ML102590589: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(One intermediate revision by the same user not shown) | |||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:CASK HANDLING PIT FUEL POOL AUX. BLDG. TRUCK BAY HSM SITE LOWERCASKI LOAD DSC INTO CASK -- DSCINTO FUEL POOL FILLANNULUS BETWEEN LOAD FUEL DSC AND CASK WITH ASSEMBLIES DEMINERALIZED INTODSC WATER | ||
, o CHECK & RECORD INSTALLAND IDENTITY& | |||
Rev.1 QECON AREA FUEL POQ1.AUX BLDG TRl.: | PRESSURIZE LOCATION OF ANNULUS SEAL EACH FUEL ASSY. | ||
INTHEDSC o | |||
FILL DSC CAVITY PLACETOP WITH BORATED WATER | |||
--- SHIELD PLUG ONDSC DECONTAMINATE REMOVE THE OUTER SURFACE CASKIDSC OF CASK FROM FUEL POOL BGE-A92.01M Figure 5.1-1 ISFSI Loading Operations Flowchart Page 1 of 3 | |||
&SKID TIE-DOWN BRACKET FASTENERS | [See Reference 5.2] | ||
Rev. 1 | |||
~ASK QECON AREA FUEL POQ1. AUX BLDG TRl.:CK BAY HSM SIT~ | |||
LOWER WATER @ WELD PLUGS OVER 1 INSTALL LEVEL IN DSC _~~~ VENT AND TRUNNION CAVITY AND SIPHON PORTS RESTRAINTS ANNULUS AND PERFORM NDE | |||
@ ,--._--1. t | |||
, t SEAL WELD TOP INSTALL DSC REf'v1OVE SHIELD PLUG TOP COVER CASK BonOM TODse PLATE COVER II INSTALLCASK PE~FORM SEALWELD INNER &OUiER NDEON COVER PLATE PLUG SEAL WELD TO DSCSHELL ASSEMBLIES I, | |||
, I 8)-----'--DRAIN PERFORM NDE TOW LOADED REMAINING WATER TRAILER FROM DSCAND ON SEAL WELD TOHSM ANNULUS VACUUM INSTALL CASK DRYDSC TOP COVER PLATE II n BACKFILL esc MOVE CAVITY WITH C.A.3KTO HELIUM mAILER | |||
~_..Io-t __ | |||
PERFORM LOWER CASK HELIUM L.EAK | |||
-reST | |||
-- ONTO SUPPORT SKID 1'1 Figure 5.1-1 ISFSI Loading Qgeratioos Flowchart Page 2 of 3 | |||
[See Reference 5.2J Rev. 2 | |||
AUX. BLDG CASK DECON PIT FUEL POOL TRUCK BAY HSM SITE INSPECTHSM ALIGN RAM AND INTERIOR FOR PUSH DSC DEBRIS INTOHSM | |||
* ,~ | |||
REMOVE RAM AND POSITION PULL CASK CASK WITH OUT OF HSMOPENING HSMOPENING REMOVE CASK INSTALLDSC TOP COVER PLATE SEISMIC | |||
& SKID TIE-DOWN RESTRAINT AND BRACKET HSMDOOR FASTENERS t | |||
ALIGN AND TACK WELD DOCK CASK HSMCLOSED WITH HSM DOOR OPENING BGE-A92.01M SECURE SKID AND INSTALL CASK ~ | |||
RESTRAINT SYSTEM Figure 5.1-1 ISFSI Loading Operations Flowchart Page 3 of 3 | |||
. f [See Reference 5.2] | |||
Rev. 1}} |
Latest revision as of 19:36, 11 March 2020
ML102590589 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 09/09/2010 |
From: | Calvert Cliffs |
To: | Office of Nuclear Material Safety and Safeguards |
References | |
Download: ML102590589 (3) | |
Text
CASK HANDLING PIT FUEL POOL AUX. BLDG. TRUCK BAY HSM SITE LOWERCASKI LOAD DSC INTO CASK -- DSCINTO FUEL POOL FILLANNULUS BETWEEN LOAD FUEL DSC AND CASK WITH ASSEMBLIES DEMINERALIZED INTODSC WATER
, o CHECK & RECORD INSTALLAND IDENTITY&
PRESSURIZE LOCATION OF ANNULUS SEAL EACH FUEL ASSY.
INTHEDSC o
FILL DSC CAVITY PLACETOP WITH BORATED WATER
--- SHIELD PLUG ONDSC DECONTAMINATE REMOVE THE OUTER SURFACE CASKIDSC OF CASK FROM FUEL POOL BGE-A92.01M Figure 5.1-1 ISFSI Loading Operations Flowchart Page 1 of 3
[See Reference 5.2]
Rev. 1
~ASK QECON AREA FUEL POQ1. AUX BLDG TRl.:CK BAY HSM SIT~
LOWER WATER @ WELD PLUGS OVER 1 INSTALL LEVEL IN DSC _~~~ VENT AND TRUNNION CAVITY AND SIPHON PORTS RESTRAINTS ANNULUS AND PERFORM NDE
@ ,--._--1. t
, t SEAL WELD TOP INSTALL DSC REf'v1OVE SHIELD PLUG TOP COVER CASK BonOM TODse PLATE COVER II INSTALLCASK PE~FORM SEALWELD INNER &OUiER NDEON COVER PLATE PLUG SEAL WELD TO DSCSHELL ASSEMBLIES I,
, I 8)-----'--DRAIN PERFORM NDE TOW LOADED REMAINING WATER TRAILER FROM DSCAND ON SEAL WELD TOHSM ANNULUS VACUUM INSTALL CASK DRYDSC TOP COVER PLATE II n BACKFILL esc MOVE CAVITY WITH C.A.3KTO HELIUM mAILER
~_..Io-t __
PERFORM LOWER CASK HELIUM L.EAK
-reST
-- ONTO SUPPORT SKID 1'1 Figure 5.1-1 ISFSI Loading Qgeratioos Flowchart Page 2 of 3
[See Reference 5.2J Rev. 2
AUX. BLDG CASK DECON PIT FUEL POOL TRUCK BAY HSM SITE INSPECTHSM ALIGN RAM AND INTERIOR FOR PUSH DSC DEBRIS INTOHSM
- ,~
REMOVE RAM AND POSITION PULL CASK CASK WITH OUT OF HSMOPENING HSMOPENING REMOVE CASK INSTALLDSC TOP COVER PLATE SEISMIC
& SKID TIE-DOWN RESTRAINT AND BRACKET HSMDOOR FASTENERS t
ALIGN AND TACK WELD DOCK CASK HSMCLOSED WITH HSM DOOR OPENING BGE-A92.01M SECURE SKID AND INSTALL CASK ~
RESTRAINT SYSTEM Figure 5.1-1 ISFSI Loading Operations Flowchart Page 3 of 3
. f [See Reference 5.2]
Rev. 1