Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 19 - Chapter 5, Figure 5.1-1, ISFSI Loading Operations Flowchart (See Reference 5.2)
ML102590589
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/09/2010
From:
Calvert Cliffs
To:
Office of Nuclear Material Safety and Safeguards
References
Download: ML102590589 (3)


Text

CASK HANDLING PIT LOAD DSC INTOCASK FILLANNULUS BETWEEN DSCANDCASK WITH DEMINERALIZED WATER o

FUEL POOL LOWERCASKI DSCINTO FUELPOOL LOADFUEL ASSEMBLIES INTODSC AUX. BLDG. TRUCK BAY HSM SITE INSTALLAND PRESSURIZE ANNULUS SEAL o

FILL DSCCAVITY WITH BORATED WATER DECONTAMINATE OUTER SURFACE OF CASK CHECK & RECORD IDENTITY&

LOCATION OF EACHFUELASSY.

INTHEDSC PLACETOP SHIELDPLUG ONDSC REMOVE THE CASKIDSC FROM FUEL POOL BGE-A92.01M Figure 5.1-1 ISFSI Loading Operations Flowchart Page 1 of 3

[See Reference 5.2]

Rev. 1

~ASK QECON AREA FUEL POQ1.

AUX BLDG TRl.:CK BAY HSM SIT~

LOWER WATER LEVEL IN DSC CAVITY AND ANNULUS WELD PLUGS OVER 1

_~~~

VENT AND SIPHON PORTS AND PERFORM NDE INSTALL TRUNNION RESTRAINTS t

REf'v1OVE CASKBonOM COVER INSTALL DSC TOPCOVER PLATE t

SEAL WELD TOP SHIELD PLUG TODse

@,--._--1.

II PE~FORM NDEON SEAL WELD SEALWELD COVER PLATE TO DSCSHELL INSTALLCASK INNER &OUiER PLUG ASSEMBLIES I,

TOWLOADED TRAILER TOHSM

, I PERFORM NDE ON SEAL WELD DRAIN REMAINING WATER FROM DSCAND ANNULUS 8)-----'--

VACUUM DRYDSC INSTALL CASK TOPCOVER PLATE II n

BACKFILL esc CAVITY WITH HELIUM MOVE C.A.3KTO mAILER LOWER CASK ONTO SUPPORT SKID t

PERFORM HELIUM L.EAK

-reST

~_..Io-__

1'1 Figure 5.1-1 ISFSI Loading Qgeratioos Flowchart Page 2 of 3

[See Reference 5.2J Rev. 2

AUX. BLDG CASK DECON PIT FUEL POOL TRUCK BAY HSM SITE INSPECTHSM INTERIOR FOR DEBRIS POSITION CASK WITH HSMOPENING REMOVE CASK TOP COVER PLATE

&SKID TIE-DOWN BRACKET FASTENERS t

ALIGN AND DOCK CASK WITH HSM OPENING SECURE SKID AND INSTALL CASK

~

RESTRAINT SYSTEM ALIGN RAM AND PUSH DSC INTOHSM

,~

REMOVE RAM AND PULL CASK OUT OF HSMOPENING INSTALLDSC SEISMIC RESTRAINT AND HSMDOOR TACK WELD HSMCLOSED DOOR BGE-A92.01M f

Figure 5.1-1 ISFSI Loading Operations Flowchart Page 3 of 3

[See Reference 5.2]

Rev. 1