| | issue date = 12/06/2013 | | | issue date = 12/06/2013 |
| | title = 2013 Report of Changes and Errors to 10CFR50.46 | | | title = 2013 Report of Changes and Errors to 10CFR50.46 |
| | author name = Seiter J A | | | author name = Seiter J |
| | author affiliation = Entergy Operations, Inc | | | author affiliation = Entergy Operations, Inc |
| | addressee name = | | | addressee name = |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:GNRO-2013/00093 December 6, 2013 U.S.Nuclear Regulatory Commission AnN: Document Control Desk Washington, DC 20055-0001 Entergy Operations, Inc.P.o.Box 756 Port Gibson, Mississippi 39150 Tel: 601-437-2344 Jeffery A.Seiter Acting Licensing Manager Grand Gulf Nuclear Station | | {{#Wiki_filter:~ |
| | ~Entergy Entergy Operations, Inc. |
| | P.o. Box 756 Port Gibson, Mississippi 39150 Tel: 601-437-2344 Jeffery A. Seiter Acting Licensing Manager Grand Gulf Nuclear Station GNRO-2013/00093 December 6, 2013 U.S. Nuclear Regulatory Commission AnN: Document Control Desk Washington, DC 20055-0001 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| | 2013 Report of Changes and Errors to 10CFR50.46 Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29 |
|
| |
|
| ==REFERENCES:== | | ==REFERENCES:== |
| | : 1. Letter GNRO-2012-00148, UReport of Changes and Errors to 10CFR50.46," dated December 6, 2012. |
|
| |
|
| 2013 Report of Changes and Errors to 10CFR50.46 Grand Gulf Nuclear Station, Unit 1 Docket No.50-416 License No.NPF-29 1.Letter GNRO-2012-00148, UReport of Changes and Errors to 10CFR50.46," dated December 6, 2012.
| | ==Dear Sir or Madam:== |
|
| |
|
| ==Dear Sir or Madam:==
| | In accordance with 10CFR50.46 (a)(3)(ii) Grand Gulf Nuclear Station, Unit 1 (GGNS) is required to report to the Commission, at least annually, the estimated effect on the limiting Emergency Core Cooling System (ECCS) analysis caused by changes to or errors discovered in the acceptable ECCS evaluation. |
| In accordance with 10CFR50.46 (a)(3)(ii) | | Since the last 10CFR50.46 report dated December 6, 2012 [see reference 1], there have been no changes to or errors discovered in the GGNS ECCS evaluation model. The enclosed table summarizes the effects of all changes or errors to the current GGNS ECCS analysis performed by General Electric-Hitachi Nuclear Energy (GEH) for the current reporting period. |
| Grand Gulf Nuclear Station, Unit 1 (GGNS)is required to report to the Commission, at least annually, the estimated effect on the limiting Emergency Core Cooling System (ECCS)analysis caused by changes to or errors discovered in the acceptable ECCS evaluation. | | |
| Since the last 10CFR50.46 report dated December 6, 2012[see reference 1], there have been no changes to or errors discovered in the GGNS ECCS evaluation model.The enclosed table summarizes the effects of all changes or errors to the current GGNS ECCS analysis performed by General Electric-Hitachi Nuclear Energy (GEH)for the current reporting period. | | GNRO-2013/00093 Page 2 of 2 Evaluation Model: SAFERIGESTR-LOCA Estimated PCT Notification Nature of Change Effect (~PCT) |
| GNRO-2013/00093 Page 2 of 2 Evaluation Model: SAFERIGESTR-LOCA Estimated PCT Notification Nature of Change Effect GE14 GNF2 N/A No changes or errors have been identifiedN/AN/A since the last 10 CFR 50.46 report for GGNS Cumutative sum of absolute magnitude of errors during thisOaFOaF period.The GGNS core is comprised of GE14 and GNF2 fuel types.The GNF2 is the limiting fuel type with a current licensing basis PCT of<1770°F, which is well below the 2200 of acceptance criterion of 10CFR50.46. | | GE14 GNF2 N/A No changes or errors have been identified N/A N/A since the last 10 CFR 50.46 report for GGNS Cumutative sum of absolute magnitude of errors during this OaF OaF period. |
| This letter does not contain any commitments. | | The GGNS core is comprised of GE14 and GNF2 fuel types. The GNF2 is the limiting fuel type with a current licensing basis PCT of <1770°F, which is well below the 2200 of acceptance criterion of 10CFR50.46. |
| Should you have any questions or require additional information, please contact Jeffery A.Seiter at 601-437-2344. | | This letter does not contain any commitments. Should you have any questions or require additional information, please contact Jeffery A. Seiter at 601-437-2344. |
| Sincerely, JAS/cb cc: U.S.Nuctear Regulatory Commission ATTN: Mr.Mark Dapas, (w/2)Regional Administrator, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 U.S.Nuclear Regulatory Commission AnN: Mr.Alan Wang, NRR/DORL (w/2)Mail Stop OWFN 8 B1 Washington, DC 20555-0001 State Health Officer Mississippi Department of Health P.O.Box 1700 Jackson, MS 39215-1700 NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150}} | | Sincerely, JAS/cb cc: U.S. Nuctear Regulatory Commission ATTN: Mr. Mark Dapas, (w/2) |
| | Regional Administrator, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 U. S. Nuclear Regulatory Commission AnN: Mr. Alan Wang, NRR/DORL (w/2) |
| | Mail Stop OWFN 8 B1 Washington, DC 20555-0001 State Health Officer Mississippi Department of Health P. O. Box 1700 Jackson, MS 39215-1700 NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150}} |
|
---|
Category:Letter type:GNRO
MONTHYEARGNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors GNRO-2021/00037, 2021 Annual Report of Changes and Errors to 10 CFR 50.46 Analysis Grand Gulf Nuclear Station, Unit 12021-11-30030 November 2021 2021 Annual Report of Changes and Errors to 10 CFR 50.46 Analysis Grand Gulf Nuclear Station, Unit 1 GNRO-2021/00017, Notification of Readiness for Supplemental Inspection2021-06-22022 June 2021 Notification of Readiness for Supplemental Inspection GNRO-2021/00014, Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency2021-06-0101 June 2021 Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency GNRO-2021/00015, Annual Radioactive Effluent Release Report2021-04-28028 April 2021 Annual Radioactive Effluent Release Report GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 20202021-04-19019 April 2021 Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 GNRO-2021/00012, Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.22062021-04-13013 April 2021 Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.2206 GNRO-2020/00045, 2020 Report of Changes and Errors to 10 CFR 50.46 Analysis2020-12-16016 December 2020 2020 Report of Changes and Errors to 10 CFR 50.46 Analysis GNRO-2020/00034, Notification of Spent Fuel Cask Use2020-10-0808 October 2020 Notification of Spent Fuel Cask Use GNRO-2020/00033, Response to NRC Integrated Inspection Report 05000416/20200022020-09-10010 September 2020 Response to NRC Integrated Inspection Report 05000416/2020002 GNRO-2020/00029, Report of 10 CFR 72.48 Evaluations July 1, 2018 Through June 30, 20202020-08-18018 August 2020 Report of 10 CFR 72.48 Evaluations July 1, 2018 Through June 30, 2020 GNRO-2020/00022, Report of Technical Specification Bases Changes2020-07-21021 July 2020 Report of Technical Specification Bases Changes GNRO-2020/00027, Core Operating Limits Report (COLR) Cycle 23 Revision 1 for Grand Gulf Nuclear Station, Unit 1 (GGNS)2020-07-16016 July 2020 Core Operating Limits Report (COLR) Cycle 23 Revision 1 for Grand Gulf Nuclear Station, Unit 1 (GGNS) GNRO-2020/00023, Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-06-26026 June 2020 Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies GNRO-2020/00020, Core Operating Limits Report (COLR) Cycle 23, and Pressure and Temperature Limits Report (PTLR) Update for Grand Gulf Nuclear Station, Unit 1 (GGNS)2020-05-0505 May 2020 Core Operating Limits Report (COLR) Cycle 23, and Pressure and Temperature Limits Report (PTLR) Update for Grand Gulf Nuclear Station, Unit 1 (GGNS) GNRO-2020/00018, Annual Radiological Effluent Release Report2020-04-30030 April 2020 Annual Radiological Effluent Release Report GNRO-2020/00016, Annual Report of Individual Monitoring -NRC Form 5 for 2019 Per 10 CFR 20.22062020-04-16016 April 2020 Annual Report of Individual Monitoring -NRC Form 5 for 2019 Per 10 CFR 20.2206 GNRO-2020/00015, Response to Request for Additional Information - License Amendment Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test2020-04-0707 April 2020 Response to Request for Additional Information - License Amendment Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test GNRO-2020/00007, Spent Fuel Storage Radioactive Effluent Release Report for 20192020-02-20020 February 2020 Spent Fuel Storage Radioactive Effluent Release Report for 2019 GNRO-2020/00006, License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-02-19019 February 2020 License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies GNRO-2019/00052, Report of Changes and Errors to 10 CFR 50.46 Analysis2019-12-13013 December 2019 Report of Changes and Errors to 10 CFR 50.46 Analysis GNRO-2019/00051, Notification of Readiness of 92723 Inspection2019-12-11011 December 2019 Notification of Readiness of 92723 Inspection GNRO-2019/00045, Emergency Plan, Revision 792019-10-29029 October 2019 Emergency Plan, Revision 79 GNRO-2019/00037, Notification of Spent Fuel Cask Use2019-09-20020 September 2019 Notification of Spent Fuel Cask Use GNRO-2019/00036, Correction to Gnro 2019-00017 Emergency Plan Revision 782019-08-0808 August 2019 Correction to Gnro 2019-00017 Emergency Plan Revision 78 GNRO-2019/00027, Notification of Readiness of 95001 Supplemental Inspections2019-07-0303 July 2019 Notification of Readiness of 95001 Supplemental Inspections GNRO-2019/00031, Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 - Corrected Report2019-06-25025 June 2019 Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 - Corrected Report GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation.2019-06-13013 June 2019 Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. GNRO-2019/00026, Response to Requests for Additional Information Regarding Relief Request Number GG-ISI-023, Inservice Inspection Impracticality - Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval2019-05-0606 May 2019 Response to Requests for Additional Information Regarding Relief Request Number GG-ISI-023, Inservice Inspection Impracticality - Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval GNRO-2019/00024, Annual Radioactive Effluent Release Report2019-04-30030 April 2019 Annual Radioactive Effluent Release Report GNRO-2019/00020, Annual Radiological Operating Report (AREOR)2019-04-30030 April 2019 Annual Radiological Operating Report (AREOR) GNRO-2019/00022, Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.22062019-04-22022 April 2019 Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 GNRO-2019/00017, Emergency Plan, Revision 782019-03-14014 March 2019 Emergency Plan, Revision 78 GNRO-2019/00014, Snubber Testing Program for Fourth Inspection Interval2019-03-13013 March 2019 Snubber Testing Program for Fourth Inspection Interval GNRO-2019/00012, Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2019-03-0606 March 2019 Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program GNRO-2019/00016, Spent Fuel Storage Radioactive Effluent Release Report for 20182019-02-21021 February 2019 Spent Fuel Storage Radioactive Effluent Release Report for 2018 GNRO-2019/00003, Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation2019-01-23023 January 2019 Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation GNRO-2018/00057, Submittal of Revision 17 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan2018-12-0404 December 2018 Submittal of Revision 17 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan GNRO-2018/00055, Response to Request for Additional Information for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a ...2018-11-30030 November 2018 Response to Request for Additional Information for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a ... GNRO-2018/00054, Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval2018-11-30030 November 2018 Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval GNRO-2018/00052, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Partial Response to Request for Additional Information and Extension of Response to Request for Additional Information2018-10-24024 October 2018 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Partial Response to Request for Additional Information and Extension of Response to Request for Additional Information GNRO-2018/00051, Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-10-23023 October 2018 Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control GNRO-2018/00046, Submittal of 2018 Report of Changes and Errors to 10CFR50.462018-10-16016 October 2018 Submittal of 2018 Report of Changes and Errors to 10CFR50.46 GNRO-2018/00047, Submittal of 2018 Inservice Inspection Summary Report2018-10-16016 October 2018 Submittal of 2018 Inservice Inspection Summary Report GNRO-2018/00048, Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 62018-10-10010 October 2018 Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 GNRO-2018/00042, Core Operating Limits Report Cycle 22, Revision 12018-09-18018 September 2018 Core Operating Limits Report Cycle 22, Revision 1 GNRO-2018/00043, Revised Offsite Dose Calculation Manual2018-09-18018 September 2018 Revised Offsite Dose Calculation Manual GNRO-2018/00039, Report of Technical Specification Bases Changes2018-08-20020 August 2018 Report of Technical Specification Bases Changes GNRO-2018/00040, Report of 10CFR50.59 Evaluations and Commitment Change Evaluations - July 1, 2016 Through June 30, 20182018-08-20020 August 2018 Report of 10CFR50.59 Evaluations and Commitment Change Evaluations - July 1, 2016 Through June 30, 2018 2023-06-06
[Table view] |
Text
~
~Entergy Entergy Operations, Inc.
P.o. Box 756 Port Gibson, Mississippi 39150 Tel: 601-437-2344 Jeffery A. Seiter Acting Licensing Manager Grand Gulf Nuclear Station GNRO-2013/00093 December 6, 2013 U.S. Nuclear Regulatory Commission AnN: Document Control Desk Washington, DC 20055-0001
SUBJECT:
2013 Report of Changes and Errors to 10CFR50.46 Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29
REFERENCES:
- 1. Letter GNRO-2012-00148, UReport of Changes and Errors to 10CFR50.46," dated December 6, 2012.
Dear Sir or Madam:
In accordance with 10CFR50.46 (a)(3)(ii) Grand Gulf Nuclear Station, Unit 1 (GGNS) is required to report to the Commission, at least annually, the estimated effect on the limiting Emergency Core Cooling System (ECCS) analysis caused by changes to or errors discovered in the acceptable ECCS evaluation.
Since the last 10CFR50.46 report dated December 6, 2012 [see reference 1], there have been no changes to or errors discovered in the GGNS ECCS evaluation model. The enclosed table summarizes the effects of all changes or errors to the current GGNS ECCS analysis performed by General Electric-Hitachi Nuclear Energy (GEH) for the current reporting period.
GNRO-2013/00093 Page 2 of 2 Evaluation Model: SAFERIGESTR-LOCA Estimated PCT Notification Nature of Change Effect (~PCT)
GE14 GNF2 N/A No changes or errors have been identified N/A N/A since the last 10 CFR 50.46 report for GGNS Cumutative sum of absolute magnitude of errors during this OaF OaF period.
The GGNS core is comprised of GE14 and GNF2 fuel types. The GNF2 is the limiting fuel type with a current licensing basis PCT of <1770°F, which is well below the 2200 of acceptance criterion of 10CFR50.46.
This letter does not contain any commitments. Should you have any questions or require additional information, please contact Jeffery A. Seiter at 601-437-2344.
Sincerely, JAS/cb cc: U.S. Nuctear Regulatory Commission ATTN: Mr. Mark Dapas, (w/2)
Regional Administrator, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 U. S. Nuclear Regulatory Commission AnN: Mr. Alan Wang, NRR/DORL (w/2)
Mail Stop OWFN 8 B1 Washington, DC 20555-0001 State Health Officer Mississippi Department of Health P. O. Box 1700 Jackson, MS 39215-1700 NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150