| issue date = 08/09/2012
| issue date = 08/09/2012
| title = Readiness for NRC Inspection Procedure (IP) 95002, Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area
| title = Readiness for NRC Inspection Procedure (IP) 95002, Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area
| author name = Kaminskas V A
| author name = Kaminskas V
| author affiliation = FirstEnergy Nuclear Operating Co
| author affiliation = FirstEnergy Nuclear Operating Co
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:~~ ~OC Perry Nuclear Power Plant 10 Center Road FirstEnergy Nuclear Operating Company Perry Ohio 44081 Vito A. Kaminskas 440-280-5382 Vice President Fax: 440-280-8029 August 9, 2012 L-12-311 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
{{#Wiki_filter:~~           ~OC                                                                           Perry Nuclear Power Plant 10 Center Road Perry Ohio 44081 FirstEnergyNuclear OperatingCompany Vito A. Kaminskas                                                                                       440-280-5382 Vice President                                                                                     Fax: 440-280-8029 August 9, 2012 L-12-311 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Readiness for NRC Inspection Procedure (IP) 95002. "Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Stratecqic Performance Area" In the U.S. Nuclear Regulatory Commission's (NRC) Annual Assessment Letter for Perry Nuclear Power Plant (Report 05000440/2011007, ADAMS Accession No.ML12065A1 57), dated March 5, 2012, the NRC staff requested that FirstEnergy Nuclear Operating Company (FENOC) advise the staff, in writing, when FENOC is ready for the supplemental inspection at the Perry Nuclear Power Plant (PNPP) using NRC Inspection Procedure (IP) 95002, "Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area." In letter L-12-176, dated April 30, 2012, PNPP informed the NRC that FENOC was ready for the IP 95002 inspection.
 
In letter L-12-252, dated June 19, 2012, PNPP documented a request to postpone the scheduled IP 95002 inspection to provide additional time to conduct a review of recent events to assure that the plant was adequately prepared for the NRC's supplemental inspection.
Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Readiness for NRC Inspection Procedure (IP) 95002. "Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Stratecqic Performance Area" In the U.S. Nuclear Regulatory Commission's (NRC) Annual Assessment Letter for Perry Nuclear Power Plant (Report 05000440/2011007, ADAMS Accession No. ML12065A157), dated March 5, 2012, the NRC staff requested that FirstEnergy Nuclear Operating Company (FENOC) advise the staff, in writing, when FENOC is ready for the supplemental inspection at the Perry Nuclear Power Plant (PNPP) using NRC Inspection Procedure (IP) 95002, "Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area." In letter L-12-176, dated April 30, 2012, PNPP informed the NRC that FENOC was ready for the IP 95002 inspection.
PNPP stated that the NRC will be advised in writing when this review is complete and FENOC is ready for the inspection.
In letter L-12-252, dated June 19, 2012, PNPP documented a request to postpone the scheduled IP 95002 inspection to provide additional time to conduct a review of recent events to assure that the plant was adequately prepared for the NRC's supplemental inspection. PNPP stated that the NRC will be advised in writing when this review is complete and FENOC is ready for the inspection.
The causal analysis of two recent events that lead to reporting Occupational Exposure Control Effectiveness performance indicator occurrences has been completed.
The causal analysis of two recent events that lead to reporting Occupational Exposure Control Effectiveness performance indicator occurrences has been completed. The review included an assessment of the corrective actions that were developed to address the root and contributing causes of the previously identified IP 95002 performance issues. Based on completion of these activities, this letter is informing the NRC staff that FENOC is ready for the IP 95002 inspection at the PNPP site.
The review included an assessment of the corrective actions that were developed to address the root and contributing causes of the previously identified IP 95002 performance issues. Based on completion of these activities, this letter is informing the NRC staff that FENOC is ready for the IP 95002 inspection at the PNPP site.ot Perry Nuclear Power Plant L-12-311 Page 2 of 2 There are no regulatory commitments contained in this letter. If there are any questions, or if additional information is required, please contact Mr. Robert Coad, Manager -Regulatory Compliance, at (440) 280-5328.Sincerely, Vito A. Kaminskas cc: NRC Regional Administrator, Region III NRC Resident Inspector NRR Project Manager}}
ot
 
Perry Nuclear Power Plant L-12-311 Page 2 of 2 There are no regulatory commitments contained in this letter. If there are any questions, or if additional information is required, please contact Mr. Robert Coad, Manager - Regulatory Compliance, at (440) 280-5328.
Sincerely, Vito A. Kaminskas cc:   NRC Regional Administrator, Region III NRC Resident Inspector NRR Project Manager}}

Latest revision as of 13:51, 6 February 2020

Readiness for NRC Inspection Procedure (IP) 95002, Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area
ML12223A207
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/09/2012
From: Kaminskas V
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
IP 95002, L-12-311
Download: ML12223A207 (2)


Text

~~ ~OC Perry Nuclear Power Plant 10 Center Road Perry Ohio 44081 FirstEnergyNuclear OperatingCompany Vito A. Kaminskas 440-280-5382 Vice President Fax: 440-280-8029 August 9, 2012 L-12-311 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Readiness for NRC Inspection Procedure (IP) 95002. "Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Stratecqic Performance Area" In the U.S. Nuclear Regulatory Commission's (NRC) Annual Assessment Letter for Perry Nuclear Power Plant (Report 05000440/2011007, ADAMS Accession No. ML12065A157), dated March 5, 2012, the NRC staff requested that FirstEnergy Nuclear Operating Company (FENOC) advise the staff, in writing, when FENOC is ready for the supplemental inspection at the Perry Nuclear Power Plant (PNPP) using NRC Inspection Procedure (IP) 95002, "Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area." In letter L-12-176, dated April 30, 2012, PNPP informed the NRC that FENOC was ready for the IP 95002 inspection.

In letter L-12-252, dated June 19, 2012, PNPP documented a request to postpone the scheduled IP 95002 inspection to provide additional time to conduct a review of recent events to assure that the plant was adequately prepared for the NRC's supplemental inspection. PNPP stated that the NRC will be advised in writing when this review is complete and FENOC is ready for the inspection.

The causal analysis of two recent events that lead to reporting Occupational Exposure Control Effectiveness performance indicator occurrences has been completed. The review included an assessment of the corrective actions that were developed to address the root and contributing causes of the previously identified IP 95002 performance issues. Based on completion of these activities, this letter is informing the NRC staff that FENOC is ready for the IP 95002 inspection at the PNPP site.

ot

Perry Nuclear Power Plant L-12-311 Page 2 of 2 There are no regulatory commitments contained in this letter. If there are any questions, or if additional information is required, please contact Mr. Robert Coad, Manager - Regulatory Compliance, at (440) 280-5328.

Sincerely, Vito A. Kaminskas cc: NRC Regional Administrator, Region III NRC Resident Inspector NRR Project Manager