.gibson@nrc.gov. |
| Sincerely, Lauren K. Gibson, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-397 cc: Edward D. Schrull, PE Vice President, Regulatory Affairs Services Licensing GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Rd. | | Sincerely, Lauren K. Gibson, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-397 cc: |
| Wilmington, NC 28401 Additional distribution via Listserv | | Edward D. Schrull, PE Vice President, Regulatory Affairs Services Licensing GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Rd. |
| | Wilmington, NC 28401 Additional distribution via Listserv |
|
| |
|
| ML12192A454 OFFICE NRR/LPL4/PM NRR/DORULAit NRR/LPL4/LA NRRlDE/EICB/BC JThorp NAME LKGibson CDorsey JBurkhardt (DRahn for) | | ML12192A454 OFFICE NRR/LPL4/PM NRR/DORULAit NRR/LPL4/LA NRRlDE/EICB/BC NAME LKGibson CDorsey JBurkhardt JThorp (DRahn for) |
| DATE 7/23/12 7/20/12 7/20/12 7/23/12 OFFICE NRR/DSS/SRXB/BC NRR/LPL4/BC NRR/LPL4/PM AUlses NAME (SMiranda for) MMarkley LKGibson DATE 7/24/12 7/27112 7/30/12}} | | DATE 7/23/12 7/20/12 7/20/12 7/23/12 OFFICE NRR/DSS/SRXB/BC NRR/LPL4/BC NRR/LPL4/PM NAME AUlses (SMiranda for) |
| | MMarkley LKGibson DATE 7/24/12 7/27112 7/30/12}} |
Letter Sequence Withholding Request Acceptance |
|---|
TAC:ME7905, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
|
MONTHYEARML12040A0732011-10-31031 October 2011 0000-0101-7647-R3, Columbia Generating Station Plant-Specific Responses Required by Numac Prnm Retrofit Plus Option III Stability Trip Function Topical Report, (NEDC-3241 OP-A) Project stage: Request ML12040A0752011-11-30030 November 2011 NEDO-33690, Revision 0, Columbia Generating Station Power Range Neutron Monitoring System Response Time Analysis Report Project stage: Request GO2-12-003, License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License2012-01-0909 January 2012 License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License Project stage: Request ML12040A0742012-01-31031 January 2012 NEDO-33685, Revision 1, Digital I&C-ISG-06 Compliance for Columbia Generating Station Numac Power Range Neutron Monitoring Retrofit Plus Option III Stability Trip Function Project stage: Request GO2-12-017, License Amendment Request to Change Technical Specification in Support of Prnm/Arts/Mellla Implementation2012-01-31031 January 2012 License Amendment Request to Change Technical Specification in Support of Prnm/Arts/Mellla Implementation Project stage: Request ML12040A0762012-01-31031 January 2012 NEDO-33694, Revision 1, Columbia Generating Station Power Range Neutron Monitoring System Diversity and Defense-in-Depth (D3) Analysis Project stage: Request ML12040A0792012-01-31031 January 2012 NEDO-33698, Revision 1, Columbia Generating Station Power Range Neutron Monitoring System Design Report on Computer Integrity, Test and Calibration, and Fault Detection. Enclosure 2, Attachment 14 to List of Commitments and Enclosure 3 Are Project stage: Request ML12040A0802012-01-31031 January 2012 NEDO-33507, Revision 1, Columbia Generating Station Aprm/Rbm/Technical Specifications / Maximum Extended Load Line Limit Analysis (Arts/Mellla) Project stage: Request ML1210702222012-04-16016 April 2012 Acceptance Review Email, License Amendment Request, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: Acceptance Review ML1216704042012-06-15015 June 2012 Draft Request for Additional Information, Amendment Request, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: Draft RAI ML1216704012012-06-15015 June 2012 E-mail, Draft Request for Additional Information, Amendment Request, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mella Project stage: Draft RAI ML1219301042012-07-10010 July 2012 Draft Request for Additional Information, Round 2, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: Draft RAI ML1219301002012-07-10010 July 2012 Email, Draft Request for Additional Information, Round 2, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: Draft RAI ML12201B0502012-07-23023 July 2012 Request for Additional Information, Rounds 1 and 2, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: RAI ML12192A3612012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/5/12 Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33685P, Revision 1 Project stage: Withholding Request Acceptance ML12192A4332012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 11/1/11, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33690P, Revision 0 Project stage: Withholding Request Acceptance ML12192A4542012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/5/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33694P, Revision 1 Project stage: Withholding Request Acceptance ML12192A5352012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/5/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33697P, Revision 1 Project stage: Withholding Request Acceptance ML12192A5892012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/5/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33698P, Revision 1 Project stage: Withholding Request Acceptance ML12193A1092012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/27/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33507P, Revision 1 Project stage: Withholding Request Acceptance ML12192A3252012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 10/31/11 Executed by E. Schrull, GE Hitachi Americas LLC, 0000-0101-7647-R3 Plant-Specific Responses Required by NEDC-32410P-P-A Project stage: Withholding Request Acceptance GO2-12-105, Submittal of Phase 2 Information in Support of License Amendment Request to Change Technical Specifications in Support of Prnm /Arts/Mellla Implementation; NEDO-33750, NEDO-33753; NEDO-33754: NEDO-33755; & NEDO-337582012-07-31031 July 2012 Submittal of Phase 2 Information in Support of License Amendment Request to Change Technical Specifications in Support of Prnm /Arts/Mellla Implementation; NEDO-33750, NEDO-33753; NEDO-33754: NEDO-33755; & NEDO-33758 Project stage: Request GO2-12-116, Response to Request for Additional Information Regarding License Amendment Request to Implement Prnm/Arts/Mellla2012-08-22022 August 2012 Response to Request for Additional Information Regarding License Amendment Request to Implement Prnm/Arts/Mellla Project stage: Response to RAI ML12249A0112012-09-0505 September 2012 Redacted, Request for Additional Information, Amendment Request for Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: RAI ML12261A1972012-09-17017 September 2012 Email, Draft Request for Additional Information, Round 4, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: Draft RAI ML12283A2692012-10-15015 October 2012 Request for Additional Information, Round 4, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Prnm/Arts/Mellla Project stage: RAI ML12328A0782012-10-31031 October 2012 NEDO-33751, Revision 3, Columbia Generating Station Power Range Neutron Monitoring System Reliability Analysis, Attachment 3 Project stage: Request GO2-12-162, Response to Request for Additional Information Regarding License Amendment Request to Implement Prnm/Arts/Mellla2012-11-12012 November 2012 Response to Request for Additional Information Regarding License Amendment Request to Implement Prnm/Arts/Mellla Project stage: Response to RAI ML12229A4802012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/7/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33754P, Revision 0 Project stage: Withholding Request Acceptance ML12192A4812012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, Affidavits Dated 11/16/11 and 7/26/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33696P, Revisions 0 and 1 Project stage: Withholding Request Acceptance ML12229A4682012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/4/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33750P, Revision 0 Project stage: Withholding Request Acceptance ML12229A4762012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/7/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33753P, Revision 0 Project stage: Withholding Request Acceptance ML12229A4822012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/27/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33756P, Revision 0 Project stage: Withholding Request Acceptance ML12229A4832012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/7/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33758P, Revision 0 Project stage: Withholding Request Acceptance ML12229A4902012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/12/12 Affidavit Executed by E. Schrull, GEH-Hitachi, Letter GE-MS-CT-106244-JC14 Project stage: Withholding Request Acceptance ML12328A0792012-11-30030 November 2012 NEDO-33789, Revision 0, Numac Power Range Neutron Monitoring Components 268X1331TCG001, 268X1332TCG001, G002 268X1333TCG001, Qualification Summary for Energy Northwest (Enw) Columbia Generating Station (Cgs), Attachment 5 Project stage: Request ML12345A3582012-12-18018 December 2012 Request for Withholding Information from Public Disclosure, 9/26/12 Affidavit Executed by E.Schrull, GEH-Hitachi, GEH 10/5/12 Responses to Nrc/De/Eicb 9/5/12 Request for Additional Information Project stage: RAI ML12345A3662012-12-18018 December 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 11/1/12 Executed by E. Schrull, GEH-Hitachi, NEDC-33789P, Revision 0 Project stage: Withholding Request Acceptance ML12229A4712012-12-18018 December 2012 Request for Withholding Information from Public Disclosure, 6/29/12 and 10/22/12 Affidavits Executed by E. Schrull, GEH-Hitachi, NEDC-33751P, Revisions 2 and 3 Project stage: Withholding Request Acceptance ML13015A2732012-12-31031 December 2012 NEDO-33698, Rev 2, Columbia Generating Station Power Range Neutron Monitoring System Design Report on Computer Integrity, Test and Calibration, and Fault Detection Project stage: Request ML13025A3512013-02-21021 February 2013 Request for Withholding Information from Public Disclosure, Affidavit Dated 12/12/12, Executed by L. Dolan, GE Hitachi Americas LLC, NEDC-33685P, Revision 2 Project stage: Withholding Request Acceptance ML13025A3612013-02-21021 February 2013 Request for Withholding Information from Public Disclosure, Affidavit Dated 12/12/12, Executed by L. Dolan, GE Hitachi Americas LLC, NEDC-33698P, Revision 2 Project stage: Withholding Request Acceptance ML13067A1062013-03-12012 March 2013 Redacted, Request for Additional Information, Round 5, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: RAI ML13098A7782013-04-0808 April 2013 Request for Additional Information Following 4/3/13 Calculation Audit, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: RAI ML13099A0432013-04-10010 April 2013 Request for Additional Information Following 4/3/13 Calculation Audit, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla Project stage: RAI PNP 2013-038, 2012 Annual Radioactive Effluent Release and Waste Disposal Report2013-04-23023 April 2013 2012 Annual Radioactive Effluent Release and Waste Disposal Report Project stage: Request ML13109A1632013-04-26026 April 2013 Request for Withholding Information from Public Disclosure - 4/2/13 and 4/10/13 Affidavits Executed by L. Dolan, GEH; Enclosures 1 and 3 of GEHs Request for Additional Information Responses Project stage: RAI GO2-13-074, Independent Spent Fuel Storage Installation, Submittal of 2012 Annual Radiological Environmental Operating Report2013-05-0909 May 2013 Independent Spent Fuel Storage Installation, Submittal of 2012 Annual Radiological Environmental Operating Report Project stage: Request GO2-13-075, Response to Request for Additional Information Regarding License Amendment to Implement Prnm/Arts/Mellla2013-05-0909 May 2013 Response to Request for Additional Information Regarding License Amendment to Implement Prnm/Arts/Mellla Project stage: Response to RAI ML13140A0612013-06-0303 June 2013 Request for Withholding Information from Public Disclosure - 5/6/13 Affidavit Executed by L. Dolan, GEH, Enclosure 1 of Response to Request for Additional Information to Audit RAI 5 Project stage: RAI 2012-07-10
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 July 30, 2012 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE COLUMBIA GENERATING STATION (TAC NO. ME7905)
Dear Mr. Reddemann:
By letter dated January 31, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML120400144), Energy Northwest submitted a license amendment request (LAR). The LAR included an affidavit dated January 5, 2012, executed by Mr. Edward D. Schrull, of GE Hitachi Nuclear Energy Americas LLC (GEH) requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
NEDC-33694P, Revision 1, "Columbia Generating Station Power Range Neutron Monitoring System Diversity and Defense-in-Depth (D3) Analysis," January 2012 A nonproprietary copy of this document has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the NRC Library at ADAMS Accession No. ML12040A076.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
- a.
Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies;
- b.
Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
M. Reddemann
-2 Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1056 or via e-mail at lauren.gibson@nrc.gov.
Sincerely, Lauren K. Gibson, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-397 cc:
Edward D. Schrull, PE Vice President, Regulatory Affairs Services Licensing GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Rd.
Wilmington, NC 28401 Additional distribution via Listserv
ML12192A454 OFFICE NRR/LPL4/PM NRR/DORULAit NRR/LPL4/LA NRRlDE/EICB/BC NAME LKGibson CDorsey JBurkhardt JThorp (DRahn for)
DATE 7/23/12 7/20/12 7/20/12 7/23/12 OFFICE NRR/DSS/SRXB/BC NRR/LPL4/BC NRR/LPL4/PM NAME AUlses (SMiranda for)
MMarkley LKGibson DATE 7/24/12 7/27112 7/30/12