|
|
(2 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML061360358 | | | number = ML061360358 |
| | issue date = 05/08/2006 | | | issue date = 05/08/2006 |
| | title = Salem, Unit 2 - License Change Request S05-15 Maximum Allowable Power with Inoperable Steam Line Safety Valves | | | title = License Change Request S05-15 Maximum Allowable Power with Inoperable Steam Line Safety Valves |
| | author name = Tosch K W | | | author name = Tosch K |
| | author affiliation = State of NJ, Dept of Environmental Protection | | | author affiliation = State of NJ, Dept of Environmental Protection |
| | addressee name = | | | addressee name = |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:-5 k P Ntate of New e3?rsqy DEPARTMENT OF ENVIRONMENTAL PROTECTION JON S. CORZMNE LISA P. JACKSON Governor Division of Environmental Safety and Health Commissioner Radiation Protection and Release Prevention Element Bureau of Nuclear Engineering P.O. Box 415 Trenton, New Jersey 08625-0415 Tel (609) 984-7700 Fax (609) 984-7513 May 8, 2006 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 | | {{#Wiki_filter:- 5 k P Ntate of New e3?rsqy DEPARTMENT OF ENVIRONMENTAL PROTECTION JON S. CORZMNE LISA P. JACKSON Governor Division of Environmental Safety and Health Commissioner Radiation Protection and Release Prevention Element Bureau of Nuclear Engineering P.O. Box 415 Trenton, New Jersey 08625-0415 Tel (609) 984-7700 Fax (609) 984-7513 May 8, 2006 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 |
|
| |
|
| ==Dear Sir:== | | ==Dear Sir:== |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Salem Generating Station Unit 2 Docket Number 50-311 License Change Request S05-15 Maximum Allowable Power With Inoperable Steam Line Safety Valves PSEG Nuclear LLC submitted the proposed change to the Salem Unit 2 Technical Specifications by letter to the NRC dated April 6, 2006. The proposed amendment would reduce the maximum allowable reactor power level with two inoperable Main Steam Safety Valves. This change is consistent with the safety analyses performed to support the Salem Unit 2 Steam Generator Replacement Project.The BNE has no comments on the proposed change. If you need to discuss this subject firther, please contact Elliot Rosenfeld at (609) 984-7548.Sincerely Kent W. Tosch, Manager Bureau of Nuclear Engineering New Jersey Is An Equal Opportunity Employer | | Salem Generating Station Unit 2 Docket Number 50-311 License Change Request S05-15 Maximum Allowable Power With Inoperable Steam Line Safety Valves PSEG Nuclear LLC submitted the proposed change to the Salem Unit 2 Technical Specifications by letter to the NRC dated April 6, 2006. The proposed amendment would reduce the maximum allowable reactor power level with two inoperable Main Steam Safety Valves. This change is consistent with the safety analyses performed to support the Salem Unit 2 Steam Generator Replacement Project. |
| * Printed on Recycled Paper and Recyclable Ditribution Paul Baldauf, DEP Dennis Zannoni, DEP Elliot Rosenfeld, DEP Dr. Robert Bores, NRC Stewart Bailey, NRC Licensing Project Manager-Daniel Orr, Sr Resident Inspector Darin Benyak, Regulatory Assurance Director, PSEG Nuclear LLC}} | | The BNE has no comments on the proposed change. If you need to discuss this subject firther, please contact Elliot Rosenfeld at (609) 984-7548. |
| | Sincerely Kent W. Tosch, Manager Bureau of Nuclear Engineering New Jersey Is An Equal Opportunity Employer |
| | * Printedon Recycled Paperand Recyclable |
| | |
| | Ditribution Paul Baldauf, DEP Dennis Zannoni, DEP Elliot Rosenfeld, DEP Dr. Robert Bores, NRC Stewart Bailey, NRC Licensing Project Manager |
| | - Daniel Orr, Sr Resident Inspector Darin Benyak, Regulatory Assurance Director, PSEG Nuclear LLC}} |
Similar Documents at Salem |
---|
Category:Letter
MONTHYEARIR 05000272/20244032024-09-25025 September 2024 and Salem Nuclear Generating Station, Units 1 and 2, Cybersecurity Inspection Report 05000354/2024403, 05000272/2024403, and 05000311/2024403 (Cover Letter Only) ML24267A1082024-09-23023 September 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report IR 05000272/20244022024-09-23023 September 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML24145A1772024-07-15015 July 2024 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary IR 05000272/20245012024-06-12012 June 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 LR-N24-0038, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger2024-05-0909 May 2024 Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML24071A2132024-03-12012 March 2024 Senior Reactor and Reactor Operator Initial License Examinations LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24250A0582023-11-14014 November 2023 PSEG to Marine Mammal Stranding Center, Salem Sea Turtle Stranding Response Services IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000272/20230022023-08-0909 August 2023 Integrated Inspection Report 05000272/2023002 and 05000311/2023002 LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities 2024-09-25
[Table view] |
Text
- 5 k P Ntate of New e3?rsqy DEPARTMENT OF ENVIRONMENTAL PROTECTION JON S. CORZMNE LISA P. JACKSON Governor Division of Environmental Safety and Health Commissioner Radiation Protection and Release Prevention Element Bureau of Nuclear Engineering P.O. Box 415 Trenton, New Jersey 08625-0415 Tel (609) 984-7700 Fax (609) 984-7513 May 8, 2006 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Dear Sir:
Subject:
Salem Generating Station Unit 2 Docket Number 50-311 License Change Request S05-15 Maximum Allowable Power With Inoperable Steam Line Safety Valves PSEG Nuclear LLC submitted the proposed change to the Salem Unit 2 Technical Specifications by letter to the NRC dated April 6, 2006. The proposed amendment would reduce the maximum allowable reactor power level with two inoperable Main Steam Safety Valves. This change is consistent with the safety analyses performed to support the Salem Unit 2 Steam Generator Replacement Project.
The BNE has no comments on the proposed change. If you need to discuss this subject firther, please contact Elliot Rosenfeld at (609) 984-7548.
Sincerely Kent W. Tosch, Manager Bureau of Nuclear Engineering New Jersey Is An Equal Opportunity Employer
- Printedon Recycled Paperand Recyclable
Ditribution Paul Baldauf, DEP Dennis Zannoni, DEP Elliot Rosenfeld, DEP Dr. Robert Bores, NRC Stewart Bailey, NRC Licensing Project Manager
- Daniel Orr, Sr Resident Inspector Darin Benyak, Regulatory Assurance Director, PSEG Nuclear LLC