| | docket = 05000277 | | | docket = 05000277 |
| | license number = DPR-044 | | | license number = DPR-044 |
| | contact person = Hughey J D, NRR/DORL, 301-415-3204 | | | contact person = Hughey J, NRR/DORL, 301-415-3204 |
| | case reference number = TAC MD2631, TAC MD2632 | | | case reference number = TAC MD2631, TAC MD2632 |
| | package number = ML072140535 | | | package number = ML072140535 |
Line 19: |
Line 19: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:1The Training and Qualification Plan and Safeguards Contingency Plan are Appendicesto the Security Plan.Renewed License No. DPR-44Revised by letter dated October 28, 2004Revised by letter dated May 29, 2007Page 3(5) Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30and 70, to possess, but not to separate, such byproduct and special nuclear material as may be produced by operation of the facility. C. This renewed license shall be deemed to contain and is subject to the conditionsspecified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 of Part 50, and Section 70.32 of Part 70; all applicable provisions of the Act and the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:(1) Maximum Power LevelExelon Generation Company is authorized to operate the Peach BottomAtomic Power Station, Unit 2, at steady state reactor core power levels not in excess of 3514 megawatts thermal.(2) Technical SpecificationsThe Technical Specifications contained in Appendices A and B, asrevised through Amendment No. 261, are hereby incorporated in the license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications.(3) Physical ProtectionExelon Generation Company shall fully implement and maintain in effectall provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans 1, submitted by letter dated May 17, 2006, isentitled: "Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 3." The set contains Safeguards Information protected under 10 CFR 73.21.(4) Fire ProtectionThe Exelon Generation Company shall implement and maintain in effectall provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report for the facility, and as approved in the NRC Safety Evaluation Report (SER) dated May 23, 1979, and Supplements dated August 14, September 15, October 10 and November 24, 1980, and in the NRC SERs dated September 16, 1993, and August 24, 1994, subject to the following provision:The Exelon Generation Company may make changes to the approved}} | | {{#Wiki_filter:(5) Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not to separate, such byproduct and special nuclear material as may be produced by operation of the facility. |
| | C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 of Part 50, and Section 70.32 of Part 70; all applicable provisions of the Act and the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below: |
| | (1) Maximum Power Level Exelon Generation Company is authorized to operate the Peach Bottom Atomic Power Station, Unit 2, at steady state reactor core power levels not in excess of 3514 megawatts thermal. |
| | (2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 261, are hereby incorporated in the license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications. |
| | (3) Physical Protection Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans1, submitted by letter dated May 17, 2006, is entitled: "Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 3." The set contains Safeguards Information protected under 10 CFR 73.21. |
| | (4) Fire Protection The Exelon Generation Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report for the facility, and as approved in the NRC Safety Evaluation Report (SER) dated May 23, 1979, and Supplements dated August 14, September 15, October 10 and November 24, 1980, and in the NRC SERs dated September 16, 1993, and August 24, 1994, subject to the following provision: |
| | The Exelon Generation Company may make changes to the approved 1 |
| | The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan. |
| | Renewed License No. DPR-44 Revised by letter dated October 28, 2004 Revised by letter dated May 29, 2007 Page 3}} |
Letter Sequence Other |
---|
|
|
MONTHYEARML0719701672007-07-12012 July 2007 Tech Spec Pages for Amendment 261 Risk-Informed Modification to Selected Required End States Project stage: Other ML0719701642007-07-12012 July 2007 Tech Spec Pages for Amendment 265 Risk-Informed Modification to Selected Required End States Project stage: Other ML0634501642007-07-12012 July 2007 Issuance of Amendments 261 and 265 Risk-Informed Modification to Selected Required End States Project stage: Approval ML0722706322007-08-14014 August 2007 Correction-Amendment #265 Peach Bottom/Unit 3 Project stage: Other ML0722705982007-08-14014 August 2007 Correction-Amendment #261 Peach Bottom/Unit 2 Project stage: Other ML0721405472007-08-14014 August 2007 Errata for Amendment Nos. 261 and 265, Risk-Informed Modification to Selected Required End States Tac Nos. MD2631 and MD2632) Project stage: Other 2007-07-12
[Table View] |
|
---|
Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML23265A1502023-09-22022 September 2023 License Amendment Request – Revise a License Condition and Certain Technical Specifications to Remove Restrictions in Support of Decommissioning Activities LR-N23-0045, And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21119A1412021-04-29029 April 2021 License Amendment Request, Revise Technical Specifications Administrative Controls Section 5.5.7 Regarding the Frequency for Performing Certain Ventilation Filter Testing RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments RS-21-016, Supplement to Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems2021-01-29029 January 2021 Supplement to Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems ML20337A3012020-12-0202 December 2020 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. ML20150A0072020-05-29029 May 2020 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-20-031, License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process2020-04-30030 April 2020 License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process ML20024G4292020-03-0404 March 2020 Record of Decision - Issuance of Subsequent Renewed Facility Operation License Nos. DPR-44 and DPR-56 for Peach Bottom Atomic Power Station, Units 2 and 3 RS-19-044, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions2019-08-28028 August 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions ML19193A0062019-07-12012 July 2019 Supplement No. 7 - Changes to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application ML19182A1122019-07-0101 July 2019 First 10 CFR 54.21 (B) Annual Amendment to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-06-25025 June 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19158A3122019-06-0707 June 2019 License Amendment Request to Revise Technical Specifications 3.8.4, DC Sources - Operating ML19116A1962019-04-26026 April 2019 License Amendment Request to Revise Technical Specifications 3.8.1, Required Action A.3, for Temporary One-Time Extension of Completion Time ML19042A1312019-02-11011 February 2019 Supplement No. 3 - Changes to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application RS-19-003, Application to Adopt TSTF-564, Safety Limit Mcpr.2019-02-0101 February 2019 Application to Adopt TSTF-564, Safety Limit Mcpr. ML19023A0152019-01-23023 January 2019 Supplement No. 2 - Changes to the Subsequent License Renewal Application ML18305B2702018-11-0101 November 2018 Response to Request for Additional Information - License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements ML18275A0232018-09-28028 September 2018 License Amendment Request to Reduce High Pressure Service Water System Design Pressure and Revise Technical Specifications 3.6.2.3, 3.6.2.4, 3.6.2.5, and 3.7.1 for Temporary Extension of ... ML18271A0092018-09-27027 September 2018 License Amendment Request -Technical Specifications Section 3.3.6.2 Functions 3 and 4 Applicability Changes Pertaining to Reactor Building and Refueling Floor Ventilation ML18257A1432018-09-14014 September 2018 Changes to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application ML18239A3552018-08-27027 August 2018 License Amendment Request - Expanded Actions for LEFM Conditions ML18213A2712018-08-0101 August 2018 Application to Revise Technical Specifications to Adopt TSTF-500, Revision 2, DC Electrical Rewrite Update to TSTF-360, - Supplement 1, Revision of Implementation Dates. ML18193A6972018-07-10010 July 2018 Cover Letter Submitting Subsequent License Renewal Application ML18193A6992018-07-10010 July 2018 Cover Letter Submitting Paper Copies, Cds and Boundary Drawings Accompany Submittal of Subsequent License Renewal Application RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement ML18149A3022018-05-10010 May 2018 Enclosure 4 - Summary of Regulatory Commitments ML18149A2992018-05-10010 May 2018 Enclosure 2 - Peach Bottom Staffing LAR - Evaluation of Proposed Changes and Attachments 2A & 2B, Emergency Plan Marked-Up Pages and Emergency Plan Clean Copy Pages RS-17-161, Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR)2018-03-0101 March 2018 Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) ML17275A0692017-09-29029 September 2017 Application to Revise Technical Specifications to Adopt Technical Specification Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite-Update to TSTF-360. ML17258A1792017-09-15015 September 2017 Submittal of Measurement Uncertainty Recapture Power Uprate License Amendment Request - Supplement 5, Supplemental Reload Licensing Report ML17243A0142017-08-30030 August 2017 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors. ML17241A1942017-08-29029 August 2017 License Amendment Request - Revise Technical Specifications Section 3.4.3 (Srvs/Svs) for the Remainder of the Current Operating Cycle for Unit 2 - Supplement 1 Response to Request for Additional Information ML17139D3572017-05-19019 May 2017 License Amendment Request Revise Technical Specifications Section 3.4.3 for the Remainder of the Current Operating Cycle RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process2017-03-28028 March 2017 Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process ML17080A0672017-03-20020 March 2017 Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate - Supplement 1 - Request for Non-Proprietary Version of Cameron Corporation Proprietary Documents ML17048A4442017-02-17017 February 2017 Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate ML16342C4552016-12-0707 December 2016 Supplement to License Amendment Request, Revise Turbine Condenser - Low Vacuum Scram Instrumentation Function Allowable Value ML16309A2982016-11-0404 November 2016 Request for License Amendment to Revise Turbine Condenser - Low Vacuum Scram Instrumentation Function Allowable Value ML16280A4022016-10-0606 October 2016 License Amendment Request - Supplement Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. ML16173A3712016-06-20020 June 2016 Application to Revise Technical Specifications to Adopt TSTF-501-A, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control, Revision 1, Using the Consolidated Line Item Improvement Process 2024-04-12
[Table view] |
Text
(5) Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not to separate, such byproduct and special nuclear material as may be produced by operation of the facility.
C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 of Part 50, and Section 70.32 of Part 70; all applicable provisions of the Act and the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:
(1) Maximum Power Level Exelon Generation Company is authorized to operate the Peach Bottom Atomic Power Station, Unit 2, at steady state reactor core power levels not in excess of 3514 megawatts thermal.
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 261, are hereby incorporated in the license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications.
(3) Physical Protection Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans1, submitted by letter dated May 17, 2006, is entitled: "Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 3." The set contains Safeguards Information protected under 10 CFR 73.21.
(4) Fire Protection The Exelon Generation Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report for the facility, and as approved in the NRC Safety Evaluation Report (SER) dated May 23, 1979, and Supplements dated August 14, September 15, October 10 and November 24, 1980, and in the NRC SERs dated September 16, 1993, and August 24, 1994, subject to the following provision:
The Exelon Generation Company may make changes to the approved 1
The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.
Renewed License No. DPR-44 Revised by letter dated October 28, 2004 Revised by letter dated May 29, 2007 Page 3