| issue date = 05/07/2009 | | issue date = 05/07/2009 | ||
| title = 6.a.ii.10 SQN Hours of Operation Annual Air Report 2008 | | title = 6.a.ii.10 SQN Hours of Operation Annual Air Report 2008 | ||
| author name = Cleary T | | author name = Cleary T | ||
| author affiliation = Tennessee Valley Authority | | author affiliation = Tennessee Valley Authority | ||
| addressee name = Frazier J | | addressee name = Frazier J | ||
| addressee affiliation = Chattanooga-Hamilton County, TN, Air Pollution Control Bureau, NRC/NRR | | addressee affiliation = Chattanooga-Hamilton County, TN, Air Pollution Control Bureau, NRC/NRR | ||
| docket = 05000327, 05000328 | | docket = 05000327, 05000328 | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:S58 090507 800 Air Correspondence May 7, 2009 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416 | {{#Wiki_filter:S58 090507 800 Air Correspondence May 7, 2009 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416 | ||
==Dear Mr. Frazier:== | ==Dear Mr. Frazier:== | ||
SEQUOYAH NUCLEAR PLANT -HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report on the hours of operation from April 1, 2008 to March 31, 2009 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-10200501-08C and 4150-20200102-11 C.If you have any questions regarding this report, please contact Stephanie Howard at (423)843-6700 or Ann Hurt at (423)843-6714 of Sequoyah's Environmental staff.Sincerely, Timothy P. Cleary Site Vice President Sequoyah Nuclear Plant SAH Enclosure cc: D. J. Bodine, POB 2A-SQN A. A. Ray, WT 7C-K C. R. Church, POB 2B-SQN G. R. Signer, WT 6A-K T. P. Cleary, OPS 4A-SQN B. A. Wetzel, OPS 4A-SQN D. E. Pittman, BR 4T-C EDMS, WT CA-K (Enclosure) | |||
REVIEW/CONCURRENCE SHEET DOCUMENT NAME: SEQUOYAH NUCLEAR PLANT -AIR ANNUAL REPORT ORGANIZATION: | SEQUOYAH NUCLEAR PLANT - HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report on the hours of operation from April 1, 2008 to March 31, 2009 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-10200501-08C and 4150-20200102-11 C. | ||
Chemistry and Environmental DOCUMENT PREPARED BY: Stephanie A. Howard DATE: 04/24/2009 07 I EDMS TRACKING NO.: S58 0905?? 800 -Air Correspondence CONCURRENCES Name R C Signature | If you have any questions regarding this report, please contact Stephanie Howard at (423)843-6700 or Ann Hurt at (423)843-6714 of Sequoyah's Environmental staff. | ||
-Comment Date V N Stephanie A Howard x I -b 4L;~atoc Ann Hurt x Alan K Barringer x Debra J Bodine Beth A. Wetzel x ) 6 Chris R Church Timothy P Cleary x (for signature) ,iV INSTRUCTIONS: | Sincerely, Timothy P. Cleary Site Vice President Sequoyah Nuclear Plant SAH Enclosure cc: D. J. Bodine, POB 2A-SQN A. A. Ray, WT 7C-K C. R. Church, POB 2B-SQN G. R. Signer, WT 6A-K T. P. Cleary, OPS 4A-SQN B. A. Wetzel, OPS 4A-SQN D. E. Pittman, BR 4T-C EDMS, WT CA-K (Enclosure) | ||
Originator will determine the review/concurrence assignment. | |||
REVIEW: Examine technical content and commitments made. A review (RV) should confirm the truth and accuracy of factual statements and indicate agreement with commitments made which are applicable to the reviewer's organization. | REVIEW/CONCURRENCE SHEET DOCUMENT NAME: SEQUOYAH NUCLEAR PLANT - AIR ANNUAL REPORT ORGANIZATION: Chemistry and Environmental DOCUMENT PREPARED BY: Stephanie A. Howard DATE: 04/24/2009 07 I EDMS TRACKING NO.: S58 0905?? 800 - Air Correspondence CONCURRENCES Name R C Signature - Comment Date V N Stephanie A Howard x I -b 4L;~atoc Ann Hurt x Alan K Barringer x Debra J Bodine Beth A. Wetzel x ) 6 Chris R Church Timothy P Cleary x (for signature) ,iV INSTRUCTIONS: Originator will determine the review/concurrence assignment. | ||
CONCURRENCE: | REVIEW: Examine technical content and commitments made. A review (RV) should confirm the truth and accuracy of factual statements and indicate agreement with commitments made which are applicable to the reviewer's organization. | ||
Indication of agreement with the document as a whole.Concurrence (CN) signifies that the document is responsive to the intended purpose, logical in construction, and clear in meaning in the eyes of the recipient. | CONCURRENCE: Indication of agreement with the document as a whole. | ||
A concurrence signature indicates that the individual would be willing to sign the document for the agency. | Concurrence (CN) signifies that the document is responsive to the intended purpose, logical in construction, and clear in meaning in the eyes of the recipient. A concurrence signature indicates that the individual would be willing to sign the document for the agency. | ||
Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2 00 May 7, 2009 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416 | |||
Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2 00 May 7, 2009 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416 | |||
==Dear Mr. Frazier:== | ==Dear Mr. Frazier:== | ||
SEQUOYAH NUCLEAR PLANT -HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report on the hours of operation from April 1, 2008 to March 31, 2009 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-10200501-08C and 4150-20200102-11C. | |||
If you have any questions regarding this report, please contact Stephanie Howard at (423)843-6700 or Ann Hurt at (423)843-6714 of Sequoyah's Environmental staff.Sincerely, Timothy P. Clear~Site Vice President Sequoyah Nuclear Plant Enclosure Pr,,~ | SEQUOYAH NUCLEAR PLANT - HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report on the hours of operation from April 1, 2008 to March 31, 2009 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-10200501-08C and 4150-20200102-11C. | ||
SEQUOYAH NUCLEAR PLANT -HOURS OF OPERATION ANNUAL REPORT APRIL 1, 2008 to MARCH 31, 2009 Equipment Name Maximum Permitted Actual Hours Hours of Operation of Operation Auxiliary Boilers 2,000 (combined) | If you have any questions regarding this report, please contact Stephanie Howard at (423)843-6700 or Ann Hurt at (423)843-6714 of Sequoyah's Environmental staff. | ||
Boiler A 0 Hours Boiler B 0 Hours Total 2,000 (combined) 0 Hours Emergency Diesel 204 Hours 64.5 Hours Generator 1-A Emergency Diesel 204 Hours 42.1 Hours Generator 2-A Emergency Diesel 204 Hours 59.8 Hours Generator 1-B Emergency Diesel 204 Hours 36.5 Hours Generator 2-B Blackout Diesel 204 Hours 7.7 Hours Generator 1 Blackout Diesel 204 Hours 7.1 Hours Generator 2}} | Sincerely, Timothy P.Clear~ | ||
Site Vice President Sequoyah Nuclear Plant Enclosure Pr,,~ wlar-d~ epap., | |||
SEQUOYAH NUCLEAR PLANT - HOURS OF OPERATION ANNUAL REPORT APRIL 1, 2008 to MARCH 31, 2009 Equipment Name Maximum Permitted Actual Hours Hours of Operation of Operation Auxiliary Boilers 2,000 (combined) | |||
Boiler A 0 Hours Boiler B 0 Hours Total 2,000 (combined) 0 Hours Emergency Diesel 204 Hours 64.5 Hours Generator 1-A Emergency Diesel 204 Hours 42.1 Hours Generator 2-A Emergency Diesel 204 Hours 59.8 Hours Generator 1-B Emergency Diesel 204 Hours 36.5 Hours Generator 2-B Blackout Diesel 204 Hours 7.7 Hours Generator 1 Blackout Diesel 204 Hours 7.1 Hours Generator 2}} |
Latest revision as of 13:26, 4 November 2019
Text
S58 090507 800 Air Correspondence May 7, 2009 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416
Dear Mr. Frazier:
SEQUOYAH NUCLEAR PLANT - HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report on the hours of operation from April 1, 2008 to March 31, 2009 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-10200501-08C and 4150-20200102-11 C.
If you have any questions regarding this report, please contact Stephanie Howard at (423)843-6700 or Ann Hurt at (423)843-6714 of Sequoyah's Environmental staff.
Sincerely, Timothy P. Cleary Site Vice President Sequoyah Nuclear Plant SAH Enclosure cc: D. J. Bodine, POB 2A-SQN A. A. Ray, WT 7C-K C. R. Church, POB 2B-SQN G. R. Signer, WT 6A-K T. P. Cleary, OPS 4A-SQN B. A. Wetzel, OPS 4A-SQN D. E. Pittman, BR 4T-C EDMS, WT CA-K (Enclosure)
REVIEW/CONCURRENCE SHEET DOCUMENT NAME: SEQUOYAH NUCLEAR PLANT - AIR ANNUAL REPORT ORGANIZATION: Chemistry and Environmental DOCUMENT PREPARED BY: Stephanie A. Howard DATE: 04/24/2009 07 I EDMS TRACKING NO.: S58 0905?? 800 - Air Correspondence CONCURRENCES Name R C Signature - Comment Date V N Stephanie A Howard x I -b 4L;~atoc Ann Hurt x Alan K Barringer x Debra J Bodine Beth A. Wetzel x ) 6 Chris R Church Timothy P Cleary x (for signature) ,iV INSTRUCTIONS: Originator will determine the review/concurrence assignment.
REVIEW: Examine technical content and commitments made. A review (RV) should confirm the truth and accuracy of factual statements and indicate agreement with commitments made which are applicable to the reviewer's organization.
CONCURRENCE: Indication of agreement with the document as a whole.
Concurrence (CN) signifies that the document is responsive to the intended purpose, logical in construction, and clear in meaning in the eyes of the recipient. A concurrence signature indicates that the individual would be willing to sign the document for the agency.
Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2 00 May 7, 2009 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416
Dear Mr. Frazier:
SEQUOYAH NUCLEAR PLANT - HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report on the hours of operation from April 1, 2008 to March 31, 2009 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-10200501-08C and 4150-20200102-11C.
If you have any questions regarding this report, please contact Stephanie Howard at (423)843-6700 or Ann Hurt at (423)843-6714 of Sequoyah's Environmental staff.
Sincerely, Timothy P.Clear~
Site Vice President Sequoyah Nuclear Plant Enclosure Pr,,~ wlar-d~ epap.,
SEQUOYAH NUCLEAR PLANT - HOURS OF OPERATION ANNUAL REPORT APRIL 1, 2008 to MARCH 31, 2009 Equipment Name Maximum Permitted Actual Hours Hours of Operation of Operation Auxiliary Boilers 2,000 (combined)
Boiler A 0 Hours Boiler B 0 Hours Total 2,000 (combined) 0 Hours Emergency Diesel 204 Hours 64.5 Hours Generator 1-A Emergency Diesel 204 Hours 42.1 Hours Generator 2-A Emergency Diesel 204 Hours 59.8 Hours Generator 1-B Emergency Diesel 204 Hours 36.5 Hours Generator 2-B Blackout Diesel 204 Hours 7.7 Hours Generator 1 Blackout Diesel 204 Hours 7.1 Hours Generator 2