ML082520039: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(One intermediate revision by the same user not shown) | |||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:September 16, 2008 | {{#Wiki_filter:September 16, 2008 Mr. Bryan Hanson Site Vice President Exelon Generation Company, LLC Braidwood Station 35100 South Route 53, Suite 84 Braceville, IL 60407-9619 | ||
Mr. Bryan Hanson Site Vice President Exelon Generation Company, LLC Braidwood Station 35100 South Route 53, Suite 84 Braceville, IL | |||
==SUBJECT:== | ==SUBJECT:== | ||
BRAIDWOOD STATION, UNITS 1 AND 2 - CLOSURE OF CONFIRMATORY ACTION LETTER (CAL) NRR-07-008 (TAC NO. MD7295) | BRAIDWOOD STATION, UNITS 1 AND 2 - CLOSURE OF CONFIRMATORY ACTION LETTER (CAL) NRR-07-008 (TAC NO. MD7295) | ||
==Dear Mr. Hanson:== | ==Dear Mr. Hanson:== | ||
On March 22, 2007 | On March 22, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070740294) regarding dissimilar metal welds in the pressurizer at Braidwood Station (Braidwood), Units 1 and 2. This letter acknowledges receipt of your letter dated July 10, 2008 (ADAMS Accession No. ML081920287), informing the NRC staff of actions taken in response to this CAL. | ||
, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070740294) regarding dissimilar metal welds in the pressurizer at Braidwood Station (Braidwood), Units 1 and 2. This letter acknowledges receipt of your letter dated July 10, 2008 (ADAMS Accession No. ML081920287), informing the NRC staff of actions taken in response to this CAL. | |||
In your letter, you stated that actions and commitments related to CAL NRR-07-008 have been completed for Braidwood, Unit 2, and confirmed actions previously reported by letter dated May 19, 2008 (ADAMS Accession No. ML081400792), regarding the application of structural weld overlays to the pressurizer spray, relief, safety and surge nozzle safe ends for Braidwood, Unit 2, including satisfactory non-destructive examination results. Based on your letters, the NRC staff has found that all the commitments listed in the CAL and supporting commitment letter (ADAMS Accession No. ML070520499) have been met for Braidwood, Unit 2. As such, it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system at Braidwood, Unit 2. Technical Assignment Control (TAC) | In your letter, you stated that actions and commitments related to CAL NRR-07-008 have been completed for Braidwood, Unit 2, and confirmed actions previously reported by letter dated May 19, 2008 (ADAMS Accession No. ML081400792), regarding the application of structural weld overlays to the pressurizer spray, relief, safety and surge nozzle safe ends for Braidwood, Unit 2, including satisfactory non-destructive examination results. Based on your letters, the NRC staff has found that all the commitments listed in the CAL and supporting commitment letter (ADAMS Accession No. ML070520499) have been met for Braidwood, Unit 2. As such, it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system at Braidwood, Unit 2. Technical Assignment Control (TAC) | ||
No. MD7295 has been closed. | No. MD7295 has been closed. | ||
Further, by letter dated December 17, 2007 (ADAMS Accession No. ML073390179), the NRC staff acknowledged the completion of the applicable confirmatory action items for Braidwood, Unit 1. Therefore, no further response is required regarding the CAL. We consider the CAL closed for both Braidwood units. | |||
Further, by letter dated December 17, 2007 (ADAMS Accession No. ML073390179), the NRC staff acknowledged the completion of the applicable confirmatory action items for Braidwood, Unit 1. Therefore, no further response is required regarding the CAL. We consider the CAL closed for both Braidwood units. | Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility. | ||
Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays). | |||
Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility. | |||
Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays). | |||
B. Hanson In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html. | |||
Sincerely, | |||
/RA/ | |||
Joseph G. Giitter, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-456 and 50-457 cc: See next page | |||
Ms. Lorraine Creek RR 1, Box 182 Manteno, IL | ML082520039 NRR-106 OFFICE DCI/CPNB DCI/CPNB LPL3-2/PM LPL3-2/LA LPL3-2/BC NAME JCollins TChan MDavid THarris RGibbs DATE 9/10/08 9/10/08 9/9/08 9/9/08 9/9/08 OFFICE DCI/D DRP/D RIII DORL/D NAME MEvans CPederson JGiitter DATE 9/10/08 9/11/08 9/16/08 Braidwood Station, Units 1 and 2 cc: | ||
Corporate Distribution Exelon Generation Company, LLC Via e-mail Braidwood Distribution Exelon Generation Company, LLC Via e-mail Mr. Dwain W. Alexander, Project Manager Westinghouse Electric Corporation Via e-mail Ms. Bridget Little Rorem Appleseed Coordinator Via e-mail Howard A. Learner Environmental Law and Policy Center of the Midwest Via e-mail Braidwood Resident Inspector U.S. Nuclear Regulatory Commission Via e-mail Illinois Emergency Management Agency Division of Nuclear Safety Via e-mail Will County Executive Via e-mail Attorney General Springfield, IL Via e-mail Chairman, Ogle County Board Via e-mail Ms. Lorraine Creek RR 1, Box 182 Manteno, IL 60950}} |
Latest revision as of 21:22, 12 March 2020
ML082520039 | |
Person / Time | |
---|---|
Site: | Braidwood |
Issue date: | 09/16/2008 |
From: | Giitter J Division of Operating Reactor Licensing |
To: | Bryan Hanson Exelon Generation Co |
David, Marshall - DORL 415-1547 | |
References | |
TAC MD7295, NRR-07-008 | |
Download: ML082520039 (4) | |
Text
September 16, 2008 Mr. Bryan Hanson Site Vice President Exelon Generation Company, LLC Braidwood Station 35100 South Route 53, Suite 84 Braceville, IL 60407-9619
SUBJECT:
BRAIDWOOD STATION, UNITS 1 AND 2 - CLOSURE OF CONFIRMATORY ACTION LETTER (CAL) NRR-07-008 (TAC NO. MD7295)
Dear Mr. Hanson:
On March 22, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070740294) regarding dissimilar metal welds in the pressurizer at Braidwood Station (Braidwood), Units 1 and 2. This letter acknowledges receipt of your letter dated July 10, 2008 (ADAMS Accession No. ML081920287), informing the NRC staff of actions taken in response to this CAL.
In your letter, you stated that actions and commitments related to CAL NRR-07-008 have been completed for Braidwood, Unit 2, and confirmed actions previously reported by letter dated May 19, 2008 (ADAMS Accession No. ML081400792), regarding the application of structural weld overlays to the pressurizer spray, relief, safety and surge nozzle safe ends for Braidwood, Unit 2, including satisfactory non-destructive examination results. Based on your letters, the NRC staff has found that all the commitments listed in the CAL and supporting commitment letter (ADAMS Accession No. ML070520499) have been met for Braidwood, Unit 2. As such, it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system at Braidwood, Unit 2. Technical Assignment Control (TAC)
No. MD7295 has been closed.
Further, by letter dated December 17, 2007 (ADAMS Accession No. ML073390179), the NRC staff acknowledged the completion of the applicable confirmatory action items for Braidwood, Unit 1. Therefore, no further response is required regarding the CAL. We consider the CAL closed for both Braidwood units.
Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility.
Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).
B. Hanson In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.
Sincerely,
/RA/
Joseph G. Giitter, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-456 and 50-457 cc: See next page
ML082520039 NRR-106 OFFICE DCI/CPNB DCI/CPNB LPL3-2/PM LPL3-2/LA LPL3-2/BC NAME JCollins TChan MDavid THarris RGibbs DATE 9/10/08 9/10/08 9/9/08 9/9/08 9/9/08 OFFICE DCI/D DRP/D RIII DORL/D NAME MEvans CPederson JGiitter DATE 9/10/08 9/11/08 9/16/08 Braidwood Station, Units 1 and 2 cc:
Corporate Distribution Exelon Generation Company, LLC Via e-mail Braidwood Distribution Exelon Generation Company, LLC Via e-mail Mr. Dwain W. Alexander, Project Manager Westinghouse Electric Corporation Via e-mail Ms. Bridget Little Rorem Appleseed Coordinator Via e-mail Howard A. Learner Environmental Law and Policy Center of the Midwest Via e-mail Braidwood Resident Inspector U.S. Nuclear Regulatory Commission Via e-mail Illinois Emergency Management Agency Division of Nuclear Safety Via e-mail Will County Executive Via e-mail Attorney General Springfield, IL Via e-mail Chairman, Ogle County Board Via e-mail Ms. Lorraine Creek RR 1, Box 182 Manteno, IL 60950