ML13289A223: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 05/07/2009
| issue date = 05/07/2009
| title = 6.a.ii.10 SQN Hours of Operation Annual Air Report 2008
| title = 6.a.ii.10 SQN Hours of Operation Annual Air Report 2008
| author name = Cleary T P
| author name = Cleary T
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
| addressee name = Frazier J A
| addressee name = Frazier J
| addressee affiliation = Chattanooga-Hamilton County, TN, Air Pollution Control Bureau, NRC/NRR
| addressee affiliation = Chattanooga-Hamilton County, TN, Air Pollution Control Bureau, NRC/NRR
| docket = 05000327, 05000328
| docket = 05000327, 05000328
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:S58 090507 800 Air Correspondence May 7, 2009 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416  
{{#Wiki_filter:S58 090507 800 Air Correspondence May 7, 2009 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416


==Dear Mr. Frazier:==
==Dear Mr. Frazier:==
SEQUOYAH NUCLEAR PLANT -HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report on the hours of operation from April 1, 2008 to March 31, 2009 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-10200501-08C and 4150-20200102-11 C.If you have any questions regarding this report, please contact Stephanie Howard at (423)843-6700 or Ann Hurt at (423)843-6714 of Sequoyah's Environmental staff.Sincerely, Timothy P. Cleary Site Vice President Sequoyah Nuclear Plant SAH Enclosure cc: D. J. Bodine, POB 2A-SQN A. A. Ray, WT 7C-K C. R. Church, POB 2B-SQN G. R. Signer, WT 6A-K T. P. Cleary, OPS 4A-SQN B. A. Wetzel, OPS 4A-SQN D. E. Pittman, BR 4T-C EDMS, WT CA-K (Enclosure)
 
REVIEW/CONCURRENCE SHEET DOCUMENT NAME: SEQUOYAH NUCLEAR PLANT -AIR ANNUAL REPORT ORGANIZATION:
SEQUOYAH NUCLEAR PLANT - HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report on the hours of operation from April 1, 2008 to March 31, 2009 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-10200501-08C and 4150-20200102-11 C.
Chemistry and Environmental DOCUMENT PREPARED BY: Stephanie A. Howard DATE: 04/24/2009 07 I EDMS TRACKING NO.: S58 0905?? 800 -Air Correspondence CONCURRENCES Name R C Signature  
If you have any questions regarding this report, please contact Stephanie Howard at (423)843-6700 or Ann Hurt at (423)843-6714 of Sequoyah's Environmental staff.
-Comment Date V N Stephanie A Howard x I -b 4L;~atoc Ann Hurt x Alan K Barringer x Debra J Bodine Beth A. Wetzel x ) 6 Chris R Church Timothy P Cleary x (for signature) ,iV INSTRUCTIONS:
Sincerely, Timothy P. Cleary Site Vice President Sequoyah Nuclear Plant SAH Enclosure cc:     D. J. Bodine, POB 2A-SQN                 A. A. Ray, WT 7C-K C. R. Church, POB 2B-SQN                 G. R. Signer, WT 6A-K T. P. Cleary, OPS 4A-SQN                 B. A. Wetzel, OPS 4A-SQN D. E. Pittman, BR 4T-C                   EDMS, WT CA-K (Enclosure)
Originator will determine the review/concurrence assignment.
 
REVIEW: Examine technical content and commitments made. A review (RV) should confirm the truth and accuracy of factual statements and indicate agreement with commitments made which are applicable to the reviewer's organization.
REVIEW/CONCURRENCE SHEET DOCUMENT NAME:       SEQUOYAH NUCLEAR PLANT - AIR ANNUAL REPORT ORGANIZATION: Chemistry and Environmental DOCUMENT PREPARED BY: Stephanie A. Howard DATE: 04/24/2009 07     I EDMS TRACKING NO.: S58 0905?? 800 - Air Correspondence CONCURRENCES Name             R   C             Signature - Comment                     Date V   N Stephanie A Howard       x       I                             -b               4L;~atoc Ann Hurt                 x Alan K Barringer               x Debra J Bodine Beth A. Wetzel                 x                                   )                 6 Chris R Church Timothy P Cleary               x (for signature)                                   ,iV INSTRUCTIONS:     Originator will determine the review/concurrence assignment.
CONCURRENCE:
REVIEW:       Examine technical content and commitments made. A review (RV) should confirm the truth and accuracy of factual statements and indicate agreement with commitments made which are applicable to the reviewer's organization.
Indication of agreement with the document as a whole.Concurrence (CN) signifies that the document is responsive to the intended purpose, logical in construction, and clear in meaning in the eyes of the recipient.
CONCURRENCE:       Indication of agreement with the document as a whole.
A concurrence signature indicates that the individual would be willing to sign the document for the agency.
Concurrence (CN) signifies that the document is responsive to the intended purpose, logical in construction, and clear in meaning in the eyes of the recipient. A concurrence signature indicates that the individual would be willing to sign the document for the agency.
Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2 00 May 7, 2009 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416  
 
Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2 00 May 7, 2009 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416


==Dear Mr. Frazier:==
==Dear Mr. Frazier:==
SEQUOYAH NUCLEAR PLANT -HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report on the hours of operation from April 1, 2008 to March 31, 2009 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-10200501-08C and 4150-20200102-11C.
 
If you have any questions regarding this report, please contact Stephanie Howard at (423)843-6700 or Ann Hurt at (423)843-6714 of Sequoyah's Environmental staff.Sincerely, Timothy P. Clear~Site Vice President Sequoyah Nuclear Plant Enclosure Pr,,~ wla r-d~ epap.,
SEQUOYAH NUCLEAR PLANT - HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report on the hours of operation from April 1, 2008 to March 31, 2009 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-10200501-08C and 4150-20200102-11C.
SEQUOYAH NUCLEAR PLANT -HOURS OF OPERATION ANNUAL REPORT APRIL 1, 2008 to MARCH 31, 2009 Equipment Name Maximum Permitted Actual Hours Hours of Operation of Operation Auxiliary Boilers 2,000 (combined)
If you have any questions regarding this report, please contact Stephanie Howard at (423)843-6700 or Ann Hurt at (423)843-6714 of Sequoyah's Environmental staff.
Boiler A 0 Hours Boiler B 0 Hours Total 2,000 (combined) 0 Hours Emergency Diesel 204 Hours 64.5 Hours Generator 1-A Emergency Diesel 204 Hours 42.1 Hours Generator 2-A Emergency Diesel 204 Hours 59.8 Hours Generator 1-B Emergency Diesel 204 Hours 36.5 Hours Generator 2-B Blackout Diesel 204 Hours 7.7 Hours Generator 1 Blackout Diesel 204 Hours 7.1 Hours Generator 2}}
Sincerely, Timothy P.Clear~
Site Vice President Sequoyah Nuclear Plant Enclosure Pr,,~ wlar-d~ epap.,
 
SEQUOYAH NUCLEAR PLANT - HOURS OF OPERATION ANNUAL REPORT APRIL 1, 2008 to MARCH 31, 2009 Equipment Name   Maximum Permitted         Actual Hours Hours of Operation       of Operation Auxiliary Boilers   2,000 (combined)
Boiler A                               0 Hours Boiler B                               0 Hours Total               2,000 (combined)           0 Hours Emergency Diesel       204 Hours             64.5 Hours Generator 1-A Emergency Diesel       204 Hours             42.1 Hours Generator 2-A Emergency Diesel       204 Hours             59.8 Hours Generator 1-B Emergency Diesel       204 Hours             36.5 Hours Generator 2-B Blackout Diesel         204 Hours             7.7 Hours Generator 1 Blackout Diesel         204 Hours             7.1 Hours Generator 2}}

Latest revision as of 13:26, 4 November 2019

6.a.ii.10 SQN Hours of Operation Annual Air Report 2008
ML13289A223
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/07/2009
From: Cleary T
Tennessee Valley Authority
To: Frazier J
Chattanooga-Hamilton County, TN, Air Pollution Control Bureau, Office of Nuclear Reactor Regulation
Shared Package
ML13289A109 List: ... further results
References
Download: ML13289A223 (4)


Text

S58 090507 800 Air Correspondence May 7, 2009 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416

Dear Mr. Frazier:

SEQUOYAH NUCLEAR PLANT - HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report on the hours of operation from April 1, 2008 to March 31, 2009 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-10200501-08C and 4150-20200102-11 C.

If you have any questions regarding this report, please contact Stephanie Howard at (423)843-6700 or Ann Hurt at (423)843-6714 of Sequoyah's Environmental staff.

Sincerely, Timothy P. Cleary Site Vice President Sequoyah Nuclear Plant SAH Enclosure cc: D. J. Bodine, POB 2A-SQN A. A. Ray, WT 7C-K C. R. Church, POB 2B-SQN G. R. Signer, WT 6A-K T. P. Cleary, OPS 4A-SQN B. A. Wetzel, OPS 4A-SQN D. E. Pittman, BR 4T-C EDMS, WT CA-K (Enclosure)

REVIEW/CONCURRENCE SHEET DOCUMENT NAME: SEQUOYAH NUCLEAR PLANT - AIR ANNUAL REPORT ORGANIZATION: Chemistry and Environmental DOCUMENT PREPARED BY: Stephanie A. Howard DATE: 04/24/2009 07 I EDMS TRACKING NO.: S58 0905?? 800 - Air Correspondence CONCURRENCES Name R C Signature - Comment Date V N Stephanie A Howard x I -b 4L;~atoc Ann Hurt x Alan K Barringer x Debra J Bodine Beth A. Wetzel x ) 6 Chris R Church Timothy P Cleary x (for signature) ,iV INSTRUCTIONS: Originator will determine the review/concurrence assignment.

REVIEW: Examine technical content and commitments made. A review (RV) should confirm the truth and accuracy of factual statements and indicate agreement with commitments made which are applicable to the reviewer's organization.

CONCURRENCE: Indication of agreement with the document as a whole.

Concurrence (CN) signifies that the document is responsive to the intended purpose, logical in construction, and clear in meaning in the eyes of the recipient. A concurrence signature indicates that the individual would be willing to sign the document for the agency.

Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2 00 May 7, 2009 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416

Dear Mr. Frazier:

SEQUOYAH NUCLEAR PLANT - HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report on the hours of operation from April 1, 2008 to March 31, 2009 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-10200501-08C and 4150-20200102-11C.

If you have any questions regarding this report, please contact Stephanie Howard at (423)843-6700 or Ann Hurt at (423)843-6714 of Sequoyah's Environmental staff.

Sincerely, Timothy P.Clear~

Site Vice President Sequoyah Nuclear Plant Enclosure Pr,,~ wlar-d~ epap.,

SEQUOYAH NUCLEAR PLANT - HOURS OF OPERATION ANNUAL REPORT APRIL 1, 2008 to MARCH 31, 2009 Equipment Name Maximum Permitted Actual Hours Hours of Operation of Operation Auxiliary Boilers 2,000 (combined)

Boiler A 0 Hours Boiler B 0 Hours Total 2,000 (combined) 0 Hours Emergency Diesel 204 Hours 64.5 Hours Generator 1-A Emergency Diesel 204 Hours 42.1 Hours Generator 2-A Emergency Diesel 204 Hours 59.8 Hours Generator 1-B Emergency Diesel 204 Hours 36.5 Hours Generator 2-B Blackout Diesel 204 Hours 7.7 Hours Generator 1 Blackout Diesel 204 Hours 7.1 Hours Generator 2