| title = Cyber Security Inspection Report 05000272/2018403 and 05000311/2018403 (Cover Letter Only) | |||
| author name = Dentel G | |||
| author affiliation = NRC/RGN-I/DRS/EB2 | |||
| addressee name = Sena P | |||
| addressee affiliation = PSEG Nuclear, LLC | |||
| docket = 05000272, 05000311 | |||
| license number = DPR-070, DPR-075 | |||
| contact person = Dentel G | |||
| document report number = IR 2018403 | |||
| document type = Inspection Report Correspondence, Letter | |||
| page count = 3 | |||
}} | |||
See also: [[see also::IR 05000272/2018403]] | |||
=Text= | |||
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | |||
UNITED STATES | |||
NUCLEAR REGULATORY COMMISSION | |||
REGION I | |||
2100 RENAISSANCE BLVD. | |||
KING OF PRUSSIA, PA 19406-2713 | |||
August 6, 2018 | |||
Mr. Peter P. Sena, III | |||
President and Chief Nuclear Officer | |||
PSEG Nuclear LLC - N09 | |||
P.O. Box 236 | |||
Hancocks Bridge, NJ 08038 | |||
SUBJECT: SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 - CYBER | |||
SECURITY INSPECTION REPORT 05000272/2018403 AND 05000311/2018403 | |||
Dear Mr. Sena: | |||
On June 22, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at | |||
Salem Nuclear Generating Stations (Salem), Units 1 and 2. On the same day, the NRC | |||
inspectors discussed the results of this inspection with Mr. Charles McFeaters, Salem Vice | |||
President and other members of your staff. The results of this inspection are documented in the | |||
enclosed report. | |||
NRC inspectors documented one finding of very low safety significance (Green) in this report. | |||
This finding involved a violation of NRC requirements. Additionally, inspectors documented a | |||
licensee-identified violation which was determined to be of very low safety significance. The | |||
NRC is treating these violations as a non-cited violations (NCVs) consistent with Section 2.3.2.a | |||
of the Enforcement Policy. | |||
One cross-cutting aspect was assigned to a finding in the area of Problem Identification and | |||
Resolution. Specifically, PSEG failed to thoroughly evaluate issues to ensure that resolutions | |||
address causes and extent of conditions commensurate with their safety significance, [P.2]. | |||
If you contest the violations or significance of these NCVs, you should provide a response within | |||
30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear | |||
Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with | |||
copies to the Regional Administrator, Region I; the Director, Office of Enforcement; and the NRC | |||
Resident Inspector at Salem. | |||
Enclosure(s) transmitted herewith contain(s) Sensitive, | |||
Unclassified, Non-Safeguards Information. When separated | |||
from the Enclosure(s), the transmittal document is decontrolled. | |||
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | |||
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | |||
P. Sena 2 | |||
In addition, if you disagree with the cross-cutting aspect assignment, you should provide a | |||
response within 30 days of the date of this inspection report, with the basis for your | |||
disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, | |||
Washington, DC, 20555-0001; with copies to the Regional Administrator, Region I and the NRC | |||
Resident Inspector at Salem. | |||
This letter will be made available for public inspection and copying at | |||
http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance | |||
with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, Public Inspections, | |||
Exemptions, Requests for Withholding. | |||
However, the enclosed report contains Security-Related Information, so the enclosed report will | |||
not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to | |||
provide a response that contains Security-Related Information, please mark your entire | |||
response Security-Related Information-Withhold from Public Disclosure under 10 CFR 2.390 | |||
in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in | |||
10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in | |||
accordance with 10 CFR 2.390(b)(1)(ii). | |||
Sincerely, | |||
/RA/ | |||
Glenn T. Dentel, Chief | |||
Engineering Branch 2 | |||
Division of Reactor Safety | |||
Docket Numbers: 50-272 and 50-311 | |||
License Numbers: DPR-70 and DPR-75 | |||
Enclosure: | |||
Inspection Report 05000272/2018403 and | |||
05000311/2018403 (OUO-SRI) | |||
cc w/o encl: Distribution via ListServ | |||
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | |||
ML18218A506 (Cover letter) | |||
ADAMS ACCESSION NUMBER: ML18218A487 (Cover letter w/enclosure-NP) | |||
Cover Letter Non-Sensitive Publicly Available | |||
SUNSI Review Sensitive Non-Publicly Available | |||
Cover Letter w/ Enclosure Non-Sensitive Publicly Available | |||
SUNSI Review Sensitive Non-Publicly Available | |||
OFFICE RI/DRS RI/DRS RI/DRP RI/DRP RI/DRS | |||
NAME DWerkheiser FArner/AAR for FBower GDentel | |||
DATE 8/06/18 8/06/18 8/06/18 8/06/18 | |||
}} |
Latest revision as of 20:02, 20 October 2019
ML18218A506 | |
Person / Time | |
---|---|
Site: | Salem ![]() |
Issue date: | 08/06/2018 |
From: | Glenn Dentel Engineering Region 1 Branch 2 |
To: | Sena P Public Service Enterprise Group |
Dentel G | |
References | |
IR 2018403 | |
Download: ML18218A506 (3) | |
See also: IR 05000272/2018403
Text
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406-2713
August 6, 2018
Mr. Peter P. Sena, III
President and Chief Nuclear Officer
P.O. Box 236
Hancocks Bridge, NJ 08038
SUBJECT: SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 - CYBER
SECURITY INSPECTION REPORT 05000272/2018403 AND 05000311/2018403
Dear Mr. Sena:
On June 22, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at
Salem Nuclear Generating Stations (Salem), Units 1 and 2. On the same day, the NRC
inspectors discussed the results of this inspection with Mr. Charles McFeaters, Salem Vice
President and other members of your staff. The results of this inspection are documented in the
enclosed report.
NRC inspectors documented one finding of very low safety significance (Green) in this report.
This finding involved a violation of NRC requirements. Additionally, inspectors documented a
licensee-identified violation which was determined to be of very low safety significance. The
NRC is treating these violations as a non-cited violations (NCVs) consistent with Section 2.3.2.a
of the Enforcement Policy.
One cross-cutting aspect was assigned to a finding in the area of Problem Identification and
Resolution. Specifically, PSEG failed to thoroughly evaluate issues to ensure that resolutions
address causes and extent of conditions commensurate with their safety significance, [P.2].
If you contest the violations or significance of these NCVs, you should provide a response within
30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear
Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with
copies to the Regional Administrator, Region I; the Director, Office of Enforcement; and the NRC
Resident Inspector at Salem.
Enclosure(s) transmitted herewith contain(s) Sensitive,
Unclassified, Non-Safeguards Information. When separated
from the Enclosure(s), the transmittal document is decontrolled.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
P. Sena 2
In addition, if you disagree with the cross-cutting aspect assignment, you should provide a
response within 30 days of the date of this inspection report, with the basis for your
disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington, DC, 20555-0001; with copies to the Regional Administrator, Region I and the NRC
Resident Inspector at Salem.
This letter will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance
with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, Public Inspections,
Exemptions, Requests for Withholding.
However, the enclosed report contains Security-Related Information, so the enclosed report will
not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to
provide a response that contains Security-Related Information, please mark your entire
response Security-Related Information-Withhold from Public Disclosure under 10 CFR 2.390
in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in
10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in
accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/
Glenn T. Dentel, Chief
Engineering Branch 2
Division of Reactor Safety
Docket Numbers: 50-272 and 50-311
License Numbers: DPR-70 and DPR-75
Enclosure:
Inspection Report 05000272/2018403 and
05000311/2018403 (OUO-SRI)
cc w/o encl: Distribution via ListServ
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
ML18218A506 (Cover letter)
ADAMS ACCESSION NUMBER: ML18218A487 (Cover letter w/enclosure-NP)
Cover Letter Non-Sensitive Publicly Available
SUNSI Review Sensitive Non-Publicly Available
Cover Letter w/ Enclosure Non-Sensitive Publicly Available
SUNSI Review Sensitive Non-Publicly Available
OFFICE RI/DRS RI/DRS RI/DRP RI/DRP RI/DRS
NAME DWerkheiser FArner/AAR for FBower GDentel
DATE 8/06/18 8/06/18 8/06/18 8/06/18