IR 05000327/2010403: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 1: | Line 1: | ||
{{Adams|number = ML102390032}} | {{Adams | ||
| number = ML102390032 | |||
| issue date = 07/14/2010 | |||
| title = IR 05000327-10-403 & 05000328-10-403, Conducted on 04/30/2010, Sequoyah Nuclear Plant, NRC Material Control & Accounting Inspection | |||
| author name = Guthrie E F | |||
| author affiliation = NRC/RGN-II/DRP/RPB6 | |||
| addressee name = Krich R M | |||
| addressee affiliation = Tennessee Valley Authority | |||
| docket = 05000327, 05000328 | |||
| license number = DPR-077, DPR-079 | |||
| contact person = | |||
| document report number = IR-10-403 | |||
| document type = Inspection Report Correspondence | |||
| page count = 5 | |||
}} | |||
{{IR-Nav| site = 05000327 | year = 2010 | report number = 403 }} | {{IR-Nav| site = 05000327 | year = 2010 | report number = 403 }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:Enclosure(s) transmitted herewith contains(s) SUNSI. When separated from enclosure(s) this transmittal document is decontrolled. July 14, 2010 | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 Enclosure(s) transmitted herewith contains(s) SUNSI. When separated from enclosure(s) this transmittal document is decontrolled. July 14, 2010 Mr. R. Vice President, Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 | ||
SUBJECT: | SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000327/2010403 AND 05000328/2010403 | ||
==Dear Mr. Krich:== | ==Dear Mr. Krich:== | ||
On April 30, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed a material control and accounting inspection at your Sequoyah Nuclear Plant, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on July 7, 2010, with Mr. Chris Church and other members of your staff | On April 30, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed a material control and accounting inspection at your Sequoyah Nuclear Plant, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on July 7, 2010, with Mr. Chris Church and other members of your staff. | ||
This inspection examined activities conducted under your license as they relate to security and compliance with the Commission | |||
=s rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | |||
Based on the results of this inspection, no findings of significance were identified. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter | |||
=s enclosure will not be available for public inspection. | |||
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC | |||
NRC | =s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable TVA 2 response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1). | ||
= | |||
Should you have any questions concerning this letter, please contact us. | Should you have any questions concerning this letter, please contact us. | ||
Sincerely,/RA/ | Sincerely,/RA/ | ||
Eugene F. Guthrie, Chief Reactor Projects Branch 6 Division of Reactor Projects | Eugene F. Guthrie, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket No.: 50-327, 50-328 License No.: DPR-77, DPR-79 | ||
===Enclosure:=== | ===Enclosure:=== | ||
NRC Material Control and Accounting Inspection Report 05000327/2010403 | NRC Material Control and Accounting Inspection Report 05000327/2010403 and 05000328/2010403 | ||
===w/Attachment:=== | ===w/Attachment:=== | ||
Supplemental Information cc w/encl.: | Supplemental Information | ||
cc w/encl.: (See page 3) | |||
_________________________ | |||
G SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE WXD /RA/ Via email Via email CRK /RA/ EFG /RA/ NAME WDeschaine MSpeck CYoung CKontz EGuthrie DATE 07/13/2010 07/13/2010 07/13/2010 07/14/2010 07/14/2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO TVA 3 cc w/o encl: C.R. Church Vice President Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy-Daisy, TN 37384-2000 K. Langdon Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000 B. A. Wetzel Manager Licensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000 E. J. Vigluicci Assistant General Counsel Tennessee Valley Authority 6A West Tower 400 West Summit Hill Drive Knoxville, TN 37902 County Mayor Hamilton County Hamilton County Courthouse Chattanooga, TN 37402-2801 Division of Radiological Health TN Dept. of Environment & Conservation 401 Church Street Nashville, TN 37243-1532 Ann Harris 341 Swing Loop Rockwood, TN 37854 4 Letter to R. from Eugene Guthrie dated July 14, 2010 | |||
SUBJECT: | SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000327/2010403 AND 05000328/2010403 Distribution w/encl | ||
: C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSequoyah Resource | |||
}} | }} |
Revision as of 09:46, 21 August 2018
ML102390032 | |
Person / Time | |
---|---|
Site: | Sequoyah |
Issue date: | 07/14/2010 |
From: | Guthrie E F Reactor Projects Region 2 Branch 6 |
To: | Krich R M Tennessee Valley Authority |
References | |
IR-10-403 | |
Download: ML102390032 (5) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 Enclosure(s) transmitted herewith contains(s) SUNSI. When separated from enclosure(s) this transmittal document is decontrolled. July 14, 2010 Mr. R. Vice President, Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000327/2010403 AND 05000328/2010403
Dear Mr. Krich:
On April 30, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed a material control and accounting inspection at your Sequoyah Nuclear Plant, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on July 7, 2010, with Mr. Chris Church and other members of your staff.
This inspection examined activities conducted under your license as they relate to security and compliance with the Commission
=s rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter
=s enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC
=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable TVA 2 response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Should you have any questions concerning this letter, please contact us.
Sincerely,/RA/
Eugene F. Guthrie, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket No.: 50-327, 50-328 License No.: DPR-77, DPR-79
Enclosure:
NRC Material Control and Accounting Inspection Report 05000327/2010403 and 05000328/2010403
w/Attachment:
Supplemental Information
cc w/encl.: (See page 3)
_________________________
G SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE WXD /RA/ Via email Via email CRK /RA/ EFG /RA/ NAME WDeschaine MSpeck CYoung CKontz EGuthrie DATE 07/13/2010 07/13/2010 07/13/2010 07/14/2010 07/14/2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO TVA 3 cc w/o encl: C.R. Church Vice President Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy-Daisy, TN 37384-2000 K. Langdon Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000 B. A. Wetzel Manager Licensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000 E. J. Vigluicci Assistant General Counsel Tennessee Valley Authority 6A West Tower 400 West Summit Hill Drive Knoxville, TN 37902 County Mayor Hamilton County Hamilton County Courthouse Chattanooga, TN 37402-2801 Division of Radiological Health TN Dept. of Environment & Conservation 401 Church Street Nashville, TN 37243-1532 Ann Harris 341 Swing Loop Rockwood, TN 37854 4 Letter to R. from Eugene Guthrie dated July 14, 2010
SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000327/2010403 AND 05000328/2010403 Distribution w/encl
- C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSequoyah Resource