{{#Wiki_filter:Survey Unit Release Record Design # I EP-SAN 13 1 Revision # I Original ( Page 1 of 3 Survey Unit #(s) I $AN 13 1) Embedded Pipe (EP) Survey Unit SAN 13 meets the definition of embedded pipe for Plum Brook Reactor Facility (PBRF). 2) EP SAN 13 is a Class 1, Group 3.2 survey unit as per the PBRF Final Status Survey Plan (FSSP) and Technical Basis Document (TF3D)-06-004.
{{#Wiki_filter:Survey Unit Release Record Design #         I   EP-SAN 13     1   Revision #     I   Original     ( Page   1 of 3 Survey Unit #(s)
I                                     $AN 13
: 1) Embedded Pipe (EP) Survey Unit SAN 13 meets the definition of embedded pipe for Plum Brook Reactor Facility (PBRF).
: 2) EP SAN 13 is a Class 1, Group 3.2 survey unit as per the PBRF Final Status Survey Plan (FSSP) and Technical Basis Document (TF3D)-06-004.
: 3) Surveys in EP SAN 13 were performed using a scintillation detector optimized to measure gamma energies representative of Cs-137. Sample #EP 3-8 from Survey Request (SR)-13 was referenced for this decision.
: 3) Surveys in EP SAN 13 were performed using a scintillation detector optimized to measure gamma energies representative of Cs-137. Sample #EP 3-8 from Survey Request (SR)-13 was referenced for this decision.
Description
: 4) Survey Instructions for this survey unit are incorporated into and performed in accordance with (IAW) the Babcock Services Incorporated (BSI)/LVS-002, Work Execution Package (WEP) 05-006. Survey instructions described in this Description document constitute "Special Methods" and the survey design used in the acquisition of survey measurements.
: 4) Survey Instructions for this survey unit are incorporated into and performed in accordance with (IAW) the Babcock Services Incorporated (BSI)/LVS-002, Work Execution Package (WEP) 05-006. Survey instructions described in this document constitute "Special Methods" and the survey design used in the acquisition of survey measurements.
: 5) Instnunent efficiency determinations are developed in accordance with the BSVLVS-002, WEP 05-006, these determinations are appropriate for the types of radiation involved and the media being surveyed.
: 5) Instnunent efficiency determinations are developed in accordance with the BSVLVS-002, WEP 05-006, these determinations are appropriate for the types of radiation involved and the media being surveyed.
Approval Signatures I Date: FS SIC haracterization Engineer FSSICharacterization Manager FSS Design # EP SAN 13 Revisi on # Original Page 2 of 3 Survey Unit: SAN 13 1.0 History/Description 1.1 The subject pipe system is a 4" drain line which received influents from the decontamination room and contaminated showers during plant operations. The influents were transf erred through the SAN 13 piping to the -15' RB hot sump.
Approval Signatures                                     I           Date:
1.2 EP SAN 13 is approximatel y 13 feet in length.
FSSICharacterization Engineer FSSICharacterization Manager
2.0 Survey Design Information 2.1 EP SAN 13 was surveyed IAW Procedure #BSI/LVS-002.
2.2 100% of the 4" ID pipe was accessible for survey. The accessible 4" ID pipe was surveyed by static measurement at one foot increments, for a total of 13 survey measurements.
2.3 Surface area for the 4" ID piping is 973 cm 2 for each foot of piping, corresponding to a total 4" ID piping surface area of 12649 cm 2 (1.3 m 2) for the entire accessible length of (13') of 4" piping.
3.0 Survey Unit Measurement Locations/Data 3.1 Pipe interior radiological survey forms are provided in Attachment 2 of this release record.
4.0 Survey Unit Investigations/Results 4.1 None 5.0 Data Assessment Results 5.1 Data assessment results are provided in the EP/Buried Pipe (BP) Survey Report provided in Attachment 1.
5.2 All measurement results are less than the Derived Concentration Guideline Level (DCGL) for radionuclide specif ic EP that corresponds to the 1 mrem/yr dose goal established in Table 3-3 of the FSSP.
5.3 When implementing the Unity Rule, provided in Section 3.6.3 of the FSSP, and applying the Nuclide Frac tion (NF), provided in TBD-06-004, the survey unit that is constituted by EP SAN 13 passes FSS.
5.4 Background was not subtracted from the survey measurements and the Elevated Measurement Comparison (EMC) was not employed for the accessible portion of this survey unit.
5.5 The instrument/detector used for this survey was >12 months and <15 months from it's calibration date. Procedure #BSI/LVS-002, Step 4.3.2 allows use of instrument/detectors within this periodicity. The detector was maintained in service for this survey due to a limited window of schedule opportunity to accomplish the survey of SAN 13, and limited


availability of 1" X 1" scintillation detectors with which to accomplish the survey.
FSS Design # EP SAN 13             Revision # Original                     Page 2 of 3 Survey Unit: SAN 13 1.0    History/Description 1.1    The subject pipe system is a 4 drain line which received influents from the decontamination room and contaminated showers during plant operations. The influents were transferred through the SAN 13 piping to the -15 RB hot sump.
FSS Design # EP SAN 13 Revisi on # Original Page 3 of 3 Survey Unit: SAN 13 5.6 Statistical Summary Table Statistical Parameter 4" Pipe Total Number of Survey Measurements 13 Number of Measurements >MDC 13 Number of Measurements Above 50% of DCGL 0 Number of Measurements Above DCGL 0 Mean  0.003 Median  0.003 Standard Deviation 0.001 Maximum  0.004 Minimum  0.002  6.0 Documentation of evaluations pertaining to compliance with the unrestricted use limit of 25 mrem/yr and dose contributions from Embedded Pipe and radionuclides contributing 10% in aggregat e of the total dose for both structural scenarios and soils.
1.2    EP SAN 13 is approximately 13 feet in length.
6.1 A review of the survey results has sh own that the dose contribution for the accessible portion of EP SAN 13 to be less than 1 mrem/yr. The dose contribution is estimated to be 0.003 mrem/yr based on the average of the  
2.0    Survey Design Information 2.1    EP SAN 13 was surveyed IAW Procedure #BSI/LVS-002.
2.2    100% of the 4 ID pipe was accessible for survey. The accessible 4 ID pipe was surveyed by static measurement at one foot increments, for a total of 13 survey measurements.
2.3    Surface area for the 4 ID piping is 973 cm2 for each foot of piping, corresponding to a total 4 ID piping surface area of 12649 cm2 (1.3 m2) for the entire accessible length of (13) of 4 piping.
3.0   Survey Unit Measurement Locations/Data 3.1    Pipe interior radiological survey forms are provided in Attachment 2 of this release record.
4.0   Survey Unit Investigations/Results 4.1    None 5.0   Data Assessment Results 5.1    Data assessment results are provided in the EP/Buried Pipe (BP) Survey Report provided in Attachment 1.
5.2    All measurement results are less than the Derived Concentration Guideline Level (DCGL) for radionuclide specific EP that corresponds to the 1 mrem/yr dose goal established in Table 3-3 of the FSSP.
5.3    When implementing the Unity Rule, provided in Section 3.6.3 of the FSSP, and applying the Nuclide Fraction (NF), provided in TBD-06-004, the survey unit that is constituted by EP SAN 13 passes FSS.
5.4    Background was not subtracted from the survey measurements and the Elevated Measurement Comparison (EMC) was not employed for the accessible portion of this survey unit.
5.5    The instrument/detector used for this survey was >12 months and <15 months from its calibration date. Procedure #BSI/LVS-002, Step 4.3.2 allows use of instrument/detectors within this periodicity. The detector was maintained in service for this survey due to a limited window of schedule opportunity to accomplish the survey of SAN 13, and limited availability of 1 X 1 scintillation detectors with which to accomplish the survey.


actual gross counts.
FSS Design # EP SAN 13              Revision # Original                  Page 3 of 3 Survey Unit: SAN 13 5.6    Statistical Summary Table Statistical Parameter                4 Pipe Total Number of Survey Measurements              13 Number of Measurements >MDC                    13 Number of Measurements Above 50% of DCGL                0 Number of Measurements Above DCGL                  0 Mean                          0.003 Median                        0.003 Standard Deviation                    0.001 Maximum                        0.004 Minimum                        0.002 6.0    Documentation of evaluations pertaining to compliance with the unrestricted use limit of 25 mrem/yr and dose contributions from Embedded Pipe and radionuclides contributing 10% in aggregate of the total dose for both structural scenarios and soils.
7.0 Attachments Attachment 1 - BSI EP/BP Survey Report Attachment 2 -Pipe Interior Radiological Survey Form Attachment 3 - DQA Worksheet Attachment 4 -Disc containing RR for EP SAN 13 & Spreadsheet  
6.1    A review of the survey results has shown that the dose contribution for the accessible portion of EP SAN 13 to be less than 1 mrem/yr. The dose contribution is estimated to be 0.003 mrem/yr based on the average of the actual gross counts.
7.0   Attachments Attachment 1 - BSI EP/BP Survey Report Attachment 2 -Pipe Interior Radiological Survey Form Attachment 3 - DQA Worksheet Attachment 4 -Disc containing RR for EP SAN 13 & Spreadsheet


SECTION 7 ATTACHMENT 1 2 PAGES BSI EPlBP SURVEY REPORT LUES NOT BACKGROUND CORRECTED RP Engineer I Date EP SAN 13 4" Pipe TBD 06-004 Group 3.2Measurement #gcpmncpm Cs-137 activity (total dpm)
SECTION 7 ATTACHMENT 1 2 PAGES
Cs-137 activity (dpm/100cm2)
 
Co-60 activity (dpm/100cm2)
BSI EPlBP SURVEY REPORT LUES NOT BACKGROUND CORRECTED RP Engineer I Date
Eu-152 activity (dpm/100cm2)
 
Eu-154 activity (dpm/100cm2)
EP SAN 13 4" Pipe TBD 06-004 Group 3.2 Measurement #
Nb-94 activity (dpm/100cm2)
Cs-137 activity   Cs-137 activity  Co-60 activity    Eu-152 activity  Eu-154 activity  Nb-94 activity  Ag-108m activity gcpm  ncpm    (total dpm)     (dpm/100cm2)     (dpm/100cm2)       (dpm/100cm2)     (dpm/100cm2)     (dpm/100cm2)     (dpm/100cm2)
Ag-108m activity (dpm/100cm2)
Unity 1                16    16          30,189             3,103               340                   -               22             -                   -     0.002 2                26    26          49,057             5,042               552                   -               35             -                   -     0.004 3                20    20          37,736             3,879               425                   -               27             -                   -     0.003 4                18    18          33,962             3,491               382                   -               25             -                   -     0.003 5                19    19          35,849             3,685               404                   -               26             -                   -     0.003 6                22    22          41,509             4,267               467                   -               30             -                   -     0.003 7                28    28          52,830             5,430               595                   -               38             -                   -     0.004 8                18    18          33,962             3,491               382                   -               25             -                   -     0.003 9                19    19          35,849             3,685               404                   -               26             -                   -     0.003 10              19    19          35,849             3,685               404                   -               26             -                   -     0.003 11              22    22          41,509             4,267               467                   -               30             -                   -     0.003 12              22    22          41,509             4,267               467                   -               30             -                   -     0.003 13              27    27          50,943             5,236               574                   -               37             -                   -     0.004 MEAN           0.003 MEDIAN         0.003 STD DEV         0.001 MAX           0.004 MIN         0.002 1 of 1
Unity1161630,189         3,103             340               -                   22                 -               -                   0.0022262649,057         5,042             552               -                   35                 -               -                   0.0043202037,736         3,879             425               -                   27                 -               -                   0.0034181833,962         3,491             382               -                   25                 -               -                   0.0035191935,849         3,685             404               -                   26                 -               -                   0.0036222241,509         4,267             467               -                   30                 -               -                   0.0037282852,830         5,430             595               -                   38                 -               -                   0.0048181833,962         3,491             382               -                   25                 -               -                   0.0039191935,849         3,685             404               -                   26                 -               -                   0.00310191935,849         3,685             404               -                   26                 -               -                   0.00311222241,509         4,267             467               -                   30                 -               -                   0.00312222241,509         4,267             467               -                   30                 -               -                   0.00313272750,943         5,236             574               -                   37                 -               -                   0.004 MEAN 0.003 MEDIAN 0.003 STD DEV 0.001 MAX 0.004 MIN 0.002 1 of 1 SECTION 7 ATTACHMENT 2 2 PAGES SECTION 7 ATTACHMENT 3 1 PAGE
 
- BSILVSPipeCrawler-002 Revision 5 Pipe Interior Radiological Survey Form Date: -1 7- 0 Tie: 1047 d 13 I/ Pipe ID#: &+ Pipe Diameter:
SECTION 7 ATTACHMENT 2 2 PAGES
Access Point Area: Building:
 
Elevation: -Idf System: Type of Survey Investigation Characterization Final Survey Other )< Gross Co60 cs 25- Detector ID# I Sled ID# A0 1 1 Lo/ Detector Cal Date: /-11-0 7 Detector Cal Due Date:
SECTION 7 ATTACHMENT 3 1 PAGE
I-//- t7 R Instrument:
 
zi36v - 1 Instrument ID #: Instrument Cal Date: /-I/-@ 7 Instrument Cal Due Date: From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value
                                                                              -         BSILVSPipeCrawler-002 Revision 5 Pipe Interior Radiological Survey Form Date:       -1 7-0               Tie:           1047 Pipe ID#:   &+ d 13              Pipe Diameter:
: 8. I cpm MDCRsm 14 CPm Efficiency Factor for Pipe Diameter 8 . p O V d3 (from detector efficiency determination)
I/
MDCsat,c Zt!~q & dpd 1 OU cm2 Is the MDCaBn, acceptable?
Access Point Area:
NO (if no, adjust sample count time and recalculate MDC%,a Comments:
Building:                         Elevation:       -Idf                         System:
Technician Signature Pipe Interior Radiological Survey Package Page 1 of hment 3, Page 1
Type of Survey     Investigation         Characterization             Final Survey             Other )<
- Pipe Interior Radiological Survey Form (Continuation Form)  
Gross                           Co60                                     cs 25-Detector ID# I Sled ID#         A  0 1                 1         Lo/
-. BSI/LVSPipeCrawler-002 Revision 5 Date: 1-1 7- D Pipe ID#: 3&J4 a Pipe Diameter: Access Point Area:
Detector Cal Date:         /-11-0     7         Detector Cal Due Date:               I-//-t7 R Instrument:           zi36v -               Instrument ID #:
Building:
Instrument Cal Date:       /-I/-@     7         Instrument Cal Due Date:
Elevation:
From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value 8. I           cpm MDCRsm             14           CPm Efficiency Factor for Pipe Diameter     .
System: 2- z- Package Page - of - Attachment 3, Page 2 I DQA Check Sheet I I Design # I EP SAN 13 I Revision # / Original I I I Survey Unit # I EP SAN 13 I Preliminary Data Review' Answers to the following questions should be fully documented in the Survey Unit Release Record 1. Have surveys been performed in accordance with survey instructions in the Survey Design? 2 Is the ~nstr~mentat,on MDC for structure statlc measurements be ow the DCGLw for Class 1 and 2 Jn ts, or be ow 0 5 DCGLx for Class 3 survey un~ts? -. . . . .. . . . -. . . . - . . - . 1 3. Is the instrumentation MDC for embeddedlburied piping static measurements below the DCGLw ? 1 4. Was the instrumentation MDC for structure scan measurements.
8 p O V d3           (from detector efficiency determination)
soil scan measurements.
MDCsat,c       Zt!~q &         dpd       1 OU         cm2 Is the MDCaBn,acceptable?                 NO       (if no, adjust sample count time and recalculate MDC%,a Comments:
and I embeddedlbuned piping scan measurements below the DCGLw or, if not, was the need for additional static measurements or soil sam~les addressed in the survev desian?
Technician Signature Pipe Interior Radiological Survey Package Page 1 of hment 3, Page 1
: 5. Was the instrumentation MDC for volumetric measurements and smear analysis < 10% DCGLw ? 6. Were the MDCs and assumptions used to develop them appropriate for the instruments and techniques used to perform the survey?
 
                                -                            -. BSI/LVSPipeCrawler-002 Revision 5 Pipe Interior Radiological Survey Form (Continuation Form)
Date:     1-1 7- D Pipe ID#:   3&J 4    a       Pipe Diameter:               Access Point Area:
Building:                       Elevation:                     System:
Package Page of -z-Attachment 3, Page 2
 
I                                                             DQA Check Sheet                                             I I     Design #         I   EP SAN 13         I Revision # /       Original   I                                             I I   Survey Unit #     I                                                   EP SAN 13 I                                                         Preliminary Data Review' Answers to the following questions should be fully documented in the Survey Unit Yes Release Record
: 1. Have surveys been performed in accordance with survey instructions in the Survey Design?
2   Is the ~nstr~mentat,on   MDC for structure statlc measurements be ow the DCGLw for Class 1 and 2 Jn ts, or be ow 0 5..DCGLx for Class 3.survey un~ts?
1 3. Is the instrumentation MDC for embeddedlburied piping static measurements below the DCGLw ?
1 4. Was the instrumentation MDC for structure scan measurements. soil scan measurements. and I     embeddedlbuned piping scan measurements below the DCGLw or, if not, was the need for additional static measurements or soil sam~lesaddressed in the survev desian?
: 5. Was the instrumentation MDC for volumetric measurements and smear analysis < 10% DCGLw ?
: 6. Were the MDCs and assumptions used to develop them appropriate for the instruments and techniques used to perform the survey?
: 7. Were the survey methods used to collect data proper for the types of radiation involved and for the media being surveyed?
: 7. Were the survey methods used to collect data proper for the types of radiation involved and for the media being surveyed?
: 8. Were "S~ecial Methods" for data collection  
: 8. Were "S~ecialMethods" for data collection ~rooerlvaDDlied for the survev unit under review?
~rooerlv aDDlied for the survev unit under review?
II                                                                                                        I                I 1s the data set conipr~sedof qual~fieorneas~rementresuns wllecteo .n accordance wlth the survey           I 9
Yes 9 1s the data set conipr~sed of qual~fieo rneas~rement resuns wllecteo .n accordance wlth the survey I I I deslan whlch accuratelv reflects the radlo oa cal status of the faol tv? I I Graphical Data Review
deslan whlch accuratelv reflects the radlo oa cal status of the faol tv?
: 4. Is the result of the Elevated Measurements Test < 1.0? 5. Is the result of the statistical test (S+ for Sign Test or W, for WRS Test) the critical value? 1. Has a posting plot been created?
Graphical Data Review
: 2. Has a histogram (or other frequency plot) been created?
: 1. Has a posting plot been created?                                                                                   X
: 3. Have other graphical data tools been created to assist in analyzing the data? - - 2. Is the mean of the sample data  
: 2. Has a histogram (or other frequency plot) been created?                                                           X
< DCGLw? 3. If elevated areas have been identified by scans andlor sampling, is the average activity in each elevated area c DCGLEMC (Class I), < DCGLw (Class 2). or <05 DCGLw (Class 3)? I Comments:
: 3. Have other graphical data tools been created to assist in analyzing the data?                                     X Data Analysis
X X X Data Analysis 1. Are all sam~le measurements below the DCGLw (Class 1 & 21. or 0.5 DCGLw (Class 3)? I X I X X FSSlCharacterization Engineer (printlsign)
: 1. Are all sam~lemeasurements below the DCGLw (Class 1 & 21. or 0.5 DCGLw (Class 3)?
Page 1 of 1 FSSI Characterization Manager (printlsign)
I  X    I
Form CS-09R 1 Rev0 I & L3 @&/&,&?dd Date Date SECTION 7 ATTACHMENT 4 1 DISC}}
: 2. Is the mean of the sample data < DCGLw?                                                               X
: 3. If elevated areas have been identified by scans andlor sampling, is the average activity in each                   X elevated area c DCGLEMC       (Class I ) , < DCGLw (Class 2). or <05 DCGLw (Class 3)?
: 4. Is the result of the Elevated Measurements Test < 1.0?
: 5. Is the result of the statistical test (S+for Sign Test or W, for WRS Test) the critical value?
I Comments:
FSSlCharacterization Engineer (printlsign)
                                                              & L3 @&/&,&?d                                  Date FSSI Characterization Manager (printlsign)                                                             Date Page 1 of 1 1    Form CS-09R Rev0   I
 
SECTION 7 ATTACHMENT 4 1 DISC}}

Latest revision as of 06:06, 13 March 2020

Plum Brook Reactor Facility (Pbrf) Survey Unit Release Record EP-SAN 13
ML080670215
Person / Time
Site: Plum Brook
Issue date: 03/05/2008
From:
US National Aeronautics & Space Admin (NASA), John H. Glenn Research Ctr at Lewis Field
To:
NRC/RGN-III
References
EP-SAN 13
Download: ML080670215 (12)


Text

Survey Unit Release Record Design # I EP-SAN 13 1 Revision # I Original ( Page 1 of 3 Survey Unit #(s)

I $AN 13

1) Embedded Pipe (EP) Survey Unit SAN 13 meets the definition of embedded pipe for Plum Brook Reactor Facility (PBRF).
2) EP SAN 13 is a Class 1, Group 3.2 survey unit as per the PBRF Final Status Survey Plan (FSSP) and Technical Basis Document (TF3D)-06-004.
3) Surveys in EP SAN 13 were performed using a scintillation detector optimized to measure gamma energies representative of Cs-137. Sample #EP 3-8 from Survey Request (SR)-13 was referenced for this decision.
4) Survey Instructions for this survey unit are incorporated into and performed in accordance with (IAW) the Babcock Services Incorporated (BSI)/LVS-002, Work Execution Package (WEP)05-006. Survey instructions described in this Description document constitute "Special Methods" and the survey design used in the acquisition of survey measurements.
5) Instnunent efficiency determinations are developed in accordance with the BSVLVS-002, WEP 05-006, these determinations are appropriate for the types of radiation involved and the media being surveyed.

Approval Signatures I Date:

FSSICharacterization Engineer FSSICharacterization Manager

FSS Design # EP SAN 13 Revision # Original Page 2 of 3 Survey Unit: SAN 13 1.0 History/Description 1.1 The subject pipe system is a 4 drain line which received influents from the decontamination room and contaminated showers during plant operations. The influents were transferred through the SAN 13 piping to the -15 RB hot sump.

1.2 EP SAN 13 is approximately 13 feet in length.

2.0 Survey Design Information 2.1 EP SAN 13 was surveyed IAW Procedure #BSI/LVS-002.

2.2 100% of the 4 ID pipe was accessible for survey. The accessible 4 ID pipe was surveyed by static measurement at one foot increments, for a total of 13 survey measurements.

2.3 Surface area for the 4 ID piping is 973 cm2 for each foot of piping, corresponding to a total 4 ID piping surface area of 12649 cm2 (1.3 m2) for the entire accessible length of (13) of 4 piping.

3.0 Survey Unit Measurement Locations/Data 3.1 Pipe interior radiological survey forms are provided in Attachment 2 of this release record.

4.0 Survey Unit Investigations/Results 4.1 None 5.0 Data Assessment Results 5.1 Data assessment results are provided in the EP/Buried Pipe (BP) Survey Report provided in Attachment 1.

5.2 All measurement results are less than the Derived Concentration Guideline Level (DCGL) for radionuclide specific EP that corresponds to the 1 mrem/yr dose goal established in Table 3-3 of the FSSP.

5.3 When implementing the Unity Rule, provided in Section 3.6.3 of the FSSP, and applying the Nuclide Fraction (NF), provided in TBD-06-004, the survey unit that is constituted by EP SAN 13 passes FSS.

5.4 Background was not subtracted from the survey measurements and the Elevated Measurement Comparison (EMC) was not employed for the accessible portion of this survey unit.

5.5 The instrument/detector used for this survey was >12 months and <15 months from its calibration date. Procedure #BSI/LVS-002, Step 4.3.2 allows use of instrument/detectors within this periodicity. The detector was maintained in service for this survey due to a limited window of schedule opportunity to accomplish the survey of SAN 13, and limited availability of 1 X 1 scintillation detectors with which to accomplish the survey.

FSS Design # EP SAN 13 Revision # Original Page 3 of 3 Survey Unit: SAN 13 5.6 Statistical Summary Table Statistical Parameter 4 Pipe Total Number of Survey Measurements 13 Number of Measurements >MDC 13 Number of Measurements Above 50% of DCGL 0 Number of Measurements Above DCGL 0 Mean 0.003 Median 0.003 Standard Deviation 0.001 Maximum 0.004 Minimum 0.002 6.0 Documentation of evaluations pertaining to compliance with the unrestricted use limit of 25 mrem/yr and dose contributions from Embedded Pipe and radionuclides contributing 10% in aggregate of the total dose for both structural scenarios and soils.

6.1 A review of the survey results has shown that the dose contribution for the accessible portion of EP SAN 13 to be less than 1 mrem/yr. The dose contribution is estimated to be 0.003 mrem/yr based on the average of the actual gross counts.

7.0 Attachments Attachment 1 - BSI EP/BP Survey Report Attachment 2 -Pipe Interior Radiological Survey Form Attachment 3 - DQA Worksheet Attachment 4 -Disc containing RR for EP SAN 13 & Spreadsheet

SECTION 7 ATTACHMENT 1 2 PAGES

BSI EPlBP SURVEY REPORT LUES NOT BACKGROUND CORRECTED RP Engineer I Date

EP SAN 13 4" Pipe TBD 06-004 Group 3.2 Measurement #

Cs-137 activity Cs-137 activity Co-60 activity Eu-152 activity Eu-154 activity Nb-94 activity Ag-108m activity gcpm ncpm (total dpm) (dpm/100cm2) (dpm/100cm2) (dpm/100cm2) (dpm/100cm2) (dpm/100cm2) (dpm/100cm2)

Unity 1 16 16 30,189 3,103 340 - 22 - - 0.002 2 26 26 49,057 5,042 552 - 35 - - 0.004 3 20 20 37,736 3,879 425 - 27 - - 0.003 4 18 18 33,962 3,491 382 - 25 - - 0.003 5 19 19 35,849 3,685 404 - 26 - - 0.003 6 22 22 41,509 4,267 467 - 30 - - 0.003 7 28 28 52,830 5,430 595 - 38 - - 0.004 8 18 18 33,962 3,491 382 - 25 - - 0.003 9 19 19 35,849 3,685 404 - 26 - - 0.003 10 19 19 35,849 3,685 404 - 26 - - 0.003 11 22 22 41,509 4,267 467 - 30 - - 0.003 12 22 22 41,509 4,267 467 - 30 - - 0.003 13 27 27 50,943 5,236 574 - 37 - - 0.004 MEAN 0.003 MEDIAN 0.003 STD DEV 0.001 MAX 0.004 MIN 0.002 1 of 1

SECTION 7 ATTACHMENT 2 2 PAGES

SECTION 7 ATTACHMENT 3 1 PAGE

- BSILVSPipeCrawler-002 Revision 5 Pipe Interior Radiological Survey Form Date: -1 7-0 Tie: 1047 Pipe ID#: &+ d 13 Pipe Diameter:

I/

Access Point Area:

Building: Elevation: -Idf System:

Type of Survey Investigation Characterization Final Survey Other )<

Gross Co60 cs 25-Detector ID# I Sled ID# A 0 1 1 Lo/

Detector Cal Date: /-11-0 7 Detector Cal Due Date: I-//-t7 R Instrument: zi36v 1 - Instrument ID #:

Instrument Cal Date: /-I/-@ 7 Instrument Cal Due Date:

From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value 8. I cpm MDCRsm 14 CPm Efficiency Factor for Pipe Diameter .

8 p O V d3 (from detector efficiency determination)

MDCsat,c Zt!~q & dpd 1 OU cm2 Is the MDCaBn,acceptable? NO (if no, adjust sample count time and recalculate MDC%,a Comments:

Technician Signature Pipe Interior Radiological Survey Package Page 1 of hment 3, Page 1

- -. BSI/LVSPipeCrawler-002 Revision 5 Pipe Interior Radiological Survey Form (Continuation Form)

Date: 1-1 7- D Pipe ID#: 3&J 4 a Pipe Diameter: Access Point Area:

Building: Elevation: System:

Package Page of -z-Attachment 3, Page 2

I DQA Check Sheet I I Design # I EP SAN 13 I Revision # / Original I I I Survey Unit # I EP SAN 13 I Preliminary Data Review' Answers to the following questions should be fully documented in the Survey Unit Yes Release Record

1. Have surveys been performed in accordance with survey instructions in the Survey Design?

2 Is the ~nstr~mentat,on MDC for structure statlc measurements be ow the DCGLw for Class 1 and 2 Jn ts, or be ow 0 5..DCGLx for Class 3.survey un~ts?

1 3. Is the instrumentation MDC for embeddedlburied piping static measurements below the DCGLw ?

1 4. Was the instrumentation MDC for structure scan measurements. soil scan measurements. and I embeddedlbuned piping scan measurements below the DCGLw or, if not, was the need for additional static measurements or soil sam~lesaddressed in the survev desian?

5. Was the instrumentation MDC for volumetric measurements and smear analysis < 10% DCGLw ?
6. Were the MDCs and assumptions used to develop them appropriate for the instruments and techniques used to perform the survey?
7. Were the survey methods used to collect data proper for the types of radiation involved and for the media being surveyed?
8. Were "S~ecialMethods" for data collection ~rooerlvaDDlied for the survev unit under review?

II I I 1s the data set conipr~sedof qual~fieorneas~rementresuns wllecteo .n accordance wlth the survey I 9

deslan whlch accuratelv reflects the radlo oa cal status of the faol tv?

Graphical Data Review

1. Has a posting plot been created? X
2. Has a histogram (or other frequency plot) been created? X
3. Have other graphical data tools been created to assist in analyzing the data? X Data Analysis
1. Are all sam~lemeasurements below the DCGLw (Class 1 & 21. or 0.5 DCGLw (Class 3)?

I X I

2. Is the mean of the sample data < DCGLw? X
3. If elevated areas have been identified by scans andlor sampling, is the average activity in each X elevated area c DCGLEMC (Class I ) , < DCGLw (Class 2). or <05 DCGLw (Class 3)?
4. Is the result of the Elevated Measurements Test < 1.0?
5. Is the result of the statistical test (S+for Sign Test or W, for WRS Test) the critical value?

I Comments:

FSSlCharacterization Engineer (printlsign)

& L3 @&/&,&?d Date FSSI Characterization Manager (printlsign) Date Page 1 of 1 1 Form CS-09R Rev0 I

SECTION 7 ATTACHMENT 4 1 DISC