(3 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 08/02/2010 | | | issue date = 08/02/2010 |
| | title = Email Attachment: Point Beach Nuclear Plant, Units 1 and 2 - Draft RAIs Extended Power Uprate and Associated with Diesel FO Storage Requirements | | | title = Email Attachment: Point Beach Nuclear Plant, Units 1 and 2 - Draft RAIs Extended Power Uprate and Associated with Diesel FO Storage Requirements |
| | author name = Beltz T A | | | author name = Beltz T |
| | author affiliation = NRC/NRR/DORL/LPLIII-1 | | | author affiliation = NRC/NRR/DORL/LPLIII-1 |
| | addressee name = Hale S | | | addressee name = Hale S |
Line 15: |
Line 15: |
| | page count = 2 | | | page count = 2 |
| | project = TAC:ME1044, TAC:ME1045 | | | project = TAC:ME1044, TAC:ME1045 |
| | stage = Draft Other | | | stage = Draft RAI |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:REQUESTS FOR ADDITIONAL INFORMATION Point Beach Nuclear Plant (PBNP), Units 1 and 2 License Amendment Request (LAR-261) dated April 7, 2009 Extended Power Uprate (TAC Nos. ME1044 and ME1045) | | {{#Wiki_filter:REQUESTS FOR ADDITIONAL INFORMATION Point Beach Nuclear Plant (PBNP), Units 1 and 2 License Amendment Request (LAR-261) dated April 7, 2009 Extended Power Uprate (TAC Nos. ME1044 and ME1045) |
| | | The following requests for additional information are associated with the NRC staff review of the LAR-261 associated with the extended power uprate for the PBNP, Units 1 and 2. |
| The following requests for additional information are associated with the NRC staff review of the LAR-261 associated with the extended power uprate for the PBNP, Units 1 and 2. | |
| | |
| EEEB-1 The following questions are related to information provided in response to request for additional information related to extended power uprate and EDG loading/fuel oil consumption, (License Amendment Request 261) NextEra letter dated September 25, 2009 (ADAMS Accession No. ML092750395): | | EEEB-1 The following questions are related to information provided in response to request for additional information related to extended power uprate and EDG loading/fuel oil consumption, (License Amendment Request 261) NextEra letter dated September 25, 2009 (ADAMS Accession No. ML092750395): |
| Enclosure 8 has the following statement related to the fuel oil consumption calculation: | | Enclosure 8 has the following statement related to the fuel oil consumption calculation: |
| | Revision 5 includes the following changes: (1) Removes the 10% margin identified for the T-176A and T-1 76B day tank capacity determination. This margin was provided for initial tank sizing and is not applicable to subsequent capacity evaluations; (2) Clarifies the basis for the High Heating Value to be used for Ultra Low Sulfur Diesel and recalculates fuel consumption rate at PBNP fuel conditions to address A/R 0114489; (3) |
| | Removes the conservatism in the temperature correction used for the fuel oil consumption rate determination. |
| | a) Industry Standard ANSI/ANS-59.51-1997 Fuel Oil System For Safety-Related Emergency Diesel Generators (previously ANSI N195-1976), as endorsed by Regulatory Guide 1.137, Section 5.5.1, states that each diesel shall have a day tank with sufficient capacity to maintain at least 60 minutes of operation and that this capacity shall assume the fuel consumption with the diesel running at 100% continuous rated plus a minimum additional margin of 10%. This requirement is under component performance requirements. |
| | i) Please provide an explanation as to why this requirement is being deleted from your calculation. |
| | ii) The calculation uses the load dependant method of calculating the fuel oil storage requirements. Please clarify if the 10% margin has been removed from the fuel oil storage required on site for seven day operation of EDGs. |
| | iii) Provide details on the changes associated with the consumption rate related to Ultra Low Sulfur fuel at the bounding density allowable by Technical Specifications. |
| | b) Please verify that the Appendix R related fuel oil requirements with spurious accident signal actuations associated with EDG(s) operation or Gas Turbine operation is not the bounding case for fuel oil storage requirements. |
|
| |
|
| "Revision 5 includes the following changes: (1) Removes the 10% margin identified for the T-176A and T-1 76B day tank capacity determination. This margin was provided for initial tank sizing and is not applicable to subsequent capacity evaluations; (2) Clarifies the basis for the High Heating Value to be used for Ultra Low Sulfur Diesel and recalculates fuel consumption rate at PBNP fuel conditions to address A/R 0114489; (3)
| |
| Removes the conservatism in the temperature correction used for the fuel oil consumption rate determination."
| |
| a) Industry Standard ANSI/ANS-59.51-1997 "Fuel Oil System For Safety-Related Emergency Diesel Generators" (previously ANSI N195-1976), as endorsed by Regulatory Guide 1.137, Section 5.5.1, states that each diesel shall have a day tank with sufficient capacity to maintain at least 60 minutes of operation and that this capacity shall assume the fuel consumption with the diesel running at 100% continuous rated plus a minimum additional margin of 10%. This requirement is under component performance requirements.
| |
|
| |
| i) Please provide an explanation as to why this requirement is being deleted from your calculation.
| |
| ii) The calculation uses the load dependant method of calculating the fuel oil storage requirements. Please clarify if the 10% margin has been removed from the fuel oil storage required on site for seven day operation of EDGs.
| |
|
| |
| iii) Provide details on the changes associated with the consumption rate related to Ultra Low Sulfur fuel at the bounding density allowable by Technical Specifications.
| |
| b) Please verify that the Appendix R related fuel oil requirements with spurious accident signal actuations associated with EDG(s) operation or Gas Turbine operation is not the bounding case for fuel oil storage requirements.
| |
| c) Assumption 17 states that fuel oil consumption rate at 2951kW is equal to that at 2848kW. | | c) Assumption 17 states that fuel oil consumption rate at 2951kW is equal to that at 2848kW. |
| Please provide supporting documentation. Provide details on the method used to evaluate fuel oil consumption at different EDG loadings during a seven day operation. | | Please provide supporting documentation. Provide details on the method used to evaluate fuel oil consumption at different EDG loadings during a seven day operation. |
| d) Assumption 18 states that the average loading of the EDGs over a seven day period is used for fuel oil consumption. The justification provided in assumption 20 is based on a future rebuild of a service water pump. | | d) Assumption 18 states that the average loading of the EDGs over a seven day period is used for fuel oil consumption. The justification provided in assumption 20 is based on a future rebuild of a service water pump. |
| Please provide details on the current load profile of EDG(s) loading and fuel oil consumption for current plant design using actual loading over a seven day period. | | Please provide details on the current load profile of EDG(s) loading and fuel oil consumption for current plant design using actual loading over a seven day period. |
| | | e) The latest revision of the calculation imposes a restriction on the BTU/pound for fuel oil receipt. |
| e) The latest revision of the calculation imposes a restriction on the BTU/pound for fuel oil receipt. | | Please provide details on the actual value of BTU/pound used in the calculation and the method used to convert BTUs to gallons per kW/hr. Provide data on the BTU content of the fuel oil currently available in the storage tanks.}} |
| Please provide details on the actual value of BTU/pound used in the calculation and the method used to convert BTUs to gallons per kW/hr. Provide data on the BTU content of the fuel oil currently available in the storage tanks.}} | |
Letter Sequence Draft RAI |
---|
TAC:ME1044, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) TAC:ME1045, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement
|
MONTHYEARNRC-2008-0086, License Amendment Request 258 Incorporate Best Estimate Large Break Loss of Coolant Accident (LOCA) Analysis Using Astrum2008-11-25025 November 2008 License Amendment Request 258 Incorporate Best Estimate Large Break Loss of Coolant Accident (LOCA) Analysis Using Astrum Project stage: Request NRC 2009-0030, License Amendment Request 261, Extended Power Uprate2009-04-0707 April 2009 License Amendment Request 261, Extended Power Uprate Project stage: Request NRC 2009-0068, License Amendment Request 261 Supplement 2 Extended Power Uprate2009-06-17017 June 2009 License Amendment Request 261 Supplement 2 Extended Power Uprate Project stage: Supplement NRC 2009-0066, License Amendment Request 261 Supplement 1 Extended Power Uprate2009-06-17017 June 2009 License Amendment Request 261 Supplement 1 Extended Power Uprate Project stage: Supplement NRC 2009-0094, License Amendment Request 261 Extended Power Uprate Expedited Review Request2009-09-11011 September 2009 License Amendment Request 261 Extended Power Uprate Expedited Review Request Project stage: Request NRC 2009-0098, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-09-25025 September 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0116, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-11-21021 November 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0115, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-11-21021 November 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0124, License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information2009-11-30030 November 2009 License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0120, License Amendment Request 261, Supplement 3 Extended Power Uprate2009-12-0808 December 2009 License Amendment Request 261, Supplement 3 Extended Power Uprate Project stage: Supplement NRC 2009-0122, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-12-16016 December 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0128, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-12-21021 December 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2010-0013, License Amendment Request 264 - Diesel Fuel Oil Storage Requirements2010-01-27027 January 2010 License Amendment Request 264 - Diesel Fuel Oil Storage Requirements Project stage: Request NRC 2010-0022, License Amendment Request 261, Extended Power Uprate & Transmittal of Proposed Technical Specifications for Reactor Protection System & Engineered Safety Features Setpoints Not Associated with Extended Power Uprate2010-02-25025 February 2010 License Amendment Request 261, Extended Power Uprate & Transmittal of Proposed Technical Specifications for Reactor Protection System & Engineered Safety Features Setpoints Not Associated with Extended Power Uprate Project stage: Request NRC 2010-0012, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Lnformation2010-03-0303 March 2010 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Lnformation Project stage: Request NRC 2010-0037, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2010-04-29029 April 2010 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2010-0060, License Amendment Request 261 Extended Power Uprate, Response to Request for Additional Information2010-04-30030 April 2010 License Amendment Request 261 Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI ML1013401032010-05-13013 May 2010 License Amendment Request 261 Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2010-0063, License Amendment Request 261, Extended Power Uprate Response to Request for Additional Information2010-06-11011 June 2010 License Amendment Request 261, Extended Power Uprate Response to Request for Additional Information Project stage: Response to RAI NRC 2010-0039, License Amendment Request 261 Extended Power Uprate, Transmittal of Attachments 3 and 4 to NRC 2010-00392010-07-15015 July 2010 License Amendment Request 261 Extended Power Uprate, Transmittal of Attachments 3 and 4 to NRC 2010-0039 Project stage: Request ML1020401382010-07-21021 July 2010 License Amendment Request 261 Extended Power Uprate, Transmittal of Sample Reactor Protection System/Engineered Safety Features Actuation System Instrumentation Setpoint Calculations Project stage: Request NRC 2010-0105, License Amendment Request 261, Supplement 6 Extended Power Uprate2010-07-28028 July 2010 License Amendment Request 261, Supplement 6 Extended Power Uprate Project stage: Supplement ML1021702352010-08-0202 August 2010 Email Attachment: Point Beach Nuclear Plant, Units 1 and 2 - Draft RAIs Extended Power Uprate and Associated with Diesel FO Storage Requirements Project stage: Draft RAI NRC 2010-0112, License Amendment Request 261, Extended Power Uprate Transmittal of Proposed Technical Specifications for Reactor Protection System and Engineered Safety Features Setpoints Not Associated with Extended Power Uprate2010-08-0202 August 2010 License Amendment Request 261, Extended Power Uprate Transmittal of Proposed Technical Specifications for Reactor Protection System and Engineered Safety Features Setpoints Not Associated with Extended Power Uprate Project stage: Request ML1022406372010-08-11011 August 2010 Draft RAIs Extended Power Uprate (TAC Nos. ME1044 & ME1045 Project stage: Draft RAI NRC 2010-0133, License Amendment Request 261, Extended Power Uprate, Regulatory Commitment Change2010-08-12012 August 2010 License Amendment Request 261, Extended Power Uprate, Regulatory Commitment Change Project stage: Request NRC 2010-0116, License Amendment Request 261 Extended Power Uprate, Response to Request for Additional Information2010-08-23023 August 2010 License Amendment Request 261 Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2010-0123, Response to Request for Additional Information on License Amendment Request 261 Extended Power Uprate2010-08-26026 August 2010 Response to Request for Additional Information on License Amendment Request 261 Extended Power Uprate Project stage: Response to RAI ML1025603032010-09-0303 September 2010 Summary of Teleconference to Clarify RAI Response Regarding Dynamic Analysis of Feedwater Valve Fast Closure Project stage: Meeting NRC 2010-0148, License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information2010-09-27027 September 2010 License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information Project stage: Response to RAI NRC 2010-0146, License Amendment Request 261, Extended Power Uprate, Withdrawal of Proposed Technical Specifications for Reactor Protection System and Engineered Safety Features Setpoints Not Associated with Extended Power Uprate2010-09-28028 September 2010 License Amendment Request 261, Extended Power Uprate, Withdrawal of Proposed Technical Specifications for Reactor Protection System and Engineered Safety Features Setpoints Not Associated with Extended Power Uprate Project stage: Withdrawal ML1028002632010-10-0404 October 2010 AFW Modification LAR Requests for Additional Information - Scvb Project stage: RAI ML1028105912010-10-0808 October 2010 Request a Conference Call to Discuss Some Issues Found in Recent Submittals Re. Extended Power Uprate Project stage: Other NRC 2010-0161, License Amendment Request 261 Extended Power Uprate, Response to Request for Additional Lnformation2010-10-15015 October 2010 License Amendment Request 261 Extended Power Uprate, Response to Request for Additional Lnformation Project stage: Request ML1031906532010-11-0808 November 2010 Draft Requests for Additional Information, (Srxb) EPU LAR Review Project stage: Draft RAI NRC 2010-0189, License Amendment Request 261, Extended Power Uprate Response to Request for Clarification2010-12-21021 December 2010 License Amendment Request 261, Extended Power Uprate Response to Request for Clarification Project stage: Request NRC 2010-0195, License Amendment Request 261 Extended Power Uprate Response to Request for Clarification2010-12-21021 December 2010 License Amendment Request 261 Extended Power Uprate Response to Request for Clarification Project stage: Request ML1101103532011-01-0707 January 2011 Comment (4) of Dennis Dums and Katie Nekola, on Point Beach, Units 1 & 2 Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Draft Other NRC 2011-0003, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2011-01-13013 January 2011 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2011-0013, License Amendment Request 261 Extended Power Uprate, Response to Request for Clarification2011-01-21021 January 2011 License Amendment Request 261 Extended Power Uprate, Response to Request for Clarification Project stage: Request ML1103200602011-03-25025 March 2011 (Pbnp), Units 1 and 2 - Issuance of License Amendments Revision of Reactor Protection System (RPS) and Engineered Safety Feature Actuation System (ESFAS) Instrumentation Setpoints Project stage: Approval 2010-04-29
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML24215A2092024-08-0101 August 2024 NRR E-mail Capture - Final RAI - Point Beach 1 & 2 - License Amendment Request to Modify Containment Average Air Temperature Requirements ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan ML24176A2242024-06-24024 June 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24149A1922024-05-28028 May 2024 Notification of NRC Baseline Inspection and Request for Information ML24141A1382024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection.Docx ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23163A2422023-06-13013 June 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2023004 ML23136A2802023-05-0505 May 2023 SLRA Second Annual Update RAI Set 1 ML23122A0132023-05-0101 May 2023 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding Risk-Informed Approach to Address GSI-191 ML23033A0292023-01-31031 January 2023 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI (Volume 2) - License Amendment Request Regarding TSTS-505 ML23003A8022023-01-0303 January 2023 Notification of NRC Baseline Inspection and Request for Information ML22354A1612022-12-20020 December 2022 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding TSTS-505 ML22311A5582022-11-22022 November 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Cep ML22266A0872022-09-23023 September 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML22172A1192022-06-27027 June 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-505 Provide Risk Informed Extended Complete Times - RITSTF Initiative 4B ML22130A5712022-05-12012 May 2022 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML22041B0752022-02-10010 February 2022 Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000266/2022002 ML21362A6812021-12-17017 December 2021 SLRA Safety RAIs Set 14 Final ML21362A6822021-12-17017 December 2021 SLRA Safety RAIs Set 14 Final Email ML21362A6702021-12-15015 December 2021 SLRA Safety RAIs Set 13 Final ML21362A6712021-12-15015 December 2021 SLRA Safety RAIs Set 13 Final Email ML21287A0852021-10-14014 October 2021 SLRA Safety RAI Set 11 Final Email ML21286A6042021-10-0505 October 2021 SLRA Safety RAIs Set 10 Final ML21286A6032021-10-0505 October 2021 SLRA Safety RAIs Set 10 Final Email ML21273A0222021-09-29029 September 2021 SLRA Safety RAI Set 9 Final ML21287A0862021-09-29029 September 2021 SLRA Safety RAI Set 11 Final ML21253A1672021-09-10010 September 2021 Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information Inspection Report 05000266/2022010 05000301/2022010 ML21242A2292021-08-27027 August 2021 SLRA Draft Safety RAI Set 9 Email ML21242A2282021-08-27027 August 2021 SLRA Draft Safety RAI Set 9 ML21242A2472021-08-26026 August 2021 SLRA Safety RAIs Set 8 Final ML21242A2222021-08-23023 August 2021 SLRA Draft Safety RAI Set 8 ML21242A2232021-08-23023 August 2021 SLRA Draft Safety RAI Set 8 Email ML21242A2192021-08-20020 August 2021 SLRA Safety RAI Set 7 Final Email ML21242A2202021-08-20020 August 2021 SLRA Safety RAI Set 7 Final ML21242A2142021-08-13013 August 2021 SLRA Safety RAIs Set 7 Draft ML21242A2132021-08-13013 August 2021 SLRA Safety RAIs Set 7 Draft Email ML21242A0152021-08-12012 August 2021 SLRA Safety RAIs Set 6 Final ML21242A2392021-08-12012 August 2021 SLRA Safety RAIs Set 6 Final ML21242A2032021-08-12012 August 2021 Srla Safety RAIs Set 5 Final ML21242A2382021-08-12012 August 2021 SLRA Safety RAIs Set 6 Final Email ML21242A2042021-08-12012 August 2021 SLRA Safety RAIs Set 5 Final Email ML21242A0122021-08-0909 August 2021 SLRA Draft Safety RAIs Set 6 ML21285A1212021-08-0505 August 2021 SLRA Public Meeting Discussion Questions August 5 2021 ML21242A2002021-08-0505 August 2021 SLRA Draft Safety RAIs Set 5 Email ML21242A1992021-08-0505 August 2021 Srla Draft Safety RAIs Set 5 ML21238A2322021-08-0404 August 2021 SLRA Safety RAI Set 4 Final Email ML21238A2332021-08-0404 August 2021 SLRA Safety RAI Set 4 Final ML21237A0062021-08-0202 August 2021 SLRA Draft Safety RAIs Set 4 ML21208A1892021-07-27027 July 2021 SLRA Safety RAIs Set 2 Final 2024-08-01
[Table view] |
Text
REQUESTS FOR ADDITIONAL INFORMATION Point Beach Nuclear Plant (PBNP), Units 1 and 2 License Amendment Request (LAR-261) dated April 7, 2009 Extended Power Uprate (TAC Nos. ME1044 and ME1045)
The following requests for additional information are associated with the NRC staff review of the LAR-261 associated with the extended power uprate for the PBNP, Units 1 and 2.
EEEB-1 The following questions are related to information provided in response to request for additional information related to extended power uprate and EDG loading/fuel oil consumption, (License Amendment Request 261) NextEra letter dated September 25, 2009 (ADAMS Accession No. ML092750395):
Enclosure 8 has the following statement related to the fuel oil consumption calculation:
Revision 5 includes the following changes: (1) Removes the 10% margin identified for the T-176A and T-1 76B day tank capacity determination. This margin was provided for initial tank sizing and is not applicable to subsequent capacity evaluations; (2) Clarifies the basis for the High Heating Value to be used for Ultra Low Sulfur Diesel and recalculates fuel consumption rate at PBNP fuel conditions to address A/R 0114489; (3)
Removes the conservatism in the temperature correction used for the fuel oil consumption rate determination.
a) Industry Standard ANSI/ANS-59.51-1997 Fuel Oil System For Safety-Related Emergency Diesel Generators (previously ANSI N195-1976), as endorsed by Regulatory Guide 1.137, Section 5.5.1, states that each diesel shall have a day tank with sufficient capacity to maintain at least 60 minutes of operation and that this capacity shall assume the fuel consumption with the diesel running at 100% continuous rated plus a minimum additional margin of 10%. This requirement is under component performance requirements.
i) Please provide an explanation as to why this requirement is being deleted from your calculation.
ii) The calculation uses the load dependant method of calculating the fuel oil storage requirements. Please clarify if the 10% margin has been removed from the fuel oil storage required on site for seven day operation of EDGs.
iii) Provide details on the changes associated with the consumption rate related to Ultra Low Sulfur fuel at the bounding density allowable by Technical Specifications.
b) Please verify that the Appendix R related fuel oil requirements with spurious accident signal actuations associated with EDG(s) operation or Gas Turbine operation is not the bounding case for fuel oil storage requirements.
c) Assumption 17 states that fuel oil consumption rate at 2951kW is equal to that at 2848kW.
Please provide supporting documentation. Provide details on the method used to evaluate fuel oil consumption at different EDG loadings during a seven day operation.
d) Assumption 18 states that the average loading of the EDGs over a seven day period is used for fuel oil consumption. The justification provided in assumption 20 is based on a future rebuild of a service water pump.
Please provide details on the current load profile of EDG(s) loading and fuel oil consumption for current plant design using actual loading over a seven day period.
e) The latest revision of the calculation imposes a restriction on the BTU/pound for fuel oil receipt.
Please provide details on the actual value of BTU/pound used in the calculation and the method used to convert BTUs to gallons per kW/hr. Provide data on the BTU content of the fuel oil currently available in the storage tanks.