ML093170022: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/12/2009
| issue date = 11/12/2009
| title = Cycle 23 Core Operating Limits Report Revision 0
| title = Cycle 23 Core Operating Limits Report Revision 0
| author name = Funderburk C L
| author name = Funderburk C
| author affiliation = Dominion Resources Services, Inc, Virginia Electric & Power Co (VEPCO)
| author affiliation = Dominion Resources Services, Inc, Virginia Electric & Power Co (VEPCO)
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261November12,2009U.S.NuclearRegulatoryCommissionAttention:DocumentControlDesk Washington,D.C.20555-0001SerialNo.09-716 NLOSlvlhDocketNo.50-281LicenseNo.DPR-37 VIRGINIA ELECTRICANDPOWER COMPANY (DOMINION)SURRYPOWER STATIONUNIT2CYCLE23CORE OPERATINGLIMITSREPORTREVISION0PursuanttoSurryTechnicalSpecification(TS)6.2.C,enclosedisacopyofDominion'sCoreOperatingLimitsReport(COLR)forSurryUnit2Cycle23PatternBOA, Revision O.Ifyouhaveanyquestionsorrequireadditionalinformation,pleasecontactMr.GaryMillerat(804)273-2771.
{{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 November 12, 2009 U. S. Nuclear Regulatory Commission                        Serial No. 09-716 Attention: Document Control Desk                            NLOSlvlh Washington, D. C. 20555-0001                                Docket No. 50-281 License No. DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
Sincerely,C.L.Funderburk,DirectorNuclearLicensingandOperationsSupportDominionResourcesServices,Inc.forVirginiaElectricandPowerCompany Enclosure CommitmentSummary:Therearenonewcommitmentsasaresultofthisletter.
SURRY POWER STATION UNIT 2 CYCLE 23 CORE OPERATING LIMITS REPORT REVISION 0 Pursuant to Surry Technical Specification (TS) 6.2.C, enclosed is a copy of Dominion's Core Operating Limits Report (COLR) for Surry Unit 2 Cycle 23 Pattern BOA, Revision O.
cc:U.S.Nuclear Regulatory Commission Region"SamNunn Atlanta Federal Center61Forsyth Street,S.W.Suite 23T85 Atlanta,GA30303-8931Dr.V.Sreenivas NRC Project ManagerU.S.Nuclear Regulatory Commission One WhiteFlintNorthMaiIStop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738Ms.K.R.Cotton NRC Project ManagerU.S.Nuclear Regulatory Commission One WhiteFlintNorthMaiIStop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Surry Power Station Serial No.09-716 Cycle23Core Operating Limits ReportPage2of2 COLR-S2C23,Rev.0 COLR-S2C23, Revision 0 CORE OPERATING LIMITS REPORTSurry2Cycle23 Pattern BOAPage1 of 6  
If you have any questions or require additional          information, please  contact Mr. Gary Miller at (804) 273-2771.
Sincerely,
/--~-7'
(~~.)[-
C. L. Funderburk, Director Nuclear Licensing and Operations Support Dominion Resources Services, Inc. for Virginia Electric and Power Company Enclosure Commitment Summary: There are no new commitments as a result of this letter.
 
Serial No. 09-716 Cycle 23 Core Operating Limits Report Page 2 of 2 cc: U. S. Nuclear Regulatory Commission Region" Sam Nunn Atlanta Federal Center 61 Forsyth Street, S. W.
Suite 23T85 Atlanta, GA 30303-8931 Dr. V. Sreenivas NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mai I Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Ms. K. R. Cotton NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mai I Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Surry Power Station
 
COLR-S2C23, Revision 0 CORE OPERATING LIMITS REPORT Surry 2 Cycle 23 Pattern BOA COLR-S2C23, Rev. 0                                 Page 1 of 6


==1.0 INTRODUCTION==
==1.0 INTRODUCTION==


This Core Operating Limits Report(COLR)forSurry Unit2Cycle23hasbeenprepared in accordance with the requirements of Technical Specification 6.2.C.TheTechnicalSpecificationsaffectedbythisreportare:TS3.1.E-Moderator Temperature Coefficient TS 3.12.A.l, TS 3.12.A.2, TS 3.12.AJ,andTS 3.12.C.3.b.1.b
This Core Operating Limits Report (COLR) for Surry Unit 2 Cycle 23 has been prepared in accordance with the requirements of Technical Specification 6.2.C.
-Control BankInsertionLimits TS 3.12.B.landTS3.12.B.2-Power Distribution Limits TS 3.12.A.l.a, TS 3.12.A.2.a,andTS 3.12.0-Shutdown Margin  
The Technical Specifications affected by this report are:
TS 3.1.E - Moderator Temperature Coefficient TS 3.12.A.l, TS 3.12.A.2, TS 3.12.AJ, and TS 3.12.C.3.b.1.b - Control Bank Insertion Limits TS 3.12.B.l and TS 3.12.B.2 - Power Distribution Limits TS 3.12.A.l.a, TS 3.12.A.2.a, and TS 3.12.0 - Shutdown Margin


==2.0 REFERENCES==
==2.0 REFERENCES==
: 1. VEP-FRD-42, Rev. 2.1-A, "Reload Nuclear Design Methodology," August 2003 (Methodology for TS 3.l.E - Moderator Temperature Coefficient; TS 3.12.A.l, TS 3.12.A.2, TS 3.12.A.3, and TS 3.12.C.3.b.1.b - Control Bank Insertion Limit; TS 3.12.B.l and TS 3.12.B.2 - Heat Flux Hot Channel Factor and Nuclear Enthalpy Rise Hot Channel Factor; TS 3.12.A.1.a, TS 3.12.A.2.a, and TS 3.12.0 - Shutdown Margin) 2a. WCAP-16009-P-A, "Realistic Large Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM)," (Westinghouse Proprietary), January 2005 (Methodology forTS 3.12.B.l and TS 3.12.B.2 - Heat Flux Hot Channel Factor) 2b. WCAP-I0054-P-A, "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code," August 1985 (WestinghouseProprietary)
(Methodology for TS 3.l2.B.l and TS 3.12.B.2 - Heat Flux Hot Channel Factor) 2c. WCAP-I0079-P-A, "NOTRUMP, A Nodal Transient Small Break and Oeneral Network Code," August 1985 (Westinghouse Proprietary)
(Methodology for TS 3.12.B.l and TS 3.12.B.2 - Heat Flux Hot Channel Factor) 2d. WCAP-12610-P-A, "VANTAGE+ Fuel Assembly Report," June 1990 (Westinghouse Proprietary)
(Methodology forTS 3.12.B.l and TS 3.l2.B.2 - Heat Flux Hot Channel Factor) 3a. VEP-NE-2-A, Rev. 0, "Statistical DNBR Evaluation Methodology," June 1987 (Methodology for TS 3.12.B.l and TS 3.12.B.2 - Nuclear Enthalpy Rise Hot Channel Factor) 3b. VEP-NE-3-A, Rev. 0, "Qualification of the WRB-l CHF Correlation in the Virginia Power COBRA Code," July 1990 (Methodology for TS 3.12.B.I and TS 3.l2.B.2 - Nuclear Enthalpy Rise Hot Channel Factor)
COLR-S2C23, Rev.    °                                                          Page 2 of 6
3.0 OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in section 1.0 are presented in the following subsections. These limits have been developed using the NRC-approved methodologies specified in Technical Specification 6.2.C.
3.1 Moderator Temperature Coefficient (TS 3.I.E) 3.1.1 The Moderator Temperature Coefficient (MTC) limits are:
                +6.0 pcm/F at less than 50 percent ofRATED POWER, or
                +6.0 pcm/F at 50 percent of RATED POWER and linearly decreasing to          a pcm/F at RATED POWER 3.2 Control Bank Insertion Limits (TS 3.12.A.I, TS 3.I2.A.2, and TS 3.12.C.3.b.1.b) 3.2.1 The control rod banks shall be limited in physical insertion as shown in Figure A-I.
3.2.2 The rod insertion limit for the A and B control banks is the fully withdrawn position as shown on Figure A-I.
3.2.3 The rod insertion limit for the A and B shutdown banks is the fully withdrawn position as shown on Figure A-I.
3.3 Shutdown Margin (TS 3.I2.A.1.a, TS 3.I2.A.2.a, and TS 3.I2.G) 3.3.1 Whenever the reactor is subcritical the shutdown margin (SDM) shall be 21.77 %&Ik.
COLR-S2C23, Rev. 0                                                                Page 3 of 6
3.4 Heat Flux Hot Channel Factor-FQ(z) (TS 3.12.B.l)
CFQ FQ(z) S --K(z) for P> 0.5 P
CFQ FQ(z) S --K(z) for P S 0.5


1.VEP-FRD-42,Rev.2.1-A,"Reload Nuclear Design Methodology," August 2003 (MethodologyforTS 3.l.E-Moderator Temperature Coefficient; TS 3.12.A.l, TS 3.12.A.2, TS 3.12.A.3,andTS 3.12.C.3.b.1.b-ControlBank InsertionLimit;TS 3.12.B.landTS 3.12.B.2-Heat Flux Hot ChannelFactorand Nuclear EnthalpyRiseHotChannelFactor;TS 3.12.A.1.a, TS 3.12.A.2.a,andTS 3.12.0-Shutdown Margin)2a.WCAP-16009-P-A,"Realistic Large Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM)," (Westinghouse Proprietary), January 2005 (Methodology forTS3.12.B.landTS3.12.B.2-HeatFluxHotChannelFactor) 2b.WCAP-I0054-P-A,"WestinghouseSmallBreakECCSEvaluationModelUsingtheNOTRUMPCode,"August1985(WestinghouseProprietary)(MethodologyforTS 3.l2.B.landTS3.12.B.2-HeatFluxHotChannelFactor) 2c.WCAP-I0079-P-A,"NOTRUMP, A Nodal Transient Small Break and Oeneral Network Code," August 1985 (Westinghouse Proprietary)(MethodologyforTS 3.12.B.landTS 3.12.B.2-Heat Flux Hot Channel Factor)2d.WCAP-12610-P-A,"VANTAGE+FuelAssemblyReport,"June1990(WestinghouseProprietary)(Methodology forTS3.12.B.landTS 3.l2.B.2-HeatFluxHotChannelFactor) 3a.VEP-NE-2-A,Rev.0,"Statistical DNBR Evaluation Methodology,"June1987(MethodologyforTS3.12.B.landTS3.12.B.2-NuclearEnthalpyRiseHotChannelFactor)3b.VEP-NE-3-A,Rev.
===0.5 where===
0,"Qualification oftheWRB-lCHFCorrelationintheVirginiaPowerCOBRACode,"July1990(MethodologyforTS3.12.B.IandTS 3.l2.B.2-NuclearEnthalpyRiseHotChannelFactor)
P  = Thermal Power Rated Power 3.4.1 CFQ=2.32 3.4.2 K(z) is provided in Figure A-2.
COLR-S2C23, Rev.°Page2 of 6  
3.5 Nuclear Enthalpy Rise Hot Channel Factor-FMI(N) (TS 3.12.B.l)
F!ili(N) S CFDHx{I+PFDH(I-P)}
Thermal Power were:
h    P =-   ----
Rated Power 3.5.1  CFDH = 1.56 for Surry Improved Fuel (SIP) 3.5.2 PFDH= 0.3 COLR-S2C23, Rev. 0                                              Page 4 of 6


===3.0 OPERATING===
Figure A-I SURRY UNIT 2 CYCLE 23 ROD GROUP INSERTION LIMITS Fully wId position = 230 steps 230
LIMITSThecycle-specific parameterlimitsforthespecificationslisted insection1.0arepresented in the following subsections.
                                                          /(1          1 (0.4938, 230) 220 I          V 210                                        /
Theselimitshavebeendevelopedusingthe NRC-approved methodologiesspecifiedin TechnicalSpecification6.2.C.
200                                  /
190                        /
                                      / C-BANK (1.0,183)
                                  ~                                                                ~
180 170              iii"'"
                              /                                                              /
                    /                                                                    /"
160 150  /                            !
i
                                                                                      /
:E
  ~    140 (0,151)
                                                                                  /
III 0.
                                                                                /
  .2!  130                                  I                              ./
III
'It:
                                                                          /
..c:: 120 o
'iii 110 o
                                                                    /
a..                                        I                ~
                                                                /  D-BANK g-100 C>
e  90                                              /
:§... 80
                                                  /"
70
                                              /
60
                                    /
                                      /'
50                      ./            I 40                /
30
                  /
V 20 -(0,23) 10 o
0.0        0.1        0.2     0.3        0.4      0.5      0.6  0.7  0.8    0.9      1.0 Fraction of Rated Thermal Power COLR-S2C23, Rev. 0                                                                        Page 5 of 6


===3.1 Moderator===
Figure A-2 K(Z)
Temperature Coefficient (TS 3.I.E)3.1.1The Moderator TemperatureCoefficient(MTC)limitsare:
* Normalized FQ as a Function of Core Height 1.2 1.1 (6, 1.0) 1.0
+6.0 pcm/Fatlessthan50percent ofRATEDPOWER,or
                                                  - r--- r----     r--- ~
+6.0 pcm/Fat50percent of RATED POWER and linearlydecreasingto a pcm/F at RATED POWER 3.2 Control Bank Insertion Limits (TS 3.12.A.I, TS 3.I2.A.2,andTS3.12.C.3.b.1.b)3.2.1Thecontrolrodbanksshallbelimitedinphysical insertionasshowninFigure A-I.3.2.2Therod insertion limitfortheAandBcontrolbanksisthefully withdrawn positionasshownonFigure A-I.3.2.3Therod insertionlimitfortheAandBshutdownbanksisthefully withdrawn position as shown on Figure A-I.3.3 Shutdown Margin (TS 3.I2.A.1.a, TS 3.I2.A.2.a,andTS 3.I2.G)3.3.1 Whenever the reactorissubcriticaltheshutdown margin(SDM)shallbe 21.77%&Ik.COLR-S2C23,Rev.0Page3 of 6 3.4HeatFlux Hot Channel Factor-FQ(z)(TS 3.12.B.l)CFQ FQ(z)S--K(z)for P>0.5 P CFQ FQ(z)S--K(z)for P S 0.5 0.5 where: P=ThermalPower Rated Power 3.4.1 CFQ=2.32 3.4.2 K(z)is provided in Figure A-2.3.5 Nuclear Enthalpy Rise Hot Channel Factor-FMI(N)(TS 3.12.B.l)F!ili(N)S CFDHx{I+PFDH(I-P)}hPThermalPower were:=RatedPower 3.5.1 CFDH=1.56for Surry ImprovedFuel(SIP)3.5.2 PFDH=0.3 COLR-S2C23,Rev.0Page4 of 6 Figure A-I SURRYUNIT2 CYCLE 23 ROD GROUP INSERTION LIMITS Fully wId position=230steps 230 220 210 200 190 180 170 160 150:E140 III 0..2!130 III'It: c:: 120 o..'iii 110 o a..g-100 e C>90:§...80 70 60 50 40 30 20 10/(11(0.4938,230)
0.9 (12,0.925) 0.8 I
I/V///C-BANK (1.0,183)///iii"'"/"/!/i (0,151)!/I.//!//I/D-BANK//"//'.///I/V-(0,23)o 0.0 0.10.20.30.40.50.60.7FractionofRatedThermal Power0.80.9 1.0 COLR-S2C23,Rev.0Page5 of 6 Figure A-2K(Z)*NormalizedFQasaFunctionofCoreHeight(6,1.0)-r---r------r---(12,0.925)
N                             I Ci u,
I I!, I I 1.2 1.1 1.0 0.9 0.8 N Ci 0.7 u, e LLI N0.6:E0 z 0.5 I s 0.4 0.3 0.2 0.1 0.0 o 1 2 3 45678COREHEIGHT(FT) 910111213 COLR-S2C23,Rev.0Page6 of 6}}
0.7 eLLI                          I N
    ~ 0.6
:E
    ~
0 z   0.5 s
I 0.4 0.3 0.2 0.1 0.0               I o 1   2       3     4    5      6      7    8    9    10    11    12  13 CORE HEIGHT (FT)
COLR-S2C23, Rev. 0                                                              Page 6 of 6}}

Latest revision as of 07:47, 12 March 2020

Cycle 23 Core Operating Limits Report Revision 0
ML093170022
Person / Time
Site: Surry Dominion icon.png
Issue date: 11/12/2009
From: Funderburk C
Dominion Resources Services, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
09-716
Download: ML093170022 (8)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 November 12, 2009 U. S. Nuclear Regulatory Commission Serial No.09-716 Attention: Document Control Desk NLOSlvlh Washington, D. C. 20555-0001 Docket No. 50-281 License No. DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

SURRY POWER STATION UNIT 2 CYCLE 23 CORE OPERATING LIMITS REPORT REVISION 0 Pursuant to Surry Technical Specification (TS) 6.2.C, enclosed is a copy of Dominion's Core Operating Limits Report (COLR) for Surry Unit 2 Cycle 23 Pattern BOA, Revision O.

If you have any questions or require additional information, please contact Mr. Gary Miller at (804) 273-2771.

Sincerely,

/--~-7'

(~~.)[-

C. L. Funderburk, Director Nuclear Licensing and Operations Support Dominion Resources Services, Inc. for Virginia Electric and Power Company Enclosure Commitment Summary: There are no new commitments as a result of this letter.

Serial No.09-716 Cycle 23 Core Operating Limits Report Page 2 of 2 cc: U. S. Nuclear Regulatory Commission Region" Sam Nunn Atlanta Federal Center 61 Forsyth Street, S. W.

Suite 23T85 Atlanta, GA 30303-8931 Dr. V. Sreenivas NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mai I Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Ms. K. R. Cotton NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mai I Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Surry Power Station

COLR-S2C23, Revision 0 CORE OPERATING LIMITS REPORT Surry 2 Cycle 23 Pattern BOA COLR-S2C23, Rev. 0 Page 1 of 6

1.0 INTRODUCTION

This Core Operating Limits Report (COLR) for Surry Unit 2 Cycle 23 has been prepared in accordance with the requirements of Technical Specification 6.2.C.

The Technical Specifications affected by this report are:

TS 3.1.E - Moderator Temperature Coefficient TS 3.12.A.l, TS 3.12.A.2, TS 3.12.AJ, and TS 3.12.C.3.b.1.b - Control Bank Insertion Limits TS 3.12.B.l and TS 3.12.B.2 - Power Distribution Limits TS 3.12.A.l.a, TS 3.12.A.2.a, and TS 3.12.0 - Shutdown Margin

2.0 REFERENCES

1. VEP-FRD-42, Rev. 2.1-A, "Reload Nuclear Design Methodology," August 2003 (Methodology for TS 3.l.E - Moderator Temperature Coefficient; TS 3.12.A.l, TS 3.12.A.2, TS 3.12.A.3, and TS 3.12.C.3.b.1.b - Control Bank Insertion Limit; TS 3.12.B.l and TS 3.12.B.2 - Heat Flux Hot Channel Factor and Nuclear Enthalpy Rise Hot Channel Factor; TS 3.12.A.1.a, TS 3.12.A.2.a, and TS 3.12.0 - Shutdown Margin) 2a. WCAP-16009-P-A, "Realistic Large Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM)," (Westinghouse Proprietary), January 2005 (Methodology forTS 3.12.B.l and TS 3.12.B.2 - Heat Flux Hot Channel Factor) 2b. WCAP-I0054-P-A, "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code," August 1985 (WestinghouseProprietary)

(Methodology for TS 3.l2.B.l and TS 3.12.B.2 - Heat Flux Hot Channel Factor) 2c. WCAP-I0079-P-A, "NOTRUMP, A Nodal Transient Small Break and Oeneral Network Code," August 1985 (Westinghouse Proprietary)

(Methodology for TS 3.12.B.l and TS 3.12.B.2 - Heat Flux Hot Channel Factor) 2d. WCAP-12610-P-A, "VANTAGE+ Fuel Assembly Report," June 1990 (Westinghouse Proprietary)

(Methodology forTS 3.12.B.l and TS 3.l2.B.2 - Heat Flux Hot Channel Factor) 3a. VEP-NE-2-A, Rev. 0, "Statistical DNBR Evaluation Methodology," June 1987 (Methodology for TS 3.12.B.l and TS 3.12.B.2 - Nuclear Enthalpy Rise Hot Channel Factor) 3b. VEP-NE-3-A, Rev. 0, "Qualification of the WRB-l CHF Correlation in the Virginia Power COBRA Code," July 1990 (Methodology for TS 3.12.B.I and TS 3.l2.B.2 - Nuclear Enthalpy Rise Hot Channel Factor)

COLR-S2C23, Rev. ° Page 2 of 6

3.0 OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in section 1.0 are presented in the following subsections. These limits have been developed using the NRC-approved methodologies specified in Technical Specification 6.2.C.

3.1 Moderator Temperature Coefficient (TS 3.I.E) 3.1.1 The Moderator Temperature Coefficient (MTC) limits are:

+6.0 pcm/F at less than 50 percent ofRATED POWER, or

+6.0 pcm/F at 50 percent of RATED POWER and linearly decreasing to a pcm/F at RATED POWER 3.2 Control Bank Insertion Limits (TS 3.12.A.I, TS 3.I2.A.2, and TS 3.12.C.3.b.1.b) 3.2.1 The control rod banks shall be limited in physical insertion as shown in Figure A-I.

3.2.2 The rod insertion limit for the A and B control banks is the fully withdrawn position as shown on Figure A-I.

3.2.3 The rod insertion limit for the A and B shutdown banks is the fully withdrawn position as shown on Figure A-I.

3.3 Shutdown Margin (TS 3.I2.A.1.a, TS 3.I2.A.2.a, and TS 3.I2.G) 3.3.1 Whenever the reactor is subcritical the shutdown margin (SDM) shall be 21.77 %&Ik.

COLR-S2C23, Rev. 0 Page 3 of 6

3.4 Heat Flux Hot Channel Factor-FQ(z) (TS 3.12.B.l)

CFQ FQ(z) S --K(z) for P> 0.5 P

CFQ FQ(z) S --K(z) for P S 0.5

0.5 where

P = Thermal Power Rated Power 3.4.1 CFQ=2.32 3.4.2 K(z) is provided in Figure A-2.

3.5 Nuclear Enthalpy Rise Hot Channel Factor-FMI(N) (TS 3.12.B.l)

F!ili(N) S CFDHx{I+PFDH(I-P)}

Thermal Power were:

h P =- ----

Rated Power 3.5.1 CFDH = 1.56 for Surry Improved Fuel (SIP) 3.5.2 PFDH= 0.3 COLR-S2C23, Rev. 0 Page 4 of 6

Figure A-I SURRY UNIT 2 CYCLE 23 ROD GROUP INSERTION LIMITS Fully wId position = 230 steps 230

/(1 1 (0.4938, 230) 220 I V 210 /

200 /

190 /

/ C-BANK (1.0,183)

~ ~

180 170 iii"'"

/ /

/ /"

160 150 /  !

i

/

E

~ 140 (0,151)

/

III 0.

/

.2! 130 I ./

III

'It:

/

..c:: 120 o

'iii 110 o

/

a.. I ~

/ D-BANK g-100 C>

e 90 /

§... 80

/"

70

/

60

/

/'

50 ./ I 40 /

30

/

V 20 -(0,23) 10 o

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Fraction of Rated Thermal Power COLR-S2C23, Rev. 0 Page 5 of 6

Figure A-2 K(Z)

  • Normalized FQ as a Function of Core Height 1.2 1.1 (6, 1.0) 1.0

- r--- r---- r--- ~

0.9 (12,0.925) 0.8 I

N I Ci u,

0.7 eLLI I N

~ 0.6

E

~

0 z 0.5 s

I 0.4 0.3 0.2 0.1 0.0 I o 1 2 3 4 5 6 7 8 9 10 11 12 13 CORE HEIGHT (FT)

COLR-S2C23, Rev. 0 Page 6 of 6