RIS 2006-23, Post-Tornado Operability of Ventilating and Air-Conditioning (Vac) Systems Housed in Emergency Diesel Generator (EDG) Rooms: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/06/2006
| issue date = 12/06/2006
| title = Post-Tornado Operability of Ventilating and Air-Conditioning (Vac) Systems Housed in Emergency Diesel Generator (EDG) Rooms
| title = Post-Tornado Operability of Ventilating and Air-Conditioning (Vac) Systems Housed in Emergency Diesel Generator (EDG) Rooms
| author name = Case M J
| author name = Case M
| author affiliation = NRC/NRR/ADRA/DPR
| author affiliation = NRC/NRR/ADRA/DPR
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 4
| page count = 4
}}
}}
{{#Wiki_filter:UNITED STATESNUCLEAR REGULATORY COMMISSIONOFFICE OF NUCLEAR REACTOR REGULATIONOFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDSWASHINGTON, DC 20555-0001December 6, 2006NRC REGULATORY ISSUE SUMMARY 2006-23POST-TORNADO OPERABILITY OF VENTILATING ANDAIR-CONDITIONING SYSTEMS HOUSED IN EMERGENCY DIESELGENERATOR ROOMS
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION
OFFICE OF NUCLEAR REACTOR REGULATION
OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS
WASHINGTON, DC 20555-0001 December 6, 2006 NRC REGULATORY ISSUE SUMMARY 2006-23 POST-TORNADO OPERABILITY OF VENTILATING AND
AIR-CONDITIONING SYSTEMS HOUSED IN EMERGENCY DIESEL
GENERATOR ROOMS


==ADDRESSEES==
==ADDRESSEES==
All holders of operating licenses for nuclear power reactors, except those who havepermanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.
All holders of operating licenses for nuclear power reactors, except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.


==INTENT==
==INTENT==
The U.S. Nuclear Regulatory Commission (NRC) is issuing this Regulatory Issue Summary(RIS) to notify licensees of its regulatory position regarding loading effects caused by natural phenomena to safety related systems and components housed inside a structure partially exposed to the outside environment, specifically ventilating and air-conditioning (VAC) systems housed in the Emergency Diesel Generator (EDG) room.  NRC expects addressees to review this RIS for applicability to their facilities and consider actions as appropriate.  This RISrequires no action or written response from addressees.
The U.S. Nuclear Regulatory Commission (NRC) is issuing this Regulatory Issue Summary (RIS) to notify licensees of its regulatory position regarding loading effects caused by natural phenomena to safety related systems and components housed inside a structure partially exposed to the outside environment, specifically ventilating and air-conditioning (VAC) systems housed in the Emergency Diesel Generator (EDG) room.  NRC expects addressees to review this RIS for applicability to their facilities and consider actions as appropriate.  This RIS
requires no action or written response from addressees.


==BACKGROUND INFORMATION==
==BACKGROUND INFORMATION==
During an NRC inspection in May 2005, inspectors questioned the ability of a licensee's VACsystem and other components in an EDG room to operate safely during and after a tornado event.  Specifically, the NRC staff questioned whether wind pressures and differential pressures caused by a tornado passing directly over the EDG building could adversely affect safety related systems and components inside the EDG building.In response to the NRC questions, the licensee conducted an industrywide survey revealingapproximately 25 plants with a licensing basis similar to their own.  In addition, the licensee performed rapid depressurization and re-pressurization analyses (venting) of the EDG room and large deformation inelastic-stress calculations of potentially vulnerable duct segments.  The licensee's analyses demonstrated and provided assurance that the structural integrity of the VAC system ducts in the EDG room would be maintained during the tornado event, and that afterward the VAC system would be able to perform its intended function.  The staff reviewed the analyses and concluded that the integrity of the licensee's VAC system is adequate. ML061720371The NRC staff encountered a similar situation with a different conclusion in 1996 and discussedit in Information Notice (IN) 96-06.  IN 96-06 states that South Texas Project Unit 1 (South Texas) found that an interference between a tornado damper and gusset prevented the damper from fully closing.  South Texas found that rapid depressurization could result in the collapse of the VAC system, thus, preventing the cooling of safety-related systems.Based on its review, the staff concluded that the licensee's analysis was site specific and thatother nuclear plants might not have adequately considered tornado wind and pressure-drop effects on safety-related systems and components inside building structures open to the outside environment.
During an NRC inspection in May 2005, inspectors questioned the ability of a licensees VAC
system and other components in an EDG room to operate safely during and after a tornado event.  Specifically, the NRC staff questioned whether wind pressures and differential pressures caused by a tornado passing directly over the EDG building could adversely affect safety related systems and components inside the EDG building.
 
In response to the NRC questions, the licensee conducted an industrywide survey revealing approximately 25 plants with a licensing basis similar to their own.  In addition, the licensee performed rapid depressurization and re-pressurization analyses (venting) of the EDG room and large deformation inelastic-stress calculations of potentially vulnerable duct segments.  The licensees analyses demonstrated and provided assurance that the structural integrity of the VAC system ducts in the EDG room would be maintained during the tornado event, and that afterward the VAC system would be able to perform its intended function.  The staff reviewed the analyses and concluded that the integrity of the licensees VAC system is adequate.
 
ML061720371 The NRC staff encountered a similar situation with a different conclusion in 1996 and discussed it in Information Notice (IN) 96-06.  IN 96-06 states that South Texas Project Unit 1 (South Texas) found that an interference between a tornado damper and gusset prevented the damper from fully closing.  South Texas found that rapid depressurization could result in the collapse of the VAC system, thus, preventing the cooling of safety-related systems.
 
Based on its review, the staff concluded that the licensees analysis was site specific and that other nuclear plants might not have adequately considered tornado wind and pressure-drop effects on safety-related systems and components inside building structures open to the outside environment.


==SUMMARY OF ISSUE==
==SUMMARY OF ISSUE==
Natural hazards are discussed in 10 CFR Part 50, Appendix A, GDC 2, and includeearthquakes, tornadoes, and floods.  NRC expects licensees to consider natural hazards during the design of systems and components housed inside safety-related structures if these systems and components may be exposed to the outside environment and if their malfunction or loss may prevent or impact the operability of safety-related systems and components.Vented VAC ducts, and other internal safety-related systems and components, may besubjected to the effects of rapid room depressurization and re-pressurization and other effects associated with a tornado event.  In some cases the loss of structural integrity of VAC systems may pose a challenge to the safe operation of the facility.  In such cases, licensees should take any necessary measures to ensure the operability of VAC duct systems located in EDG rooms.
Natural hazards are discussed in 10 CFR Part 50, Appendix A, GDC 2, and include earthquakes, tornadoes, and floods.  NRC expects licensees to consider natural hazards during the design of systems and components housed inside safety-related structures if these systems and components may be exposed to the outside environment and if their malfunction or loss may prevent or impact the operability of safety-related systems and components.
 
Vented VAC ducts, and other internal safety-related systems and components, may be subjected to the effects of rapid room depressurization and re-pressurization and other effects associated with a tornado event.  In some cases the loss of structural integrity of VAC systems may pose a challenge to the safe operation of the facility.  In such cases, licensees should take any necessary measures to ensure the operability of VAC duct systems located in EDG rooms.


==BACKFIT DISCUSSION==
==BACKFIT DISCUSSION==
Line 32: Line 48:


===FEDERAL REGISTER NOTIFICATION===
===FEDERAL REGISTER NOTIFICATION===
A notice of opportunity for public comment on this RIS was not published in the FederalRegister because this RIS is informational and pertains to a staff position that does notrepresent a departure from current regulatory requirements and practice.
A notice of opportunity for public comment on this RIS was not published in the Federal Register because this RIS is informational and pertains to a staff position that does not represent a departure from current regulatory requirements and practice.


===CONGRESSIONAL REVIEW ACT===
===CONGRESSIONAL REVIEW ACT===
This RIS is not a rule as designated by the Congressional Review Act (5 U.S.C.§§ 801-888)and, therefore, is not subject to the Act.
This RIS is not a rule as designated by the Congressional Review Act (5 U.S.C.§§ 801-888)
and, therefore, is not subject to the Act.


===PAPERWORK REDUCTION ACT STATEMENT===
===PAPERWORK REDUCTION ACT STATEMENT===
This RIS does not contain information collections and, therefore, is not subject to therequirements of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).
This RIS does not contain information collections and, therefore, is not subject to the requirements of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).


==CONTACT==
==CONTACT==
Please direct any questions about this matter to the technical contact listed below./RA/Michael Case, DirectorDivision of Policy and Rulemaking Office of Nuclear Reactor Regulation
Please direct any questions about this matter to the technical contact listed below.
 
/RA/
Michael Case, Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation  


===Technical Contact:===
===Technical Contact:===
Mark Hartzman, NRR       301-415-2755       E-mail: MXH@nrc.gov  
Mark Hartzman, NRR  
 
301-415-2755
 
E-mail: MXH@nrc.gov  


===FEDERAL REGISTER NOTIFICATION===
===FEDERAL REGISTER NOTIFICATION===
A notice of opportunity for public comment on this RIS was not published in the FederalRegister because this RIS is informational and pertains to a staff position that does notrepresent a departure from current regulatory requirements and practice.
A notice of opportunity for public comment on this RIS was not published in the Federal Register because this RIS is informational and pertains to a staff position that does not represent a departure from current regulatory requirements and practice.


===CONGRESSIONAL REVIEW ACT===
===CONGRESSIONAL REVIEW ACT===
This RIS is not a rule as designated by the Congressional Review Act (5 U.S.C.§§ 801-888)and, therefore, is not subject to the Act.
This RIS is not a rule as designated by the Congressional Review Act (5 U.S.C.§§ 801-888)
and, therefore, is not subject to the Act.


===PAPERWORK REDUCTION ACT STATEMENT===
===PAPERWORK REDUCTION ACT STATEMENT===
This RIS does not contain information collections and, therefore, is not subject to therequirements of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).
This RIS does not contain information collections and, therefore, is not subject to the requirements of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).


==CONTACT==
==CONTACT==
Please direct any questions about this matter to the technical contact listed below./RA/Michael Case, DirectorDivision of Policy and Rulemaking Office of Nuclear Reactor Regulation
Please direct any questions about this matter to the technical contact listed below.
 
/RA/
Michael Case, Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation  


===Technical Contact:===
===Technical Contact:===
Mark Hartzman, NRR       301-415-2755       E-mail: MXH@nrc.govDISTRIBUTION
Mark Hartzman, NRR  
:RIS FileADAMS ACCESSION NO.  ML061720371OFFICEEEMBEEMBTECH EDITORBC:EEMBD:DEBC:EGCB:DCINAMEMHartzmanMGutierrezHChang KManolyMMayfieldSSAmedder for RKavasDATE    9/11/20069/11/20066/23/2006   9/11/20069/11/2006     9/20/2006OFFICEBC:SCVB:DCIBC:ITSB:DIRSD:DORLOEOGC (NLO)OGC (CRA)NAMERDennigTKobetzDRobertsMYoungNSanchezDATE10/11/20069/14/200610/10/2006     10/03/20069/25/20069/13/2006OFFICEPMASOISLA:PGCB:DPRPGCB:DPRBC:PGCB:DPRD:DPRNAMEJHarvesBStMaryCHawesAMarkleyCJacksonMCaseDATE9/12/20069/14/200610/24/200610/26/2006     11/29/200612/06/06OFFICIAL RECORD COPY
 
301-415-2755
 
E-mail: MXH@nrc.gov DISTRIBUTION:
RIS File ADAMS ACCESSION NO.  ML061720371 OFFICE
EEMB
EEMB
TECH EDITOR
BC:EEMB
D:DE
BC:EGCB:DCI
NAME
MHartzman MGutierrez HChang KManoly MMayfield SSAmedder for RKavas DATE
 
9/11/2006
9/11/2006
6/23/2006
 
9/11/2006
9/11/2006
    9/20/2006 OFFICE
BC:SCVB:DCI
BC:ITSB:DIRS
D:DORL
OE
OGC (NLO)
OGC (CRA)
NAME
RDennig TKobetz DRoberts MYoung NSanchez DATE
10/11/2006
9/14/2006
10/10/2006
    10/03/2006
9/25/2006
9/13/2006 OFFICE
PMAS
OIS
LA:PGCB:DPR
PGCB:DPR
BC:PGCB:DPR
D:DPR
NAME
JHarves BStMary CHawes AMarkley CJackson MCase DATE
9/12/2006
9/14/2006
10/24/2006
10/26/2006
    11/29/2006
12/06/06 OFFICIAL RECORD COPY
}}
}}


{{RIS-Nav}}
{{RIS-Nav}}

Latest revision as of 08:21, 15 January 2025

Post-Tornado Operability of Ventilating and Air-Conditioning (Vac) Systems Housed in Emergency Diesel Generator (EDG) Rooms
ML061720371
Person / Time
Issue date: 12/06/2006
From: Michael Case
NRC/NRR/ADRA/DPR
To:
Hartzman M, NRC/NRR/DE/EMEB, 415-2755
References
RIS-06-023
Download: ML061720371 (4)


UNITED STATES

NUCLEAR REGULATORY COMMISSION

OFFICE OF NUCLEAR REACTOR REGULATION

OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS

WASHINGTON, DC 20555-0001 December 6, 2006 NRC REGULATORY ISSUE SUMMARY 2006-23 POST-TORNADO OPERABILITY OF VENTILATING AND

AIR-CONDITIONING SYSTEMS HOUSED IN EMERGENCY DIESEL

GENERATOR ROOMS

ADDRESSEES

All holders of operating licenses for nuclear power reactors, except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.

INTENT

The U.S. Nuclear Regulatory Commission (NRC) is issuing this Regulatory Issue Summary (RIS) to notify licensees of its regulatory position regarding loading effects caused by natural phenomena to safety related systems and components housed inside a structure partially exposed to the outside environment, specifically ventilating and air-conditioning (VAC) systems housed in the Emergency Diesel Generator (EDG) room. NRC expects addressees to review this RIS for applicability to their facilities and consider actions as appropriate. This RIS

requires no action or written response from addressees.

BACKGROUND INFORMATION

During an NRC inspection in May 2005, inspectors questioned the ability of a licensees VAC

system and other components in an EDG room to operate safely during and after a tornado event. Specifically, the NRC staff questioned whether wind pressures and differential pressures caused by a tornado passing directly over the EDG building could adversely affect safety related systems and components inside the EDG building.

In response to the NRC questions, the licensee conducted an industrywide survey revealing approximately 25 plants with a licensing basis similar to their own. In addition, the licensee performed rapid depressurization and re-pressurization analyses (venting) of the EDG room and large deformation inelastic-stress calculations of potentially vulnerable duct segments. The licensees analyses demonstrated and provided assurance that the structural integrity of the VAC system ducts in the EDG room would be maintained during the tornado event, and that afterward the VAC system would be able to perform its intended function. The staff reviewed the analyses and concluded that the integrity of the licensees VAC system is adequate.

ML061720371 The NRC staff encountered a similar situation with a different conclusion in 1996 and discussed it in Information Notice (IN) 96-06. IN 96-06 states that South Texas Project Unit 1 (South Texas) found that an interference between a tornado damper and gusset prevented the damper from fully closing. South Texas found that rapid depressurization could result in the collapse of the VAC system, thus, preventing the cooling of safety-related systems.

Based on its review, the staff concluded that the licensees analysis was site specific and that other nuclear plants might not have adequately considered tornado wind and pressure-drop effects on safety-related systems and components inside building structures open to the outside environment.

SUMMARY OF ISSUE

Natural hazards are discussed in 10 CFR Part 50, Appendix A, GDC 2, and include earthquakes, tornadoes, and floods. NRC expects licensees to consider natural hazards during the design of systems and components housed inside safety-related structures if these systems and components may be exposed to the outside environment and if their malfunction or loss may prevent or impact the operability of safety-related systems and components.

Vented VAC ducts, and other internal safety-related systems and components, may be subjected to the effects of rapid room depressurization and re-pressurization and other effects associated with a tornado event. In some cases the loss of structural integrity of VAC systems may pose a challenge to the safe operation of the facility. In such cases, licensees should take any necessary measures to ensure the operability of VAC duct systems located in EDG rooms.

BACKFIT DISCUSSION

This RIS requires no action or written response. Any action on the part of the addressees to inform NRC regarding the ability of their systems to withstand loadings caused by partial exposure to the environment in accordance with the guidance contained in this RIS is strictly voluntary and, therefore, is not a backfit under 10 CFR 50.109. Consequently, the staff has not performed a backfit analysis.

FEDERAL REGISTER NOTIFICATION

A notice of opportunity for public comment on this RIS was not published in the Federal Register because this RIS is informational and pertains to a staff position that does not represent a departure from current regulatory requirements and practice.

CONGRESSIONAL REVIEW ACT

This RIS is not a rule as designated by the Congressional Review Act (5 U.S.C.§§ 801-888)

and, therefore, is not subject to the Act.

PAPERWORK REDUCTION ACT STATEMENT

This RIS does not contain information collections and, therefore, is not subject to the requirements of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).

CONTACT

Please direct any questions about this matter to the technical contact listed below.

/RA/

Michael Case, Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

Technical Contact:

Mark Hartzman, NRR

301-415-2755

E-mail: MXH@nrc.gov

FEDERAL REGISTER NOTIFICATION

A notice of opportunity for public comment on this RIS was not published in the Federal Register because this RIS is informational and pertains to a staff position that does not represent a departure from current regulatory requirements and practice.

CONGRESSIONAL REVIEW ACT

This RIS is not a rule as designated by the Congressional Review Act (5 U.S.C.§§ 801-888)

and, therefore, is not subject to the Act.

PAPERWORK REDUCTION ACT STATEMENT

This RIS does not contain information collections and, therefore, is not subject to the requirements of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).

CONTACT

Please direct any questions about this matter to the technical contact listed below.

/RA/

Michael Case, Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

Technical Contact:

Mark Hartzman, NRR

301-415-2755

E-mail: MXH@nrc.gov DISTRIBUTION:

RIS File ADAMS ACCESSION NO. ML061720371 OFFICE

EEMB

EEMB

TECH EDITOR

BC:EEMB

D:DE

BC:EGCB:DCI

NAME

MHartzman MGutierrez HChang KManoly MMayfield SSAmedder for RKavas DATE

9/11/2006

9/11/2006

6/23/2006

9/11/2006

9/11/2006

9/20/2006 OFFICE

BC:SCVB:DCI

BC:ITSB:DIRS

D:DORL

OE

OGC (NLO)

OGC (CRA)

NAME

RDennig TKobetz DRoberts MYoung NSanchez DATE

10/11/2006

9/14/2006

10/10/2006

10/03/2006

9/25/2006

9/13/2006 OFFICE

PMAS

OIS

LA:PGCB:DPR

PGCB:DPR

BC:PGCB:DPR

D:DPR

NAME

JHarves BStMary CHawes AMarkley CJackson MCase DATE

9/12/2006

9/14/2006

10/24/2006

10/26/2006

11/29/2006

12/06/06 OFFICIAL RECORD COPY