{{#Wiki_filter:ExelIn@LaSalle Generating Station www.exeloncorp.com NuceaT 26o0 North 21st Road Marseilles, IL 61341-9757 RA07-056 June 22, 2007 U. S. Nuclear Regulatory Commission Attention:
{{#Wiki_filter:ExelIn@
Office of Enforcement Washington, D.C. 20555-0001 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-1 1 and NPF-1 8 NRC Docket Nos. 50-373 and 50-374  
LaSalle Generating Station           www.exeloncorp.com                                   NuceaT 26o0 North 21st Road Marseilles, IL61341-9757 RA07-056 June 22, 2007 U. S. Nuclear Regulatory Commission Attention: Office of Enforcement Washington, D.C. 20555-0001 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-1 1 and NPF-1 8 NRC Docket Nos. 50-373 and 50-374


==Subject:==
==Subject:==
Line 25: Line 25:


==Reference:==
==Reference:==
U. S. NRC to C.M. Crane, "Confirmatory Order Modifying License (Effectively Immediate), Reclassification of Severity Level, and Reduction of Civil Penalty (NRC Office of Investigations Report No. 3-2004-009)" dated November 22, 2005 The purpose of this letter is to request that the NRC rescind the Confirmatory Order modifying the operating licenses for LaSalle County Station (LSCS), Units 1 and 2 that was issued in the referenced letter. The referenced letter transmitted to Exelon Generation Company, LLC (EGC) Confirmatory Order (EA-04-170) that documented specific commitments made by EGC as part of a settlement agreement between EGC and the NRC concerning an apparent violation involving three Venture employees, contractors to EGC, and their foreman, also a Venture employee. The apparent violation involved the access of the contractors to a high radiation area at LSCS on January 24, 2004.
The Confirmatory Order detailed actions to be taken by LSCS in preparation for and during the subsequent two refueling outages (L1 R1 1 and L2R1 1). These actions have been completed and reviewed by the NRC. The results of these reviews are documented in NRC Inspection Reports 05000373(374)/2006003 and 05000373(374)2007002.
The basis for the request to rescind the Order is the successful completion of the actions required by the Order for the specified two refueling outages.


U. S. NRC to C.M. Crane, "Confirmatory Order Modifying License (Effectively Immediate), Reclassification of Severity Level, and Reduction of Civil Penalty (NRC Office of Investigations Report No. 3-2004-009)" dated November 22, 2005 The purpose of this letter is to request that the NRC rescind the Confirmatory Order modifying the operating licenses for LaSalle County Station (LSCS), Units 1 and 2 that was issued in the referenced letter. The referenced letter transmitted to Exelon Generation Company, LLC (EGC) Confirmatory Order (EA-04-170) that documented specific commitments made by EGC as part of a settlement agreement between EGC and the NRC concerning an apparent violation involving three Venture employees, contractors to EGC, and their foreman, also a Venture employee.
June 22, 2007 U.S. Nuclear Regulatory Commission Page 2 Should you have any questions concerning this letter, please contact Mr. Terrence W. Simpkin, Regulatory Assurance Manager, at (815) 415-2800.
The apparent violation involved the access of the contractors to a high radiation area at LSCS on January 24, 2004.The Confirmatory Order detailed actions to be taken by LSCS in preparation for and during the subsequent two refueling outages (L1 R1 1 and L2R1 1). These actions have been completed and reviewed by the NRC. The results of these reviews are documented in NRC Inspection Reports 05000373(374)/2006003 and 05000373(374)2007002.
Respectfully, Susan R. Landahl Site Vice President LaSalle County Station cc:     Regional Administrator - NRC Region III NRC Senior Resident Inspector - LaSalle County Station Document Control Desk}}
The basis for the request to rescind the Order is the successful completion of the actions required by the Order for the specified two refueling outages.
June 22, 2007 U.S. Nuclear Regulatory Commission Page 2 Should you have any questions concerning this letter, please contact Mr. Terrence W. Simpkin, Regulatory Assurance Manager, at (815) 415-2800.Respectfully, Susan R. Landahl Site Vice President LaSalle County Station cc: Regional Administrator  
-NRC Region III NRC Senior Resident Inspector  
-LaSalle County Station Document Control Desk}}

Latest revision as of 06:00, 23 November 2019

Request from Exelon to Rescind Confirmatory Order, Dated November 22, 2005, (EA-04-170) Issued to LaSalle County Station, Units 1 and 2
ML071790242
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 06/22/2007
From: Landahl S
Exelon Nuclear
To:
NRC/OE
References
3-2004-009, EA-04-170, IR-06-003, IR-07-002, RA07-056
Download: ML071790242 (2)


Text

ExelIn@

LaSalle Generating Station www.exeloncorp.com NuceaT 26o0 North 21st Road Marseilles, IL61341-9757 RA07-056 June 22, 2007 U. S. Nuclear Regulatory Commission Attention: Office of Enforcement Washington, D.C. 20555-0001 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-1 1 and NPF-1 8 NRC Docket Nos. 50-373 and 50-374

Subject:

Request to Rescind Confirmatory Order (EA-04-170)

Reference:

U. S. NRC to C.M. Crane, "Confirmatory Order Modifying License (Effectively Immediate), Reclassification of Severity Level, and Reduction of Civil Penalty (NRC Office of Investigations Report No. 3-2004-009)" dated November 22, 2005 The purpose of this letter is to request that the NRC rescind the Confirmatory Order modifying the operating licenses for LaSalle County Station (LSCS), Units 1 and 2 that was issued in the referenced letter. The referenced letter transmitted to Exelon Generation Company, LLC (EGC) Confirmatory Order (EA-04-170) that documented specific commitments made by EGC as part of a settlement agreement between EGC and the NRC concerning an apparent violation involving three Venture employees, contractors to EGC, and their foreman, also a Venture employee. The apparent violation involved the access of the contractors to a high radiation area at LSCS on January 24, 2004.

The Confirmatory Order detailed actions to be taken by LSCS in preparation for and during the subsequent two refueling outages (L1 R1 1 and L2R1 1). These actions have been completed and reviewed by the NRC. The results of these reviews are documented in NRC Inspection Reports 05000373(374)/2006003 and 05000373(374)2007002.

The basis for the request to rescind the Order is the successful completion of the actions required by the Order for the specified two refueling outages.

June 22, 2007 U.S. Nuclear Regulatory Commission Page 2 Should you have any questions concerning this letter, please contact Mr. Terrence W. Simpkin, Regulatory Assurance Manager, at (815) 415-2800.

Respectfully, Susan R. Landahl Site Vice President LaSalle County Station cc: Regional Administrator - NRC Region III NRC Senior Resident Inspector - LaSalle County Station Document Control Desk