ML13032A129: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 14: | Line 14: | ||
| page count = 3 | | page count = 3 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:8:00 AM Daily Reactor Oversight Coordination Meeting- August 16, 2012 Date Added Lead Branch Plant/Issue/Status 8/13/12 PB1 CC- U1 Tech Spec required shutdown due to CEA #9 dropped MS- U2 Tech Spec required shutdown due to ultimate heat sink exceeding temp Events, Significant 8limit of 75 degrees, Mode 5 Cold Shutdown Safety Issues, and 8/13/12 PB6 TMI- Flood Barrier Seals could not be verified installed in the Air Intake Tunnel Operational Challenges 8/13/12 PB4 SUS- Dry fuel storage transfer trailer detected with removable contamination Fi 8/13/12 PB6 1 TMI- Flood Barrier Seals could not be verified installed in the Air Intake Tunnel IMC 0309 Reviews _6/21/12 PB1 NMP -U1 AL3 UIL 0.35 gpm 7/09/12 PB6 TMI -AL3 UIL 0.16 gpm; downpower 8/22 Plant Status Items PlaIntetsIte 8/07/12 PB4 S -U2 UIL 0.35 gpm (first 90 days)8/13/12 PB4 LM- U1 LP Turbine Blade Inspection 8/23 HC- CDBI 7/30, 8/13, 8/27 Salem/HC -95002 8/27 Team Inspections OC -PI&R 8/13 & 8/27 MS- 95001 9/10 1/03/12 *EB1/PB3 SB -ASR resolution: | |||
: 1) CAL Follow-up INSP in progress; | |||
: 2) Working group priority 1/03/12 Profe Issues: TIA, deviation memo, technical issues position papers High Profile 7/02/12 ORA/DRP Meeting w/ NJ OC Oversight Panel 8/23 Actrivities 7/12/12 PB1 CC -Magwood visit to site 8/23 7/31/12 PB2 IP -Magwood visit 9/13 GAMDP\Morning Meeting Files\New Format 2012\June 2012\06-14-2012.docx 8/02/12 DRM 1 Region -Chairman visit 9/13 8/16/12 PB1 CC -GAO visit to site 9/25 8/16/12 PB4 jPB --Apostolakis visit 10/3 Daily Notes & One-Week Look Aheads FOIA Requests 2515/177 ECCS Gas Accumulation | |||
-96% complete, pending at BV Due 12/31/12 2515/185 Follow-up on Industry's Groundwater Protection Initiative Due 12/31/12 TI Status 2516/001 Review of License Renewal Activities (1P2) Due 12/31/13 (1 st Tuesday of the Due Month) 2515/187 Inspection of Near-Term Task Force Recommendations 2.3 Flooding Walkdowns 12/31/13 2515/188 Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns Due 12/31/13 Review of the Implementation of the Industry Initiative to Control Degradation of Due 2515/182 0/01 Underground Piping and Tanks -50% 06/30/14 General Announcements and Other Items of Interest G:\DRP\Morning Meeting Files\New Format 2012\June 2012\06-14-2012.docx Weeend CoverageI (Thursdays) | |||
DRP: Clifford DRS: Wilson 51: RDO: Powell PAO: Sheehan 10/2011 11PB6 TM__I -Flood evaluation review (PI&R sample)Long-Term Items of 5/29/12 PB4 LM & 5O -Siemens Turbine Blade Cracking Interest 7/30/12 PB2 IP -ASLB license renewal oral testimony 10/15-18; 10/22-24; 12/10-14 (discussed if there 7/31/12 ,3PB2 FP -Increasing tritium in RB perimeter sump; TI inspection in August are updates) 8/16/12 PSB2 NMP -U1 Tritium leak, no identified source" NRR/OpE" Off-line security issues Following the meeting please select file and send email to Georqe.Wilson(M.nrc.lov G:\DRP\MorninR Meeting Files\New Format 2012\June 2012\06-14-2012.docx}} |
Revision as of 06:31, 19 July 2018
ML13032A129 | |
Person / Time | |
---|---|
Site: | Millstone |
Issue date: | 08/16/2012 |
From: | Division Reactor Projects I |
To: | |
References | |
FOIA/PA-2013-0045 | |
Download: ML13032A129 (3) | |
Text
8:00 AM Daily Reactor Oversight Coordination Meeting- August 16, 2012 Date Added Lead Branch Plant/Issue/Status 8/13/12 PB1 CC- U1 Tech Spec required shutdown due to CEA #9 dropped MS- U2 Tech Spec required shutdown due to ultimate heat sink exceeding temp Events, Significant 8limit of 75 degrees, Mode 5 Cold Shutdown Safety Issues, and 8/13/12 PB6 TMI- Flood Barrier Seals could not be verified installed in the Air Intake Tunnel Operational Challenges 8/13/12 PB4 SUS- Dry fuel storage transfer trailer detected with removable contamination Fi 8/13/12 PB6 1 TMI- Flood Barrier Seals could not be verified installed in the Air Intake Tunnel IMC 0309 Reviews _6/21/12 PB1 NMP -U1 AL3 UIL 0.35 gpm 7/09/12 PB6 TMI -AL3 UIL 0.16 gpm; downpower 8/22 Plant Status Items PlaIntetsIte 8/07/12 PB4 S -U2 UIL 0.35 gpm (first 90 days)8/13/12 PB4 LM- U1 LP Turbine Blade Inspection 8/23 HC- CDBI 7/30, 8/13, 8/27 Salem/HC -95002 8/27 Team Inspections OC -PI&R 8/13 & 8/27 MS- 95001 9/10 1/03/12 *EB1/PB3 SB -ASR resolution:
- 1) CAL Follow-up INSP in progress;
- 2) Working group priority 1/03/12 Profe Issues: TIA, deviation memo, technical issues position papers High Profile 7/02/12 ORA/DRP Meeting w/ NJ OC Oversight Panel 8/23 Actrivities 7/12/12 PB1 CC -Magwood visit to site 8/23 7/31/12 PB2 IP -Magwood visit 9/13 GAMDP\Morning Meeting Files\New Format 2012\June 2012\06-14-2012.docx 8/02/12 DRM 1 Region -Chairman visit 9/13 8/16/12 PB1 CC -GAO visit to site 9/25 8/16/12 PB4 jPB --Apostolakis visit 10/3 Daily Notes & One-Week Look Aheads FOIA Requests 2515/177 ECCS Gas Accumulation
-96% complete, pending at BV Due 12/31/12 2515/185 Follow-up on Industry's Groundwater Protection Initiative Due 12/31/12 TI Status 2516/001 Review of License Renewal Activities (1P2) Due 12/31/13 (1 st Tuesday of the Due Month) 2515/187 Inspection of Near-Term Task Force Recommendations 2.3 Flooding Walkdowns 12/31/13 2515/188 Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns Due 12/31/13 Review of the Implementation of the Industry Initiative to Control Degradation of Due 2515/182 0/01 Underground Piping and Tanks -50% 06/30/14 General Announcements and Other Items of Interest G:\DRP\Morning Meeting Files\New Format 2012\June 2012\06-14-2012.docx Weeend CoverageI (Thursdays)
DRP: Clifford DRS: Wilson 51: RDO: Powell PAO: Sheehan 10/2011 11PB6 TM__I -Flood evaluation review (PI&R sample)Long-Term Items of 5/29/12 PB4 LM & 5O -Siemens Turbine Blade Cracking Interest 7/30/12 PB2 IP -ASLB license renewal oral testimony 10/15-18; 10/22-24; 12/10-14 (discussed if there 7/31/12 ,3PB2 FP -Increasing tritium in RB perimeter sump; TI inspection in August are updates) 8/16/12 PSB2 NMP -U1 Tritium leak, no identified source" NRR/OpE" Off-line security issues Following the meeting please select file and send email to Georqe.Wilson(M.nrc.lov G:\DRP\MorninR Meeting Files\New Format 2012\June 2012\06-14-2012.docx